GSA Hartford Courthouse Project - Pricing Template - 2025-08-29.xlsx

XLSX spreadsheet 204 KB Posted

Attached to
Request for Qualifications (RFQ) for Design-Build Services for a New United States Courthouse in Hartford, CT
Solicitation number
47PC0325R0013
Issued by

About this file

This is a comprehensive pricing template for the GSA Hartford Courthouse Project, detailing a detailed cost breakdown across multiple construction divisions. The template provides a granular breakdown of potential construction costs organized by CSI division, including categories such as Demolition, Concrete, Masonry, Metals, Wood, Thermal Protection, Openings, Finishes, Specialties, Equipment, Conveying Systems, Mechanical, Electrical, and Site Work. Currently, all line items show $0, suggesting this is a blank template awaiting specific cost inputs.

The template includes additional sections for Unit Costs, Allowances, and Options/Alternates, with specific provisions for potential additional soil characterization and offsite disposal (up to 25,000 cubic yards). The document is directly related to the GSA Public Buildings Service Region 2's Request for Qualifications (RFQ) for a new United States Courthouse in Hartford, CT, which is planned to be approximately 281,000 gross square feet and will incorporate classical or traditional architecture as specified by Executive Order 14344.

View the file

Other files

File Type Posted
GSA Hartford New Federal Courthouse Solicitation Amendment 2.pdf PDF
Phase 1 Environmental Site Assessment prepared by BL Companies December 2018.pdf PDF
Environmental Review and Status Report prepared by GeoQuest Inc dated June 2019.pdf PDF
Allyn Street Data Gap Review prepared by Solve March 2024.pdf PDF
Allyn St. Site Plan, prepared by Close Jensen & Miller, April 1991.pdf PDF
Utility Assessment Report prepared by Fuss ONeill August 2024.pdf PDF
Results of Environmental Soil Pre Characterization Sampling.pdf PDF
Pre-Site Analysis Report II_Michael Maltzan Architecture.pdf PDF
Phase II III Site Investigation prepared by BL April 2019.pdf PDF
Phase 2 Site Investigation Draft prepared by BL dated January 2018.pdf PDF
Preliminary Geotechnical Considerations prepared by GEI Consultants dated June 2024.pdf PDF
Results of Environmental Soil Pre-Characterization Sampling.pdf PDF
Draft Phase 2 Submission Requirements.pdf PDF
GSA Hartford New Federal Courthouse Solicitation Amendment 1.pdf PDF
Phase I ESA Hartford New Courthouse - Allyn Site.pdf PDF
GSA New Federal Courthouse RFI Log Template.xlsx XLSX spreadsheet
Hartford_Courthouse Tours Report - Edition II.pdf PDF
Draft Final Site Civil Report.pdf PDF
Hartford First Proprietary Meeting GSA Slides.pdf PDF
GSA Hartford Courthouse Project - RFI Template for Offerors .xlsx XLSX spreadsheet
Hartford DB Agreement DRAFT document.pdf PDF
Hartford USCH DRAFT DB SOW .pdf PDF
DRAFT Hartford SF 1442.pdf PDF
Hartford Federal Courthouse Prelim Geo Rpt (GEI 09 15 25).pdf PDF
Proprietary Information Agreement - Sample Template .docx DOCX document
Hartford Reps and Certs GC MAY 2025.docx DOCX document
Hartford Site Feasibility Report_DRAFT.pdf PDF
Hartford Small Business Participation Commitment Document (SBPCD) Template.docx DOCX document
Solicitation Phase 1 RFQ Design Build New US Courthouse Hartford CT.pdf PDF
Hartford POR Parts 1 2 DRAFT.pdf PDF
Hartford_POR - Appendix A _DRAFT.pdf PDF
Past Performance Questionnaire Hartford.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Cost Summary

