DOCA_PH2_FINAL_CD_SPECS_VOL2.pdf
PDF 12 MB Posted
- Solicitation number
- GS11P15MMC7000
About this file
DOCA_PH2_FINAL CD SPECS_VOL2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND_02 SF30.docx | DOCX document | |
| DOC A RFI LOG 01062016.xlsx | XLSX spreadsheet | |
| DOC A RFI LOG 12312015.pdf | ||
| AMEND 01.docx | DOCX document | |
| PreSol Agenda 121815.pdf | ||
| Site Visit Sign In 121815.pdf | ||
| SOL C201 SBLPTA OCT 15A.pdf | ||
| GSA527-15.pdf | ||
| RnC C301 GC OCT 15.docx | DOCX document | |
| SF1442-14a.pdf | ||
| SF_24-98 Bid Bond.pdf | ||
| NEW--BLANK--NCIC GSA SCVR Oct 2014.xlsx | XLSX spreadsheet | |
| PBS_Past_Performance_Form_Rev_6_12_15.docx | DOCX document | |
| AGREE C101 SB OCT 15.pdf | ||
| DOCA_PH2_FINAL_CD_SPECS_VOL1.pdf | ||
| Final_CD_Narrative.pdf | ||
| DOCA_PH2_FINAL_CD_SPECS_VOL3.pdf | ||
| Final_CD_Narrative_-_Appendix.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF
HOMELAND SECURITY
National Capital Region
DHS Operations Center (DOC A) Phase 2
95% CONSTRUCTION DOCUMENTS NARRATIVE, VOLUME 1
JULY 2, 2015
SENSITIVE BUT UNCLASSIFIED
PROPERTY OF THE UNITED STATES GOVERNMENT
COPYING, DISSEMINATION, OR DISTRIBUTION OF
THESE DRAWINGS, PLANS, OR SPECIFICATIONS
TO UNAUTHORIZED PERSONS IS PROHIBITED.
Do not remove this notice.
Properly destroy documents when no longer needed.
FINAL CONSTRUCTION DOCUMENTS, SPECIFICATIONS - VOLUME 2
JULY 31, 2015
Contract # GS11P08MKC0080
St. Elizabeths West Campus Final Construction Documents July 31, 2015 DOC A – Phase II 000010-1 TABLE OF CONTENTS
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
Do not remove this notice. Properly destroy documents when no longer needed.
SECTION 000010 – TABLE OF CONTENTS
VOLUME 1
DIVISION 01 - GENERAL REQUIREMENTS
011000 SUMMARY
011400 WORK RESTRICTIONS
011500 SENSITIVE COMPARTMENTED INFORMATION FACILITIES
012100 ALLOWANCES
012300 ALTERNATES
012500 SUBSTITUTION PROCEDURES
012700 UNIT PRICES
012900 PAYMENT PROCEDURES
013000 ELECTRONIC PROJECT MANAGEMENT
013100 PROJECT MANAGEMENT AND COORDINATION
013110 CRITICAL PATH METHOD SCHEDULING
013200 CONSTRUCTION PROGRESS DOCUMENTATION
013220 PHOTOGRAPHIC DOCUMENTATION
013300 SUBMITTAL PROCEDURES
013600 CONSTRUCTION-OPERATIONS BUILDING INFORMATION EXCHANGE
014000 QUALITY ASSURANCE AND CONTROL
014100 STRUCTURAL SPECIAL INSPECTIONS AND TESTING LABORATORY SERVICES
014200 REFERENCES
015000 TEMPORARY FACILITIES
015639 TEMPORARY TREE AND PLANT PROTECTION
015930 SECURITY REGULATIONS
015950 SAFETY AND HEALTH
016000 PRODUCT REQUIREMENTS
017000 EXECUTION REQUIREMENTS
017310 CUTTING AND PATCHING
017320 SELECTIVE DEMOLITION
017350 FIRE PREVENTION PRECAUTIONS FOR HOT WORK
017410 CONSTRUCTION INDOOR AIR QUALITY
017419 CONSTRUCTION NONHAZARDOUS WASTE MANAGEMENT AND DISPOSAL
017700 CLOSEOUT PROCEDURES
017810 PROJECT RECORD DOCUMENTS
017822 OPERATION AND MAINTENANCE DOCUMENTATION
018111 SUSTAINABLE DESIGN REQUIREMENTS
018200 DEMONSTRATION AND TRAINING
019113 COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
DOC A – Phase II 000010-2 TABLE OF CONTENTS
SENSITIVE BUT UNCLASSIFIED (SBU)
024119 SELECTIVE STRUTURE DEMOLITION
VOLUME 2
DIVISION 03 – CONCRETE
031000 CONCRETE FORMWORK
032000 CONCRETE REINFORCEMENT AND EMBEDDED ASSEMBLIES
033000 CAST-IN-PLACE CONCRETE
035400 CAST UNDERLAYMENT
DIVISION 04 – MASONRY
040514 UNIT MASONRY MORTARING AND GROUTING
042000 UNIT MASONRY
DIVISION 05 – METALS
051200 STRUCTURAL STEEL
053000 STEEL DECK
055000 METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
060573 WOOD TREATMENT
061000 ROUGH CARPENTRY
062000 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
071326 SELF-ADHERED SHEET WATERPROOFING
071413 HOT FLUID APPLIED RUBBERIZED ASPHALT WATERPROOFING
071700 BENTONITE WATERPROOFING
072100 THERMAL INSULATION
076200 SHEET METAL FLASHING AND TRIM
077200 ROOF ACCESSORIES
078400 FIRESTOPPING
079200 JOINT SEALANTS
079513 EXPANSION JOINT COVER ASSEMBLIES
DOC A – Phase II 000010-3 TABLE OF CONTENTS
SENSITIVE BUT UNCLASSIFIED (SBU)
DIVISION 08 - OPENINGS
081113 HOLLOW METAL DOORS AND FRAMES
081416 FLUSH WOOD DOORS
083100 ACCESS DOORS AND PANELS
083473 SOUND CONTROL SECURITY DOOR ASSEMBLIES
087100 DOOR HARDWARE
088000 GLAZING
089000 LOUVERS
DIVISION 09 - FINISHES
091000 NON-STRUCTURAL METAL FRAMING
092900 GYPSUM BOARD
093000 TILING
095100 ACOUSTICAL CEILINGS
095426 LINEAR WOOD CEILINGS
096500 RESILIENT FLOORING
096623 RESINOUS MATRIX TERRAZZO FLOORING
096800 CARPETING
096900 ACCESS FLOORING
097200 WALL COVERINGS
098415 ACOUSTICAL PANELS
099000 PAINTING AND COATING
DIVISION 10 - SPECIALTIES
101400 SIGNAGE
102113 TOILET COMPARTMENTS
102219 DEMOUNTABLE PARTITIONS
102226 OPERABLE PARTITIONS
102600 WALL AND DOOR PROTECTION
102813 TOILET ACCESSORIES
104400 FIRE PROTECTION SPECIALTIES
