The file's text, extracted by GovTribe without its formatting.
H92222-10-R-1006
Contract Data Requirements List (CDRL)
| DATA ITEM NO. |
| TITLE OF DATA ITEM |
| SUBTITLE |
| A0001 |
| In-Plant Burn-in Test |
| Burn-in Test Report |
| A0002 |
| Product Qualification Test (PQT) |
| PQT Procedures |
| A0003 |
| Product Qualification Test (PQT) Report |
| PQT Report |
| A0004 |
| Certification/Data Report |
| Ku SATCOM Service Provider Compliance |
| A0005 |
| Certification/Data Report |
| DSCS/WGS Pre-Certification Test Report |
| A0006 |
| Proposed Spare Parts List |
| Provisioning Parts List |
| A0007 |
| Proposed Spare Parts List |
| LCSM Pipeline Spare Parts List |
| A0008 |
| Commercial Off The Shelf (COTS) Manual |
| System O&M Manual |
| A0009 |
| IKPT Training Materials |
| IKPT Materials |
| A0010 |
| IKPT Training Instruction |
| IKPT Course |
| A0011 |
| CBT Application |
| CBT Materials |
| A0012 |
| Contractor’s Progress, Status and Management |
| Program Status Report |
| A0013 |
| Program Reviews |
| Program Management Review |
| A0014 |
| Program Review Documents |
| Conference Minutes, Agendas, Briefings |
| A0015 |
| Safety Assessment Report |
| SAR |
| A0016 |
| Engineering Change Proposal (ECP) |
| ECP |
| A0017 |
| As-Built Configuration |
| HW/SW Database |
| A0018 |
| Production Acceptance Test (PAT) Procedures |
| PAT Procedures |
| A0019 |
| Production Acceptance Test (PAT) Report |
| PAT Report |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0001 |
| In-Plant Burn-in Test Report |
| Burn-in Test Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-NDTI-80809B |
| SOW paragraph 5.1 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
LT
b. COPIES
8. APP CODE
A
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
Final
16. REMARKS:
Block 4: The contractor shall perform a 48 hour In-Plant Burn-in Test, at ambient temperature (23˚ C), for all first article and at least 20% of all additional production terminals. The system shall be power-cycled, one half hour off for every 3 hours on. If a failure occurs, the unit under test will be repaired and the burn-in will continue from that point on with the exception that the burn-in will continue until the last 12 hours are failure-free. Daily test consisting of simulated traffic shall be conducted to verify system performance.
Block 10, 12: The contractor shall provide a burn in test report within 10 days of completion of the burn in test for each terminal.
| USSOCOM SORDAC –PMC4 |
| 0 |
| 1 |
| 0 |
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 10 Nov 09 |
| //signed// |
| 10 Nov 09 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0002 |
| Product Qualification Test (PQT) |
| (PQT) Procedures |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-NDTI-80603A |
| SOW paragraph 5.2 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
LT
b. COPIES
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
A
16. REMARKS:
Block 4: The Government will witness qualification test on the SDN-Lite v(3) at the Contractor's facility. The in-plant qualification tests shall verify system compliance with the technical and environmental requirements, safety of operation, radiation hazard protection, and shall be conducted IAW Contractor proposed and/or Government approved test procedures. The Contractor shall provide all the necessary equipment for testing purposes with the exception of the identified GFE.
Blocks 12 and 13: Initial delivery 45 days prior to the start of PQT. The Government shall have seven (7) days to review the PQT Procedures and provide comments to the contractor. The contractor shall have seven (7) days to incorporate the Governments comments and return the PQT Procedures in final form to the Government.
| USSOCOM SORDAC-PMC4 |
| 1 |
| 1 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 10 Nov 09 |
| //signed// |
| 10 Nov 09 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0003 |
| Product Qualification Test (PQT) Report |
| (PQT) Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-NDTI-80809B |
| SOW paragraph 5.2 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
LT
b. COPIES
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
A
16. REMARKS:
Block 4: Use DID-NDTI-80809B as a guide. Contractor format is acceptable.
Blocks 12 and 13: The contractor shall provide a PQT report to the Government at least seven (7) days prior to the shipment of any terminal.
| USSOCOM SORDAC-PMC4 |
| 0 |
| 1 |
| 0 |
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 10 Nov 09 |
| //signed// |
| 10 Nov 09 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0004 |
| Certification/Data Report |
| Ku SATCOM Service Provider Compliance |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80678 |
| SOW paragraph 5.3.1 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
LT
b. COPIES
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
A
16. REMARKS:
Block 4: Contractor format is acceptable, use DI-MISC-80678 as a guide.
Blocks 12 and 13: The Contractor shall conduct all testing required to verify terminal performance is compliant with the appropriate service standard when the terminal is integrated into the SIE architecture. The contractor shall provide the Government a data report no later than 30 days prior to delivery of the Low Rate Initial Production systems used in the User Acceptance Training .
| USSOCOM SORDAC-PMC4 |
| 0 |
| 1 |
| 0 |
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 14 Dec 09 |
| //signed// |
| 14 Dec 09 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 0001 |
| A |
| TDP TM OTHER: MISC |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0005 |
| Certification/Data Report |
| DSCS/ WGS Pre-Certification Test Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80678 |
| SOW paragraph 5.3.2 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DEST
b. COPIES
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
A
16. REMARKS:
Block 4: Contractor format is acceptable, use DI-MISC-80678 as a guide.
Blocks 12 and 13: The Contractor shall conduct required testing and provide a pre-certification readiness test report to the Government IAW SOW paragraph 5.3.2. The data package will be based upon Contractor conducted pre-certification readiness testing of the system IAW the requirements defined in MIL-STD-188-164A and the DSCS Earth Terminal Certification documents cited in paragraph 2.1 of the SOW.
| USSOCOM SORDAC-PMC4 |
| 0 |
| 1 |
| 0 |
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 10 Nov 09 |
| //signed// |
| 10 Nov 09 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0006 |
| Proposed Spare Parts List |
| Provisioning Parts List |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-ILSS-80134A |
| SOW paragraph 5.4.5.1 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
LT
b. COPIES
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
A
16. REMARKS:
Block 4: Contractor format is acceptable. The Contractor shall provide a Spares list should include replacement screw types, cables types and lengths, connector types with pin identification, etc. for all equipment and/or subassemblies. The list will include part number, CAGE Code, and quantity.
Blocks 12 and 13: The Contractor shall provide a final spare parts list to the Government 30 calendar days after the CDR. This list will be updated on an annual basis.
| USSOCOM SORDAC-PMC4 |
| 1 |
| 1 |
| 0 |
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 10 Nov 09 |
| //signed// |
| 10 Nov 09 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0007 |
| Proposed Spare Parts List |
| LCSM Pipeline Spares List |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-ILSS-80134A |
| SOW paragraph 5.4.5.1 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
LT
b. COPIES
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
A
16. REMARKS:
Block 4: Contractor format is acceptable. The Contractor shall provide a LCSM pipeline spares list that can be fielded to system users. Spares list should include replacement screw types, cables types and lengths, connector types with pin identification, etc. for all equipment and/or subassemblies. The list will include part number, CAGE Code, and quantity.
Blocks 12 and 13: The Contractor shall provide a final spare parts list to the Government 30 calendar days after the CDR. This list will be updated on an annual basis.
| USSOCOM SORDAC-PMC4 |
| 1 |
| 1 |
| 0 |
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 10 Nov 09 |
| //signed// |
| 10 Nov 09 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0008 |
| Commercial Off The Shelf (COTS) Manual |
| System O&M Manual |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-TMSS-80527B |
| SOW paragraph 5.4.5.3 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
LT
b. COPIES
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
A
16. REMARKS:
Block 4: Contractor format is acceptable. The contractor shall deliver an integrated systems manual with unlimited reproduction rights that provides a road map through the COTS subsystem manuals. The systems manual shall reflect the SDN-Lite (v)3 configuration delivered under this contract. The systems manual shall include: equipment technical data, equipment setup and installation procedures, detailed menu field definitions, warnings and precautions, all authorized operator level tasks/procedures, principles of operation, all authorized organizational level testing, fault isolation and troubleshooting, support/test equipment, and removal/replacement procedures, warranty handling instructions, and a repair parts and special tools list if required. Actual photos showing step by step assembly is required in the systems manual.
