Conformed_H92222-14-R-0021.pdf

PDF 583 KB Posted

Attached to
SOCOM Wide Mission Support (SWMS) Group B Federal contract opportunity
Solicitation number
H92222-14-R-0021
Issued by
United States Special Operations Command

About this file

Conformed copy of solicitation through Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to SOCOM Wide Mission Support (SWMS) Group B, newest first.
File Type Posted
H92222-14-R-0021_Conformed_Amend_05.pdf PDF
Atch_7_FMD_MA_Amend_05.pdf PDF
Atch_14_Amend_05.xls XLS spreadsheet
Amendment_0004_Q As.pdf PDF
Batch_6_Final_Q As.pdf PDF
Atch_14_Amend_04.xls XLS spreadsheet
Atch_6_LL_Amend_04.pdf PDF
Atch_8_ITC_Amend_04.pdf PDF
H92222-14-R-0021_Amendment_0004.pdf PDF
Atch_14_Amend_03.xls XLS spreadsheet
Atch_4_LREC_SOW_Amend_03.pdf PDF
Atch_8_ITC_Amend_03.pdf PDF
Atch_4_LREC_SOW_Amend_02.pdf PDF
Attachment_7b_MA_Amend_01.xls XLS spreadsheet
Attachment_13_SF_1408.doc DOC document
Atch_9_PPI_Amend_02.doc DOC document
Attachment_6b_Lessons_Learned.xls XLS spreadsheet
Attachment_9_PPI_Group_B.doc DOC document
Attachment_8b_ITC_Amend_01.xls XLS spreadsheet
Attachment_6b_LL_Amend_01.xls XLS spreadsheet
Atch_5_MARSOC_SOW_RFP_Amend_01.pdf PDF
141121_FBO_Batch_3_87-190.pdf PDF
141114_FBO_Batch_2_37-86.pdf PDF
Final_Group_B_RFP.doc DOC document
Atch_5_MARSOC_SOW_Amend_02.pdf PDF
Attachment_8b_ITC_Vol_III_Template.xls XLS spreadsheet
Atch_6_LL_Amend_02.pdf PDF
Exhibit_A_CDRL_A001.pdf PDF
Attachment_5a_Exercise_DD254.pdf PDF
Atch_4_LREC_SOW_RFP_Amend_01.pdf PDF
Attachment_7_FMD_Manpower_Augmentation.pdf PDF
Attachment_8a_ITC_DD254.pdf PDF
Attachment_2_Group_B_DD254.pdf PDF
Attachment_8_ITC.pdf PDF
Atch_1_Group_B_SOW_RFP_Amend_01.pdf PDF
141121_FBO_Amend_02.pdf PDF
Atch_4_LREC_SOW_RFP_Amend_01.pdf PDF
Atch_10_PPQ_Amend_01.doc DOC document
Exhibit_A_CDRL_A002_Atch.doc DOC document
Attachment_5_Exercise_Sample_SOW.pdf PDF
Attachment_6b_Lessons_Learned.xls XLS spreadsheet
Attachment_1_Group_B_SOW.pdf PDF
Attachment_4_LREC_Sample_SOW.pdf PDF
Attachment_8a_ITC_DD254.pdf PDF
Attachment_2_Group_B_DD254.pdf PDF
Attachment_9_PPI_Group_B.doc DOC document
Exhibit_A_CDRL_A002.pdf PDF
Attachment_11_Consent_Letter.doc DOC document
Group_B_Draft_RFP_Sample_SOO.doc DOC document
Draft_H92222-14-R-0021_Group_B.doc DOC document
Show all 50

SOCOM Wide Mission Support (SWMS) Group B has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local time

X

A

X B

X C

D

EX

X

G

F 23 - 32

33 - 40

X H 41 - 44

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.214(c)

1 44

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

H92222 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 4

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

5 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 8 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 9 - 12 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

13 - 21

PART II - CO NTRACT CLAUSES

HQ USSOCOM SORDAC-K

ATTN: KAREN STEVENS

7701 TAMPA POINT BLVD

MACDILL AFB FL 33621 (813) 826-7351

(813) 826-7504FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

27 Oct 2014

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

H92222-14-R-0021

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 UNDEFINED

SWMS Group B

FFP

The Contractor shall provide all services as outlined in the Statement of Work

(SOW). Specific requirements and period of performance will be identified at the task order level. Individual task orders under this CLIN series will be negotiated on a Firm-Fixed-Price basis.

FOB: Destination

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0002 UNDEFINED

SWMS Group B

CPFF

The Contractor shall provide all services as outlined in the Statement of Work

(SOW). Specific requirements and period of performance will be identified at the task order level. Individual task orders under this CLIN series will be negotiated on a Cost Plus Fixed Fee basis.