105116 LOCKERS
DIVISION 11 – EQUIPMENT
113100 RESIDENTIAL APPLIANCES
DOC A – Phase II 000010-4 TABLE OF CONTENTS
SENSITIVE BUT UNCLASSIFIED (SBU)
DIVISION 12 – NOT USED
DIVISION 13–NOT USED
DIVISION 14 - CONVEYING EQUIPMENT
142100 TRACTION ELEVATORS
VOLUME 3
DIVISION 21 – FIRE SUPPRESSION
210517 SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING
210518 ESCUTCHEONS FOR FIRE-SUPPRESSION PIPING
210548 VIBRATION AND SEISMIC CONTROLS FOR FIRE-SUPPRESSION PIPING AND
EQUIPMENT
210553 IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT
211200 FIRE-SUPPRESSION STANDPIPES
211313 WET-PIPE SPRINKLER SYSTEMS
DIVISION 22 – PLUMBING
221016 PLUMBING PIPING
221113 FACILITIES WATER DISTRIBUTION PIPING
221223 FACILING INDOOR WATER STORAGE TANKS - MODULAR
221329 SANITARY SEWAGE PUMPS
224200 PLUMBING FIXTURES
DIVISION 23 – MECHANICAL
230500 SPECIAL MECHANICAL REQUIREMENTS
230523 MANUAL VALVES
230529 PENETRATIONS AND SUPPORTS
230548 MECHANICAL SEISMIC RESTRAINT SYSTEMS
230550 MECHANICAL SOUND AND VIBRATION CONTROL
230553 MECHANICAL IDENTIFICATION SYSTEMS
230700 PIPE, DUCT AND EQUIPMENT INSULATION
230800 TESTING AND BALANCING
231100 PIPE AND FITTINGS
232113 HYDRONIC PIPING SYSTEMS
233113 AIR DISTRIBUTION SYSTEM
233500 EXHAUST AND VENTILATING FANS
233600 AIR TERMINAL UNITS AND CHILLED BEAMS
237323 FACTORY BUILT CUSTOM AIR HANDLING UNITS
238123 COMPUTER-ROOM RACK-COOLING EQUIPMENT
238313 RADIANT HEATING ELECTRICAL CABLES
DOC A – Phase II 000010-5 TABLE OF CONTENTS
SENSITIVE BUT UNCLASSIFIED (SBU)
DIVISION 25 –INTEGRATED AUTOMATION
255000 BUILDING MANAGEMENT AND CONTROL SYSTEM
DIVISION 26 – ELECTRICAL
260010 ELECTRICAL GENERAL REQUIREMENTS
260519 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260533 CONDUITS
260534 BOXES
260535 WIREWAYS
260548 SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
260943 LOW VOLTAGE LIGHTING CONTROL SYSTEM
262213 LOW VOLTAGE DISTRIBUTION TRANSFORMERS
262413 SWITCHBOARDS
262416 PANELBOARDS
262726 WIRING DEVICES
262816 ENCLOSED SAFETY SWITCHES
264313 SURGE PROTECTIVE DEVICES FOR LOW VOLTAGE EQUIPMENT
265113 BUILDING LIGHTING
DIVISION 27 COMMUNICATIONS
270530 COMMUNICATIONS EMPTY CONDUIT AND OUTLET BOXES
271000 TELECOMMUNICATIONS
274100 AUDIO VISUAL
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
280000 ELECTRONIC SAFETY AND SECURITY
283111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM
DIVISION 31 SITE WORK
311000 SITE CLEARING
312000 EARTH MOVING
DIVISION 32 EXTERIOR IMPROVEMENTS
321216 ASPHALT PAVING
321313 CONCRETE PAVING
321373 CONCRETE PAVING JOINT SEALANTS
329113 SOIL PREPARATION
329200 TURF AND GRASSES
329300 EXTERIOR PLANTS
DIVISION 33 UTILITIES
DOC A – Phase II 000010-6 TABLE OF CONTENTS
SENSITIVE BUT UNCLASSIFIED (SBU)
330500 COMMON WORK RESULTS FOR UTILITIES
334100 STORM UTILITY DRAINAGE PIPING
DOC A - Phase II 031000 -1 CONCRETE FORMWORK
SENSITIVE BUT UNCLASSIFIED (SBU)
SECTION 031000 – CONCRETE FORMWORK
PART 1 - GENERAL
1.1 GENERAL
A. Work of this Section shall conform to requirements of Drawings and general provisions of the
Contract, including General and Supplementary Conditions and Division 1 Specification sections.
1.2 SCOPE
A. Provide all labor, materials, equipment, services and transportation for formwork and related accessories required to complete all cast-in-place concrete work as shown on Drawings, and shoring of steel deck supporting concrete slabs as specified herein, and as required by the job conditions.
1.3 RELATED WORK SPECIFIED IN OTHER SECTIONS
A. Submittals Division 1
B. Quality Control Division 1
C. Concrete Reinforcement and Embedded Assemblies Section 032000
D. Cast-in-Place Concrete Section 033000
E. Thermal and Moisture Protection Division 7
1.4 CODES AND STANDARDS
A. Building Code: Concrete work shall conform to the requirements of the Building Code identified on the Structural General Notes, and OSHA requirements, except where more stringent conditions or criteria occur in the standards referenced below and on the Drawings.
B. Standards:
1. ACI 117 – Standard Specifications for Tolerances for Concrete Construction and Materials.
2. ACI 301 –Specifications for Structural Concrete.
3. ACI 318 – Building Code Requirements for Structural Concrete and Commentary.
4. ACI 347 – Guide to Formwork for Concrete.
5. ACI 347.2R – Guide for Shoring/Reshoring of Concrete Multistory Buildings
C. Definitions:
1. See Section 033000.
1.5 CONTRACTOR QUALIFICATIONS
DOC A - Phase II 031000 -2 CONCRETE FORMWORK
A. The work of this section shall be performed by a company specializing in the type of concrete formwork required for this Project, with a minimum of 10 years of documented successful experience and shall be performed by skilled workers thoroughly experienced in the necessary crafts.