Blocks 10: A system operations and maintenance (O&M) manual shall be provided 45 days prior to User Acceptance Testing (UAT). The Government will have 15 days to review the manual. The contractor shall have 15 days to incorporate Government comments.
Blocks 12 and 13: Upon completion of UAT, the Government may provide additional comments for incorporation into the integrated systems manual. Final delivery shall be one complete copy of the final version and one digital copy in PDF format on CD-ROM. One (1) O&M manual shall be delivered with each terminal.
| USSOCOM SORDAC-PMC4 |
| 1 |
| 1 |
| 1 |
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 10 Nov 09 |
| //signed// |
| 10 Nov 09 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0009 |
| IKPT Training Materials |
| Instructor and Key Personnel Training (IKPT) Materials |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-ILSS-80872 |
| SOW paragraph 5.4.5.4 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
SEE BLOCK 16
LT
b. COPIES
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
16. REMARKS:
Block 4: Use DI-ILSS-80872 as a guide. Contractor format approved by the Government is acceptable. Material shall include instructional materials introducing the operation and maintenance manual, system capabilities, block diagram description, theory of operation, installation, operation, performance testing, packing, scheduled maintenance, repair and trouble shooting, to include depot level maintenance. Instructor training materials necessary for the IKPT shall be the Contractor’s responsibility, and shall be provided to each student, along with a copy of the SDN-Lite (v)3 system O&M manual. Training materials shall include: Presentation slides used in the classroom as the primary teaching document; Program Of Instruction (POI) that documents the lessons, objectives, training time, and identifies the training materials and equipment to conduct each lesson; and a Student Guide (SG) .
Blocks 12 and 13: Initial delivery 30 days prior to the initial IKPT class (2-4 weeks prior to User Acceptance Testing). Government will provide comments within 7 days. The contractor shall have 7 days to incorporate Government comments.
Block 14: Materials shall be delivered to the customer with full reproduction rights, and consist of one hard-copy paper document and an electronic version on CD-ROM. The electronic deliverable shall be in a mutually agreeable version of PDF format.
| USSOCOM SORDAC-PMC4 |
| 1 |
| 1 |
| 0 |
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 14 Dec 09 |
| //signed// |
| 14 Dec 09 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0010 |
| IKPT Training Instruction |
| Instructor and Key Personnel Training (IKPT) Course |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-ILSS-80872 |
| SOW paragraph 5.4.5.4 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
SEE BLOCK 16
DEST
b. COPIES
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
16. REMARKS:
Block 10: The contractor shall provide Train-the-Trainer instruction, for the Operation and Maintenance of the SDN-Lite (v)3 terminal. The initial IKPT class shall be provided to LCSM instructors and other personnel, not to exceed 8 students, 2-4 weeks prior to User Acceptance Training at the LCSM CONUS site using the initial SDN-Lite (v)3 equipment. Additional IKPT classes shall be at least one week (40 hours) in duration, and presented to a maximum of 8 students per class. A minimum of 30 days notification shall be given by the Government prior to the course need-date, and the Government, in coordination with the Contractor, shall be responsible for providing the facilities and SDN-Lite (v)3 systems (two terminals for 8 students) to conduct the training. Instructor training materials necessary for the IKPT shall be the Contractor’s responsibility, and shall be provided to each student, along with a copy of the SDN-Lite (v)3 system O&M manual.
Block 12: Initial delivery 2-4 weeks prior to User Acceptance Training.
