This document contains questions and answers related to a solicitation for the OASIS SB 8(a) SubPool On-Ramping opportunity. The solicitation will create new 8(a) set-aside SubPools under the existing OASIS SB multiple award, indefinite delivery/indefinite quantity contract vehicle. It anticipates making multiple awards for SubPools 1, 2, 3, 4, 5B and 6 to add new 8(a) contractors. The scope of work involves providing a full range of professional services and integrated solutions to support federal agencies' program management, consulting, engineering, scientific, logistics, and financial needs across all life cycle phases. The period of performance for OASIS SB task orders issued against the new SubPools will be through December 2024. Primary NAICS codes covered include 541330, 541219, 541715 under various small business size standards. The final solicitation is expected to be available on February 8, 2019 on FBO, and interested vendors must register in SAM to be eligible for award.
Amendment 05 - J.17 continuation
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gform
| Question Number | Question Text | Reference Text | Answer |
| 1 | Section L.5.3.1, paragraph 3. says Subcontract performance is non-conforming for the purposes of relevant experience. |
Section L.5.1.10, paragraph (b), appears to allow First Tier Subcontractor to a CTA prime contractor. Is performance as a first tier Subcontractor to a CTA prime contractor considered conforming relevant experience for evaluation purposes?
| Not Provided | All work performed must be done as a Prime contractor IAW L.2.7(b). Offerors may utilize the experience of their subcontractors only if that experience is as a Prime contractor on the project being submitted. For example, Company A is a Prime contractor with Company B as a First Tier Small Business Subcontractor. Company A may utilize Company B's experience where Company B was a Prime contractor. | |
| 2 | ||
| 1. | With respect to Solicitation Section L.5.1.10(c)1.a., since SBA does not approve 8(a) joint ventures for admission to the 8(a) program, we assume that the reference to “current participant in the 8(a) program” refers to the 8(a) participant in a joint venture that is approved by SBA prior to award under 13 CFR 124.513. Is that correct? |
2. Is a joint venture between an 8(a) Participant and another small business concern to perform under an any of the 8(a) SubPool contracts eligible for an award if the joint venture is supported by a joint venture agreement that is approved by SBA prior to the award of the 8(a) contract, even if the agreement is not approved as of the date of the Offeror’s initial offer?
Not Provided 1. For Mentor-Protege JVs, the SBA must approve the Mentor-Protege Agreement before the firm may submit an offer (reference 13 CFR 125.9(d)(1)(i), 13 CFR § 124.520(d)(1)(i)). For 8(a) Joint Ventures where all members are small under the applicable size standard per 13 CFR 124.513(e), the SBA must approve the JVA prior to award, not prior to submission of an offer. Note that this has been revised via amendment, as the original solicitation incorrectly stated that JV offerors were required to upload an entity-level Dynamic Small Business Search printout evidencing 8(a) program status. For JVs, the Offeror must upload a DSBS printout showing at least one of its individual members is an 8(a) program participant.
2. Yes, per the revised solicitation, provided that the SBA approves the JV Agreement prior to award of the OASIS SubPool IDIQ contract.
| 3 | The period to obtain SBA approval of mentor protege agreements is 45 days. We respectively request an extension in the due date to permit adequate time for acceptance of SBA approval of mentor protégé agreements. Thank you. | Not Provided | Extensions to the solicitation will be issued on an as needed basis as determined by the OASIS SB Contracting Officer. | |
| 4 | ||||
| 1. | With respect to Solicitation Section L.5.1.10(c)1.a., since SBA does not approve 8(a) joint ventures for admission to the 8(a) program, we assume that the reference to “current participant in the 8(a) program” refers to the 8(a) participant in a joint venture that is approved by SBA prior to award under 13 CFR 124.513. Is that correct? |
2. Is a joint venture between an 8(a) Participant and another small business concern to perform under an any of the 8(a) SubPool contracts eligible for an award if the joint venture is supported by a joint venture agreement that is approved by SBA prior to the award of the 8(a) contract, even if the agreement is not approved as of the date of the Offeror’s initial offer?