B. Contractor’s Testing Agency Services: Required as specified in Division 1, and herein.
C. Materials and installed work may require testing and retesting at any time during progress of work, as directed by Design Professionals. Tests, including retesting of rejected materials for installed work will be done at Contractor's expense.
1.6 SUBMITTALS
A. Required Submittals - Where the SUBMITTALS section of this Specification is in conflict with
Division 1 Submittals, the more stringent requirements for the Contractor apply. Required submittal items are listed here; see below for detailed requirements. Do not submit items not requested.
1. Submittal Schedule: See Section 033000.
2. Formwork Shop Drawings:
a. Submit for Record: Formwork shop drawings sealed and signed by a registered
Design Professional licensed to practice as aProfessional Engineer in the state where the project is located. Shop drawings shall clearly indicate but not be limited to the following:
1) Size, type and quality of form materials including conditions at tops and ends of walls. (If wood is used, indicate species.)
2) Form construction indicating structural stability and jointing including special form joints or reveals required by Contract Documents
3) Location and pattern of form tie placement, and other items that affect the appearance of concrete that will remain exposed to view.
4) Form finish clearly indicating proper locations and full coordination with concrete finishes required by Contract Documents.
5) Layout, procedures, and sequencing of shoring and reshoring that correlates with the information contained in the shoring/reshoring calculations described below.
6) Comprehensive (a single drawing per area/element) layout drawings showing openings in structural members, including floor slabs, walls, columns and beams. Drawings shall consolidate the work of all trades and shall be coordinated by the Contractor. Submit with or prior to reinforcement submittal for same element/area.
b. Submit for Review
1) Location of proposed construction joints in walls, floors, slabs, beams per
Specification Section 033000.
DOC A - Phase II 031000 -3 CONCRETE FORMWORK
3. Product Data: Submit copies of manufacturers' product data and installation instructions for proprietary materials used in exposed concrete work, including form liners, release agents, manufactured form systems, ties, and accessories.
4. Samples: At request of Architect, submit samples of form ties and spreaders.
5. Compatibility Certification: Submit for record a written statement certifying that form release agent used is compatible with subsequent architectural finish materials applied to concrete surfaces. Submit along with manufacturer's data.
6. Hazardous Materials Notification: Submit for record. In the event no product or material is available that does not contain hazardous materials as determined by the Owner, a
"Material Safety Data Sheet" (MSDS) equivalent to OSHA Form 20 shall be submitted for that proposed product or material prior to installation.
7. LEED Submittals:
a. LEED Submittal MR Credit 7: Letter of Certification(s) for Sustainable Forestry for wood formwork – Submit for Record:
1) Forest Stewardship Council (FSC): Provide letter of certification signed by lumber supplier. Indicate compliance with FSC "Principles for Natural Forest
Management" and identify certifying organization.
a) Submit FSC certification numbers; identify each certified product on a line-item basis.
b) Submit copies of invoices bearing the FSC certification numbers.
2) Sustainable Forestry Board: Provide letter of certification signed by lumber supplier. Indicate compliance with the Sustainable Forestry Board’s
"Sustainable Forestry Initiative" (SFI) and identify certifying organization.
a) Submit SFI certification numbers; identify each certified product on a line-item basis.
b) Submit copies of invoices bearing the SFI certification numbers.
3) Canadian Standards Association (CSA): Provide letter of certification signed by lumber supplier. Indicate compliance with the CSA and identify certifying organization.
a) Submit CSA certification numbers; identify each certified product on a line-item basis.
b) Submit copies of invoices bearing the CSA certification numbers.
4) Indicate total cost for all wood.
b. LEED Submittal IEQ Credit 4.2: VOC
1) Submit Product Data and material safety data sheets stating compliance with
VOC limits. Refer to Division 1 for additional LEED requirements.
c. See Division 1 for additional LEED requirements.
B. Submittal Process: See Section 033000
C. SER Submittal Review: See Section 033000
D. Substitution Request: See Section 033000
DOC A - Phase II 031000 -4 CONCRETE FORMWORK
E. Request for Information (RFI): See Section 033000
1.7 FORMWORK DESIGN
A. Design of Formwork, and its removal is the Contractor’s responsibility.
B. Design, erect, support, brace and maintain formwork so that it will safely support vertical and lateral loads per SEI/ASCE 37-02 that might be applied, until such loads can be supported by the concrete structure.
C. Design Requirements:
1. Forms shall be designed for fabrication and erection in accordance with Design
Professionals’ requirements and recommendations of ACI 301, 318 and 347.
2. Design formwork and shoring of slabs on steel deck in a manner such that the total construction load does not at any time exceed the total design load of new or existing construction and accounts for concrete age and relative strength at time of loading. See
Section 3.2 for shoring/reshoring requirements.
3. Design formwork for loads and lateral pressures outlined in Section 2.2, ACI 347, and wind and seismic loads as specified by SEI/ASCE 37-02 unless otherwise controlled by local building code.
4. Design formwork and shoring of slabs on steel deck to include loads imposed during construction, including weight of construction equipment, concrete mix, height of concrete drop, rate of filling of formwork, vibrator frequency, ambient temperature, foundation pressures, lateral stability, temporary imbalance or discontinuity of building components, and other factors pertinent to safety of structure during construction.
5. The use of flowing concrete (8” to 10” slump) of Self-Consolidating Concrete requires a review of the formwork design based on the rate of placement and setting time of the mix.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Comply with General Conditions and Division 1, including the following:
1. Store forms and form materials clear of ground and protect from damage.
1.9 QUALITY ASSURANCE BY INDEPENDENT TESTING AGENCY
A. Field Quality Assurance General: The Independent Testing Agency shall test and inspectconcrete formwork and shoring as Work progresses. Failure to detect any defective work or material shall not in any way prevent later rejection when such a defect is discovered nor shall it obligate Design Professionals for final acceptance.
B. Testing Agency shall provide qualified personnel at site to inspect formwork using the latest
Contract Documents and approved shop drawings as follows:
1. Prior to placement of reinforcement, inspect formwork for grade, quality of material, absence of foreign matter, and other imperfections that might affect suitability of concrete placement and tolerances stated herein.