MAX COST

FIXED FEE

TOTAL MAX COST + FEE

UNIT UNIT PRICE MAX AMOUNT

0003 UNDEFINED

SWMS Group B

FPI

The Contractor shall provide all services as outlined in the Statement of Work

(SOW). Specific requirements and period of performance will be identified at the task order level. Individual task orders under this CLIN series will be negotiated on a Fixed-Price Incentive Fee basis.

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

UNIT UNIT PRICE MAX AMOUNT

0004 UNDEFINED

SWMS Group B

CPIF

The Contractor shall provide all services as outlined in the Statement of Work

(SOW). Specific requirements and period of performance will be identified at the task order level. Individual task orders under this CLIN series will be negotiated on a Cost Plus Incentive Fee basis.

TARGET COST

TARGET FEE

TOTAL TGT COST + FEE

MINIMUM FEE

MAXIMUM FEE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

UNIT UNIT PRICE MAX AMOUNT

0005 UNDEFINED

Cost Reimbursable Travel

COST

This CLIN will be utilized in conjunction with specific task orders if the

Government cannot with reasonable certainty determine the anticipated travel requirements at the time of task order issuance. If the Government will require use of this CLIN, it will be specified in the Task order Instruction to offerors.

MAX COST

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0006 UNDEFINED

Data - Not Separately Priced (NSP)

This CLIN is established for the purpose of delivering data as required by Exhibit

A DD Form 1423, Contract Data Requirements List (CDRL) and shall not be priced separately.

NET AMT

See Exhibit A

IDIQ CONTRACT VALUE

The minimum value for each contract is $2,500.00. The SWMS Group B maximum amount is $450M total over all prime contracts over the five-year ordering period. The total value of all contracts/Task Orders awarded under

SWMS Group B will not exceed this amount.

SECTION B CLIN NOTE

CLINs in addition to those identified in the basic contract may be established at the Task Order level as necessary.

The applicable contract type language identified in the basic contract CLINs will be included with any new CLIN established at the task order level.

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

The SOCOM Wide Mission Support (SWMS) Group B Statement of Work (SOW) is provided separately. See

Section J Attachment 1.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0002 Destination Government Destination Government

0003 Destination Government Destination Government

0004 Destination Government Destination Government

0005 N/A N/A N/A N/A

0006 N/A N/A N/A Government

CLAUSES INCORPORATED BY REFERENCE

52.246-4 Inspection Of Services--Fixed Price AUG 1996

52.246-5 Inspection Of Services Cost-Reimbursement APR 1984

Section F - Deliveries or Performance

TASK ORDER DELIVERIES

Section F Deliveries will be specified on individual Task Orders.

52.247-34 F.O.B. Destination NOV 1991

Section G - Contract Administration Data

SECTION G SPECIAL INSTRUCTIONS

G.1 Responsibility for Contract Administration: Administration responsibility for this contract will remain with the procuring contracting office. The Contracting Officer is authorized to take actions on behalf of the Government to amend, modify or deviate from the contract terms, conditions, and requirements. The Contracting Officer may delegate certain other responsibilities to his/her authorized representatives or Contracting Officer Representative

(COR).

G.2 Accounting & Appropriation Data: To be cited in individual task orders.

G.3 Payment Instructions IAW PGI 204.7108: To be cited on individual task orders.

252.204-7006 Billing Instructions OCT 2005

CLAUSES INCORPORATED BY FULL TEXT

5652.228-9000 Required Insurance (2003)

The kinds and minimum amounts of insurance required in accordance with 52.228-5 "Insurance-Work on a

Government Installation" are as follows:

TYPE AMOUNT

Automobile Bodily Injury Liability $200,000 per person/ $500,000 per occurrence

Property Damage Liability $20,000 per occurrence

Workers Compensation & Occupational Disease As required by federal and State Statutes

Employer's Liability $100,000

(end of clause)

Section H - Special Contract Requirements

SPECIAL CONTRACT REQUIREMENTS

H.1. SOFARS 5652.204-9003 Disclosure of Unclassified Information (2013)

(a) On September 21, 2001, the Department of Defense designated Headquarters US Special Operations Command

(USSOCOM) a sensitive unit, as defined by Title 10 United States Code (USC) Section 130b (10 USC 130b). In keeping with this designation, unclassified information related to USSOCOM military technology acquisitions managed by USSOCOM or any of its component commands, will be designated Controlled Unclassified Information

(CUI). As such, the contractor hereby unequivocally agrees that it shall not release to anyone outside the

Contractor’s organization any unclassified information, regardless of medium (e.g., film, tape, document, contractor’s external website, newspaper, magazine, journal, corporate annual report, etc.), pertaining to any part of this contract or any program related to this contract, unless the Contracting Officer has given prior written approval.

Furthermore, any release of information which associates USSOCOM, Special Operation Forces (SOF), or any component command with an acquisition program, contractor, or this contract is prohibited unless specifically authorized by USSOCOM.

