About this file

RFP Section G

View the file

Other files

File Type Posted
Amendment 16 - Revised Section I_Pages 2-5.doc DOC document
Amendment 16 Revsied RFP Section A_ SF1442.xls XLS spreadsheet
AMENDMENT 16- SF30.doc DOC document
AMENDMENT 14- SF30.doc DOC document
Amendment 13 - Revised Section F Page 1-F-4.doc DOC document
AMENDMENT 12- SF30.doc DOC document
Amendment 12 - Site Visit Tour Groups.doc DOC document
AMENDMENT11- SF30.doc DOC document
AMENDMENT10- SF30.doc DOC document
Amendment 9 - Revised Section F Page 1-F-4.doc DOC document
Amendment 9 Revsied RFP Section A_ SF1442.xls XLS spreadsheet
AMENDMENT 9- SF30.doc DOC document
Amendment 8 - Wage Rates.doc DOC document
AMENDMENT 8- SF30.doc DOC document
AMENDMENT 7- SF30.doc DOC document
RFP Section D.doc DOC document
RFP Section H.doc DOC document
RFP Section K.doc DOC document
RFP Section E.doc DOC document
RFP Section I.doc DOC document
RFP Section J Attachments 1 and 2 Performance Questionnaires.DOC DOC document
Section J - Secuirity Spec Section 01541.pdf PDF
RFP Section C.doc DOC document
RFP Section L.doc DOC document
RFP Section F.doc DOC document
RFP Section J Attachment 4 Apprenticeship Reporting Form.doc DOC document
RFP Section M.doc DOC document
RFP Section B.doc DOC document
RFP Section J.doc DOC document
RFP Section A.doc DOC document
RFP Coverpage.doc DOC document
RFP Section A_ SF1442.xls XLS spreadsheet
AMENDMENT 6 Pre-Solicitation Notice 01_07_10.doc DOC document
AMENDMENT 5 Pre-Solicitation Notice 01_05_10.doc DOC document
AMENDMENT 4 Pre-Solicitation Notice 12_31_09.doc DOC document
Document Security Form.doc DOC document
Amendment 2 of Pre-Solicitation Notice 12_28.doc DOC document
Letter of Acknowledgement and Agreement.doc DOC document
Amendment of Pre-Solicitation Notice 11_27.doc DOC document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Construction Services

Phase 1B Bid Package 3 & 4 Harry S Truman Modernization Washington, DC

HARRY S TRUMAN (HST) MODERNIZATION

PHASE 1B-BID PACKAGE 3 AND 4

PART I – THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

SECTION G ‑ CONTRACT ADMINISTRATION DATA

G.1.

FAR 52.243-4 – Changes (AUG 1987) and FAR 52.243-5 Changes and Changed Conditions (APR 1984) (See Section I).

G.2.

Commencement of Change Orders Against This Contract.

G.2.1 The GC shall, within three (3) working days after receipt of a change order, initiate the actions necessary for responding to the requirements specified in accordance with the contract clauses and Section C.

G.3.

Changes or Revisions.

G.3.1 The Government shall not be liable for any costs due to changes or revisions in the scope of services for this contract, from the requirements originally negotiated and agreed to, unless such changes or revisions are authorized and approved by the Contracting Officer in writing.

G.3.2 Any requests for changes or revisions received from the GC shall be referred to the Contracting Officer for review and approval before acceptance by the Government.

G.4.

Requirements for Prompt Payment Meetings and Submission of Invoices.

G.4.1 The GC shall attend pre-invoice payment meetings each month, as scheduled herein, with the designated Government representative, before the GC submits progress or other payment invoices (payment requests). Under no circumstances may any payment meetings be waived; the GC or its authorized representatives shall always participate. The meetings/discussions will enable the making of payments promptly and within the schedule established in the Contract . The purpose of the payment meetings/ discussions is to provide a forum for the GC and Government representatives to discuss the amounts of prospective payments and the supporting documentation required, and to reach agreements on the amounts payable. Inspections by all parties will be completed before or during meetings, thus ensuring timely substantiation and agreements on payment amounts.