DOC A - Phase II 031000 -5 CONCRETE FORMWORK
2. Inspect forms and shoring for location, configuration, compliance with specified tolerances, block outs, camber, shoring ties, seal of form joints and compliance with
Contract Documents.
3. Verify condition of bond surfaces, locations and sizes of all accessories, embedment items, and anchorage for prevention of displacement.
4. Verify proper use/application of form release agents.
5. Inspect concrete surfaces immediately after removal of formwork and prior to any patching or repair work.
C. Independent Testing Agency shall submit inspection, observation, and/or test reports to the
Owner and Design Professionals, as required herein and shall provide an evaluation statement in each report stating whether or not concrete formwork conforms to requirements of
Specifications and Drawings and shall specifically note deviations therefrom.
D. Immediately report deficiencies to the Owner and Design Professionals.
1.10 QUALITY CONTROL BY CONTRACTOR
A. See Section 033000.
1.11 PERMITS AND WARRANTY
A. Permits: See Section 033000.
B. Warranty: Comply with General Conditions, agreeing to repair or replace specified materials or Work that has failed within the warranty period. Failures include but are not limited to the following:
1. Discoloration of concrete scheduled to remain exposed to view.
2. Damage of concrete finishes caused by forms.
3. Damage of concrete caused by form stripping.
4. Non-compliance with form finishes required for designated architectural finishes.
5. Non-compatibility of form release agent with subsequent architectural finish materials applied to concrete surfaces.
6. Excessive and/or noticeable bowing in placed concrete members caused by deflection of formwork during concrete placement.
PART 2 - PRODUCTS
2.1 ACCEPTABLE MANUFACTURERS
A. Products of the manufacturers specified in this section establish the minimum functional, aesthetic and quality standards required for work of this section.
B. Substitutions: Comply with General Conditions using form in Division 1.
2.2 FORMWORK REQUIREMENTS
DOC A - Phase II 031000 -6 CONCRETE FORMWORK
A. General Requirements:
1. Formwork shall meet construction safety regulations for locality in which this Project is located.
2. Forms shall be removable without impact, shock or damage to concrete surfaces, the structure and adjacent materials.
3. Forms shall be tight-fitting, designed and fabricated for required finishes and to withstand concrete weight and maintain tolerances as specified in ACI 117 for the following designations: (See architectural drawings for locations).
a. Class A – For surfaces prominently exposed to public view where appearance is of special importance.
b. Class B – Coarse-textured concrete-formed surfaces intended to receive plaster, stucco or wainscoting.
c. Class C – General Standard for permanently exposed surfaces where other finishes are not specified.
d. Class D – Minimum quality surface where roughness is not objectionable, usually applied where surfaces will be concealed.
4. Furnish forms in largest practicable sizes to minimize number of joints and to conform to joint system shown on Drawings, using form materials with sufficient thickness to withstand pressure of newly-placed concrete without bow or deflection.
5. Butt Joints: Shall be solid and complete with backup material to prevent leakage of cement paste.
B. Form Finishes for Exposed Surfaces:
1. Type: Straight, smooth, free of cement paste leaks at butt-joints, surface imperfections and other irregularities detrimental to appearance of finished concrete, fully coordinated with requirements for required finish material.
2. Form exposed areas of columns, beams, ledges, balcony fascias to achieve true alignment and level soffit of spandrel beams and concrete edges. All such areas must be sharp, straight and true to line and level. Spandrel beams and concrete canopies and ledges must have adequate shoring to prevent any visible amount of sag and sufficient bracing to prevent any lateral movement during construction.
2.3 FORM MATERIALS
A. General: Plywood, fiberglass, metal, metal-framed plywood faced, or other acceptable panel-type materials.
1. Provide materials with sufficient strength to prevent warping.
B. Plywood: Of species and grade suitable for intended use, sound undamaged sheets with clean true edges, minimum 5/8" (16mm) thick, complying with U.S. Product Standard PS-1.
1. Other Acceptable Sheet Materials: 14 gauge (2.0mm) sheet steel or fibrous glass reinforced resin.
DOC A - Phase II 031000 -7 CONCRETE FORMWORK
C. Lumber: Construction grade or better consistent with calculation requirements, without loose knots or other defects.
1. Use only where entire width can be covered with one board 11-1/4" (285mm) or less in width.
D. Forms for Cylindrical Columns and Supports: Metal, glass-fiber reinforced plastic, or paper or fiber tubes that will produce smooth surfaces without joint indications.
1. Provide units with sufficient wall thickness to resist wet concrete loads without deformation.
E. Pan-Type Forms: Glass-fiber-reinforced plastic or formed steel, stiffened to support weight of placed concrete without deformation.
F. Chamfer for Form Corners:
1. Types: Chamfer strips of wood, metal, PVC or rubber fabricated to produce smooth form lines and tight edge joints, 3/4" (20mm) size, maximum possible lengths.
2. Required for all exposed corners of beam, walls and column forms.
G. Form Ties:
1. Type: Factory-fabricated metal, adjustable length, designed to prevent form deflection and to prevent spalling concrete upon removal.
2. Ties used for architecturally exposed concrete shall be galvanized.
3. Ties shall not leave metal closer than 1-1/2" (40mm) to exposed surface.
4. When removed, ties shall not leave holes larger than 1" (25mm) diameter in concrete surface.
5. Removable Ties: Use type with tapered cones, 1" (25mm) outside diameter, for concrete walls which will remain exposed to view and scheduled for architectural finishes.
6. Snap-Off Ties: Use for concrete walls below grade and walls which will not remain exposed to view and are not scheduled for architectural finishes.
7. Wire Ties: Not acceptable.
H. Nails, Spikes, Lag Bolts, Thru-Bolts, Anchorages:
1. Type: Of size, strength and quality to meet the required quality of formwork.
I. Form Release Agent:
1. Type: Commercial formulation form release agent of non-emulsifiable type which will not bond with, stain, or adversely affect concrete surfaces. Form release agent shall not impair subsequent treatment of concrete surfaces requiring bond or adhesion, or impede the wetting of surfaces to be cured with water or curing compounds. Form release agent shall be compatible with subsequent architectural finish materials applied to concrete surfaces. Apply in compliance with manufacturers' instructions.
2. Form release agent shall meet, at a minimum, all federal and state requirements for volatile organic compounds (VOC’s).
