Addendum No. 1 Summary

This is Addendum No. 1 to the contract documents for the Groundwater Treatment Plant Filter Gallery Valve Rehabilitation Project Phase 2 – Valve and Actuator Purchase issued by the Long Beach Public Utilities Department in Long Beach, California (Specifications No. WD-13-24, Drawing No. EO-3742). The project involves the procurement of double offset butterfly valves and Rotork actuators for installation at the groundwater treatment plant. The original bid receipt deadline of April 17, 2025 at 2:00 PM has been extended to April 24, 2025 at 2:00 PM, with the pre-bid conference question submission deadline extended from April 10, 2025 at 2:00 PM to April 17, 2025 at 5:00 PM. Bidders must submit a signed copy of the Addenda Acknowledgement form along with their bid submittal. Final testing of valves and actuators must be conducted within 100 miles of ZIP code 90806, after which all items shall be shipped fully assembled and in the same condition as tested.

Bond requirements have been modified to require only a Labor and Material Bond in the amount of 100 percent of the Contract Price; the Bond for Faithful Performance is no longer required. Technical specifications have been clarified to require NSF61-approved grease for bearing lubrication and non-asbestos fiber gasket seals for extension bonnet flanges. Bid items must include sales tax, freight charges, and all applicable costs; the Long Beach sales tax rate increased to 10.5% effective April 1, 2025. Gaskets, bolts, and nuts must be provided with all valves and actuators. Installation of the five Rotork actuators on existing valves must be performed by Rotork unless authorized in writing by Long Beach Utilities Department. The acceptable manufacturers remain unchanged to ensure Phase 2 valves and actuators match those used in Phase 1. Maximum operating time for valve actuation is specified at 5 seconds per inch of valve size.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AD1-1

1800 E. Wardlow Road Long Beach, CA 90807

LBUtilities.org April 14, 2025

ADDENDUM NO. 1

TO THE CONTRACT DOCUMENTS

Long Beach Public Utilities Department Long Beach, California Specifications No. WD-13-24 Drawing No. EO-3742

GROUNDWATER TREATMENT PLANT FILTER GALLERY VALVE REHABILITATION

PROJECT PHASE 2 – VALVE AND ACTUATOR PURCHASE

TO ALL PLAN HOLDERS

The following amendment is hereby made a part of the Contract Documents of the subject project as fully and completely as if the same were set forth therein. This Addendum No.

1 consists of pages AD1-1 to AD1-4.

CONTRACT DOCUMENTS

The following clarifications, additions, and deletions are made to the Specifications and Construction Plans as stated below:

SPECIFICATIONS:

1. Notice Inviting Bids:

DELETE the following from Receipt of Bids:

RECEIPT OF BIDS: Bids will be accepted on behalf of the Board of Public Utilities Commissioners of the City of Long Beach, California, Owner of the Work, until 2:00 PM on April 17, 2025 for the Groundwater Treatment Plant Filter Gallery Valve Rehabilitation Project Phase 2 – Valve and Actuator Purchase (WD-13-24) through the City of Long Beach’s online procurement system website (Long Beach Buys):

REPLACE with:

RECEIPT OF BIDS: Bids will be accepted on behalf of the Board of Public Utilities Commissioners of the City of Long Beach, California, Owner of the Work, until 2:00 PM on April 24, 2025 for the Groundwater Treatment Plant Filter Gallery Valve Rehabilitation Project Phase 2 – Valve and Actuator

2 | P a g e

AD1-2

Purchase (WD-13-24) through the City of Long Beach’s online procurement system website (Long Beach Buys):

2. Notice Inviting Bids:

DELETE the following from Pre-Bid Conference:

All other questions shall be submitted by April 10, 2025 at 2:00 PM, in order to be reviewed by the Engineer.

REPLACE with:

All other questions shall be submitted by April 17, 2025 at 5:00 PM, in order to be reviewed by the Engineer.

3. Supplementary General Conditions:

DELETE the following from SGC 5.1 Bonds:

The Contractor shall furnish a satisfactory Bond for Faithful Performance in the amount of 100 percent of the Contract Price and a satisfactory Labor and Material Bond in the amount of 100 percent of the Contract Price as security for the faithful performance and payment of all the Contractor’s obligations under the Contract Documents.

REPLACE with:

The Contractor shall furnish a satisfactory Labor and Material Bond in the amount of 100 percent of the Contract Price as security for the faithful performance and payment of all the Contractor’s obligations under the Contract Documents. A Bond for Faithful Performance is not required as part of these Contract Documents.

4. Section 33 12 14 - Double Offset Butterfly Valves

ADD the following to Part 2.2 E:

Extension bonnets shall be coated both internally and externally. Provide bi-directional stainless steel thrust bearings. Bearings shall be well lubricated with NSF61 approved grease. Provide NSF61 grease in submittal for approval.

Extension bonnet flanges, top and bottom, shall include suitable non-asbestos fiber gasket seals.

5. Section 33 12 14 - Double Offset Butterfly Valves

3 | P a g e

AD1-3

ADD the following to Part 3.3:

Final testing of the provided valves and actuators shall be conducted within 100 miles of ZIP code 90806. Upon passing the tests, all items shall be shipped to the storage and/or project site fully assembled and in the same condition as tested.

BIDDER QUESTIONS

1. Question: On Phase 1 DHC was named in the specification. I would like to officially request to have DHC be added to the acceptable manufacturers.

Answer: LBUD intends to replace the Phase 2 valves and actuators in kind with those used in the Phase 1. Thus, DHC cannot be added to the list of acceptable manufacturers.

2. Question: The specs call for 100% bid and performance bond on page 116 of 170.

Please amend to the understood 10% bid bond and 100% labor and material bond.

Answer: The project requires a 10% Bid bond and 100% Labor and Material bond.

There is no performance bond requirement for this project. Refer to this Addendum for changes to the Supplementary General Conditions.

3. Question: I cannot tell if the valve flange bolts and nuts and the gaskets are required to be provided with the bid or if this is just for the extension bonnets. Can you confirm please?

Answer: As part of this bid, the gaskets, bolts, and nuts shall be provided with all valves and actuators including extension bonnets as required for installation.

4. Question: Is sales tax included in the bid items?

Answer: Yes, the bid items shall include sales tax, freight charges, and all applicable charges detailed in Section 01 22 00 – Unit Prices of the Specifications. Please note, effective April 1, 2025, the sales tax in the City of Long Beach has increased to 10.5%.

5. Question: Please confirm the 5 Rotork actuators for existing valves are requested to be installed on the valves. Is there a line item cost for this task and can you confirm it has to be performed by an authorized Rotork agent (as this affects the possible 5 year warranty).

Answer: Yes, the actuators in Bid Item 6 shall be installed on existing valves under this bid item. The installation must be performed by Rotork, unless authorized in writing by LBUD during the project.

4 | P a g e

AD1-4

6. Question: Please confirm the operating target times of 5 seconds per each inch of valve size is appropriate and accurate.

Answer: Yes, a maximum of 5 seconds per each inch of valve size is acceptable.

A signed copy of the Addenda Acknowledgement form provided in Part 1 of the Bidding Requirements and a copy of this addendum must accompany the Bid Submittal.

Questions regarding the project shall be directed to Kian Nejad at (562) 570-2319.

Sincerely, Robert J. Verceles, P.E.

Director of Engineering/Chief Engineer

Att.

cc: Danna Monzon, Manager of Engineering Kian Nejad, Capital Projects Coordinator III Nikolas Baykal, Senior Civil Engineer

R b t J V l P E

File details come from the government source that posted it. Updated .