This document outlines a forthcoming solicitation for Army Special Operations Forces training support services. The United States Army Special Operations Command requires a contractor to provide training support, including exercise management, role players, subject matter expertise, and support for assessment, selection, and training conducted by the 1st Special Warfare Training Group (Airborne). The training support is to provide a realistic environment for field and situational exercises focusing on developing student initiative, adaptability, and self-confidence. The period of performance includes a 30-day phase-in followed by an 11-month base period and four 1-year option periods. Services will primarily be performed in North Carolina at Camp Mackall and Fort Bragg. The acquisition will use an indefinite-delivery/indefinite-quantity contract with firm-fixed-price task orders. The solicitation is anticipated to be released in March 2019 using a 100% Service-Disabled Veteran-Owned Small Business set-aside and a best-value tradeoff evaluation.

Attachment 1 - Additional Govt Responses to Industry Questions

View the file

Other files for this federal contract opportunity

Other files attached to ARSOF Training Support, newest first.
File Type Posted
H92239-19-R-0002-0005.pdf PDF
Amendment_4_-_H92239-19-R-0002-0004.pdf PDF
Attachment_2_-_Updated_Pricing_Workbook.xls XLS spreadsheet
Amendment_3_-_H92239-19-R-0002-0003.pdf PDF
Notice_and_Order.pdf PDF
Amendment_2_-_H92239-19-R-0002-0002.pdf PDF
Amendment_1_-_H92239-19-R-0002-0001.pdf PDF
Technical_Exhibit_5_-_DD254.pdf PDF
Technical_Exhibit_9_-_Pricing_Worksheet.xls XLS spreadsheet
Attachment_2_-_Industry_Day_Slides.pdf PDF
Attachment_1_-_Govt_Responses_to_Industry_Questions.pdf PDF
TE_6_-_Past_Performance_Questionnaire.pdf PDF
TE_4_-_Tentative_Training_Schedule.xlsx XLSX spreadsheet
RFP_-_H92239-19-R-0002.pdf PDF
TE_4_-_Tentative_Training_Schedule.xlsx XLSX spreadsheet
DRAFT_RFP.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 to Amendment 0004 Government Responses to Additional Questions

ARSOF Training Support H92239-19-R-0002

**Additional Industry Questions received in response to Amendment 0001.*

Industry Questions Government Responses

65.

Amendment 0001 provided a Pricing Template for Prime Contractor submission, to include proprietary information such as indirect rates.

QUESTION: Does the Government want sealed packages from Subcontractors detailing the same level of pricing?

See Amendment 0004, H92239-19-R- 0002, Section L, para. 2.2.4.3.2.(a)(i).

66.

There are a total of 24 Exercise Support Personnel that report to the Exercise Support Cell Manager.

QUESTION: Please provide information that defines the skills, licenses, and minimum physical capabilities, e.g. ability to lift 50 lbs., for the various members that comprise this group.

See Amendment 0004, H92239-19-R- 0002, Section C, PWS, para. 1.6.17.6, para. 1.6.16.8., para. 1.6.16.8.1., and para. 1.6.16.8.2.

67.

The RFP states that the Pineland Training Lane Managers are Key and that Lane Managers are needed for each Robin Sage Training Lane.

QUESTION: Please define what the Training Lanes are and any specific requirements that are needed for each. For instance, are there specific HUMINT, SIGINT, OSINT, or Medical skill sets?

See Amendment 0004, H92239-19-R- 0002, Section C, PWS, Part 2, 2.1.34.

There are no specific skills required for the Pineland Land Manager that supports each lane for Robin Sage.

HUMINT, SIGINT, OSINT, and Medical skill are for advanced intelligence skills. These advanced intelligence skills are not required.

68.

The RFP Paragraph 1.4.3, Realism, states in part, “Proposals envisioning compensation levels lower than those of predecessor contractors for the same work will be evaluated on the basis of maintaining program continuity, uninterrupted high-quality work, and availability of required competent highly skilled service employees. Offerors are cautioned that lowered compensation for essentially the same work may indicate lack of sound management judgment and lack of understanding of the requirement.”

QUESTION: Only the incumbent can know with certainty how each employee is compensated. How are non-incumbent companies supposed to ascertain current pay scales to ensure that no one is offered less pay for essentially the same work? Please provide mandatory pay rates or GS equivalents.

The Offeror shall provide their own independent pay rates.

See Amendment 0004, H92239-19-R- 0002, Section I, FAR Clause 52.222-42, Statement of Equivalent Rates for Federal Hires.

69.

The RFP states that there shall be a PM, APM, and TMO and that the APM and TMO have the same or better qualifications than those of the PM. A previous response to Question #21 is that it is the offerors choice if the PM and TMO are dual-hatted.

QUESTION: Is it allowed that the APM also has another position, such as the TMO?

Whether the APM and TMO Manager positions are dual-hatted will be based on the Offeror’s approach.

70.

The requirement for a Facility in paragraph 4.3 has been annotated to not price a facility at this time.

QUESTION: Are respondents required to have the facility in place at time of submission?

Are respondents required to discuss a facility in the proposal response?

At any time that the contractor is required to provide the facility, the Government will negotiate the effort separately.

71.

Paragraph 4.2 states that the Contractor shall provide all uniforms and equipment shall be maintained shall be maintained by the contractors.

QUESTION: Please list which uniforms are required and quantity needed. Also, please provide a list of equipment to be maintained.

0002, Section C, PWS, para. 4.2.

72.

Paragraph 4.2 states that the Contractor shall provide rations and water for ALL

CONTRACTED PERSONNEL.

QUESTION: Please provide details covering the minimum quantity of rations and water per person per time period.

See Amendment 0004, H92239-19-R- 0002, Section C, PWS, para. 3.11.4 and para. 4.2.

73.

Amendment 001 added the extra labor position of Role Player - Interpreter (CLIN 0003- 4003AP with 2,112 Hours); however, this was not added to the Technical Exhibit 9 - new pricing worksheet.

QUESTION: Will the Government please provide an updated Technical Exhibit 9 - new pricing worksheet so that the hours associated with CLINs 0003 - 4003AP can be included?

Duplicate Question:

In Amendment #1 – H92239-19-R-0002-0001, Summary of Changes, pages 3 and 4, SubCLINs 0003AP, 1003AP, 2003AP, 3003AP and 4003AP for “Role Player – Interpreter” were indicated as added. However, in the Technical Exhibit 9 – Pricing Worksheet, the SubCLINs are not included in the Price Schedule tab and the Labor Category is not included in the Rate Build Up Table tab or the Rate Schedule tab.

QUESTION: Can you update the Technical Exhibit 9 – Pricing Worksheet file to reflect the change from the Amendment #1?

Duplicate Question:

REFERENCE: RFP, Technical Exhibit 9, Price Schedule Tab

QUESTION: The new SUBCLINs 0003AP, 1003AP, 2003AP, 3003AP and 4003AP are missing from the Section B – Supplies or Services and Prices. Please update the tab with these SUBCLINs.

Duplicate Question:

REFERENCE: RFP, Technical Exhibit 9, Rate Build Up Table Tab

See Amendment 0004, H92239-19-R- 0002, updated Technical Exhibit 9, Pricing Workbook.

QUESTION: Amendment 0001, SUBCLIN x003AP Role Player Interpreters are missing from the labor category list. Would the government please clarify if these Role Player Interpreters are necessary?

Duplicate Question:

QUESTION: Can the Government re-release Technical Exhibit 9 to include cells for CLINs 0003AP, 1003AP, 2003AP, 3003AP, and 4003AP?

74.