3. In compliance with LEEDIEQ Credit 4.2, acceptable products include but are not limited to:
DOC A - Phase II 031000 -8 CONCRETE FORMWORK
a. “Bio-Form,” Leahy-Wolf Company, Franklin, IL
b. “Enviroform,” Conspec Marketing and Manufacturing Co., Inc., Kansas City, KS
c. “Soy Form Away,” Natural Soy Products, Watkins, IA
d. “Soy Form Away,” Midwest Biologicals, Inc., Woodburn, IN]
4. For Steel Forms: Non-staining rust-preventative type.
J. Reglets: Provide sheet metal reglets formed of same type and gauge as flashing metal, unless indicated otherwise on Drawings. Where resilient or elastomeric sheet flashing, or bituminous membranes are terminated in reglets, provide reglets of not less than 26 gauge (0.55mm) galvanized sheet metal. Fill reglet or cover face opening to prevent intrusion of concrete or debris.
K. Coordinate with materials as specified in Section 032000/Concrete Reinforcement and
Embedded Assemblies.
PART 3 - EXECUTION
3.1 FORMWORK
A. General:
1. Inspect areas to receive formwork.
a. Immediately report to Independent Testing Agency and Design Professionals in writing the conditions that will adversely affect the Work.
2. Construct forms to sizes, shapes, lines, and dimensions shown on Contract Documents, and to obtain accurate alignment, location, grades, level and plumb work in finished structures.
3. Provide formwork sufficiently tight to prevent leakage of cement paste during concrete placement. Solidly butt joints and provide backup material at joints as required to prevent leakage and fins, and to maintain alignment.
4. Provide for openings, offsets, sinkages, keyways, recesses, moldings, rustications, reglets, drips, bevels, chamfers, blocking, screeds, bulkheads, anchorages and inserts and other features required in the Work.
5. Comply with shop drawings, ACI 301, 318, 347 and Contract Documents.
6. Maintain formwork and finished work construction tolerances complying with ACI 301 and 117.
7. Provide shore and struts with positive means of adjustment capable of taking up formwork settlement during concrete placing operations, using wedges or jacks or a combination thereof.
8. Erect forms for easy removal without hammering or prying against concrete surfaces.
9. Provide crush plates or wrecking plates where stripping may damage cast concrete surfaces.
10. Provide top forms for inclined surfaces where slope is too steep to place concrete with bottom forms only.
DOC A - Phase II 031000 -9 CONCRETE FORMWORK
11. Kerf wood inserts for forming keyways, reglets, recesses, and the like, to prevent swelling and for easy removal.
12. Chamfer exposed corners and edges as indicated, using wood, metal, PVC or rubber chamfer strips fabricated to produce smooth lines and tight edge joints.
13. Design, erect, support, brace and maintain formwork and shoring to support loads until such loads can be safely supported by the concrete structure.
14. Where specifically shown on the Contract Documents as monolithic, upturned beams, curbs and similar members in connection with slabs shall be formed so that they can be poured integrally with slabs.
B. Concrete Accessories and Embedded Items:
1. Install into forms concrete accessories, sleeves, inserts, anchor bolts, anchorage devices and other miscellaneous embedded items furnished by other trades or that are required for other work that is attached to or supported by cast-in-place concrete.
a. Use setting drawings, diagrams, instructions and directions provided by suppliers of items to be attached.
2. Install reglets to receive top edge of foundation sheet waterproofing and to receive through-wall flashings in outer face of concrete frame at exterior walls, where flashing is shown at lintels, relieving angles, and other conditions.
3. Install dovetail anchor slots in concrete structures as indicated on drawings or required by other trades.
4. Forms for Slabs: Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and contours in finished surfaces.
5. Coordinate with Section 032000/Concrete Reinforcement and Embedded Assemblies.
6. Install accessories and embedded items straight, level, plumb and secure in place to prevent displacement by concrete placement.
C. Temporary Openings:
1. Locate temporary openings in forms at inconspicuous locations.
2. For clean-outs and inspection before concrete placement, locate temporary openings where interior area of formwork would otherwise be inaccessible.
3. For cleaning and inspections, locate openings at bottom of forms to allow flushing water to drain.
4. Securely brace temporary openings and set tightly in forms to prevent loss of concrete.
5. Close temporary openings with tight fitting panels, flush with inside face of forms, neatly fitted so that joints will not be noticeable on exposed concrete surfaces.
D. Provisions for Other Trades: Coordinate and provide openings in concrete formwork to accommodate work of other trades.
1. Determine size and location of openings, recesses, chases, offsets, openings, depressions, and curbs from information provided by trades requiring such items.
2. Accurately place and securely support items built into forms.
E. Cleaning:
DOC A - Phase II 031000 -10 CONCRETE FORMWORK
1. Normal Conditions:
a. Thoroughly clean forms and adjacent surfaces to receive concrete.
b. Remove chips, wood, sawdust, dirt, standing water or other debris just before placing concrete.
c. Flush with water or use compressed air to remove remaining foreign matter.
d. Verify that water and debris can drain from forms through clean-out ports.
2. During Cold Weather:
a. Remove ice and snow from within forms.
b. Do not use de-icing salts.
c. Do not use water to clean out completed forms, unless formwork and concrete construction will proceed within heated enclosure.
d. Use compressed air or other means to remove foreign matter.
F. Form Release Agents
1. Before placing reinforcing steel and miscellaneous embedded items, coat contact surfaces of forms with an approved non-residual, low VOC form release agent in accordance with manufacturer's published instructions.
2. Do not allow release agent to accumulate in forms or come into contact with reinforcement or concrete against which fresh concrete will be placed.
a. Coat steel forms with nonstaining, rust-preventative material.
3. Remove form release agent and residue from reinforcement or surfaces not requiring form coating.
G. Before Placing Concrete:
1. Inspect and check completed formwork, shoring and bracing to ensure that work is in accordance with formwork requirements of this section and Contract Documents, and that supports, fastenings, wedges, ties, and parts are secure.
a. Make necessary corrections or adjustment to formwork to meet tolerance requirements.
2. Retighten forms and bracing before concrete placement to prevent mortar leaks and maintain proper alignment.
3. Notify Independent Testing Agency sufficiently in advance of placement of concrete to allow inspection of completed and cleaned forms.
H. During Concrete Placement:
1. Maintain a check on formwork to ensure that forms, shoring, ties and other parts of formwork have not been disturbed by concrete placement methods or equipment.