Not Provided 1. This assumption is correct. Note that this has been revised via amendment, as the original solicitation incorrectly stated that JV offerors were required to upload an entity-level Dynamic Small Business Search printout evidencing 8(a) program status. The SBA approval would need to occur prior to IDIQ award, not prior to award of a specific task order. Award of the IDIQ is contingent upon SBA approval. For JVs, the Offeror must upload a DSBS printout showing at least one of its individual members is an 8(a) program participant.
2. Yes.
| 5 | The period to obtain SBA approval of mentor protege agreements is 45 days. We respectively request an extension in the due date to permit adequate time for acceptance of SBA approval of mentor protégé agreements. Thank you. | Not Provided | No. The Government anticipates more than adequate competition, given the current deadline. |
| 6 | Re L.2 subpara (l) on page 63 of amendment 0: Can a given project / contract be used by a prime as a PQ and/or RESP in a prime's proposal, and that same project / contract also be used as an RESP in another prime's proposal, where the two primes have formed a Contractor Teaming Arrangement, where each prime is treating the other as a subcontractor, and where both primes are submitting proposals in the same pool? The wording of subpara (l) suggests a given project / contract can only be used ONCE, either by one prime or the other, but not by both. | Not Provided | No, this would conflict with L.2(l). |
| 7 | OASIS SB On-Ramp Pool 1, 3, and 4 #169550 -- Page 6 -- A.1.3(b) Solicitation Notice -- paragraph # (b) -- (b) This Solicitation’s Small Business Size Standard varies by Pool and covers a range of North American Industry Classification System (NAICS) code industries as follows: ….. This narrative contradicts itself, the NAICS Codes listed for Pools 1, 3, and 4 are not considered a "range of NAICS'. Since this is one of first place in the document that refers to NAICS codes, an Offeror could misinterpret this. | ||
| Not Provided | It's unclear how this could be misinterpreted. The Pools contains more than one NAICS code, therefore, the various NAICS codes contained in each Pool (e.g., the 21 NAICS codes covered under Pool 1) can appropriately be referred to as a "range." | ||
| 8 | OASIS SB On-Ramp Pool 1, 3, and 4 #169550 -- Page 39 -- H.4.2. Predominant Task Order NAICS Determination -- Paragraph 1 -- The OCO has the responsibility to determine which predominant NAICS code applies to a task order Solicitation, whether or not the task order is unrestricted or set-aside, including the type of socio-economic set-aside if applicable, and whether or not the Solicitation is sole-source or competitive. If the Solicitation could be classified in two or more NAICS codes with the same or different size standard, the OCO shall only apply the OASIS SB Pool NAICS code and corresponding size standard for the industry accounting for the greatest percentage of anticipated task order price/cost. ....... Please clarify how we should define the term "predominant NAICS Code" as used in this requirement (the term "predominate" is also used in other areas of the Solicitation). |
(a) After review of the OASIS Order Guide (Appendix A), is this the same as a "Primary NAICS Code" due to the limitations of the FPDS-NG system?
(b) If there is a "Primary Code", then what are the "Secondary Code(s)"?
(c) How can this limitation not affect the objectivity of the OCO in assigning TO NAICS determinations?
(d) How is "the greatest percentage of anticipated task order price/cost" calculated?
(e) The OASIS Order Guide (Appendix A) cites Pool 1 with a $14M Size Standard and the newly released (2019) Solicitation cites Pool 1 with a $15M Size Standard. Please clarify. Not Provided (a) Yes, this is referring to a similar concept, which is that FPDS requires a single NAICS code at the IDIQ level (e.g., the "predominant NAICS code"), and that NAICS automatically applies to any task orders issued against that IDIQ, even if a more appropriate NAICS code is applicable at the task order level.
(b) There are not secondary codes. FPDS only recognizes one code.
(c) Contracting Officers are required to assign the NAICS code most appropriate for the work performed. When system limitations prevent them from selecting a NAICS that accurately reflect the order-level work, attachment J.15 exists to allow them to designate the most appropriate NAICS reflecting the order-level work. It is not appropriate for GSA to question the objectivity of Contracting Officers.