Block 14: One CD-ROM, containing all training materials in the latest PDF format shall be provided at the training site for retention and access through the organization's training library. The CD-ROM shall also contain a mutually agreeable version of a PDF viewer for simplified viewing of the library materials. The Government has full reproduction rights to all training materials contained on the CD-ROM or utilized in the course of instruction.
| USSOCOM SORDAC-PMC4 |
| 0 |
| 1 |
| 0 |
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 14 Dec 09 |
| //signed// |
| 14 Dec 09 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0011 |
| Training Materials |
| Computer Based Training Application |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-ILSS-80872 |
| SOW paragraph 5.4.5.5 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
LT
b. COPIES
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
16. REMARKS:
Block 10: An open-systems architecture shall be used to support code reuse as well as a database-centric design to facilitate content changes as required. The CBT application shall be delivered to the Government with full reproduction rights. Format of the electronic deliverable shall be in a mutually agreeable version of a CD-ROM. The Government shall have unlimited reproduction rights for the training materials. Updates to any and all documentation due to the government shall be provided in the same conditions that the originals are provided.
Blocks 12 and 13: Initial delivery 60 days ARO. Government will provide comments within 15 days. The contractor shall have 30 days to incorporate Government comments.
Block 14: Format of the electronic deliverable shall be in a mutually agreeable version of a CD-ROM. The Government shall have unlimited reproduction rights for the training materials.
| USSOCOM SORDAC-PMC4 |
| 1 |
| 1 |
| 0 |
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 10 Nov 09 |
| //signed// |
| 10 Nov 09 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0012 |
| Contractor's Progress, Status and Management Report |
| Program Status Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-80227 |
| SOW paragraph 5.5.2 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
LT
b. COPIES
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
16. REMARKS:
Block 10: The contractor shall provide program status reports (PSR) every month. The format and content shall be contractor defined using the authority cited above as a guide. The PSR shall document the contractor’s status with respect to the Contract Master Schedule (CMS). Each report shall be a summary of activities, accomplishments, problems and resolutions occurring during the reporting period.
Blocks 12 and 13: A monthly PSR shall be provided to the Government beginning 30 days after contract award. The report is due no later than the 5th working day of each month. Electronic copy is acceptable.
In addition, the Monthly Program Status Report shall contain sections detailing Warranty, non-Warranty and Maintenance Status of all failures and repair actions, including but not limited to: point of origin, part description, part number, serial number, date of receipt, reason for return, corrective action taken, date item(s) returned to the LCSM, contractor cost of repair, and estimated hours of operation along with reliability calculations, shall be provided to the Government to maintain symptom and failure resolution for inspection.
| USSOCOM SORDAC-PMC4 |
| 0 |
| 1 |
| 0 |
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 10 Nov 09 |
| //signed// |
| 10 Nov 09 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0013 |
| Program Reviews |
| Program Management Review |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-ADMN-81250A |
| SOW paragraph 5.5.3 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
LT
b. COPIES
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
16. REMARKS:
Block 4: The Contractor shall conduct Program Management Review (PMRs) with USSOCOM at the contractor’s facility. The contractor will provide an agenda stating the date, time, objectives and topics. The Contractor shall report on progress of tasks covered by this SOW, problems encountered and/or anticipated, and corrective action planned. The Contractor will host a combined Post Award Conference (PAC) /Preliminary Design Review (PDR) and Critical Design Review (CDR). The contractor will document meeting meetings and provide to USSOCOM within 5 business days after scheduled meetings.
Block 12 and 13: The PMRs will occur every quarter until after the delivery of the first production terminal. After that, the PMRs shall occur at the Government’s request. The PAC and PDR will be conducted within 30 days after contract award, and the CDR within 60 days of the PDR.
| USSOCOM SORDAC-PMC4 |
| 0 |
| 1 |
| 0 |
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 10 Nov 09 |
| //signed// |
| 10 Nov 09 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0014 |
| Program Review Documents |
| Conference Minutes, Agendas, Briefings |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-ADMN-81250A |
| SOW paragraph 5.5.3 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
LT
b. COPIES
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
16. REMARKS:
Block 2 – Conference Minutes provide documentation of technical information and data required to record joint Contractor/ Government decisions and agreements reached during conferences, formal reviews, inspections, or audits.
Block 10, 12, and 13 - Meeting minutes shall be provided to the Government within 10 days after scheduled meetings.