2. Use positive means of adjustment as required for formwork settlement during concrete placing operations.
I. Surface Defects:
1. Install forms substantially free of surface defects.
J. Formwork Loads on Grade
DOC A - Phase II 031000 -11 CONCRETE FORMWORK
1. Where loads from formwork bear on grade, provide suitable load-spreading devices for adequate support and to minimize settlement. In no event shall frozen ground or soft ground be utilized directly as the supporting medium.
K. Footings and Grade Beams:
1. Provide forms for footings and grade beams if soil or other conditions are such that earth trench forms are unsuitable.
2. When trench forms are used, provide an additional 1” (25mm) of concrete on each side of the minimum design profiles and dimensions indicated.
L. For slabs-on-grade, secure edge forms in such a manner as to not move under weight of construction loads, construction and finishing equipment, or workers.
3.2 REMOVING FORMS
A. Formwork not supporting weight of concrete, such as sides of beams, walls, columns, and similar parts of the work, may be removed after cumulatively curing at not less than 50 o F
(10 o C) for 12 hours after placing concrete, provided concrete is sufficiently hard to avoid damage by form-removal operations, and provided curing and protection operations are maintained after removal of formwork.
B. Formwork supporting weight of concrete, such as beam soffits, joists, slabs, and other structural elements, may not be removed until concrete has attained at least 75% of design compressive strength as proven by cylinder test. If stripping occurs before [3] days, 100% strength must be achieved.
1. Provide reshores as required per ACI 347.
2. Determine potential compressive strength of in-place concrete by testing field-cured specimens representative of concrete location or members.
C. Remove formwork progressively using methods to prevent shock loads or unbalanced loads from being imposed on structure. Comply with ACI 347.
D. Loosen forms carefully. Do not wedge pry bars, hammers, or tools against concrete surfaces.
E. Reshore structural members where required due to design requirements, construction requirements, or construction conditions.
1. Reshore on same day shoring and forms are removed.
F. Whenever formwork is removed during the curing period, the exposed concrete shall be cured per requirements of Section 033000.
G. All wood formwork, including that used in void spaces, pockets and other similar places shall be removed.
H. Form tie holes shall be filled as per approved samples submitted to the Architect and Engineer.
I. The Contractor shall assume responsibility for all damage due to removal of the forms.
DOC A - Phase II 031000 -12 CONCRETE FORMWORK
3.3 RE-USING FORMS
A. Before forms can be re-used, surfaces that will be in contact with freshly poured concrete must be thoroughly cleaned, damaged areas repaired, and projecting nails withdrawn.
1. Split, frayed, delaminated or otherwise damaged form-facing material will not be acceptable.
2. Apply new form release agent on re-used forms.
B. When forms are extended for successive concrete placement, thoroughly clean surfaces, remove fins and laitance, and tighten forms to close joints. Align and secure joints to avoid offsets.
C. Forms for exposed concrete may be reused only if the surfaces have not absorbed moisture and have not splintered, warped, discolored, stained, rusted or peeled, subject to acceptance by the Design Professionals. The Design Professionals reserve the right to require the
Contractor to remove and reconstruct such formwork as will produce subsequent areas that are acceptable. Do not use "patched" forms for exposed concrete surfaces, unless approved by the Design Professionals.
END OF SECTION
DOC A - Phase II 032000 -1 CONCRETE REINFORCEMENT AND
EMBEDDED ASSEMBLIES
SENSITIVE BUT UNCLASSIFIED (SBU)
SECTION 032000 – CONCRETE REINFORCEMENT AND EMBEDDED ASSEMBLIES
1.1 GENERAL
A. Work of this Section shall conform to requirements of Drawings and general provisions of the
Contract, including General and Supplementary Conditions and Division 1 Specification sections.
1.2 SCOPE
A. Provide all labor, materials, equipment, services and transportation for reinforcing steel, accessories, embedments and miscellaneous anchorage accessories, joint fillers, and waterstops for cast-in-place concrete work as shown on Drawings, as specified herein, and as required by the job conditions.
1.3 RELATED WORK SPECIFIED IN OTHER SECTIONS
A. Submittals Division 1
B. Quality Control Division 1
C. Concrete Formwork Section 031000
D. Cast-in-Place Concrete Section 033000
E. Thermal and Moisture Protection Division 7
1.4 CODES AND STANDARDS
A. Building Code: Concrete work shall conform to the requirements of the Building Code identified on the Structural General Notes, and OSHA requirements, except where more stringent conditions or criteria occur in the standards referenced below and on the Drawings.
B. Standards:
1. ACI 117 – Standard Specifications for Tolerances for Concrete Construction and Materials.
2. ACI 301 –Specifications for Structural Concrete.
3. ACI 315 – Details and Detailing of Concrete Reinforcement.
4. ACI 318 – Building Code Requirements for Structural Concrete and Commentary.
5. American Society for Testing and Materials "ASTM Standards in Building Codes", various standards as referenced herein, latest edition.
6. AWS D1.1 – Structural Welding Code-Steel.
7. AWS D1.4 – Structural Welding Code-Reinforcing Steel.
8. CRD C 572 – Specification for Polyvinylchloride Waterstops.
DOC A - Phase II 032000 -2 CONCRETE REINFORCEMENT AND
EMBEDDED ASSEMBLIES
SENSITIVE BUT UNCLASSIFIED (SBU)
9. Concrete Reinforcing Steel Institute ”Manual of Standard Practice”
10. ASTM D3963 Fabrication and Jobsite Handling of epoxy Coated Steel Reinforcing Bars.
C. Definitions:
1. See Section 033000.
1.5 CONTRACTOR QUALIFICATIONS
A. The work of this section shall be performed by a fabricator specializing in the type of reinforcement fabrication required for this Project, with a minimum of 10 years of documented successful experience and shall be performed by skilled workmen thoroughly experienced in the necessary crafts.
1. Welders shall be qualified in accordance with applicable AWS Code within 12 months before starting the work.
a. Make qualification records available to the Design Professionals upon request.
B. Manufacturers shall specialize in manufacturing the types of concrete accessories required for cast-in-place concrete work, with a minimum of 10 years of documented successful experience and shall have the facilities capable of meeting all requirements of Contract Documents as a single-source responsibility and warranty for each type of accessory.
1.6 SUBMITTALS
A. Required Submittals - Where the SUBMITTALS section of this Specification is in conflict with
Division 1 Submittals, the more stringent requirements for the Contractor apply. Required submittal items are listed here; see below for detailed requirements. Do not submit items not requested.