G.4.2 The GC shall submit its invoices to the COR [in the form specified by the COR and in accordance with Section J Specification 01310 Critical Path Method Scheduling]. Separate payment requests must be submitted for progress payments, payments of retainage, and partial or final payments. Direct payment requests to the COR as follows:

U.S. General Services Administration

Attn: Charles Berry, Project Manager

Suite 2040 – WPC

301 7th Street, SW

Washington, DC 20407

202-345-6302

G.4.3 Payment requests shall not be submitted by the GC Contractor until after the scheduled pre-invoice payment meetings are held. If the GC fails to attend a payment meeting or participate in the telephone discussion, the Government will make payment on the GC's payment request based upon the results of the Government inspection, in an amount of no more than the Government's estimate of the amount due. The balance of the GC's payment request will remain in dispute and will not be subject to any late penalty, until such time that an invoice including the disputed amount is resubmitted and agreement is reached with the COR on any payment amount being due.

G.4.4 Payment due dates are based upon the date of receipt of a proper invoice by the COR. If the invoice is defective (see FAR Clause 52.232-27, Prompt Payment for Construction Contracts and GSAR Clause 552.232-70, Invoice Requirements), it will be returned to the GC Contractor for appropriate action. If there is a disagreement over the payment amount, the COR may pay the portion of the requested payment that is not in question.

G.4.5 Any inquiries on payments are to be directed to the Contracting Officer or designated representative (COR).

G.5.

Payment Increments.

G.5.1 Payments for Construction services, will be made by the Government in periodic installments on the basis of, or in proportion to, the following:

G.5.1.1 Construction services will be paid in accordance with FAR 52.232-5 Payments under Fixed Price Construction (SEPT 2002) G.5.2 The Government may require, in a format chosen by the COR documentation such as timesheets, invoices, etc. before the issuance of any progress payments.

G.5.3 The Government may require, in a format chosen by the COR, cost breakdowns of pricing related to performance of each project phase and/or its change orders for the purpose of arranging the most appropriate schedule of progress payments.

G.5.4 Prior to final payment as required by the COR, the GC must furnish a release of claims against the Government, other than such claims as the GC may specifically except. The GC must describe, justify, and state the amount of each such claim.

G.6

GSAM 552.232‑70 ‑ INVOICE REQUIREMENTS (SEPT 1999)

G.6.1 Invoices shall be submitted in an original and two (2) copies to the designated billing office specified in this contract.

G.6.2 Invoices must include the Pegasys Document Number (PDN) included on the award document.

G.6.3 In addition to the requirements for a proper invoice specified above and in the Prompt Payment clause of this contract, the following information or documentation must be submitted with each invoice:

(1) Name and street address of the firm, and the name and telephone number of the responsible person in the Contractor's firm. The remittance address must be as specified in this contract.

(2) Contract number.

(3) Proper enclosures/attachments as required by the COR for the type of payment, such as a release of claims, updated cost load schedule, etc.

G.7

GSAR 552.232-72 Final Payment (SEPT 1999)

Before final payment is made, the Contractor shall furnish the Contracting Officer with a release of all claims against the Government relating to this contract, other than claims in stated amounts that are specifically accepted by the Contractor from the release. If the Contractor’s claim to amounts payable under the contract has been assigned under the Assignment of Claims Act of 1940, as amended (31 U.S.C. 3727, 41 U.S.C. 15), a release may also be required of the assignee.

G.8 FAR 52-232-33 Payment by Electronic Funds Transfer—Central Contractor Registration (Oct 2003) In accordance with FAR Parts 1, 2, 4, 13, 32, and 52 and effective October 1, 2003 contractors must be registered in the Central Contractor Registration (CCR) database prior to award of any contract, basic agreement, basic ordering agreement, or blanket purchase agreement. No award will be made to any contractor not registered in CCR. This is one of the steps the Federal Government is taking to streamline the acquisition process. In an effort to broaden use and reliance upon e-business applications, the CCR was established to eliminate the need to maintain paper-based sources of contractor information.

Method of payment.

G.8.1.1. All payments by the Government under this contract shall be made by electronic funds transfer (EFT), except as provided in paragraph (G.8.1.2) of this clause. As used in this clause, the term “EFT” refers to the funds transfer and may also include the payment information transfer.

G.8.1.2. In the event the Government is unable to release one or more payments by EFT, the Contractor agrees to either—

a) Accept payment by check or some other mutually agreeable method of payment; or

b) Request the Government to extend the payment due date until such time as the Government can make payment by EFT (but see paragraph (G.8.4) of this clause).

