Amendment 5 - SF30 GS06Q-17-RL-0003
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
Page 2 of this document references the changes made to the Solicitation.
Building Maintenance and Operations (BMO) Strategic Sourcing Office General Services Administration/Federal Acquisition Service 2300 Main St., Floor 6 Kansas City, MO 64108
Same as Block 6
GS06Q-17-RL-0003
12/8/2016
12/8/2016
Building Maintenance & Operations (BMO) Unrestricted Solicitation # GS06Q-17-RL-0003
Amendment 5
The purpose of this amendment is to make the following changes. All changes to the RFP are denoted in red text in the Amendment 5 - Final BMO Unrestricted Phase II Zones 2-6 RFP_GS06Q-17-RL-0003 document and the J Attachments (when possible) included with this amendment:
1. SECTION M.4.11 PAST PERFORMANCE
• The verbiage “Pass/Fail” was added to this section title.
• The verbiage of:
“Only three (3) Past Performance Surveys….”
Has been changed to:
“A maximum of three (3) Past Performance Surveys….”
• The verbiage of:
“If the combined average score total to be at least 3.00 – Satisfactory, the Offeror will pass the Acceptability Review. If the combined average score is 2.99 or below, the Offeror will fail Acceptability and will not be considered for award. Offerors who exceed the minimum past performance requirements will receive additional points in accordance with Section M.5, Scoring Table”
Has been changed to:
“If the combined average score total to be at least 3.00 – Satisfactory, the Offeror’s proposal will be considered for further review. If the combined average score is 2.99 or below, the Offeror is considered to have poor past performance and will not be considered for award. Offerors who exceed the minimum past performance requirements will receive additional points in accordance with Section M.5, Scoring Table.
• The following verbiage has been added:
“In accordance with FAR 15.305, in cases where relevant past performance is not available the offeror will not be evaluated favorably or unfavorably (neutral).
Accordingly, offers with neutral past performance ratings will not receive scoring points (see M.5 Scoring Table) for past performance. Failure to provide three (3) Past Performance Surveys will not eliminate offerors from consideration, but will limit an offeror’s obtainable points in this area.”
| Amendment 5 - SF30 GS06Q-17-RL-0003 |