Final_CD_Narrative_-_Appendix.pdf

PDF 48 MB Posted

Attached to
DOC A- Phase 2 Fit-Out Construction, Saint Elizabeths West Campus, SE, Washington, DC
Solicitation number
GS11P15MMC7000
Issued by

About this file

Final CD Narrative - Appendix

View the file

Other files

File Type Posted
AMEND_02 SF30.docx DOCX document
DOC A RFI LOG 01062016.xlsx XLSX spreadsheet
DOC A RFI LOG 12312015.pdf PDF
AMEND 01.docx DOCX document
PreSol Agenda 121815.pdf PDF
Site Visit Sign In 121815.pdf PDF
SOL C201 SBLPTA OCT 15A.pdf PDF
GSA527-15.pdf PDF
RnC C301 GC OCT 15.docx DOCX document
SF1442-14a.pdf PDF
SF_24-98 Bid Bond.pdf PDF
NEW--BLANK--NCIC GSA SCVR Oct 2014.xlsx XLSX spreadsheet
PBS_Past_Performance_Form_Rev_6_12_15.docx DOCX document
AGREE C101 SB OCT 15.pdf PDF
DOCA_PH2_FINAL_CD_SPECS_VOL2.pdf PDF
DOCA_PH2_FINAL_CD_SPECS_VOL1.pdf PDF
Final_CD_Narrative.pdf PDF
DOCA_PH2_FINAL_CD_SPECS_VOL3.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .