Repost of Amendment 001 Attached to Amendment 001 is changes to the agreement and reference to the specification changes . Specification changes will be posted seperately on the secured site.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract of Offers.pdf | ||
| Amendment 0003 SF30.pdf | ||
| Request for Information 06302010.doc | DOC document | |
| combined amendment 002.pdf | ||
| Removal of Export Controlled Restriction.doc | DOC document | |
| 2nd Site Visit.pdf | ||
| Amendment to Volume 1.pdf | ||
| Questions and Answers.pdf | ||
| Pre Bid Conference Minutes.pdf | ||
| Specification amendments.pdf | ||
| Reference of Specification Changes.pdf | ||
| Rutland Solicitation.pdf | ||
| Combined Solicitation.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATiON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED
(SEE
ITEM
11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
Amendment 001 2
Solicitation # GS-01P-10-BZ-C-0031
Amendment to Volume 1: The Agreement:
I.A: Projection Information
Change From:
The project is to perform Parking lot upgrades which include, but are not limited to upgrades of existing parking/access areas including removal of pavements, pavement markings, trees and landscaping, salvage of an existing flag pole, monument sign and mail box for installation in an alternate location and construction of pavements, landscaping, curbing, flag pole, exterior lighting, signs, pavement markings and walks. The approximate area of the parking lot is 1,500 square yards.
Change to:
This project includes, but is not limited to, interior renovation work involving select demolition; removal and abatement of asbestos; construction of new walls and ceilings; reconfiguration and replacement of existing mechanical, electrical, and plumbing systems, and the inclusion of new systems and fixtures where required, as necessary to accommodate the new work; re-finishing of existing millwork; new custom millwork including cabinetry, trim, bookcases and courtroom related furnishings; installation of new finishes including flooring, wall and ceiling finishes. Note that attention to historic detail will be required in certain aspects of the project.
I.C Period of Performance
Change from:
I.C.2 Substantial Completion. The Contractor shall achieve Substantial Completion of the Work, as that term is defined in this Agreement, no later than 175 calendar days from issuance of Notice to Proceed (NTP
Change to:
.C.2 Substantial Completion. The Contractor shall achieve Substantial Completion of the Work, as that term is defined in this Agreement, no later than 290 calendar days from issuance of Notice to Proceed (NTP
Amendment 001 3
Solicitation # GS-01P-10-BZ-C-0031
The following Sections in Volume 3: The Specification are hereby amended
Section: 01010 – 3
C. Contracting Officer C.3 After Work Hours
Section: 01010-4
1.3 WORK PHASES
Section: 01010-5
1.5 GOVERNMENT OCCUPANCY
1.7 ITEMS FURNISHED BY THE GOVERNMENT AND INSTALLED BY THE CONTRACTOR
Section: 01010 – 6 B. On-Site Work Hours B. 3. Hours for Utility Shutdowns
Section: 01010 - 7 B. Un-planned / Incomplete utility service work:
C. Work affecting building services:
D. Utility Shut downs E. Fire Control Panel Shut downs:
Section: - 01300-2
1.3 GENERAL SUBMITTAL REQUIREMENTS
B. Scheduling
Section: 01040 Project Coordination
SECTION 01500
TEMPORARY FACILITIES
Section: 01732
SELECTIVE DEMOLITION
Section: 06402-3
INTERIOR ARCHITECTURAL WOODWORK
1.5 QUALITY ASSURANCE
Section: 06402 – 17
1.21 FLUSH WOOD PANELING AND WAINSCOTS
Section: 01311-1
Critical Path Method Scheduling
1.1 B, 1.2 A
Section: 01500- 6
3.6 USE OF SITE:
Section: 01732-6
3.2 UTILITY SERVICES
SECTION : 04400 Stone Section: 01541 SECURITY REGULATIONS
Section: 01732 SELECTIVE DEMOLITION Section: 06402 INTERIOR ARCHITECTURAL WOODWORK
Revised drawings as follows:
P102- Fourth Floor Plumbing Plan E102
Amendment 001 3
| IDCode: |
| Page: 1 |
| Pages: 1 |
| DocNo: 0001 |
| EffDate: JUN 16, 2010 |
| ReqNo: 1PCS-10-0131 |
| ProjNo: |
| IssuedByCode: 1PSA |
| IssuedBy: ACQUISITION BRANCH, SVC CENTERS DIV |
GSA/PBS
10 CAUSEWAY ST., RM 1100
BOSTON MA 02222-1077
| AdminByCode: 1P1PQ |
| AdminBy: GSA/PBS OFFICE OF DEPUTY REG'L COMMISSIONER |
ACQUISITION MANAGEMENT STAFF
T.P. O'NEILL FOB, 10 CAUSEWAY ST., 9TH FLOOR
BOSTON MA 02222-1077
| ContractorCode: |
| FacCode: |
| SolChg: Yes |
| AwdChg: Off |
| SolNo: GS-01P-10-BZ-C-0031 |
| SolDate: JUN 03, 2010 |
| AwdNo: |
| AwdDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: Solicitation# GS-01P-10-BZ-C-0031: Space Alteration, Probation Office and Bankruptcy Clerk, Rutland USPO and Courthouse, Rutland, VT is herby amended to change the following: Volume 1 The Agreement: sections I.A: Projection Information, I.C Period of Performance and to clarify and amend Volume 3 The specification |
Reference the attached documents This amendment must be acknowledge by one of the methods in Block 11 above.
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| ContratorInfo: |
| ContractorPOC: |
| Contractor: |
| text1: 10B. DATED (SEE ITEM 13) |
| block12: 12. ACCOUNTING AND APPROPIATION DATA (If required) |
| block13: 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. |
| block 14: 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) |
| pageblock: PAGE OF PAGES |
| ModAmount: |
File details come from the government source that posted it. Updated .