1. Submittal Schedule: See Section 033000.
2. Shop Drawings: Submit shop drawings that shall clearly indicate, but not be limited to:
a. All details, dimensions and information required for fabrication and placement of concrete reinforcement in accordance with Contract Documents, prepared in accordance with ACI 315 recommendations.
b. Elevations, plans, sections, and dimensions of concrete work with required reinforcement clearances.
c. Ledges, brackets, openings, sleeves, anchor rods, embedments, prefabricated bent-in dowel keyway systems, electrical conduit and items of other trades including interference with reinforcing materials.
d. Sizes, grade designations, spacing, locations, and quantities of wire fabric, reinforcement bars, temperature and shrinkage reinforcement dowels.
1) Do not use dimensions scaled from Contract Drawings to determine bar lengths.
2) Hooks and bends not specifically dimensioned shall be detailed per ACI 318.
e. Bending and cutting schedules, assembly diagrams, splicing and connection requirements, details, and laps.
f. Each type of supporting and spacing devices, including miscellaneous accessories.
DOC A - Phase II 032000 -3 CONCRETE REINFORCEMENT AND
EMBEDDED ASSEMBLIES
SENSITIVE BUT UNCLASSIFIED (SBU)
g. Construction joint type, details and locations. Contractor shall coordinate with concrete pour schedule and submit for action by the Design Professionals.
h. Submit comprehensive (a single drawing per area/element) layout/placement drawings. Drawings shall consolidate the work of all trades and shall be coordinated by the Contractor. Submit with or prior to reinforcement submittal for same element/area. Drawings shall include:
1) Concrete accessories and embedded items, including fabrication details of items to be placed (exclusive of reinforcement.)
2) Opening in structural members, including floor slab, walls, columns, and beams.
i. Reproduction of structural drawings is not permitted.
3. Product Data: Submit for record for each type of product identified in Part 2. Product
Data shall be clearly marked to indicate all technical information which specifies full compliance with this section and Contract Documents, including published installation instructions and I.C.C. reports, where applicable, for products of each manufacturer specified in this section.
4. Mill Reports: Submit for record.
5. Hazardous Materials Notification: Submit for record. In the event no product or material is available that does not contain hazardous materials as determined by the Owner, a
"Material Safety Data Sheet" (MSDS) equivalent to OSHA Form 20 shall be submitted for that proposed product or material prior to installation.
6. LEED Submittals
a. MR Credit 4: Recycled Content – Reinforcement Steel, Reinforcing Wire Fabric, Supports for Reinforcement:
1) Submit statement of recycled content; indicate percentage of pre-consumer and post-consumer recycled content per unit of product.
2) Submit statement of relative dollar value of recycled content product to total dollar value of product included in project.
b. MR Credit 5: Regional Materials – Reinforcement Steel:
1) Submit statement of manufacturing (fabrication) location(s): Indicate location of manufacturing (fabrication) facility; indicate distance between manufacturing facility and the project site.
2) Submit statement of Product Value: Indicate dollar value of product containing regional materials; include materials cost only.
3) Submit statement of Product Component(s) Value: Where product components are sourced or manufactured in separate locations, provide location information for each component. Indicate the percentage by weight of each component per unit of product.
c. See Division 1 for additional LEED requirements.
B. Submittal Process: See Section 033000
C. SER Submittal Review: See Section 033000
D. Substitution Request: See Section 033000
DOC A - Phase II 032000 -4 CONCRETE REINFORCEMENT AND
EMBEDDED ASSEMBLIES
SENSITIVE BUT UNCLASSIFIED (SBU)
E. Request for Information (RFI): See Section 033000
1.7 DELIVERY, STORAGE, AND HANDLING
A. Comply with General Conditions and Division 1, including the following:
1. Deliver reinforcing steel to Project site bundled, tagged and marked.
a. Use weatherproof tags indicating bar sizes, lengths and other information corresponding to markings shown on placement diagrams.
2. Deliver welded wire fabric in sheets. Do not deliver in rolls.
3. During construction period, properly store reinforcing steel and accessories to assure uniformity throughout the Project.
4. Deliver and store welding electrodes in accordance with AWS D1.4.
5. Immediately remove from site materials not complying with Contract Documents or determined to be damaged.
6. Store reinforcing steel above ground so that it remains clean.
a. Maintain steel surfaces free from materials and coatings that might impair bond.
b. Keep covered.
c. Protect against corrosion or deterioration of any kind.
1.8 QUALITY ASSURANCE BY INDEPENDENT TESTING AGENCY
A. Field Quality Assurance General: The Independent Testing Agency shall test and inspect concrete reinforcement and embedded assemblies as Work progresses. Failure to detect any defective work or material shall not in any way prevent later rejection when such defect is discovered nor shall it obligate the Design Professionals for final acceptance.
B. Independent Testing Agency shall provide qualified personnel at the site to inspect reinforcement, embedments, and accessories using the latest Drawings and reviewed shop drawings, as follows:
1. Prior to placement, inspect reinforcement and embeds for grade, quality of material, absence of foreign matter, and for suitable storage.
2. Provide continuous inspection of reinforcement and embedded assemblies during placement and immediately prior to concreting operations for: size, quantity, vertical and horizontal spacing and location, correctness of bends and splices, mechanical splices, clearances, compliance with specified tolerances, security of supports and ties, concrete cover, and absence of foreign matter.
3. Inspect epoxy-coated reinforcement for coating damage and required applied coatings.
4. Provide continuous inspection of adhesive anchors installed in horizontal or upwardly inclined orientations and those marked (CERT) on the latest Drawings.
C. Adhesive anchors shall be proof tested in tension as follows:
1. The Independent Testing Agency shall submit an anchorage testing plan to the SER to verify the testing requirements are adequate.
2. Tension testing shall be performed in accordance with ASTM E 488.
3. Testing shall be performed after a minimum curing period specified by the manufacturer.
DOC A - Phase II 032000 -5 CONCRETE REINFORCEMENT AND
EMBEDDED ASSEMBLIES
SENSITIVE BUT UNCLASSIFIED (SBU)
4. 10percent of each type and size of an adhesive anchor assembly and 100 percent of anchors marked (CERT) shall be proof tested in tension by the Independent Testing
Agency.
5. The adhesive anchors shall be tension proof load to 50% of expected adhesive ultimate bond strength or 80% of steel yield strength of the anchor.
6. Anchors shall have no visible indications of displacement or damage during or after proof load application. Concrete cracking in the vicinity of the anchor after loading shall be considered a failure.