G.8.2. Contractor's EFT information. The Government shall make payment to the Contractor using the EFT information contained in the Central Contractor Registration (CCR) database. In the event that the EFT information changes, the Contractor shall be responsible for providing the updated information to the CCR database.

G.8.3. Mechanisms for EFT payment. The Government may make payment by EFT through either the Automated Clearing House (ACH) network, subject to the rules of the National Automated Clearing House Association, or the Fedwire Transfer System. The rules governing Federal payments through the ACH are contained in 31 CFR Part 210.

G.8.4. Suspension of payment. If the Contractor’s EFT information in the CCR database is incorrect, then the Government need not make payment to the Contractor under this contract until correct EFT information is entered into the CCR database; and any invoice or contract financing request shall be deemed not to be a proper invoice for the purpose of prompt payment under this contract. The prompt payment terms of the contract regarding notice of an improper invoice and delays in accrual of interest penalties apply.

G.8.5. Liability for uncompleted or erroneous transfers.

G.8.5.1. If an uncompleted or erroneous transfer occurs because the Government used the Contractor’s EFT information incorrectly, the Government remains responsible for—

a) Making a correct payment;

b) Paying any prompt payment penalty due; and

c) Recovering any erroneously directed funds.

G.8.5.2. If an uncompleted or erroneous transfer occurs because the Contractor’s EFT information was incorrect, or was revised within 30 days of Government release of the EFT payment transaction instruction to the Federal Reserve System, and—

a) If the funds are no longer under the control of the payment office, the Government is deemed to have made payment and the Contractor is responsible for recovery of any erroneously directed funds; or

b) If the funds remain under the control of the payment office, the Government shall not make payment, and the provisions of paragraph (G.8.4) of this clause shall apply.

G.8.6. EFT and prompt payment. A payment shall be deemed to have been made in a timely manner in accordance with the prompt payment terms of this contract if, in the EFT payment transaction instruction released to the Federal Reserve System, the date specified for settlement of the payment is on or before the prompt payment due date, provided the specified payment date is a valid date under the rules of the Federal Reserve System.

G.8.7. EFT and assignment of claims. If the Contractor assigns the proceeds of this contract as provided for in the assignment of claims terms of this contract, the Contractor shall require as a condition of any such assignment, that the assignee shall register separately in the CCR database and shall be paid by EFT in accordance with the terms of this clause. Notwithstanding any other requirement of this contract, payment to an ultimate recipient other than the Contractor, or a financial institution properly recognized under an assignment of claims pursuant to Subpart 32.8, is not permitted. In all respects, the requirements of this clause shall apply to the assignee as if it were the Contractor. EFT information that shows the ultimate recipient of the transfer to be other than the Contractor, in the absence of a proper assignment of claims acceptable to the Government, is incorrect EFT information within the meaning of paragraph (d) of this clause.

G.8.8. Liability for change of EFT information by financial agent. The Government is not liable for errors resulting from changes to EFT information made by the Contractor’s financial agent.

G.8.9. Payment information. The payment or disbursing office shall forward to the Contractor available payment information that is suitable for transmission as of the date of release of the EFT instruction to the Federal Reserve System. The Government may request the Contractor to designate a desired format and method(s) for delivery of payment information from a list of formats and methods the payment office is capable of executing. However, the Government does not guarantee that any particular format or method of delivery is available at any particular payment office and retains the latitude to use the format and delivery method most convenient to the Government. If the Government makes payment by check in accordance with paragraph (a) of this clause, the Government shall mail the payment information to the remittance address contained in the CCR database. (End of clause)

G.9 GSAM 552.232-78 Payment Information (JUL 2000)

The General Services Administration (GSA) makes information on contract payments available electronically at http://www.finance.gsa.gov. The Contractor may register at the site and review its record of payments. This site provides information only on payments made by GSA, not by other agencies. (End of clause)

G.10 SAFEGUARDING DOCUMENTS

The drawings and specifications pertaining to this contract are for the sole use of the contractor and/or to the extent necessary, subcontractors, in preparing a bid/offer on this solicitation and/or in performing this contract. Any other use is prohibited. In addition to the restrictions on disclosure contained in section 27 of the Office of Federal Procurement Policy Act, 41 U.S.C. Sec. 423, for national security reasons, the bidder/contractor shall not further disseminate the drawings and specifications for any purpose beyond that stated in this paragraph. By submission of the bid/offer, the bidder/offeror warrants that no disclosure of the specifications and/or drawings for an unauthorized purpose has occurred.