Block 14 – Contractor’s format is acceptable. Electronic submissions shall be compatible with Microsoft Word and MS Office applications.
| USSOCOM SORDAC-PMC4 |
| 0 |
| 1 |
| 0 |
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 10 Nov 09 |
| //signed// |
| 10 Nov 09 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0015 |
| Safety Assessment Report (SAR) |
| SAR |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80678 |
| SOW paragraph 5.5.4 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
LT
b. COPIES
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
16. REMARKS:
Block 10: The contractor shall perform, or have an appropriate Government laboratory perform safety Assessment on the SDN-Lite (v)3 system. The results shall be documented in Safety Assessment Report (SAR).
Blocks 12: The contractor shall provide a copy of the SAR to the Government 30 days prior to User Acceptance Training.
| USSOCOM SORDAC-PMC4 |
| 0 |
| 1 |
| 0 |
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 14 Dec 09 |
| //signed// |
| 14 Dec 09 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0016 |
| Engineering Change Proposal (ECP) |
| ECP |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-CMAN-80639c |
| SOW paragraph 5.5.5 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
LT
b. COPIES
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
16. REMARKS:
BLK 4 - BLK 10 OF DATA ITEM DESCRIPTION. The ECP may be in contractor format. Contractor may use MIL-HDBK 61A and form DD 1692 as guidance.
BLK 8 - The Government will review the ECP for technical, impact, merit and classification of the request. Comments will be provided within 30 days after receipt of the ECP.
BLKS 10, 12 AND 13 – Submit the ECP to USSOCOM PCO. Notification of final approval will be provided within 60 days by the PCO.
BLK 14 – Provide via e-mail and hard copy. PDF format shall be used for submission of ECPs.
| USSOCOM SORDAC-PMC4 |
| 0 |
| 1 |
| 0 |
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 10 Nov 09 |
| //signed// |
| 10 Nov 09 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0017 |
| As-Built Configuration |
| HW/SW Database |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80678 |
| SOW paragraph 5.5.6 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
LT
b. COPIES
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
16. REMARKS:
Block 4: Contractor format is acceptable. The Contractor shall maintain an as-built configuration database that allows for the traceability of all hardware and software. Government access to the following data will be required: as-built configuration data; Class I/II Engineering Change Proposals, deviations/waivers; hardware and software technical design packages; serial numbers and/or lot codes.
Blocks 10, 11, 12 and 13: Access to data will be granted to the Government within 14 days notice. If an item is returned to the contractor for repair or update, the contractor shall update the configuration listing. The complete database shall be provided to the Government at the conclusion of the warranty period.
USSOCOM SORDAC-PMC4
LCSM
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 10 Nov 09 |
| //signed// |
| 10 Nov 09 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0018 |
| Production Acceptance Test (PAT) Procedures |
PAT Procedures
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-QCIC-80553 |
| SOW paragraph 5.6.2 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION S |
| 14. |
LT
b. COPIES
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
16. REMARKS:
Block 4: Consists of a brief description of the objectives including flow diagrams, milestones, personnel participation and security requirements. It also lists all tests to be accomplished in the order they are to be performed. The test plan includes a list of test equipment, support equipment, special test equipment. The test plan includes an overview used to validate the test results.
Blocks 12 and 13: Initial draft PAT procedures shall be provided to the Government 30 days after Government approval of the PQT procedures. Government comments will be provided within 15 days and the Contractor shall incorporate comments and provide final version within 15 days after receipt of Government comments.
| USSOCOM SORDAC-PMC4 |
| 1 |
| 1 |
| 0 |
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 10 Nov 09 |
| //signed// |
| 10 Nov 09 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| SDN-Lite (v)3 |
| H92222-10-R-1006 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A0019 |
| Production Acceptance Test (PAT) Report |
| PAT Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-ATTS-80283B |
| SOW paragraph 5.6.2 |
| USSOCOM SORDAC-PMC4 |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION S |
| 14. |
LT
b. COPIES
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
16. REMARKS:
Block 4: PAT reports consist of results of PAT testing and verifying compliance with SDN-Lite (v)3 performance requirements.
Block 12: PAT reports shall be provided to the Government for every terminal not undergoing PQT.
| USSOCOM SORDAC-PMC4 |
| 0 |
| 1 |
| 0 |
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Eric Barnes |
| 10 Nov 09 |
| //signed// |
| 10 Nov 09 |