GSA Hartford Courthouse Project - Pricing Template - 2025-08-29.xlsx
XLSX spreadsheet 204 KB Posted
- Solicitation number
- 47PC0325R0013
About this file
This is a comprehensive pricing template for the GSA Hartford Courthouse Project, detailing a detailed cost breakdown across multiple construction divisions. The template provides a granular breakdown of potential construction costs organized by CSI division, including categories such as Demolition, Concrete, Masonry, Metals, Wood, Thermal Protection, Openings, Finishes, Specialties, Equipment, Conveying Systems, Mechanical, Electrical, and Site Work. Currently, all line items show $0, suggesting this is a blank template awaiting specific cost inputs.
The template includes additional sections for Unit Costs, Allowances, and Options/Alternates, with specific provisions for potential additional soil characterization and offsite disposal (up to 25,000 cubic yards). The document is directly related to the GSA Public Buildings Service Region 2's Request for Qualifications (RFQ) for a new United States Courthouse in Hartford, CT, which is planned to be approximately 281,000 gross square feet and will incorporate classical or traditional architecture as specified by Executive Order 14344.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Cost Summary
| PROJECT COST SUMMARY | ||
| HARTFORD US COURTHOUSE | ||
| GSF | ||
| Trade Package | Total Cost | Cost Per SF |
| DIVISION 02 - EXISTING CONDITIONS | ||
| Demolition / Abatement | $ - 0 | $ - 0 |
| DIVISION 3 - CONCRETE | ||
| Concrete | $ - 0 | $ - 0 |
| DIVISION 4 MASONRY | ||
| Masonry | $ - 0 | $ - 0 |
| DIVISION 05 - METALS | ||
| Structural Steel | $ - 0 | $ - 0 |
| Misc. Metals | $ - 0 | $ - 0 |
| DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES | ||
| Carpentry | $ - 0 | $ - 0 |
| Millwork | $ - 0 | $ - 0 |
| DIVISION 07 - THERMAL AND MOISTURE PROTECTION | ||
| Waterproofing | $ - 0 | $ - 0 |
| Roofing | $ - 0 | $ - 0 |
| Spray-On Fireproofing | $ - 0 | $ - 0 |
| DIVISION 08 - OPENINGS | ||
| Doors, Frames & Hardware | $ - 0 | $ - 0 |
| Overhead Doors | $ - 0 | $ - 0 |
| Interior Fire/Smoke Doors | $ - 0 | $ - 0 |
| Envelop (Curtainwall, Storefront) | $ - 0 | $ - 0 |
| Interior Glazing | $ - 0 | $ - 0 |
| DIVISION 09 - FINISHES | ||
| LGMF, Drywall | $ - 0 | $ - 0 |
| Ceramic Tile | $ - 0 | $ - 0 |
| ACT & Metal Ceiling Panels | $ - 0 | $ - 0 |
| Resilient Floors | $ - 0 | $ - 0 |
| Carpet | $ - 0 | $ - 0 |
| Wood Floors | $ - 0 | $ - 0 |
| Terrazzo | $ - 0 | $ - 0 |
| Resinous Floors | $ - 0 | $ - 0 |
| Raised Access Flooring | $ - 0 | $ - 0 |
| Fabric Wrapped Panels | $ - 0 | $ - 0 |
| Painting, Wall Treatments | $ - 0 | $ - 0 |
| DIVISION 10 - SPECIALTIES | ||
| Signage and Wayfinding | $ - 0 | $ - 0 |
| Building Specialties | $ - 0 | $ - 0 |
| Operable Partitions | $ - 0 | $ - 0 |
| DIVISION 11 - EQUIPMENT | ||
| Kitchen / Food Service Equipment | $ - 0 | $ - 0 |