In Technical Exhibit 9 – Pricing Worksheet.xls, in both the Rate Build Up Table tab and the Rate Schedule tab, the Pineland Lane Managers are not listed as a Labor Category. In addition, the Pineland Area Manager line item in both those tabs only lists “North” and does not indicate “South”.

QUESTION: Can the template be updated to reflect all of the positions on the Price Schedule (CLIN/SCLIN listing)?

Duplicate Question:

REFERENCE: RFP, Technical Exhibit 9, Rate Build Up Table Tab

QUESTION: Pineland Area Manager (South) is missing from the labor category list. Our technical solution to the Performance Work Statement (PWS) may involve support from various subcontractors with different base salaries and indirect rates. Would the government please clarify?

See Amendment 0004, H92239-19-R-

75.

In Technical Exhibit 9 – Pricing Worksheet.xls, in both the Rate Build Up Table tab and the Rate Schedule tab, row 46 requires pricing for a “Role Player-CAT I-,L-III Language” position, however, the Section B tables require the “Role Player - CAT II, L-III Language” position.

QUESTION: Can the template be updated to reflect all of the positions on the Price Schedule (CLIN/SCLIN listing)?

Duplicate Question:

REFERENCE: RFP, Technical Exhibit 9, Rate Build Up Table Tab

QUESTION: Would the government please confirm that cell B46 should read: “Role Player-Cat II, L-III Language” instead of “Role Player-Cat I-,L-III Language.

See Amendment 0004, H92239-19-R-

76.

QUESTION: Will the Government allow us to change the hours and or days for the role player CLINs to match our proposed solution?

Please submit all price structure without modification.

77.

REFERENCE: RFP, page 51, Technical Exhibit 8, Enclosure 1, para. 4

SFAS STAR Exam (land navigation): Observer/Controller (Point Sitter);

See Amendment 0004, H92239-19-R- 0002, Section C, PWS para. 1.6.16.4.2.

and para. 5.10.

1.6.16.4. Observer/Controller (O/C) Qualifications….;

5.9. Observer/Controller OC Special Forces (SF) Duties;

5.9.1. The Contractor shall be able to move up to 20km cross-country with a rucksack carrying between 45-55lbs… QUESTION: What are the qualifications for the STAR Exam Point sitter? Given that it is a static duty position there is no requirement for cross-country movement or specialized equipment.

78.

REFERENCE: RFP, page 63, Technical Exhibit 8, Enclosure 11, para. 1 – 4;

1 each Role Player Supervisor/Site Manager…

QUESTION: Does the Role Player Supervisor/Site Manager fall under the Role Player - Cultural CLIN or the Site Manager CLIN, or something else?

Refer to RFP, Section C, PWS 1.6.20.2.

Site Management. The Role Player Supervisor shall be included in CLIN X003AH, Site Managers.

79.

REFERENCE: RFP, page 61, Technical Exhibit 8, Enclosure 9, para. 2:

The Contractor will provide a total of 39 personnel: 31 Cultural Role Players, 1 J39, …

QUESTION: What is a “J39” and what are its duties and qualifications?

See Amendment 0004, H92239-19-R- 0002, Section C, PWS para. 1.6.16.4.3.

See Amendment 0004, H92239-19-R- 0002, Section C, Technical Exhibit 8, Enclosure 9, Psychological Operations Culminating Exercise.

80.

REFERENCE: RFP, pages 50-63, Technical Exhibits 7, Estimated Workload Data & Technical Exhibit 8, Enclosures 1 – 11

Exercise durations are given in hours per year (TE7) and hours per exercise and day (TE8)

QUESTION: Do hours per year and day reflect pre-exercise movement, set-up and briefings and post exercise AARs, movement, and equipment turn-in?

The hours and days will encompass arrival to duty location, movement to and from exercise area if different from reporting location, briefings, AARs, and equipment turn-in.

Exercise set-up, if required, is included in the hours that are ordered.

81.