The contractor shall be responsible for developing procedures relative to handling, storage reproduction, safeguarding, and disposition of the drawings and specifications. These procedures shall be designed to prevent unauthorized disclosure of the information throughout the course of contract performance.

G.11 BONDS AND INSURANCE.

G.11.1 FAR 52.228-15 Performance and Payment Bonds (November 2006)

(a) Definitions. As used in this clause—

“Original contract price” means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.

(b) Amount of required bonds. Unless the resulting contract price is $100,000 or less, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:

(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 50 percent of the Total Offer. For each option exercised, “50 percent of the GMP” shall be deemed to mean the aggregate of the lump sum amount of each option exercised and not closed out.

(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 50 percent of the Total Offer. For each option exercised, “50 percent of the GMP” shall be deemed to mean the aggregate of the lump sum amount of each option exercised and not closed out..

(3) Additional bond protection.

(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 50 percent of the increase in contract price.

(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.

(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.

(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:

U.S. Department of the Treasury Financial Management Service Surety Bond Branch 3700 East West Highway, Room 6F01 Hyattsville, MD 20782.

Or via the internet at http://www.fms.treas.gov/c570/.

(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract. (End of clause) G.11.2 Additional Bonds will be required for the Options when exercised.

G.11.3 All bonds and insurance will be submitted by the GC for the options prior to the issuance of a Notice To Proceed.

G.12 FAR 52.232-27 Prompt Payment for Construction Contracts (Sept 2005) Notwithstanding any other payment terms in this contract, the Government will make invoice payments under the terms and conditions specified in this clause. The Government considers payment as being made on the day a check is dated or the date of an electronic funds transfer. Definitions of pertinent terms are set forth in sections 2.101, 32.001, and 32.902 of the Federal Acquisition Regulation. All days referred to in this clause are calendar days, unless otherwise specified. (However, see paragraph (a)(3) concerning payments due on Saturdays, Sundays, and legal holidays.)

(a) Invoice payments—

(1) Types of invoice payments. For purposes of this clause, there are several types of invoice payments that may occur under this contract, as follows:

(i) Progress payments, if provided for elsewhere in this contract, based on Contracting Officer approval of the estimated amount and value of work or services performed, including payments for reaching milestones in any project.

(A) The due date for making such payments is 30 days after the designated billing office receives a proper payment request. If the designated billing office fails to annotate the payment request with the actual date of receipt at the time of receipt, the payment due date is the 30th day after the date of the Contractor’s payment request, provided the designated billing office receives a proper payment request and there is no disagreement over quantity, quality, or Contractor compliance with contract requirements.

(B) The due date for payment of any amounts retained by the Contracting Officer in accordance with the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts, is as specified in the contract or, if not specified, 30 days after approval by the Contracting Officer for release to the Contractor.

(ii) Final payments based on completion and acceptance of all work and presentation of release of all claims against the Government arising by virtue of the contract, and payments for partial deliveries that have been accepted by the Government (e.g., each separate building, public work, or other division of the contract for which the price is stated separately in the contract).

(A) The due date for making such payments is the later of the following two events:

(1) The 30th day after the designated billing office receives a proper invoice from the Contractor.

(2) The 30th day after Government acceptance of the work or services completed by the Contractor. For a final invoice when the payment amount is subject to contract settlement actions (e.g., release of claims), acceptance is deemed to occur on the effective date of the contract settlement.

(B) If the designated billing office fails to annotate the invoice with the date of actual receipt at the time of receipt, the invoice payment due date is the 30th day after the date of the Contractor’s invoice, provided the designated billing office receives a proper invoice and there is no disagreement over quantity, quality, or Contractor compliance with contract requirements.

(2) Contractor's invoice. The Contractor shall prepare and submit invoices to the designated billing office specified in the contract. A proper invoice must include the items listed in paragraphs (a)(2)(i) through (a)(2)(xi) of this clause. If the invoice does not comply with these requirements, the designated billing office must return it within 7 days after receipt, with the reasons why it is not a proper invoice. When computing any interest penalty owed the Contractor, the Government will take into account if the Government notifies the Contractor of an improper invoice in an untimely manner.

