Amendment to Volume 1.pdf
PDF 10 KB Posted
- Attached to
- Space Alteration, Probation Office and Bankruptcy Clerks's Office, Rutland USPO and Courthouse, Rutland, VT
- Solicitation number
- GS-01P-10-BZ-C-0031
About this file
0001 Amendment to specification and Volume 1 The Agreement
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract of Offers.pdf | ||
| Amendment 0003 SF30.pdf | ||
| Request for Information 06302010.doc | DOC document | |
| combined amendment 002.pdf | ||
| Removal of Export Controlled Restriction.doc | DOC document | |
| 2nd Site Visit.pdf | ||
| SF30 Amendment combined.pdf | ||
| Questions and Answers.pdf | ||
| Pre Bid Conference Minutes.pdf | ||
| Specification amendments.pdf | ||
| Reference of Specification Changes.pdf | ||
| Rutland Solicitation.pdf | ||
| Combined Solicitation.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment to Volume 1: The Agreement:
I.A: Projection Information
Change From:
The project is to perform Parking lot upgrades which include, but are not limited to upgrades of existing parking/access areas including removal of pavements, pavement markings, trees and landscaping, salvage of an existing flag pole, monument sign and mail box for installation in an alternate location and construction of pavements, landscaping, curbing, flag pole, exterior lighting, signs, pavement markings and walks. The approximate area of the parking lot is 1,500 square yards.
Change to:
This project includes, but is not limited to, interior renovation work involving select demolition; removal and abatement of asbestos; construction of new walls and ceilings; reconfiguration and replacement of existing mechanical, electrical, and plumbing systems, and the inclusion of new systems and fixtures where required, as necessary to accommodate the new work; re-finishing of existing millwork; new custom millwork including cabinetry, trim, bookcases and courtroom related furnishings; installation of new finishes including flooring, wall and ceiling finishes. Note that attention to historic detail will be required in certain aspects of the project.
I.C Period of Performance
Change from:
I.C.2 Substantial Completion. The Contractor shall achieve Substantial Completion of the Work, as that term is defined in this Agreement, no later than 175 calendar days from issuance of Notice to Proceed (NTP
Change to:
.C.2 Substantial Completion. The Contractor shall achieve Substantial Completion of the Work, as that term is defined in this Agreement, no later than 290 calendar days from issuance of Notice to Proceed (NTP