2015.12.10-65__CD_BIM_Quality_Control_Form.pdf
PDF 116 KB Posted
- Solicitation number
- GS-05-P-15-FD-C-7000
About this file
65 Construction Documents BIM Quality Control Form
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The Great Lakes Region 5 Standard for
BIM Data
Quality Control Report
Submittal: 65% Design Development dated 12/10/2015
Submitted By: Zach Neill, exp
VERSION 4.0
Released: 7/1/2013
U.S. General Services Administration
Public Buildings Service
1 Introduction As part of the GSA Region 5 push towards a BIM process there is a need to ensure that BIM data meets a certain level of standards. These standards are defined within the GSA Region 5 BIM
Standards site and assistance in adhering to them can be found in the supplied BIM templates.
GSA recognizes that part of a true BIM based workflow will involve data developing over time from a very course design to the record drawings and as-builts as such the models adherence to standards will also follow a similar path. As the model progress through the five distinct stages of development the requirements of standardization will increase and GSA tolerance for error will decrease. This course to focused methodology will culminate in the final delivery of As-Built and
Record drawings. The level of standards compliance of these models is absolute as they will used to power Facility Management systems.
2 Quality Representative As part of the standard BIM Scope of Work every party responsible for delivery BIM data to the GSA is to appoint a Quality Representative at the time the complete the BEP. The Quality Representative
(often the BIM integrator) is to complete this form each time data is submitted to GSA.
3 Basic Information
3.1 Project Information
Name 536 S. Clark Street Building
Number EP-GS-P-05-15-FD-7000
Address 536 S. Clark St., Chicago, IL 60605
Description Reconfiguration of a portion of the first floor lobby into a new security screening area to accommodate the increase throughput which will be required for the new Passport Agency offices as well as tenant build-out of approximately 26,500 sf of the ninth floor, mainly on the eastern and southern sides of the building, which will be assigned to the new Passport Agency offices, including a large public reception area.
3.2 List of Included Data
File Name Description of File
Native BIM Dataset.zip BIM Dataset folder, in standard folder structure
3.3 Type of Submittal
X Informal Design Concept Phase
Formal Design Development (DD) Phase
Final (Project Close Out) X Construction Documents (CD) Phase
Construction Delivery Phase
Closeout Phase (As-Built and Record Drawings)
4 Standards and Auditing
4.1 Standards Compliance
All submitted files conform to:
X GSA National BIM Standards
X SDM Standards Per Guide 02
X Region 5 BIM Standards
X Region 5 Data Submittal Standards
X The Model Progression Matrix definition for the phase being submitted
4.2 Auditing
All submitted files have:
Have passed all GSA supplied auditing tools.
X Have been visually inspected and found to be free of errors
Have been purged of unnecessary data
4.3 Notes
Add any relevant information in the section that has not been covered above.
4.4 Quality Representative
Name Zach Neill
Phone Number 312-616-7466
Email Address zachary.neill@exp.com
File details come from the government source that posted it. Updated .