(i) Name and address of the Contractor.

(ii) Invoice date and invoice number. (The Contractor should date invoices as close as possible to the date of mailing or transmission.)

(iii) Contract number or other authorization for work or services performed (including order number and contract line item number).

(iv) Description of work or services performed.

(v) Delivery and payment terms (e.g., discount for prompt payment terms).

(vi) Name and address of Contractor official to whom payment is to be sent (must be the same as that in the contract or in a proper notice of assignment).

(vii) Name (where practicable), title, phone number, and mailing address of person to notify in the event of a defective invoice.

(viii) For payments described in paragraph (a)(1)(i) of this clause, substantiation of the amounts requested and certification in accordance with the requirements of the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts.

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision (e.g., 52.232-38, Submission of Electronic Funds Transfer Information with Offer), contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration, or 52.232-34, Payment by Electronic Funds Transfer—Other Than Central Contractor Registration), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(xi) Any other information or documentation required by the contract.

(3) Interest penalty. The designated payment office will pay an interest penalty automatically, without request from the Contractor, if payment is not made by the due date and the conditions listed in paragraphs (a)(3)(i) through (a)(3)(iii) of this clause are met, if applicable. However, when the due date falls on a Saturday, Sunday, or legal holiday, the designated payment office may make payment on the following working day without incurring a late payment interest penalty.

(i) The designated billing office received a proper invoice.

(ii) The Government processed a receiving report or other Government documentation authorizing payment and there was no disagreement over quantity, quality, Contractor compliance with any contract term or condition, or requested progress payment amount.

(iii) In the case of a final invoice for any balance of funds due the Contractor for work or services performed, the amount was not subject to further contract settlement actions between the Government and the Contractor.

(4) Computing penalty amount. The Government will compute the interest penalty in accordance with the Office of Management and Budget prompt payment regulations at 5 CFR Part 1315.

(i) For the sole purpose of computing an interest penalty that might be due the Contractor for payments described in paragraph (a)(1)(ii) of this clause, Government acceptance or approval is deemed to occur constructively on the 14th day after the Contractor has completed the work or services in accordance with the terms and conditions of the contract. If actual acceptance or approval occurs within the constructive acceptance or approval period, the Government will base the determination of an interest penalty on the actual date of acceptance or approval. Constructive acceptance or constructive approval requirements do not apply if there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. These requirements also do not compel Government officials to accept work or services, approve Contractor estimates, perform contract administration functions, or make payment prior to fulfilling their responsibilities.

(ii) The prompt payment regulations at 5 CFR 1315.10(c) do not require the Government to pay interest penalties if payment delays are due to disagreement between the Government and the Contractor over the payment amount or other issues involving contract compliance, or on amounts temporarily withheld or retained in accordance with the terms of the contract. The Government and the Contractor shall resolve claims involving disputes, and any interest that may be payable in accordance with the clause at FAR 52.233-1, Disputes.

(5) Discounts for prompt payment. The designated payment office will pay an interest penalty automatically, without request from the Contractor, if the Government takes a discount for prompt payment improperly. The Government will calculate the interest penalty in accordance with the prompt payment regulations at 5 CFR Part 1315.

(6) Additional interest penalty.

(i) The designated payment office will pay a penalty amount, calculated in accordance with the prompt payment regulations at 5 CFR Part 1315 in addition to the interest penalty amount only if—

(A) The Government owes an interest penalty of $1 or more;

(B) The designated payment office does not pay the interest penalty within 10 days after the date the invoice amount is paid; and

(C) The Contractor makes a written demand to the designated payment office for additional penalty payment, in accordance with paragraph (a)(6)(ii) of this clause, postmarked not later than 40 days after the date the invoice amount is paid.

(ii)(A) The Contractor shall support written demands for additional penalty payments with the following data. The Government will not request any additional data. The Contractor shall—

(1) Specifically assert that late payment interest is due under a specific invoice, and request payment of all overdue late payment interest penalty and such additional penalty as may be required;

(2) Attach a copy of the invoice on which the unpaid late payment interest was due; and

(3) State that payment of the principal has been received, including the date of receipt.