REFERENCE: RFP, page 50, Technical Exhibit 7: Estimated Workload Data; Course Support: Point Sitters RFP, page 52, Technical Exhibit 8: Course Enclosures, Enclosure 1: ARSOF Assessment and Selection

Under “Course Support” in Technical Exhibit 7, Point Sitters are listed as their own labor category with its own hours. However, in Enclosure 1, Point Sitters are used interchangeably with Observer/Controller.

QUESTION: Are Point Sitters a separate position from Observer/Controllers? If so, what are the qualifications for Point Sitters?

See Amendment 0004, H92239-19-R- 0002, Section C, PWS para. 1.6.16.4.2.

and para. 5.10.

82.

REFERENCE: RFP, page 16, para. 1.6.21.1, Qualifications for all Key Personnel

1.6.21.1. Program Manager (PM), Alternate PM, and TMO Manager Qualifications: The PM shall meet or exceed the following minimum qualifications: Shall have a Special Forces background with a minimum total of 15 years of military/professional experience in program management related positions including at least five (5) years of experience as a

There is no change to the Government’s stated requirement.

program manager managing a contractor workforce in support of a DoD contract of comparable size, scope, and complexity. Must possess at least five (5) years of experience in exercise planning and logistical support within Special Forces, preferably to the USAJFKSWCS. Must have been a Program Manager within the last five years.

Education: A Bachelor’s degree in Business Management or higher degree from an accredited university or college, or at least 15 years of Special Forces experience.

Program Management Responsibilities: PM shall be able to plan, direct, organize, control, and coordinate technical efforts, contractor manpower and team activities. Includes areas of administration, program control, and technical supervision of personnel involved in support of contract requirements. PM shall also be able to effectively interface with the Government’s COR and Contracting Officer’s Technical Representative (COTR) while serving as the main point of contact for the contract to the Government with full decision-making authority. The PM shall be available to the Government during normal business hours and will be available during all other times as required. The APM and the TMO Manager shall meet or exceed the same qualifications as the PM. Both must possess an active SECRET clearance.

Understand the justification for the PM and APM having the same level of qualifications due to duties and level of responsibility. However, requiring the TMO Supervisor to have "at least five (5) years of experience as a program manager managing a contractor workforce in support of a DoD contract of comparable size, scope, and complexity" eliminates any quality applicants who have retired less than five years ago. Given the scope of duties of the TMO Supervisor, a candidate with recent operational and 1st SWTG experience would very effectively perform specified duties but is currently not qualified per the solicitation.

QUESTION: Would the Government consider modifying the TMO supervisor qualifications to the following :

TMO Manager Qualifications: The TMO Manager shall meet or exceed the following minimum qualifications: Shall have a Special Forces background with a minimum total of 15 years of military/professional experience in training management related positions. Must possess at least five (5) years of experience in exercise planning and logistical support within Special Forces, preferably to the USAJFKSWCS.

83.

REFERENCE: RFP, Various pages, Section B

QUESTION: Are CLINs X002 and X003 summary totals of their respective sub-CLINs (X002AA, X002AB, etc)? For example, is CLIN 0002 the sum of the total price for each of CLINs 0002AA through 0002AH?

CLINs X002 and X003 are Informational CLINs. Pricing shall be annotated on the respective sub-CLINs.

84.

REFERENCE: RFP, Various pages Section B

QUESTION: Should CLIN X005 not be priced, since the scope and quantity of the additional work has yet to be determined?

See Amendment 0004, H92239-19-R-

85.

REFERENCE: RFP, page 157, Section L.2.2.4

QUESTION: Does the government intend for the Price Volume to be contained in only two

(2) Excel spreadsheet tabs (worksheets), Tab A and Tab B?

Refer to the RFP, Section L, para.

2.2.4. for contents, Volume IV, Price, and Table 2.1.2.

86.

REFERENCE: RFP, page 153, Section L.2.1.2 RFP, page 158, Section L.2.2.4.3.1

QUESTION: Does the government want Section B completed in its current PDF format, or instead can offerors submit the same information (CLINs, description, quantity, unit, unit price, total price) in an Excel format in lieu of Section B to reduce the risk of typographical and/or calculation errors?