PROJECT COST SUMMARY
HARTFORD US COURTHOUSE
GSF
Trade PackageTotal CostCost Per SF
DIVISION 02 - EXISTING CONDITIONS
Demolition / Abatement$ - 0$ - 0
DIVISION 3 - CONCRETE
Concrete$ - 0$ - 0
DIVISION 4 MASONRY
Masonry$ - 0$ - 0
DIVISION 05 - METALS
Structural Steel$ - 0$ - 0
Misc. Metals$ - 0$ - 0
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
Carpentry$ - 0$ - 0
Millwork$ - 0$ - 0
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
Waterproofing$ - 0$ - 0
Roofing$ - 0$ - 0
Spray-On Fireproofing$ - 0$ - 0
DIVISION 08 - OPENINGS
Doors, Frames & Hardware$ - 0$ - 0
Overhead Doors$ - 0$ - 0
Interior Fire/Smoke Doors$ - 0$ - 0
Envelop (Curtainwall, Storefront)$ - 0$ - 0
Interior Glazing$ - 0$ - 0
DIVISION 09 - FINISHES
LGMF, Drywall$ - 0$ - 0
Ceramic Tile$ - 0$ - 0
ACT & Metal Ceiling Panels$ - 0$ - 0
Resilient Floors$ - 0$ - 0
Carpet$ - 0$ - 0
Wood Floors$ - 0$ - 0
Terrazzo$ - 0$ - 0
Resinous Floors$ - 0$ - 0
Raised Access Flooring$ - 0$ - 0
Fabric Wrapped Panels$ - 0$ - 0
Painting, Wall Treatments$ - 0$ - 0
DIVISION 10 - SPECIALTIES
Signage and Wayfinding$ - 0$ - 0
Building Specialties$ - 0$ - 0
Operable Partitions$ - 0$ - 0
DIVISION 11 - EQUIPMENT
Kitchen / Food Service Equipment$ - 0$ - 0
Fitness/Health Equipment$ - 0$ - 0
Roof Safety Anchors, Window Washing Provisions$ - 0$ - 0
Misc. Equipment$ - 0$ - 0
DIVISION 12 - FURNISHINGS
Window Treatments$ - 0$ - 0
FF&E / Furniture$ - 0$ - 0
DIVISION 13 - SPECIAL CONSTRUCTION
TBD$ - 0$ - 0
DIVISION 14 - CONVEYING EQUIPMENT
Elevators$ - 0$ - 0
Escalators$ - 0$ - 0
DIVISION 21 - FIRE SUPPRESSION
Fire Protection$ - 0$ - 0
DIVISION 22 - PLUMBING
Plumbing$ - 0$ - 0
DIVISION 23 - HVAC
HVAC$ - 0$ - 0
Automatic Temperature Controls (ATC)$ - 0$ - 0
DIVISION 26 – ELECTRICAL
Electrical$ - 0$ - 0
DIVISION 27 - COMMUNICATIONS
Telecommunications$ - 0$ - 0
Network$ - 0$ - 0
Audio Visual$ - 0$ - 0
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
Security, Intrusion Detection, Video Surveillance, Access Control$ - 0$ - 0
Fire Alarm$ - 0$ - 0
DIVISION 31 - EARTHWORK
Earthwork$ - 0$ - 0
Utilities$ - 0$ - 0
DIVISION 32 - EXTERIOR IMPROVEMENTS
Landscaping, Plantings$ - 0$ - 0
Hardscape$ - 0$ - 0
Site Furnishings$ - 0$ - 0
MISC. DIRECT WORK
Testing$ - 0$ - 0
Staging$ - 0$ - 0
TBD$ - 0$ - 0

TOTAL DIRECT COST $ - 0

Contingency$ - 0
Design
Project Requirements$ - 0
General Conditions$ - 0
Allowances$ - 0
DBC Bonds$ - 0
Subcontractor Bonds$ - 0
Builder's Risk$ - 0
Building Permit$ - 0
Insurance$ - 0
Escalation$ - 0
Fee$ - 0

BASE CONTRACT COST $ - 0

OPTIONS-ALTERNATES
Remediation of the Allyn site$ - 0
TBD$ - 0

Unit Costs

UNIT COST SUMMARY
HARTFORD US COURTHOUSE

Item Description Unit Cost

01Cubic Yard Unit Cost: Additional soil characterization and offsite disposal of contaminated soil exceeding the scope established for the firm fixed price (25,000 cubic yard maximum)$ - 0
02$ - 0
03$ - 0
04$ - 0
05$ - 0
06$ - 0
07$ - 0

Allowances

ALLOWANCE SUMMARY
HARTFORD US COURTHOUSE

Item Description Quantity Unit Unit Cost Total Cost

01(Allowance description including basis of cost: labor, material, equipment, etc.)$ - 0$ - 0
02$ - 0$ - 0
03$ - 0$ - 0
04$ - 0$ - 0
05$ - 0$ - 0
06$ - 0$ - 0
07$ - 0$ - 0

Options-Alternates

OPTION/ALTERNATE SUMMARY
HARTFORD US COURTHOUSE

Item Description Add/Deduct Quantity Unit Unit Cost Total Cost

01(Option/Alternate description including basis of cost: labor, material, equipment, etc.)$ - 0$ - 0
02$ - 0$ - 0
03$ - 0$ - 0
04$ - 0$ - 0
05$ - 0$ - 0
06$ - 0$ - 0
07$ - 0$ - 0