(B) If there is no postmark or the postmark is illegible—

(1) The designated payment office that receives the demand will annotate it with the date of receipt provided the demand is received on or before the 40th day after payment was made; or

(2) If the designated payment office fails to make the required annotation, the Government will determine the demand’s validity based on the date the Contractor has placed on the demand, provided such date is no later than the 40th day after payment was made.

(b) Contract financing payments. If this contract provides for contract financing, the Government will make contract financing payments in accordance with the applicable contract financing clause.

(c) Subcontract clause requirements. The Contractor shall include in each subcontract for property or services (including a material supplier) for the purpose of performing this contract the following:

(1) Prompt payment for subcontractors. A payment clause that obligates the Contractor to pay the subcontractor for satisfactory performance under its subcontract not later than 7 days from receipt of payment out of such amounts as are paid to the Contractor under this contract.

(2) Interest for subcontractors. An interest penalty clause that obligates the Contractor to pay to the subcontractor an interest penalty for each payment not made in accordance with the payment clause—

(i) For the period beginning on the day after the required payment date and ending on the date on which payment of the amount due is made; and

(ii) Computed at the rate of interest established by the Secretary of the Treasury, and published in the Federal Register, for interest payments under section 12 of the Contract Disputes Act of 1978 (41 U.S.C. 611) in effect at the time the Contractor accrues the obligation to pay an interest penalty.

(3) Subcontractor clause flowdown. A clause requiring each subcontractor to—

(i) Include a payment clause and an interest penalty clause conforming to the standards set forth in paragraphs (c)(1) and (c)(2) of this clause in each of its subcontracts; and

(ii) Require each of its subcontractors to include such clauses in their subcontracts with each lower-tier subcontractor or supplier.

(d) Subcontract clause interpretation. The clauses required by paragraph (c) of this clause shall not be construed to impair the right of the Contractor or a subcontractor at any tier to negotiate, and to include in their subcontract, provisions that—

(1) Retainage permitted. Permit the Contractor or a subcontractor to retain (without cause) a specified percentage of each progress payment otherwise due to a subcontractor for satisfactory performance under the subcontract without incurring any obligation to pay a late payment interest penalty, in accordance with terms and conditions agreed to by the parties to the subcontract, giving such recognition as the parties deem appropriate to the ability of a subcontractor to furnish a performance bond and a payment bond;

(2) Withholding permitted. Permit the Contractor or subcontractor to make a determination that part or all of the subcontractor’s request for payment may be withheld in accordance with the subcontract agreement; and

(3) Withholding requirements. Permit such withholding without incurring any obligation to pay a late payment penalty if—

(i) A notice conforming to the standards of paragraph (g) of this clause previously has been furnished to the subcontractor; and

(ii) The Contractor furnishes to the Contracting Officer a copy of any notice issued by a Contractor pursuant to paragraph (d)(3)(i) of this clause.

(e) Subcontractor withholding procedures. If a Contractor, after making a request for payment to the Government but before making a payment to a subcontractor for the subcontractor’s performance covered by the payment request, discovers that all or a portion of the payment otherwise due such subcontractor is subject to withholding from the subcontractor in accordance with the subcontract agreement, then the Contractor shall—

(1) Subcontractor notice. Furnish to the subcontractor a notice conforming to the standards of paragraph (g) of this clause as soon as practicable upon ascertaining the cause giving rise to a withholding, but prior to the due date for subcontractor payment;

(2) Contracting Officer notice. Furnish to the Contracting Officer, as soon as practicable, a copy of the notice furnished to the subcontractor pursuant to paragraph (e)(1) of this clause;

(3) Subcontractor progress payment reduction. Reduce the subcontractor’s progress payment by an amount not to exceed the amount specified in the notice of withholding furnished under paragraph (e)(1) of this clause;

(4) Subsequent subcontractor payment. Pay the subcontractor as soon as practicable after the correction of the identified subcontract performance deficiency, and—

(i) Make such payment within—

(A) Seven days after correction of the identified subcontract performance deficiency (unless the funds therefore must be recovered from the Government because of a reduction under paragraph (e)(5)(i)) of this clause; or

(B) Seven days after the Contractor recovers such funds from the Government; or

(ii) Incur an obligation to pay a late payment interest penalty computed at the rate of interest established by the Secretary of the Treasury, and published in the Federal Register, for interest payments under section 12 of the Contracts Disputes Act of 1978 (41 U.S.C. 611) in effect at the time the Contractor accrues the obligation to pay an interest penalty;