0002, Section L, Table 2.1.2.

87.

REFERENCE: RFP, page 152, Section L.2.1.1.i, Section L.2.1.1.ii

QUESTION: Section L.2.1.1.i states that margins on the sides shall be at least 3/4 inch, while Section L.2.1.1.ii states all margins shall be at least 1 inch. Can the government please clarify the required margins?

Refer to Amendment 0001, Attachment to Amendment 0001, Question #18.

88.

REFERENCE: RFP, Various pages, Section B

QUESTION: Will the government define the estimated quantity potentially required for CLINs X003AK, X003AL, X003AM, and X003AN?

REFERENCE: RFP, Various pages, Section B, Section C.1.6.7

QUESTION: Does the government anticipate the role players under CLINs X003AK, X003AL, X003AM, and X003AN to have workdays with hours different from the typical 12-hour workday defined in Section C.1.6.7?

See Amendment 0004, H92239-19-R- 0002, Section B and updated Technical Exhibit 9, Pricing Workbook.

89.

REFERENCE: RFP, page 158, Section L.2.2.4.3.1

QUESTION: The RFP refers to “The pricing schedule in Section 1 of the RFP,” is “Section 1” referring to Section B of the RFP?

0002, Section L, para. 2.2.4.3.1.

90.

REFERENCE: RFP, page 86, Section C.3.1.

QUESTION: Section C.3.1 states that “The Government will provide the PM with office space with a SOFNet computer and telephone at Fort Bragg. The APM shall occupy the same PM office space while performing duties during the absences (emphasis added) of the PM.” Can the government clarify in instances when the PM is present if the APM will occupy the same PM office space or will the APM occupy another government-provided office space?

The Government’s stated requirement is if the Program Manager is out of the office, then the Alternate Program Manager will occupy that space.

91.

REFERENCE: RFP, page 88, Section C.3.11.4 RFP, page 89, Section C.4.2

QUESTION: Section C.3.11.4 includes as part of the government furnished items:

“Climate control tents, cots, and on-site electrical power, water, refrigeration, hand washing and latrine facilities.” Section C.4.2 states, “The contractor shall provide rations and water for ALL CONTRACTED PERSONNEL.” Can the government clarify when it will provide water and the type of water it will provide (e.g., drinking water, wash water, etc)?

See Amendment 0004, H92239-19-R- 0002, Section C, PWS, para. 3.11.4 and para. 4.2.

92.

REFERENCE: RFP, pages 86-89, Section C.3, Section C.4

QUESTION: Will the government provide storage space for government furnished equipment and contractor furnished equipment?

The Government will provide adequate storage space for Government provided equipment. The Contractor shall provide adequate storage space for contractor owned equipment.

93. REFERENCE: RFP, page 114, Technical Exhibit 8, Enclosure 2, paragraph 3.A See Amendment 0004, H92239-19-R- 0002, updated Enclosure 2, 18A

QUESTION: Can the government provide the number of days the Observer/Controllers (Special Forces) will be supporting 18A FID FTX?

Military Occupational Specialty (MOS) Training, Practical Exercises (PEs), and Field Training Exercises (FTXs).

The Observer/Controllers (Special Forces) requirement for the 18A FID FTX has been deleted.

94.

REFERENCE: RFP, page 122, Technical Exhibit 8, Enclosure 9, paragraph 2

QUESTION: Can the government clarify under which CLIN the requirement for J39 support falls?

The J39 Role Player is under CLIN X003AJ, Observer Controllers.

95.

REFERENCE: RFP, pages 111-112, Technical Exhibit 7, Technical Exhibit 8, Enclosure 1, paragraph 2

QUESTION: Interpreters are listed in the Estimated Workload Data table and as support for the ARSOF POAS exercise but there is no pricing requirement for interpreters in Section B. Can the government clarify?

See Amendment 0004, H92239-19-R-

96.

REFERENCE: RFP, Section 1.6.20

QUESTION: How many resumes does the government require for the Site Managers and Pineland Lane Managers?

Refer to Amendment 0001, Attachment to Amendment 0001, Questions # 2, 48, and 49. Section L, para. 2.2.2.3.ii., which states the Contractor shall provide resumes and letters of commitment of proposed key personnel.

97.

QUESTION: Does the government-provided Price Schedule sheet found in Technical Exhibit 9 satisfy the Section L.2.2.4.3.1 requirement that the pricing schedule in Section 1 of the RFP be submitted fully completed?

Refer to the RFP, Section L, para. 2.2.4 for contents, Volume IV, Price, and Table 2.1.2.

98.

REFERENCE: RFP, Section L, Paragraph 2.2.3.2

Past Performance Information Sheets states: “The offeror shall submit a maximum of five

(5) and a minimum of three (3) Performance Information Sheets identifying active or completed contracts, either Government or commercial, for each prime, and a maximum of five (5) and a minimum of one (1) Past Performance Information Sheet for each major subcontractor, teaming partner, and/or joint venture (”major” is defined as those subcontractors, teaming partners, or joint ventures who are projected to perform 25% or more of the total contract effort).”

QUESTION: Based on this statement in the RFP, it is our assumption a major subcontractor’s past performance citation will be rated similar as the prime’s. Will major subcontractors’ past performance citations be rated with the same weight as primes’ citations?

The past performance will be combined at the prime’s offeror level.

99.

REFERENCE: RFP, page 70, para 2.2.1.1.b., QUOTE: Section 2 - All Section K, Representations, Certifications and Disclosures.

Yes, the Government will accept a statement that the Representations, Certifications, and Disclosures in the System for Award Management (SAM.gov) are up to date.

QUESTION: Will the government accept a statement that our Representations, Certifications, and Disclosures in the System for Award Management (SAM.gov) are up to date in lieu of providing a copy of them in the proposal?

100.

REFERENCE: RFP, page 5, para 1.2.

QUOTE: This contract includes previously authorized but separate contract requirements to include: SFQC Training Support, Military Occupational Specialty (MOS) Support, 18A Cultural Adaptive Response Training (CART), 18A Advanced Special Operations (ASO), Military Information Support Operations (MISO) Training Support, Civil Affairs (CA) Training Support, and Range 37 and Camp Mackall Support.

QUESTION: Is it the government’s intent to have full time Contractors assigned to SFQC, MOS, CART, ASO, MISO, and CA training support and if so, where is each specified in the

RFP?

It is based on the Offeror’s approach.

See Technical Exhibit 8, Course Enclosures.

101.

REFERENCE: RFP, page 14, para 1.6.16.6

QUOTE: Site Manager or Role Player Supervisor Qualifications

QUESTION: Does the “or” imply “Site Manager” and “Role Player Supervisor” are terms referring to the same individual?

It is based on the Offeror’s approach.

At a minimum, the contractor shall provide site management for each exercise as designated. The only exception is during Robin Sage where the Guerrilla Chief fulfills the role of Site Manager in addition to being a role player. This exception is noted in 1.6.20.2, Site Management.

102.

REFERENCE: RFP, page 15, para 1.6.20. and 1.6.20.2., page 16, para 1.6.21.2.

Quote: Key personnel include … Site Managers, … Quote: The Contractor shall provide one (1) Site Manager Quote: The contract personnel performing the Site Manager functions in support of the Special Forces Qualification Course … Civil Affairs Qualification Course … Civil Affairs Qualification Course.

QUESTION: 1.6.20 alludes to multiple Site Managers. 1.6.20.2 states clearly there is one Site Manager. 1.6.21.2 alludes to at least two Site Managers with the one for CAQC repeated so the intent may have been for at least three.

QUESTION: How many Site Managers are required, what are they responsible for, and are they full-time or part-time personnel? Is the repeated CAQC site manger supposed to be MISO Site Manager?

Multiple exercises are being conducted simultaneously. A Site Manager shall be present at each exercise location.

See Amendment 0004, H92239-19-R- 0002, Section C, PWS, para. 1.2., para.

1.4, para. 5.1.5, Enclosures 7 through 9 to change “MISO” to “PSYOPS”.

103.

REFERENCE: RFP, Technical Exhibit 9, Rate Build Up Table Tab

QUESTION: The Salary calculation in Column C is based on 1,920 hours instead of industry standard 2,080 hours. Would the government please clarify if 1,920 hours is their intention?

Information provided in Column C was provided as an example. It is the Offeror’s decision to apply the applicable industry standards hours.

See Amendment 0004, H92239-19-R-

104.

QUESTION: For consistency, should the Salary in Columns F, I, L, O, R be based on industry standard 2,080 hours, 1,920 hours from the Rate Build Up Tab, Column C formula or 1,880 hours from the Technical Exhibit 7, Estimated Workload Data for one annual full

The information on the Rate Build Up Table Tab was provided as an example.

It is the Offeror’s decision to apply the applicable industry standards hours.

time equivalent (FTE)? Would the government please clarify which time equivalent is defined by (FTE).

See Amendment 0004, H92239-19-R-

105.

QUESTION: Twelve (12) Pineland Lane Managers are missing from the labor category list. Our technical solution to the Performance Work Statement (PWS) may involve support from various subcontractors with different base salaries and indirect rates. Would the government please clarify?

See Amendment 0004, H92239-19-R-

106.

QUESTION: Our PWS execution strategy for the Course Support labor categories (Guerilla Chiefs through Role Player Interpreters) is to obtain support from a team of various subcontractors with different base salaries and indirect rates. Should each of our subcontractors provide directly to the Government the same level of proprietary pricing detail as Technical Exhibit 9, excluding the Price Schedule tab, which is reserved for Prime contractor completion? If so, how should this proprietary subcontractor data be delivered directly to the government?

See Amendment 0004, H92239-19-R- 0002, Section L, para. 2.2.4.3.2.

The proprietary subcontractor data shall utilize the same method as stated in Section L, para 2, Proposal Organization and Format.

107.

QUESTION: Where should a bidder calculate the program manage office (PMO) cost adder for the PWS required key personnel Program Manager (PM) and Alternate PM (APM) that do not have specific direct charge SUBCLINs in the Section B – Supplies or Services and Prices? Will the government allow a bidder to add a column(s) to Technical Exhibit 9 – Pricing Worksheet, Rate Build Up Table Tab to apply these costs or any other allowable costs from its cost estimating procedures?

See Amendment 0004, H92239-19-R- 0002, updated Technical Exhibit 9, Pricing Workbook.

The Program Manager and Alternate Program Manager have been incorporated. The Offeror can add another category, if needed.

108.

The Rate Build Up Table Tab and Rate Schedule Tab articulate salary, direct labor rate, and fully burdened hourly labor rates. However, the Price Schedule Tab, column E, fill-in boxes requires various SUBCLINs in Monthly and Daily units. Do bidders need to create further tabs on the Technical Exhibit 9 to comply with the RFP Section 2.2.4.3.1 TAB A – Price Schedule which reads: “All formulas, lookup tables, and links should be intact, and no links should exist to files not included with the proposal. Spreadsheets shall not contain hidden worksheets. The Offeror shall include totals for the base period (to include phase-in), each option, and overall total.” The Technical Exhibit 9 spreadsheet has no crosswalk calculations from the fully burdened labor rates on the Rate Build Up Table Tab, column M, to a 12-hour workday (PWS 1.6.7 Hours of Operation) or 156.67 (1,880 hours / 12 months) hour work-month to populate the unit prices in the Price Schedule Tab. This crosswalk becomes further complicated when the full-time equivalents (FTEs) and course support hours from Technical Exhibit 7 – Estimated Workload Data are split amongst subcontractor teammates.