(d) This is at the discretion of the Contracting Officer.
(e) The applicable size standard is $15M. The ordering guide is designed to assist Ordering Contracting Officers in using the vehicle and should not be construed as governing the terms and conditions of this solicitation.
9 OASIS SB ON-RAMP Pool 1, 3, and 4 -- Page 83 -- L.5.1.10. Contractor Team Arrangement, if applicable -- Paragraph #(b) and (d).2 -- (b) All CTA members must be small businesses under the applicable size standard, as reflected in their representations and certifications (see L.5.1.10(d)(1))
| (d).2 For any approved Mentor-Protégé Joint Ventures in accordance with 13 CFR 125.8 where the Mentor is not a Small Business under the applicable size standard, that Mentor may submit ........... Projects ........ " Doesn't this mean that Mentor-Protege JVs have a competitive advantage? | Not Provided | The perceived competitive advantage afforded to Mentor-Proteges is inherent in the design of the Mentor-Protege program. Questions/concerns/issues with the inherent fairness of the Mentor-Protege program should be addressed to the SBA and/or your legislative representative. |
| 10 | OASIS SB ON-RAMP Pool 1, 3, and 4 #169550 -- Page 108 -- M.3. SCREENING AND EVALUATION PROCESS -- Paragraph # (i).1 -- (i) Once the highest scored offers, including all ties, and all additional Socio-Economic considerations have been accomplished, evaluations will cease and all remaining successful contract awards will be issued under applicable OASIS Pool. |
| 1. While the Government intends to issue all awards simultaneously for each respective Pool, the Government reserves the right to screen, evaluate, and award offers on a rolling basis if determined to be in the best interest of the Government. Please provide a more detailed explanation of how all awards will be issued if the Government decides to use a "rolling basis" method? | Not Provided | As an example, GSA may elect to issue awards on a rolling basis if, for example, significant delays or backlogs are encountered involved with required pre-award clearances being conducted by other agencies (e.g., DCAA audits for Offerors who don't already have an approved accounting system, SBA approvals for amendments to Mentor-Protege JV agreements, or SBA approvals for 8(a) Joint Ventures). In these instances, GSA may elect to issue awards to Offerors who are cleared for award and not subject to these potentially delayed external audits/reviews, followed by awards issued to the delayed Offerors pending approval from the external reviews. |
| 11 | Questions |
1. Can a joint venture that is an 8(a) certified Joint Venture, offer a successful proposal, even if one of the JV partners to the 8(a) Certified JV, is not itself an 8(a) certified firm. L.5.1.10.(c) on page 97seems to allow this.
2. What is the reason and/or regulatory authority to require that all members of a teaming agreement (to include joint ventures), be 8(a) firms (see L.5.1.10.(b) on page 97)? This requirement appears to be contrary to FAR 9.6 and 13 CFR § 124.513(1). If the intent is to ensure that at least 50% of the work will be performed by the 8(a) prime contractor, or a “similarly situated subcontractor”, could that not be addresses under Limitations on Subcontracting (see 13 CFR § 125.6) without violating FAR 9.6 and 13 CFR § 125.6?
3. Can we use a professional employee compensation plan for a sister company with a MRCL (see L.5.1.5 on page 92)?
4. Regarding Vol 2 – Responsibility, If an 8(a) Certified JV is proposing, would a 527, financial statements, and reps and certs be provided just for the JV, or for each firm that formed the JV (see L.5.2 on page 99)?
5. Are Pool Qualification Projects required to be Federal projects (see L.5.1.2 on page 85)?
6. L.5.3.1, Minimum Requirements for Primary Relevant Experience Projects says that these projects can by US Federal Government, State government, or commercial. L.5.3.2.1 says we are to provide evidence of the assigned NAICS code for each Relevant Experience Primary Project. What do we provide for projects that are not US government, such as commercial projects, which are unlikely to have an assigned NAICS?