7. If more than [10%] of the tested adhesive anchors fail to achieve the specified proof load within the limits defined on these Drawings, [100%] of the anchors of the same diameter and type as the failed anchor shall be proof tested, unless otherwise direct in writing by the SER.
D. Independent Testing Agency shall submit inspection, observation, and/or test reports to the
Owner and Design Professionals, as required herein and shall provide an evaluation statement in each report stating whether or not concrete reinforcement, embedded assemblies, and post-installed anchors conforms to requirements of Specifications and Drawings and shall specifically note deviations therefrom.
E. Immediately report deficiencies to the Owner and Design Professionals.
1.9 QUALITY CONTROL BY CONTRACTOR
A. See Section 033000.
1.10 OBSERVATIONS AND CORRECTIONS BY DESIGN PROFESSIONALS
A. See Section 033000.
1.11 PERMITS AND WARRANTY
A. Permits: See Section 033000.
B. Warranty: Comply with General Conditions, agreeing to repair or replace specified materials or
Work that has failed within the warranty period. Failures include but are not limited to the following:
1. Bars with kinks or bends not indicated on Drawings or on approved shop drawings.
2. Bars damaged due to bending, straightening or cutting.
3. Bars heated for bending.
PART 2 - PRODUCTS
2.1 REINFORCEMENT
A. Reinforcing Steel:
1. Type: Deformed billet steel bars, ASTM A 615, Grade 60 indicated on Drawings.
DOC A - Phase II 032000 -6 CONCRETE REINFORCEMENT AND
EMBEDDED ASSEMBLIES
SENSITIVE BUT UNCLASSIFIED (SBU)
2. Size: As indicated on structural Drawings.
3. Where indicated on Drawings, reinforcing steel shall be hot-dipped galvanized after fabrication in accordance with ASTM A 767, Class II, with galvanizing material protected from embrittlement during galvanizing process in accordance with ASTM A 143.
a. Galvanized finish shall meet the bend and shear test requirements of ASTM A 615.
4. Epoxy-Coated: ASTM A 775 where indicated on Drawings.
5. Weldable reinforcement: ASTM A 706 where indicated on Drawings.
B. Welded Wire Reinforcement:
1. Type: steel wire, plain finish, ASTM A 82.
2. Type: steel wire, deformed, ASTM A 496.
3. Size: As indicated on structural Drawings.
4. Where indicated on Drawings, welded wire reinforcement shall be hot-dipped galvanized after fabrication in accordance with ASTM A 767, Class II, with galvanizing material protected from embrittlement during galvanizing process in accordance with ASTM A 143.
a. Galvanized finish shall meet the bend and shear test requirements of ASTM A 615.
5. Plain Steel Welded Wire Reinforcement: ASTM A 185.
6. Deformed Steel Welded Wire Reinforcement: ASTM A 497.
7. Epoxy-Coated Welded Wire Reinforcement: ASTM A 884, Class A.
2.2 ACCESSORIES
A. Tie Wire:
1. Type: Minimum 16 gauge (1.5mm) annealed steel wire, ASTM A 82.
2. Wire Bar Type: Comply with CRSI.
B. Mechanical Splicing Systems:
1. Mechanical tension and compression splicing systems shall be used where indicated on
Drawings.
2. Acceptable Products: Bartec Couplers by Dextra, Santa Fe Springs, CA or LentonCadweld by Erico, Solon, OH or Bar-Lock by Dayton Superior, Dayton, OH, TX, Grip-Twist by Bar
Splice, Dayton, OH or Lenton Couplers by Erico, Solon, OH. Splices shall be installed in compliance with manufacturer’s requirements.
3. Mechanical and welded tensile mechanical splicing systems shall be capable of developing 125% of the reinforcing steel ASTM specified minimum yield strength.
4. Mechanical compression splices shall be such that the compression stress is transmitted by end bearing held in concentric contact.
C. Headed Bars:
1. For bar sizes #11 (ø36) or smaller where specifically detailed on Drawings, mechanical bar terminators shall be used.
2. Acceptable Products: Bartec End Anchors by Dextra, Santa Fe Springs, CA or Lenton
Terminator by Erico, Solon, OH or Grip-Twist Doughnut by Bar-Splice, Dayton, OH.
DOC A - Phase II 032000 -7 CONCRETE REINFORCEMENT AND
EMBEDDED ASSEMBLIES
SENSITIVE BUT UNCLASSIFIED (SBU)
D. Supports for Reinforcement:
1. Types: Bolsters, chairs, spacers, clips, chair bars, and other devices for properly placing, spacing, supporting, and fastening the reinforcement, plastic, plastic protected steel, or epoxy coated to match supported reinforcement.
2. For Contact with Forms: Use types with not less than 3/32” (2.5mm) of plastic between metal and concrete surface.
a. Plastic tips shall extend not less than ½” (12mm) on metal legs.
3. Individual and continuous slab bolsters and chairs shall be of type to suit various conditions encountered and must be capable of supporting 300 pound (1.5kN) load without damage or permanent distortion.
4. Unless otherwise indicated on Drawings, bottom reinforcing bars in footings shall be supported by precast concrete bricks or individual high chairs with welded sand plates on bottom.
5. For Slabs on Grade: Use supports with sand plates or horizontal runners where base material will not support chair legs.
E. Deformed Bar Anchors:
1. Type: Automatic end welded, ASTM A 496 quality.
2. Size and Grade: As indicated on structural Drawings by Nelson Stud Welding.
F. Anchor rods and dowels:
1. Types and Sizes: Provide sizes and types of anchor rods and dowels as indicated on the
Drawings. Each type of anchor shall be manufactured of structural quality steel, designed for cast-in-place concrete applications and be of sizes as indicated on Drawings, complete with washers, nuts, plates and miscellaneous accessories required to meet Contract
Document requirements.
2. Adhesive Anchors for anchor rods and dowels in existing concrete: See Anchorage
Accessories.
G. Prefabricated Bent-In Dowel Keyway System:
1. Type, Size and Grade as indicated on Drawings.
2. Acceptable Products: Lenton Form Savers by Erico, Solon, OH or Stabox by Meadow
Burke, Tampa, FL or Metalstrip by Dayton Superior, Miamisburg, OH.
3. Installation: Per Manufacturer’s instructions.
2.3 ANCHORAGE ACCESSORIES
A. General: Miscellaneous anchorage accessories for anchoring structural, architectural, electrical, and mechanical items to poured concrete shall include but…