(b) Request for approval shall identify the specific information to be released, the medium to be used, and the purpose for the release. The contractor shall submit the request to the Contracting Officer at least 45 days before the propose date for release for approval. No release of any restricted information shall be made without specific written authorization by the Contracting Office.

(c) The protection of sensitive but unclassified data reflecting Special Operations technologies, personnel, plans, and business associations requires due diligence on the part of those in possession of such information. The application of appropriate security measures to ensure the safekeeping of USSOCOM and company proprietary data, intellectual property, and personnel data is the responsibility of all parties who have access to such information. All contractors supporting USSOCOM are required to inform the Contracting Officer within three business days of when there has been a breach or successful penetration of the contractor’s network(s) or information system(s). Breaches include unauthorized intrusions of the contractor’s server(s) from external parties whether through introduction of malware, hacking, the compromise of access passwords, or any other unauthorized access or compromise. Breaches also include the physical loss of storage media such and disks, hard drives, thumb drives, laptops or other devices which contain duplicates of information contained on the contractor’s data systems, or the willful or accidental transmission, copying or posting of contract information which has not been specifically authorized by the

Contracting Officer. Estimates of damage and mitigation strategies will be submitted to the Contracting Officer within a period following the breach specified and agreed upon by the Contractor and the Contracting Officer.

(d) The Contractor shall include a similar requirement to this clause in each subcontract under this contract.

Subcontractors shall submit request for authorization to release and notifications related to cyber security breaches through the prime contractor to the Contracting Officer.

(e) The Contractor further understands that Title 18 USC Section 701 specifically prohibits the use of the

USSOCOM emblem or logo in any medium (e.g., corporate website, marketing brochure, newspaper, magazine, etc.)

unless authorized in writing by USSOCOM. Forward any request to use the USSOCOM emblem or logo through the

Contracting Officer.

H.2. SOFARS 5652.209-9003 Use of Contractor Support/Advisory Personnel as Contract Specialists (2013)

The contractor’s attention is directed to the fact that contractor personnel may assist the Government in a contract administrator role for administration of this contract. Execution of this contract constitutes approval to release the contract and contractor’s proposal to Government Support Contractors who have signed Non-Disclosure and Rules of Conduct/Conflict of Interest Statements.

H.3. SOFARS 5652.216-9003 Procedures for Issuing Task Orders under Multiple Award, Indefinite

Delivery-Indefinite Quantity Contracts (2014) Note: These procedures apply to the issuance of future task orders

General. This contract is designed to meet SWMS Group B requirements. Firm Fixed Price (FFP) and Cost-reimbursement types of task orders may be issued; however, FFP will be the preferred contract type to accompany performance based concepts to the maximum extent possible. The Government will determine the most appropriate task order contract type for each task order dependent upon the requirement. The Government may unilaterally deviate from these procedures at any time as required. Task orders may include option year periods.

Standard Requirements. This contract will be focused on competition; accordingly, IDIQ prime contractors are required to submit a proposal for every requirement solicited. If the contractor has reason to request a waiver, the contractor shall submit a detailed statement of reason for a waiver to the Contracting

Officer (KO) within 2 days of request for task order proposal.

(a) All multiple award contractors shall be considered for each order over $3,000, unless the Contracting Officer determines that:

(1) The agency need for such supplies or services is of such urgency that providing such opportunity would result in unacceptable delays;

(2) Only one such contractor is capable of providing such supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized;

(3) The order should be issued on a sole source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract.

(4) It is necessary to place an order to satisfy a minimum amount guarantee.

(b) Unless the exceptions in paragraphs (a) above apply, the following procedures will be utilized in providing contract awardees with a fair opportunity to be considered for each order:

(1) Soliciting Task Order Proposals. When the Government has a requirement for services to be performed under this contract, the KO will issue a request for task order proposal which will include, but not necessarily limited to the following:

Instructions to Offerors (ITO) providing specific proposal requirements

Statement of Work/Performance Work Statement/Statement of Objectives

Period of Performance

(2) Submission of Proposals. The contractor’s proposal shall comply with the ITO. The contractor shall have 10 days to submit their proposals, unless another timeframe is included in the ITO. Proposals shall normally consist of a task order management plan and a pricing proposal.

(3) Government Evaluation of Task Order Proposals. The Government will make an integrated assessment based on the evaluation criteria identified in the ITO, and will award the task order to the contractor who provides the best value to the Government; this could include Lowest Price Technically acceptable or Trade-off process. Past performance may be a factor if applicable. If no offer is determined acceptable or the Government loses the funding for the project, the Government will notify all Offerors of the cancellation. Upon receipt of the proposal(s), the KO may:

Open discussions or negotiate with all or some contractors providing proposals

Issue a task order based upon the original proposal(s) furnished;

Reject the proposal(s), or

Cancel the requirement.

(4) TO Award. Task orders shall be issued on DD Form 1155 "Order For Supplies and Services;" (or similar form) and sent electronically to the contractor.

