AMENDMENT 16- SF30.doc
DOC document 56 KB Posted
- Solicitation number
- GS11P10MKC0004
About this file
Amendment 16 SF30
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF
PAGES
2. AMENDMENT/MODIFICATION NO.
Amendment 16
3. EFFECTIVE DATE
03/10/2010
REQUISITION/PURCHASE REQ. NO.
PROJECT NO. (If applicable)
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
General Services Administration, NCR
Property Development Division (WPC)
7th & D Streets, SW, Room 2002
Washington, DC 20407
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) |
| (X) |
| 9.A. AMENDMENT OF SOLICITATION NO. |
GS-11P-10-MKC-0004
| Prospective Offeror's |
| X |
9B. DATED (SEE ITEM 11)
01/15/2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 4_ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegraph which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. DESCRIBED IN ITEM 14.
| (x) |
| A. |
THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
c.
THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D.
OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not x is required to sign this document and return __7__ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible).
Notification of Amendment 16 is being issued electronically using the Federal Business Opportunity website (www.fbo.gov). Sketch, Detail 6-03, and Drawing, E-629-SK1, in addition to the questions and answers are being issued in hard copy via FedEx only to those firms that purchased the original CD.
1. Remove RFP Section A, Standard Form 1442 in its entirety and replace with the Attached Revised Section A, Standard Form 1442, dated 3/10/2010.
Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Vincent E. Matner, P.E., Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment #16, Issued 03/10/2010
2. Remove RFP Part I – The Schedule, Section I, Contract Clauses, Pages 2 through 5 in their entirety and replace with the attached Revised Section I, Contract Clauses, Pages 2 through 5, which removes the following Clauses:
· FAR 52.230-2, Cost Accounting Standards
· FAR 52.230-3, Disclosure and Consistency of Cost Accounting Practices
· FAR 52.230-6, Administration of Cost Accounting Standards
· FAR 52.215-10, Price Reduction for Defective Cost or Pricing Data
· FAR 52.215-12, Subcontractor Cost or Pricing Data
· FAR 52.230-1, Cost Accounting Standards Notices and Certification
· FAR 52.214-26, Audit and Records – Sealed Bidding
· FAR 52.214-27, Price Reduction for Defective Cost or Pricing Data Modifications – Sealed Bidding
· FAR 52.214-28, Subcontractor Cost or Pricing Data
· FAR 52.215-22, Limitations on Pass-Through Charges – Identification of Subcontract Effort
· FAR 52.215-23, Limitation on Pass-Through Charges End of Amendment 16 rerwrwwerwerwrexxx� EMBED WordPad.Document.1 ���� x
_1027145955.rtf X
File details come from the government source that posted it. Updated .