(5) Notice to Contracting Officer. Notify the Contracting Officer upon—

(i) Reduction of the amount of any subsequent certified application for payment; or

(ii) Payment to the subcontractor of any withheld amounts of a progress payment, specifying—

(A) The amounts withheld under paragraph (e)(1) of this clause; and

(B) The dates that such withholding began and ended; and

(6) Interest to Government. Be obligated to pay to the Government an amount equal to interest on the withheld payments (computed in the manner provided in 31 U.S.C. 3903(c)(1)), from the 8th day after receipt of the withheld amounts from the Government until—

(i) The day the identified subcontractor performance deficiency is corrected; or

(ii) The date that any subsequent payment is reduced under paragraph (e)(5)(i) of this clause.

(f) Third-party deficiency reports—

(1) Withholding from subcontractor. If a Contractor, after making payment to a first-tier subcontractor, receives from a supplier or subcontractor of the first-tier subcontractor (hereafter referred to as a "second-tier subcontractor") a written notice in accordance with the Miller Act (40 U.S.C. 3133), asserting a deficiency in such first-tier subcontractor’s performance under the contract for which the Contractor may be ultimately liable, and the Contractor determines that all or a portion of future payments otherwise due such first-tier subcontractor is subject to withholding in accordance with the subcontract agreement, the Contractor may, without incurring an obligation to pay an interest penalty under paragraph (e)(6) of this clause—

(i) Furnish to the first-tier subcontractor a notice conforming to the standards of paragraph (g) of this clause as soon as practicable upon making such determination; and

(ii) Withhold from the first-tier subcontractor’s next available progress payment or payments an amount not to exceed the amount specified in the notice of withholding furnished under paragraph (f)(1)(i) of this clause.

(2) Subsequent payment or interest charge. As soon as practicable, but not later than 7 days after receipt of satisfactory written notification that the identified subcontract performance deficiency has been corrected, the Contractor shall—

(i) Pay the amount withheld under paragraph (f)(1)(ii) of this clause to such first-tier subcontractor; or

(ii) Incur an obligation to pay a late payment interest penalty to such first-tier subcontractor computed at the rate of interest established by the Secretary of the Treasury, and published in the Federal Register, for interest payments under section 12 of the Contracts Disputes Act of 1978 (41 U.S.C. 611) in effect at the time the Contractor accrues the obligation to pay an interest penalty.

(g) Written notice of subcontractor withholding. The Contractor shall issue a written notice of any withholding to a subcontractor (with a copy furnished to the Contracting Officer), specifying—

(1) The amount to be withheld;

(2) The specific causes for the withholding under the terms of the subcontract; and

(3) The remedial actions to be taken by the subcontractor in order to receive payment of the amounts withheld.

(h) Subcontractor payment entitlement. The Contractor may not request payment from the Government of any amount withheld or retained in accordance with paragraph (d) of this clause until such time as the Contractor has determined and certified to the Contracting Officer that the subcontractor is entitled to the payment of such amount.

(i) Prime-subcontractor disputes. A dispute between the Contractor and subcontractor relating to the amount or entitlement of a subcontractor to a payment or a late payment interest penalty under a clause included in the subcontract pursuant to paragraph (c) of this clause does not constitute a dispute to which the Government is a party. The Government may not be interpleaded in any judicial or administrative proceeding involving such a dispute.

(j) Preservation of prime-subcontractor rights. Except as provided in paragraph (i) of this clause, this clause shall not limit or impair any contractual, administrative, or judicial remedies otherwise available to the Contractor or a subcontractor in the event of a dispute involving late payment or nonpayment by the Contractor or deficient subcontract performance or nonperformance by a subcontractor.

(k) Non-recourse for prime contractor interest penalty. The Contractor’s obligation to pay an interest penalty to a subcontractor pursuant to the clauses included in a subcontract under paragraph (c) of this clause shall not be construed to be an obligation of the Government for such interest penalty. A cost-reimbursement claim may not include any amount for reimbursement of such interest penalty.

(l) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall immediately notify the Contracting Officer and request instructions for disposition of the overpayment. (End of clause)

I-G-1