(5) Authorization to Proceed on Task Orders. In time-critical circumstances, after award and prior to the Contractor’s receipt of the contractual instrument, the KO may direct the contractor in writing, verbally, or electronically, to commence performance of the task. Otherwise, the contractor is not authorized to commence task performance prior to the issuance of the task order or other written or electronic notice provided by the KO. In no case shall the Contractor commence work without explicit approval from the KO.

(6) Option Exercises at Task Order Level. Task order options; if applicable, will be exercised in accordance with FAR 17.207 and the applicable option clause. Option periods will be outlined in each task order ITO.

(c) Under the provisions of the Federal Acquisition Streamlining Act of 1994, protests are not authorized in connection with the issuance or proposed issuance of a task/delivery order except for a protest on the grounds that the order increases the scope, period, or maximum value of the contract or, a protest of an order valued in excess of

$10 million. Protests of orders in excess of $10 million may only be filed with the Government Accountability

Office, in accordance with the procedures at FAR 33.104.

(d) Task and Delivery Order Ombudsman. The Task and Delivery Order Ombudsman is responsible for reviewing complaints regarding this contract. The Ombudsman shall review complaints from the contractors and ensure all contractors are afforded a fair opportunity to be considered, consistent with the procedures of the contract.

Additional information on the ombudsman can be viewed at http://www.socom.mil/sordac/Pages/Ombudsman.aspx.

H.3 DEVIATION: Proposal submission and evaluation for Force Management Development (FMD) Lessons

Learned, FMD Manpower Augmentation, and Marine Corps Special Operations Command (MARSOC)

Marine Special Operations School (MSOS), Individual Training Course (ITC) will be in accordance with Section L and M.

H.4. ORGANIZATIONAL CONFLICT OF INTEREST

(a) The guidelines and procedures of FAR Subpart 9.5 Organizational and Consultant Conflicts of Interest and FAR

Part 3 Improper Business Practices and Personal Conflicts of Interest, will be used in identifying and resolving any issues of conflict of interest.

(b) All contractor personnel (to include subcontractors and consultants) who will be personally and substantially involved in the performance of any task order issued under SWMS Group B which requires the contractor to act on behalf of, or provide advice with respect to any phase of a procurement shall execute and submit an

“Employee/Contractor Non-Disclosure Agreement” form. The Contracting Officer (KO) will provide the appropriate nondisclosure form specific to the procurement.

(c) The contractor shall be responsible for identifying and preventing personal conflicts of interest of their employees. The contractor shall prohibit employees who have access to non-public information by reason of performance on a Government contract from using that information for personal gain.

(d) In the event that a task order requires activity that would create an actual or potential conflict of interest, the contractor shall immediately notify the KO of the conflict, submit a plan for mitigation, and not commence work until specifically notified by the KO to proceed; or, identify the conflict and recommend to the KO an alternate approach to avoid the conflict.

H.5. PROTECTION OF PROPRIETARY INFORMATION

(a) The Contractor shall train and inform its employees of Subpart 9.5 of the FAR and this contract clause, and shall execute a Contractor-Employee Personal Financial Interest/Protection of Sensitive Information Agreement as appropriate.

(b) The Contactor agrees that it will use all reasonable diligence in protecting proprietary data received by it. The

Contractor further agrees it will not willfully disclose proprietary data to unauthorized parties without the prior permission of the Government, and that proprietary data shall not be duplicated, used or disclosed, in whole or part, for any purpose other than to accomplish the contracted effort. This restriction does not limit the contractors right to use, duplicate or disclose such information if such information was lawfully obtained by the contractor from other sources.

(c) The Contractor agrees to enter into written agreements with all companies whose proprietary data it shall have access to and protect such data from unauthorized use or disclosure as long as it remains proprietary. The

Contractor shall furnish to the Contracting Officer copies of these written agreements within 30 days. The

Contractor agrees to protect the proprietary data and rights of other organizations disclosed to the Contractor during performance of this contract with the same caution that a reasonably prudent Contractor would use to safeguard highly valuable property. The Contractor shall not use proprietary information for any purpose other than that for which it was furnished.

http://www.socom.mil/sordac/Pages/Ombudsman.aspx

(d) The Contractor shall not distribute reports, data or information of any nature arising from its performance under this contract, except as provided by this contract or as may be directed by the Contracting Officer.

(e) Government Representatives shall have access to the Contractor’s premises and the right to inspect all pertinent books and records in order to ensure that the contractor is in compliance with FAR 9.5.

(f) The Contractor agrees that if after award it discovers a potential organizational conflict of interest, a prompt and full disclosure shall be made in writing to the Contracting Officer. This disclosure shall include a description of the actions the Contractor has taken or proposes to take, to avoid or mitigate such conflicts.

(g) The Government may waive application of this clause when it is determined to be in the best interest of the

Government to do so.

H.6. RESERVED

H.7. COMMON ACCESS CARDS FOR CONTRACTOR PERSONNEL

(a) For installation(s)/location(s) cited in the contract, contractors shall ensure Common Access Cards (CACs) are obtained by all contract or subcontract personnel who meet one or both of the following criteria:

1. Require logical access to Department of Defense computer networks and systems in either:

i. the unclassified environment; or

ii. the classified environment where authorized by governing security directives.

2. Perform work which requires the use of a CAC for installation entry control or physical access to facilities and buildings.

(b) Contractors and their personnel shall follow the procedures outlined in the DMDC Trusted Associate

Sponsorship System Trusted Agent (TASS) User Guide Version 4.0 dated March 2013, and any subsequent versions. The Trusted Agents for this contract are the appointed CORs for task orders and the Primary

Contracting Officer’s Representative (PCOR) for the contractor management team. It is the prime contractor’s responsibility to ensure the CORs have all updated information necessary to process re-verifications and new requests timely in the TASS.

(c) During the performance period of the contract, the contractor shall:

a. Return CACs to either the nearest RAPIDS office or to the COR no later than the next business day of a change in status for contractor personnel who no longer require logical or physical access;

b. Return CACs to either the nearest RAPIDS office or to the COR no later than the next business day following a CACs expiration date; and

c. Report lost or stolen CACs in accordance with local policy/directives.

(d) No later than the next business day following completion/termination of the contract, the contractor shall return all CACs issued to their personnel to the nearest Rapids office or the COR.

(e) Failure to comply with these requirements may result in withholding of final payment.

H.8. ASSOCIATE CONTRACTOR AGREEMENTS

The Contractor shall enter into Associate Contractor Agreements (ACA) for any portion of the contract requiring joint participation in the accomplishment of the Government’s requirement as specified in individual orders. Joint participation may involve entering into this agreement with another SWMS prime in support of one or more customers or it may also include agreements with other contract primes outside of SWMS as identified within a specific task order. The agreements shall include the basis for sharing information, data, technical knowledge, expertise, and/or resources essential to the interaction of the program support, which shall ensure the greatest degree of cooperation for the development of the program to meet the terms of the contract.

H.9. THEATER BUSINESS CLEARANCE CLAUSES

In accordance with DoD Policy and the CENTCOM Contracting Command (formerly the JCC-I/A), Theater

Business Clearance (TBC) is required for contractor support in Iraq and Afghanistan. TBC approval will be obtained by the Government at the task order level when applicable. No action is required on the part of the prime contractor to receive approval. Specific clauses for contractor support covered under a TBC will be incorporated at the task order level.

Section I - Contract Clauses

52.202-1 Definitions NOV 2013

52.203-3 Gratuities APR 1984

52.203-5 Covenant Against Contingent Fees APR 1984

52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006

52.203-7 Anti-Kickback Procedures OCT 2010

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

JAN 1997

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity JAN 1997

52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-13 Contractor Code of Business Ethics and Conduct APR 2010

52.203-16 Preventing Personal Conflicts of Interest DEC 2011

52.203-17 Contractor Employee Whistleblower Rights and Requirement

To Inform Employees of Whistleblower Rights

SEP 2013

52.204-2 Security Requirements AUG 1996

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.204-10 Reporting Executive Compensation and First-Tier Subcontract

Awards

JUL 2013

52.204-13 System for Award Management Maintenance JUL 2013

52.204-15 Service Contract Reporting Requirements for Indefinite-

Delivery Contracts

JAN 2014

52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for

Debarment

AUG 2013

52.215-2 Audit and Records--Negotiation OCT 2010

52.215-8 Order of Precedence--Uniform Contract Format OCT 1997

52.215-10 Price Reduction for Defective Certified Cost or Pricing Data AUG 2011

52.215-11 Price Reduction for Defective Certified Cost or Pricing Data--

Modifications

AUG 2011

52.215-12 Subcontractor Certified Cost or Pricing Data OCT 2010

52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications OCT 2010

52.215-15 Pension Adjustments and Asset Reversions OCT 2010

52.215-21 Requirements for Certified Cost or Pricing Data or

Information Other Than Certified Cost or Pricing Data--

Modifications

OCT 2010

52.215-23 Limitations on Pass-Through Charges OCT 2009

52.216-7 Allowable Cost And Payment JUN 2013

52.216-8 Fixed Fee JUN 2011

52.216-10 Incentive Fee JUN 2011

52.216-16 Incentive Price Revision-Firm Target OCT 1997

52.219-6 Notice Of Total Small Business Set-Aside NOV 2011

52.219-8 Utilization of Small Business Concerns MAY 2014

52.219-14 Limitations On Subcontracting NOV 2011

52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013

52.222-3 Convict Labor JUN 2003

52.222-21 Prohibition Of Segregated Facilities FEB 1999

52.222-26 Equal Opportunity MAR 2007

52.222-35 Equal Opportunity for Veterans SEP 2010

52.222-37 Employment Reports on Veterans SEP 2010

52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons FEB 2009

52.222-54 Employment Eligibility Verification AUG 2013

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011

52.223-6 Drug-Free Workplace MAY 2001

52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.227-1 Authorization and Consent DEC 2007