7. L.5.2.1.(d)3, on page 100, says one year of financial statements must be provided for the most currently completed fiscal year and also interim financial statements. How current should the interim statements be (i.e., April 30, 2019, May 31, 2019, etc.)?
8. For Joint Ventures, does each member of the JV need to submit representations and certifications or just the JV itself. (see section K.1 on page 70)
9. For the previous SBA on ramp submittal in November 2018, were any evaluations completed, and if so, were the scores ever made public?
Not Provided 1. Yes.
2. The determination that all CTA members in a Prime/Subcontractor CTA submitting to the 8(a) On-Ramp must be eligible 8(a) concerns was made by the SBA itself, not by GSA. While not all CTA members in an 8(a) JV need to be 8(a), the 8(a) JV as an entity is ultimately subject to SBA approval before award; therefore, the SBA must review and approve the 8(a) JV agreement to ensure compliance with 13 CFR 124.513. No such approval process exists for 8(a) Prime/Subcontractor CTAs.
3. The professional employee compensation plan you submit will apply to the Legal Bidding Entity as defined in L.2.8.
4. Per L.5.2.1(b)(2): In the case of unpopulated Joint Ventures under Section L.5.1.10 each member of the Joint Venture shall submit Section J.13., Attachment (13) a. In the case of populated Joint Ventures (those formed prior to issuance of 81 FR 48557, August 24, 2016) a single Joint Venture level submission is permissible.
5. Yes.
6. If a project does not have an assigned NAICS, it is not eligible to receive additional evaluation points pursuant to L.5.3.2.1.
7. Section L.5.2.1(a)3.c. requires submission of the last full fiscal year statement and subsequent interim statements. All interim statements since your last full fiscal year statement should be submitted as a single PDF.
8. The language in L.5.1.10(d)(1) is unambiguous.
9. Evaluations were initiated but not completed, and no, the scores were not ever made public.
| 12 | Proposal Requirements, Section L.5.3.2.5, paragraph (b). | Question: Absent formal subcontract agreements, will Purchase Orders suffice as evidence of performance of each subcontractor supporting our Relevant Experience (Primary) Projects? | Not Provided | Yes, provided they reference the specific project. |
| 13 | Section L.5.4 Volume 4 – Past Performance. | Question: Can we use the same Past Performance Ratings we submitted previously for Oasis Small Business Pool 1? | Not Provided | Offerors may re-use whatever forms they desire from the November 2018 on-ramp provided that the content is still valid and in accordance with the solicitation requirements as they are currently stated. Significant discrepancies between the documentation provided and the solicitation requirements may result in your ineligibility for award. However, minor discrepancies, such as the header of a document having the old solicitation number, does not need to be updated. A signed NAICS code change letter, for example, could be re-used without penalty. Past Performance questionnaires already submitted remain valid, unless a CPAR for the specific project has since been released, in which case the CPAR would take precedence over a Past Performance Questionnaire and shall be submitted in accordance with RFP section L.5.4(f). |
| 14 | Proposal Requirements, Section L.5.1.2, paragraph (a). | Question: Can we submit the same qualification projects that we previously submitted for SB Pool 1? | Not Provided | Yes, provided the previous Pool Qualification projects comply with the revised solicitation requirements. |
| 15 | Proposal Requirements, Sections L.5.1.2, paragraph (a) (Pool Qualification Projects) and L.5.3.1 (Relevant Experience (Primary) Projects | Question: Can we submit the same projects for the 8(a) proposal as we are submitting for the SB Pool 1 proposal? | Not Provided | The SB and 8(a) Pools are separate and distinct, you may utilize the same project in an SB Pool that is utilized in an 8(a) SubPool without penalty. |
| 16 | Proposal Requirements, Section L.5.3.3.1, Relevant Experience (Secondary) Projects with Mission Spaces | Can we use Commercial contracts for Relevant Experience (Secondary) Projects? | Not Provided | No. |
| 17 | Are we able to use the same past performance as a prime across multiple pools? | Not Provided | Yes, as long as the same project is not submitted in more than one proposal for the same Pool. |