About this file

0001 Amendment to specification and Volume 1 The Agreement

View the file

Other files

File Type Posted
Abstract of Offers.pdf PDF
Amendment 0003 SF30.pdf PDF
Request for Information 06302010.doc DOC document
combined amendment 002.pdf PDF
Removal of Export Controlled Restriction.doc DOC document
2nd Site Visit.pdf PDF
SF30 Amendment combined.pdf PDF
Questions and Answers.pdf PDF
Pre Bid Conference Minutes.pdf PDF
Specification amendments.pdf PDF
Reference of Specification Changes.pdf PDF
Rutland Solicitation.pdf PDF
Combined Solicitation.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment to Volume 1: The Agreement:

I.A: Projection Information

Change From:

The project is to perform Parking lot upgrades which include, but are not limited to upgrades of existing parking/access areas including removal of pavements, pavement markings, trees and landscaping, salvage of an existing flag pole, monument sign and mail box for installation in an alternate location and construction of pavements, landscaping, curbing, flag pole, exterior lighting, signs, pavement markings and walks. The approximate area of the parking lot is 1,500 square yards.

Change to:

This project includes, but is not limited to, interior renovation work involving select demolition; removal and abatement of asbestos; construction of new walls and ceilings; reconfiguration and replacement of existing mechanical, electrical, and plumbing systems, and the inclusion of new systems and fixtures where required, as necessary to accommodate the new work; re-finishing of existing millwork; new custom millwork including cabinetry, trim, bookcases and courtroom related furnishings; installation of new finishes including flooring, wall and ceiling finishes. Note that attention to historic detail will be required in certain aspects of the project.

I.C Period of Performance

Change from:

I.C.2 Substantial Completion. The Contractor shall achieve Substantial Completion of the Work, as that term is defined in this Agreement, no later than 175 calendar days from issuance of Notice to Proceed (NTP

Change to:

.C.2 Substantial Completion. The Contractor shall achieve Substantial Completion of the Work, as that term is defined in this Agreement, no later than 290 calendar days from issuance of Notice to Proceed (NTP