52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.228-3 Worker's Compensation Insurance (Defense Base Act) JUL 2014

52.228-5 Insurance - Work On A Government Installation JAN 1997

52.228-7 Insurance--Liability To Third Persons MAR 1996

52.229-6 Taxes--Foreign Fixed-Price Contracts FEB 2013

52.229-8 Taxes--Foreign Cost-Reimbursement Contracts MAR 1990

52.232-1 Payments APR 1984

52.232-8 Discounts For Prompt Payment FEB 2002

52.232-11 Extras APR 1984

52.232-20 Limitation Of Cost APR 1984

52.232-22 Limitation Of Funds APR 1984

52.232-23 Assignment Of Claims JAN 1986

52.232-25 Prompt Payment JUL 2013

52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013

52.233-1 Disputes JUL 2002

52.233-3 Protest After Award AUG 1996

52.233-3 Alt I Protest After Award (Aug 1996) - Alternate I JUN 1985

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

52.242-1 Notice of Intent to Disallow Costs APR 1984

52.242-3 Penalties for Unallowable Costs MAY 2001

52.242-13 Bankruptcy JUL 1995

52.243-1 Alt I Changes--Fixed Price (Aug 1987) - Alternate I APR 1984

52.243-2 Alt I Changes--Cost-Reimbursement (Aug 1987) - Alternate I APR 1984

52.243-7 Notification Of Changes APR 1984

52.244-2 Subcontracts OCT 2010

52.244-5 Competition In Subcontracting DEC 1996

52.244-6 Subcontracts for Commercial Items DEC 2013

52.246-25 Limitation Of Liability--Services FEB 1997

52.249-4 Termination For Convenience Of The Government (Services)

(Short Form)

APR 1984

52.249-8 Default (Fixed-Price Supply & Service) APR 1984

52.249-14 Excusable Delays APR 1984

252.201-7000 Contracting Officer's Representative DEC 1991

252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-

Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013

252.203-7003 Agency Office of the Inspector General DEC 2012

252.203-7004 Display of Fraud Hotline Poster(s) DEC 2012

252.204-7000 Disclosure Of Information AUG 2013

252.204-7003 Control Of Government Personnel Work Product APR 1992

252.204-7005 Oral Attestation of Security Responsibilities NOV 2001

252.215-7000 Pricing Adjustments DEC 2012

252.215-7002 Cost Estimating System Requirements DEC 2012

252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997

252.223-7004 Drug Free Work Force SEP 1988

252.223-7006 Prohibition On Storage And Disposal Of Toxic And

Hazardous Materials

APR 2012

252.225-7043 Antiterrorism/Force Protection Policy for Defense Contractors

Outside the United States

MAR 2006

252.225-7048 Export-Controlled Items JUN 2013

252.225-7048 Export-Controlled Items JUN 2013

252.225-7995 (Dev) Contractor Personnel Performing in the United States Central

Command Area of Responsibility (Deviation)

JUN 2013

252.227-7013 Rights in Technical Data--Noncommercial Items FEB 2014

252.227-7014 Rights in Noncommercial Computer Software and

Noncommercial Computer Software Documentation

FEB 2014

252.231-7000 Supplemental Cost Principles DEC 1991

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7007 Limitation Of Government's Obligation MAY 2006

252.232-7008 Assignment of Claims (Overseas) JUN 1997

252.242-7006 Accounting System Administration FEB 2012

252.243-7001 Pricing Of Contract Modifications DEC 1991

252.243-7002 Requests for Equitable Adjustment DEC 2012

5652.216-9000 Fixed Fee Information (2003) SEP 2003

52.216-19 ORDER LIMITATIONS. (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,500.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor:

(1) Any order for a single item in excess of $15,000,000.00;

(2) Any order for a combination of items in excess of $150,000,000.00; or

(3) A series of orders from the same ordering office within 30days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal

Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the

Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.

(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 5days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons.

Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of clause)

52.216-22 INDEFINITE QUANTITY. (OCT 1995)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".

(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and

Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after the time period specified in the task order.

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 10 days prior to contract expiration.

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

Applies to Task Orders that include options.

(a) The Government may extend the term of this contract by written notice to the Contractor within 15 days prior to the end of the current period of performance; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 60 months (at the task order level).

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any Defense Federal Acquisition Regulation DFARs (48 CFR 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

252.216-7006 ORDERING (MAY 2011)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the contract schedule. Such orders may be issued from the effective date of the basic IDIQ contract through 60 months.

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c)(1) If issued electronically, the order is considered ``issued'' when a copy has been posted to the Electronic

Document Access system, and notice has been sent to the Contractor.