| Fitness/Health Equipment | $ - 0 | $ - 0 |
| Roof Safety Anchors, Window Washing Provisions | $ - 0 | $ - 0 |
| Misc. Equipment | $ - 0 | $ - 0 |
| DIVISION 12 - FURNISHINGS | ||
| Window Treatments | $ - 0 | $ - 0 |
| FF&E / Furniture | $ - 0 | $ - 0 |
| DIVISION 13 - SPECIAL CONSTRUCTION | ||
| TBD | $ - 0 | $ - 0 |
| DIVISION 14 - CONVEYING EQUIPMENT | ||
| Elevators | $ - 0 | $ - 0 |
| Escalators | $ - 0 | $ - 0 |
| DIVISION 21 - FIRE SUPPRESSION | ||
| Fire Protection | $ - 0 | $ - 0 |
| DIVISION 22 - PLUMBING | ||
| Plumbing | $ - 0 | $ - 0 |
| DIVISION 23 - HVAC | ||
| HVAC | $ - 0 | $ - 0 |
| Automatic Temperature Controls (ATC) | $ - 0 | $ - 0 |
| DIVISION 26 – ELECTRICAL | ||
| Electrical | $ - 0 | $ - 0 |
| DIVISION 27 - COMMUNICATIONS | ||
| Telecommunications | $ - 0 | $ - 0 |
| Network | $ - 0 | $ - 0 |
| Audio Visual | $ - 0 | $ - 0 |
| DIVISION 28 - ELECTRONIC SAFETY AND SECURITY | ||
| Security, Intrusion Detection, Video Surveillance, Access Control | $ - 0 | $ - 0 |
| Fire Alarm | $ - 0 | $ - 0 |
| DIVISION 31 - EARTHWORK | ||
| Earthwork | $ - 0 | $ - 0 |
| Utilities | $ - 0 | $ - 0 |
| DIVISION 32 - EXTERIOR IMPROVEMENTS | ||
| Landscaping, Plantings | $ - 0 | $ - 0 |
| Hardscape | $ - 0 | $ - 0 |
| Site Furnishings | $ - 0 | $ - 0 |
| MISC. DIRECT WORK | ||
| Testing | $ - 0 | $ - 0 |
| Staging | $ - 0 | $ - 0 |
| TBD | $ - 0 | $ - 0 |
TOTAL DIRECT COST $ - 0
| Contingency | $ - 0 |
| Design | |
| Project Requirements | $ - 0 |
| General Conditions | $ - 0 |
| Allowances | $ - 0 |
| DBC Bonds | $ - 0 |
| Subcontractor Bonds | $ - 0 |
| Builder's Risk | $ - 0 |
| Building Permit | $ - 0 |
| Insurance | $ - 0 |
| Escalation | $ - 0 |
| Fee | $ - 0 |
BASE CONTRACT COST $ - 0
| OPTIONS-ALTERNATES | |
| Remediation of the Allyn site | $ - 0 |
| TBD | $ - 0 |
Unit Costs
| UNIT COST SUMMARY |
| HARTFORD US COURTHOUSE |
Item Description Unit Cost
| 01 | Cubic Yard Unit Cost: Additional soil characterization and offsite disposal of contaminated soil exceeding the scope established for the firm fixed price (25,000 cubic yard maximum) | $ - 0 |
| 02 | $ - 0 | |
| 03 | $ - 0 | |
| 04 | $ - 0 | |
| 05 | $ - 0 | |
| 06 | $ - 0 | |
| 07 | $ - 0 |
Allowances
| ALLOWANCE SUMMARY |
| HARTFORD US COURTHOUSE |
Item Description Quantity Unit Unit Cost Total Cost
| 01 | (Allowance description including basis of cost: labor, material, equipment, etc.) | $ - 0 | $ - 0 |
| 02 | $ - 0 | $ - 0 | |
| 03 | $ - 0 | $ - 0 | |
| 04 | $ - 0 | $ - 0 | |
| 05 | $ - 0 | $ - 0 | |
| 06 | $ - 0 | $ - 0 | |
| 07 | $ - 0 | $ - 0 |
Options-Alternates
| OPTION/ALTERNATE SUMMARY |
| HARTFORD US COURTHOUSE |
Item Description Add/Deduct Quantity Unit Unit Cost Total Cost
| 01 | (Option/Alternate description including basis of cost: labor, material, equipment, etc.) | $ - 0 | $ - 0 |
| 02 | $ - 0 | $ - 0 | |
| 03 | $ - 0 | $ - 0 | |
| 04 | $ - 0 | $ - 0 | |
| 05 | $ - 0 | $ - 0 | |
| 06 | $ - 0 | $ - 0 | |
| 07 | $ - 0 | $ - 0 |