QUESTION: Would the government please clarify their intention?

Yes, each Offeror will need to provide backup calculations for phase-in costs and monthly calculations. Templates for individual labor rates per hour and per day have been provided for easy input. Additional tabs have created for Contractor input format.

Please feel free to link data as you feel necessary.

See Amendment 0004, H92239-19-R-

109.

REFERENCE: RFP, page 15, para 1.6.20.2., & page 16, para 1.6.20.5

Based on the requirements of the PWS, the Pineland Lane Managers and the Role Player Supervisors cannot be performed by the same individuals.

Quote: The Contractor shall provide … the requested number of Role Player Supervisors.

Quote: The Contractor shall provide one (1) Pineland Lane Manager for each Robin Sage training lane

QUESTION: Are the Pineland Lane Managers (1.6.20.5) the same individuals as the Role Player Supervisors (1.6.20.2)?

110.

REFERENCE: RFP, page 15, para 1.6.20.3., & page 31, para 5.2.4.3.2

Quote: Exercise Support Cell (ESC): The Contractor shall provide an Exercise Support Cell Manager that will supervise the Camp Mackall ESC Team, the Camp Mackall Logistics Specialist, the Range 37 ESC Team, and the Range 37 Weapons Specialist.

Quote: The Contractor shall not exceed manpower support of: … fourteen (14) multi-skilled support cell members including local supervision at Camp Mackall, NC; and ten (10) multi-skilled support cell members including local supervision at Range 37 on Ft. Bragg

QUESTION: Are the multi-skilled support cell members (5.2.4.3.2) the Camp Mackall ESC Team and Range 37 ESC Team (1.6.20.3)?

Yes, the multi-skilled support cell members are the Camp Mackall team and Range 37 ESC Team.

111.

REFERENCE: RFP, page 31, para 5.2.4.1., & page 38, para 5.8.10.1.

Quote: Contractor shall provide one (1) full time equivalent TMO Supervisor.

Quote: The Contractor shall provide one (1) Site Manager…

QUESTION: Is the TMO Supervisor (5.2.4.1) the same individual as the Site Manager (5.8.10.1)?

Based on the requirements of the PWS, the TMO Supervisor and the Site Manager cannot be performed by the same individual.

112.

REFERENCE: RFP, page 68, para 2.1.1.viii

Quote: Electronic copies must also be provided on CD-ROMs/DVDs, read-only memory….

QUESTION: Are CD-ROMs/DVDs +RW acceptable?

Yes, Are CD-ROMs/DVDs +RW are acceptable.

113.

REFERENCE: RFP, page 15, para 1.6.20., & page 21, para 2.1.18., & page 50, Exhibit 7

Quote: Key personnel include … and Pineland Lane Managers.

Quote: KEY PERSONNEL… When proposed key personnel resumes are used as an evaluation factor… Quote: Pineland Lane Managers 12

QUESTION: Since Pineland Lane Managers are designated Key personnel and the total number of FTEs is 12 is the government requiring 12 resumes and letters of commitment for this requirement or just a few to demonstrate the bidder’s capability to fill these 12 positions.

Refer to Amendment 0001, Attachment to Amendment 0001, Questions # 2, 48, and 49. Section L, para. 2.2.2.3.ii., which states the Contractor shall provide resumes and letters of commitment of proposed key personnel.

114.

QUESTION: Please confirm whether the Government wants SF33, SF30, and a copy of the conformed solicitation included in the Qualifying Criteria volume?

0002, Section l, para. 2.2.1.1.b.

115. QUESTION: The pricing data sheet you put out I don’t see a way to price out the PM.

Could you please let me know how we should price that position or give me a recommendation.

See Amendment 0004, H92239-19-R-