(2) If mailed or transmitted by facsimile, a delivery order or task order is considered ``issued'' when the Government deposits the order in the mail or transmits by facsimile. Mailing includes transmittal by U.S. mail or private delivery services.

(3) Orders may be issued orally only if authorized in the schedule.

(End of Clause)

5652.201-9002 Authorized Changes Only by Contracting Officer (2005)

The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as part of this contract. Except as specified herein, no order, statement, or conduct of Government personnel who visit the contractor’s facilities or in any other manner communicates with Contractor personnel during the performance of this contract shall constitute a change under the Changes clause in Section I. In the event the Contractor effects any change at the direction of any person other the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred as a result thereof. The name, number and email of the Contracting Officer is:

Karen Stevens

(813) 826-5671

Karen.stevens@socom.mil

5652.204-9002 Instructions for the Use of Electronic Contracts (2007) Section I

In accordance with DoD policy, this solicitation and the resulting contract will be executed and documented through electronic means. As a result, the use of the terms "documented," "copy," "printed," "in writing," or "written" within this document shall refer to all electronically transmitted documents that will become part of the electronic contract file and an official government record. Any reference to official signatures and signed documents shall refer to electronic signatures. Whenever an electronic signature is used it shall have the full force and effect as a handwritten signature.

End of Clause

5652.216-9005 Government Down Time for Various Reasons (2005)

From time to time Government installations may be closed in response to an unforeseen emergency or similar occurrence, or by order of the President, Secretary of Defense, or installation commander. Designated emergencies include, but are not limited to, adverse weather such as snow or flood, an act of God such as a tornado or earthquake, acts of war or terrorism, computer failures, or a base disaster such as a natural gas leak or fire.

(a) Under such designated emergencies or other ordered base closures, contractor personnel will not be allowed on the Government installation unless specifically approved by the Contracting Officer in accordance with installation policies and procedures. If an emergency requiring installation closure occurs while contractor personnel are on the installation, contractor personnel shall promptly secure all government furnished property appropriately and evacuate in an expedient but safe manner unless otherwise directed by the Contracting Officer.

(b) If the installation closure causes a delay in the work required by the contract, the Government may:

(i) grant a time extension in each task order delayed by the closure equal to the time of the closure, subject to the availability of funds.

(ii) terminate the work or a portion of the work.

(iii) reschedule the work on any day satisfactory to both parties.

(iv) permit the contractor to perform at an off-site location during the period of installation closure if meaningful work can be accomplished. Contractor shall certify to the government by letter within 5 business days of returning to work the nature and scope of the work completed off-site. There shall be no adjustment to the contract labor rates for work performed off the installation.

(v) require that the Contractor continue on-site performance during the installation closure period in accordance with installation procedures.

mailto:Karen.stevens@socom.mil

5652.232-9000 Funding Schedule (2003)

Fill-ins will be completed at the Task Order level if applicable.

(a) In accordance with FAR 52.232-22, funds in the amount of $(Insert amount of funds currently obligated for performance) have been allotted to cover performance through (Insert date).

(b) It is anticipated that additional funds will be obligated in accordance with the following schedule:

5652.233-9000 Independent Review of Agency Protests (2013)

All protests shall be submitted through the Contracting Officer. A request for an independent review of the protest decision shall be made through the Contracting Officer to the HCD/FCO. If the HCD/FCO is the Contracting

Officer, submit the request in accordance with FAR 33.103(d)(4) to: Chief, SORDAC-KM or SORDAC-KX as appropriate, 7701 Tampa Point Blvd., MacDill AFB, FL 33621, Fax (813) 826-7504.

5652.237-9000 Contractor Personnel Changes (1998)

(a) The contractor shall have the right to remove his personnel assigned to perform the tasks hereunder and to substitute other qualified personnel provided that the Contracting Officer is notified of such removal and replacement. The contractor shall notify the Contracting Officer prior to such change, giving the new employee's name, security clearance and technical qualifications.

(b) Any removals or replacements for the convenience of the contractor shall be at no additional cost to the

Government. Cost to be borne by the contractor include but are not limited to time of travel, travel and training costs for replacement personnel.

(c) Removals or replacements of contractor personnel shall be considered for the convenience of the contractor except when such removal is for:

(1) employees removed as a result of cancellation or completion of the contract,

(2) employees replaced due to death or incapacitating illness or injury,

(3) or employees removed or replaced at the Government's request.

(d) If any employee removes him/herself from the employ of the contractor, such removal will be at no additional cost to the Government.

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/33.htm#P36_6016

5652.237-9001 Key Personnel Requirements (2003)

(a) Certain experienced professional and/or technical personnel are essential for successful accomplishment of the work to be performed under this contract. Such personnel are defined as "Key Personnel" and are those persons whose resumes were submitted for evaluation of the proposal. The contractor agrees that such personnel shall not be removed from the contract work or replaced without compliance with the following:

1) If one or more of the key personnel, for any reason, becomes or is expected to become unavailable for work under this contract for a continuous period exceeding 30 work days, or is expected to devote substantially less effort to the work than indicated in the proposal or initially anticipated, the contractor shall, subject to the concurrence of the Contracting Officer or an authorized representative, promptly replace personnel with personnel of equal ability and qualifications.

2) All requests for approval of substitutions hereunder must be in writing and provide a detailed explanation of the circumstances necessitating the proposed substitutions. The request must contain a resume for the proposed substitute, and any other information requested by the Contracting Officer. The Contracting

Officer shall promptly notify the contractor of approval or disapproval in writing.

(b) If the Contracting Officer determines that suitable and timely replacement of Key Personnel who have been reassigned, terminated or have otherwise become unavailable for the contract work is not reasonably forthcoming or that the resultant reduction of productive effort would be so substantial as to impair successful completion of the contract, the Contracting Officer may terminate the contract for default or for the convenience of the Government, as appropriate, or make an equitable adjustment to the contract to compensate the Government for any resultant delay, loss or damage.

(c) The follow positions are identified as Key Personnel:

IDIQ Program Manager

Task Lead, as specified in the task order

Others, as identified at the task order level

5652.242-9002 Accounting for Common Access Cards (CACs) for Contractor Personnel Departing HQ

USSOCOM (2014) Section I

As prescribed in 5642-490 insert a clause substantially the same as the following in solicitations and contracts and or task orders:

(a) In the event a contractor employee separates without advance notice (either quits or is terminated), the contractor shall immediately notify the Trusted Agent (TA) who will ensure CAC permissions are revoked the same day. In various instances a contractor employee may not be on task (working) due to furloughs, suspensions pending the outcome of an investigation, or the contract reaches the end of the period of performance (POP) and renewal is anticipated but not yet complete. During these occurrences, the TA or a representative from the contractor (TA’s choice) will collect and retain the CACs of the affected contractor personnel residing in the local area however; CAC permissions will not be revoked in the Trusted Associate Sponsorship System (TASS). Collecting CACs however, may not be feasible for contractor personnel located in remote locations. When contractor personnel return to work under the contract, they will retrieve their CAC from the responsible party who collected it.

(b) The contractor shall include a monthly report listing contractor employees who departed during the previous http://farsite.hill.af.mil/reghtml/regs/Other/Ussocom/5642.htm#P19_1638 month and the date their CACs were turned in using the format listed below. Include with the submission of CDRL

A001.

Employee

Name

Contract

Number

TO

Number

Company

Name

HQ

USSCOM

Office

Symbol

TA Name Termination

Date

Date

CAC

returned to

RAPIDS

Site

Remarks

Section J - List of Documents, Exhibits and Other Attachments

SECTION J ATTACHMENTS

Attachment No. Description

Exhibit A Contract Data Requirements List (CDRL)

Attachment 1 SWMS Group B SOW; Amendment 0001 Revision 1

Attachment 2 SWMS Group B DD Form 254

Attachment 3 Contractor Provided Quality Control Plan (submitted as part of Sub-factor 1)

Attachment 4 LREC SOW; Amendment 0003 Revision 3

Attachment 5 MARSOC Exercise Support SOW; Amendment 0004 Revision 4

Attachment 6 FMD Lessons Learned ITO & SOW; Amendment 0004 Revision 3

Attachment 7 FMD Manpower Augmentation Support ITO & SOW; Amendment 0004 Revision 2

Attachment 8 MSOS Individual Training Course ITO & SOW; Amendment 0004 Revision 4

Attachment 9 Past Performance Information Sheet; Amendment 0002 Revision 1

Attachment 10 Past Performance Questionnaire; Amendment 0001 Revision 1

Attachment 11 Subcontractor Consent

Attachment 12 Client Authorization

Attachment 13 SWMS Modified SF 1408

Attachment 14 Group B Pricing Template; Amendment 0004 Revision 2

Section K - Representations, Certifications and Other Statements of Offerors

52.203-2 Certificate Of Independent Price Determination APR 1985

52.203-11 Certification And Disclosure Regarding Payments To

Influence Certain Federal Transactions

SEP 2007

52.204-7 System for Award Management JUL 2013

52.209-7 Information Regarding Responsibility Matters JUL 2013

52.215-22 Limitations on Pass-Through Charges--Identification of

Subcontract Effort

OCT 2009

52.222-22 Previous Contracts And Compliance Reports FEB 1999

52.222-25 Affirmative Action Compliance APR 1984

52.222-38 Compliance With Veterans' Employment Reporting

Requirements

SEP 2010

52.225-20 Prohibition on Conducting Restricted Business Operations in

Sudan--Certification

AUG 2009

52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

DEC 2012

252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7004 Alt A System for Award Management Alternate A MAY 2013

252.205-7000 Provision Of Information…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .