grte201701_Earthwork_ML159_75 to 234_60-NB.pdf

PDF 800 KB Posted

Attached to
WY NPS 2017(1) MOOSE WILSON ROAD PHASE 1
Solicitation number
69056721R000010
Issued by

View the file

Other files

File Type Posted
QA_03-09-2022.pdf PDF
QA_03-07-2022.pdf PDF
Amendment A002.pdf PDF
QA_03-04-2022.pdf PDF
QA_03-02-2022.pdf PDF
Amendment A001.pdf PDF
QA_03-01-2022.pdf PDF
grte201701_ML_HA.pdf PDF
grte201701_Earthwork_ML125_00 to 156_75-Volumes.pdf PDF
grte201701_Earthwork_AP137_26.pdf PDF
grte201701_Plans.pdf PDF
grte201701_Earthwork_PFP-NB.pdf PDF
grte2017(1)_GES-Outbound-Line_VA.pdf PDF
grte201701_ML_VA.pdf PDF
grte201701_Earthwork_ML125_00 to 156_75-NB.pdf PDF
1460-013P Lake Creek Bridge - 2019 Safety Inspection_Redacted.pdf PDF
grte201701_GR 21-20-Geotech Report.pdf PDF
Additional physical data.zip ZIP file
grte2017(1)_GES-Bike-Path_VA.pdf PDF
grte201701_Earthwork_ML159_75 to 234_60-Volumes.pdf PDF
grte2017(1)_Earthwork_GES Inbound Line.pdf PDF
grte2017(1)_GES_XS.pdf PDF
GRTE-PMIS-312456_11-30-2021_Drawings_Final-CDs.pdf PDF
grte2017(1)_Earthwork_GES Outbound Line.pdf PDF
grte201701_Earthwork_AP231_03.pdf PDF
21.11.17 - WY LCGP Compiled SWPPP - Final.pdf PDF
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
grte201701_Earthwork_AP137_18.pdf PDF
grte2017(1)_GES_HA.pdf PDF
grte201701_Earthwork_PFP-Volumes.pdf PDF
grte2017(1)_Earthwork_GES Bike Path.pdf PDF
grte2017(1)_GES-Inbound-Line_VA.pdf PDF
RFP-69056721R000010.pdf PDF
GRTE 100(1) -Lake Creek Bridge.pdf PDF
grte2017(1)_GCTH_Quantities_Report.pdf PDF
grte201701_Earthwork_AP162_16.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LAND HIGHWAY DIVISION

VANCOUVER, WASHINGTON

Earthwork Report Mainline 159+75 to 234+60 by Named

Boundary

MOOSE WILSON ROAD PHASE 1

WY NPS GRTE 2017(1)

GRAND TETON NATIONAL PARK

TETON COUNTY, WYOMING

NPS PMIS No. 225661, NPS Drwg. No. 136/167343

Quantities Report by Named Boundary

Report Created: Monday, September 27, 2021 Time: 2:27:41 PM

Named Boundary Group:

Suitable 2

Alignment Name: ML

Input Grid Factor:

Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.

16124.000 Suitable 2

Volumes_Cut: 2375.916 16.233

Volumes_Fill: 1881.686 19.194

Baseline: 150.000

XS_TL_Draft-DNC: 1554.523

XS_TL_Centerline 1: 150.000

XS_TL_Centerline 2: 150.000

XS_TL_Centerline 3: 150.000

XS_TL_Centerline: 150.000

XS_TL_Edge of Pavt 1: 600.133

XS_TL_Edge of Pavt 2: 900.198

XS_TL_Edge of Pavt 3: 600.128

XS_TL_Edge of Pavt: 300.067

XS_TL_Edge of Shld: 300.067

XS_TL_Cut: 97.897

XS_TL_Fill: 111.417

XS_TC_Pavement Layer 1: 3111.575 18.936

XS_TC_Cut: 90.220

XS_TC_Fill: 259.595 0.067

XS_TC_Pavement Layer 2: 3198.172 19.472

XS_TC_Foreslope: 943.022

XS_TC_Shoulder Foreslope: 578.131 3.330

XS_TC_Pavement Layer 3: 3927.384 68.487

16273.000 Suitable 3

Volumes_Cut: 3394.989 63.508

Volumes_Fill: 843.340 145.466

Baseline: 149.989

XS_TL_Draft-DNC: 1195.996

XS_TL_Centerline 1: 149.986

XS_TL_Centerline 2: 149.986

XS_TL_Centerline 3: 149.986

XS_TL_Subgrade: 58.025

XS_TL_Centerline: 149.986

XS_TL_Edge of Pavt 1: 491.533

XS_TL_Edge of Pavt 2: 682.357

XS_TL_Edge of Pavt 3: 490.560

XS_TL_Edge of Pavt: 300.187

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 1 of 56Volumes Report

9/27/2021file:///C:/Users/kristina.hossley/AppData/Local/Temp/RPTqcev0su5.html

AUX_10: 86.001

XS_TL_Edge of Shld: 191.276

XS_TL_Cut: 119.827

XS_TL_Fill: 81.511

XS_TC_Leveling: 464.441 6.109

XS_TC_Pavement Layer 1: 3317.923 20.304

XS_TC_Fill: 414.131 2.249

XS_TC_Cut: 236.456

XS_TC_Pavement Layer 2: 3372.997 20.644

XS_TC_Surface 1 Symbology: 38.634 1.431

XS_TC_Foreslope: 609.382

XS_TC_Shoulder Foreslope: 742.708 5.583

XS_TC_Pavement Layer 3: 3764.667 59.237

16422.000 Suitable 4

Volumes_Cut: 4209.467 67.568

Volumes_Fill: 35.469 0.045

Baseline: 149.992

XS_TL_Draft-DNC: 1881.382

XS_TL_Centerline 1: 149.994

XS_TL_Centerline 2: 149.994

XS_TL_Centerline 3: 149.994

XS_TL_Centerline: 149.994

XS_TL_Edge of Pavt 1: 599.977

XS_TL_Edge of Pavt 2: 899.927

XS_TL_Edge of Pavt 3: 599.874

XS_TL_Edge of Pavt: 299.987

XS_TL_Edge of Shld: 299.987

XS_TL_Cut: 271.943

XS_TC_Pavement Layer 1: 3086.719 18.782

XS_TC_Cut: 341.143

XS_TC_Fill: 543.964 6.510

XS_TC_Pavement Layer 2: 3173.315 19.317

XS_TC_Foreslope: 941.933

XS_TC_Shoulder Foreslope: 1234.383 9.834

XS_TC_Pavement Layer 3: 3901.561 68.060

XS_TL_Subgrade:

AUX_10:

XS_TL_Fill:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

16571.000 Suitable 5

Volumes_Cut: 4650.710 220.505

Volumes_Fill: 14.005 0.023

Baseline: 149.995

XS_TL_Draft-DNC: 2099.471

XS_TL_Centerline 1: 149.995

XS_TL_Centerline 2: 149.995

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 2 of 56Volumes Report

149.995

XS_TL_Centerline: 149.995

XS_TL_Edge of Pavt 1: 599.980

XS_TL_Edge of Pavt 2: 899.934

XS_TL_Edge of Pavt 3: 599.886

XS_TL_Edge of Pavt: 299.989

XS_TL_Edge of Shld: 299.989

XS_TL_Cut: 299.821

XS_TC_Pavement Layer 1: 3086.759 18.784

XS_TC_Cut: 763.964

XS_TC_Pavement Layer 2: 3173.368 19.320

XS_TC_Foreslope: 941.070

XS_TC_Shoulder Foreslope: 1706.519 14.757

XS_TC_Pavement Layer 3: 3900.721 68.004

XS_TC_Fill: 990.968 16.246

XS_TL_Subgrade:

AUX_10:

XS_TL_Fill:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

16720.000 Suitable 6

Volumes_Cut: 4740.176 266.584

Volumes_Fill: 1.278 0.000

Baseline: 149.994

XS_TL_Draft-DNC: 2098.375

XS_TL_Centerline 1: 149.991

XS_TL_Centerline 2: 149.991

XS_TL_Centerline 3: 149.991

XS_TL_Centerline: 149.991

XS_TL_Edge of Pavt 1: 599.968

XS_TL_Edge of Pavt 2: 899.882

XS_TL_Edge of Pavt 3: 599.784

XS_TL_Edge of Pavt: 299.982

XS_TL_Edge of Shld: 299.982

XS_TL_Cut: 299.236

XS_TC_Pavement Layer 1: 3087.387 18.781

XS_TC_Cut: 840.110

XS_TC_Pavement Layer 2: 3174.021 19.316

XS_TC_Foreslope: 941.012

XS_TC_Shoulder Foreslope: 1887.875 17.047

XS_TC_Pavement Layer 3: 3901.336 68.039

XS_TC_Fill: 1199.180 21.533

XS_TL_Subgrade:

AUX_10:

XS_TL_Fill:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 3 of 56Volumes Report

Suitable 7

Volumes_Cut: 1896.239 30.996

Volumes_Fill: 2996.747 36.733

Baseline: 149.999

XS_TL_Draft-DNC: 1252.016

XS_TL_Centerline 1: 149.999

XS_TL_Centerline 2: 149.999

XS_TL_Centerline 3: 149.999

XS_TL_Centerline: 149.999

XS_TL_Edge of Pavt 1: 599.998

XS_TL_Edge of Pavt 2: 899.984

XS_TL_Edge of Pavt 3: 599.962

XS_TL_Edge of Pavt: 299.999

XS_TL_Slopes: 67.685

XS_TL_Edge of Shld: 299.999

XS_TL_Cut: 179.691

XS_TL_Fill: 111.343

XS_TC_Pavement Layer 1: 3087.331 18.786

XS_TC_Cut: 579.820

XS_TC_Pavement Layer 2: 3174.031 19.322

XS_TC_Fill: 574.987 1.485

XS_TC_Foreslope: 942.583

XS_TC_Shoulder Foreslope: 772.460 5.007

XS_TC_Pavement Layer 3: 3904.277 68.031

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

17018.000 Suitable 8

Volumes_Cut: 749.478 20.302

Volumes_Fill: 4528.624 87.114

Baseline: 149.998

XS_TL_Draft-DNC: 1101.619

XS_TL_Centerline 1: 149.998

XS_TL_Centerline 2: 149.998

XS_TL_Centerline 3: 149.998

XS_TL_Centerline: 149.998

XS_TL_Edge of Pavt 1: 599.996

XS_TL_Edge of Pavt 2: 899.961

XS_TL_Edge of Pavt 3: 599.910

XS_TL_Edge of Pavt: 299.997

XS_TL_Slopes: 64.772

XS_TL_Edge of Shld: 299.997

XS_TL_Cut: 81.690

XS_TL_Fill: 217.440

XS_TC_Pavement Layer 1: 3087.099 18.785

XS_TC_Cut: 595.014

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 4 of 56Volumes Report

3173.798 19.319

XS_TC_Fill: 780.729

XS_TC_Foreslope: 942.295

XS_TC_Shoulder Foreslope: 523.785 2.829

XS_TC_Pavement Layer 3: 3903.790 68.075

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

17167.000 Suitable 9

Volumes_Cut: 359.801 0.585

Volumes_Fill: 3821.224 39.711

Baseline: 149.999

XS_TL_Draft-DNC: 1507.626

XS_TL_Centerline 1: 150.000

XS_TL_Centerline 2: 150.000

XS_TL_Centerline 3: 150.000

XS_TL_Centerline: 150.000

XS_TL_Edge of Pavt 1: 600.001

XS_TL_Edge of Pavt 2: 899.983

XS_TL_Edge of Pavt 3: 599.952

XS_TL_Edge of Pavt: 300.000

XS_TL_Edge of Shld: 300.000

XS_TL_Cut: 61.344

XS_TL_Fill: 227.049

XS_TC_Pavement Layer 1: 3087.913 18.786

XS_TC_Fill: 272.354

XS_TC_Cut: 5.540

XS_TC_Pavement Layer 2: 3174.635 19.320

XS_TC_Foreslope: 942.349

XS_TC_Shoulder Foreslope: 651.190 2.886

XS_TC_Pavement Layer 3: 3904.623 68.071

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

17316.000 Suitable 10

Volumes_Cut: 82.209 1.085

Volumes_Fill: 4307.546 140.918

Baseline: 149.998

XS_TL_Draft-DNC: 1554.968

XS_TL_Centerline 1: 149.997

XS_TL_Centerline 2: 149.997

XS_TL_Centerline 3: 149.997

XS_TL_Centerline: 149.997

XS_TL_Edge of Pavt 1: 599.988

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 5 of 56Volumes Report

899.961

XS_TL_Edge of Pavt 3: 599.932

XS_TL_Edge of Pavt: 299.993

XS_TL_Edge of Shld: 299.993

XS_TL_Cut: 27.631

XS_TL_Fill: 257.189

XS_TC_Pavement Layer 1: 3090.899 18.784

XS_TC_Fill: 508.783 0.576

XS_TC_Pavement Layer 2: 3177.601 19.318

XS_TC_Cut: 35.800

XS_TC_Foreslope: 943.756

XS_TC_Shoulder Foreslope: 574.578 3.482

XS_TC_Pavement Layer 3: 3907.475 68.074

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

17465.000 Suitable 11

Volumes_Cut: 824.110 16.797

Volumes_Fill: 3616.511 131.448

Baseline: 149.999

XS_TL_Draft-DNC: 1802.292

XS_TL_Centerline 1: 149.999

XS_TL_Centerline 2: 149.999

XS_TL_Centerline 3: 149.999

XS_TL_Centerline: 149.999

XS_TL_Edge of Pavt 1: 599.995

XS_TL_Edge of Pavt 2: 899.981

XS_TL_Edge of Pavt 3: 599.964

XS_TL_Edge of Pavt: 299.997

XS_TL_Edge of Shld: 299.997

XS_TL_Cut: 151.416

XS_TL_Fill: 148.674

XS_TC_Pavement Layer 1: 3091.505 18.785

XS_TC_Pavement Layer 2: 3178.218 19.319

XS_TC_Fill: 702.143 4.224

XS_TC_Cut: 236.233

XS_TC_Foreslope: 944.261

XS_TC_Shoulder Foreslope: 1034.153 7.876

XS_TC_Pavement Layer 3: 3908.564 68.081

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

17614.000 Suitable 12

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 6 of 56Volumes Report

317.618 3.817

Volumes_Fill: 4353.580 157.219

Baseline: 149.991

XS_TL_Draft-DNC: 1658.360

XS_TL_Centerline 1: 149.987

XS_TL_Centerline 2: 149.987

XS_TL_Centerline 3: 149.987

XS_TL_Centerline: 149.987

XS_TL_Edge of Pavt 1: 599.955

XS_TL_Edge of Pavt 2: 899.850

XS_TL_Edge of Pavt 3: 599.740

XS_TL_Edge of Pavt: 299.975

XS_TL_Edge of Shld: 299.975

XS_TL_Cut: 93.706

XS_TL_Fill: 166.415

XS_TC_Pavement Layer 1: 3088.067 18.779

XS_TC_Cut: 93.571

XS_TC_Fill: 807.592 0.949

XS_TC_Pavement Layer 2: 3174.732 19.312

XS_TC_Foreslope: 940.380

XS_TC_Shoulder Foreslope: 766.425 4.855

XS_TC_Pavement Layer 3: 3901.388 67.977

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

17763.000 Suitable 13

Volumes_Cut: 1677.466 22.111

Volumes_Fill: 2938.774 42.687

Baseline: 149.991

XS_TL_Draft-DNC: 1861.723

XS_TL_Centerline 1: 149.983

XS_TL_Centerline 2: 149.983

XS_TL_Centerline 3: 149.983

XS_TL_Centerline: 149.983

XS_TL_Edge of Pavt 1: 599.938

XS_TL_Edge of Pavt 2: 899.826

XS_TL_Edge of Pavt 3: 599.726

XS_TL_Edge of Pavt: 299.967

XS_TL_Edge of Shld: 299.967

XS_TL_Cut: 212.796

XS_TL_Fill: 61.153

XS_TC_Pavement Layer 1: 3086.244 18.778

XS_TC_Fill: 854.737 3.243

XS_TC_Cut: 222.829

XS_TC_Pavement Layer 2: 3172.861 19.312

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 7 of 56Volumes Report

939.632

XS_TC_Shoulder Foreslope: 1188.365 8.409

XS_TC_Pavement Layer 3: 3898.844 68.018

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

17912.000 Suitable 14

Volumes_Cut: 3800.386 59.341

Volumes_Fill: 1681.774 27.609

Baseline: 149.995

XS_TL_Draft-DNC: 1789.805

XS_TL_Centerline 1: 149.995

XS_TL_Centerline 2: 149.995

XS_TL_Centerline 3: 149.995

XS_TL_Centerline: 149.995

XS_TL_Edge of Pavt 1: 599.982

XS_TL_Edge of Pavt 2: 899.929

XS_TL_Edge of Pavt 3: 599.866

XS_TL_Edge of Pavt: 299.990

XS_TL_Edge of Shld: 299.990

XS_TL_Cut: 144.048

XS_TL_Fill: 141.368

XS_TC_Pavement Layer 1: 3087.197 18.784

XS_TC_Cut: 537.919

XS_TC_Pavement Layer 2: 3173.816 19.319

XS_TC_Fill: 1656.668 11.293

XS_TC_Foreslope: 941.397

XS_TC_Shoulder Foreslope: 1197.227 9.697

XS_TC_Pavement Layer 3: 3901.497 68.024

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

18061.000 Suitable 15

Volumes_Cut: 4177.137 97.478

Volumes_Fill: 762.176 14.927

Baseline: 149.999

XS_TL_Draft-DNC: 1820.672

XS_TL_Centerline 1: 149.998

XS_TL_Centerline 2: 149.998

XS_TL_Centerline 3: 149.998

XS_TL_Centerline: 149.998

XS_TL_Edge of Pavt 1: 599.993

XS_TL_Edge of Pavt 2: 899.972

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 8 of 56Volumes Report

599.949

XS_TL_Edge of Pavt: 299.996

XS_TL_Edge of Shld: 299.996

XS_TL_Cut: 189.470

XS_TL_Fill: 102.902

XS_TC_Pavement Layer 1: 3090.336 18.785

XS_TC_Cut: 441.700

XS_TC_Fill: 1077.922 9.365

XS_TC_Pavement Layer 2: 3177.028 19.320

XS_TC_Foreslope: 943.173

XS_TC_Shoulder Foreslope: 1206.019 9.389

XS_TC_Pavement Layer 3: 3906.328 68.040

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

18210.000 Suitable 16

Volumes_Cut: 3892.559 100.440

Volumes_Fill: 1495.792 23.815

Baseline: 149.998

XS_TL_Draft-DNC: 1796.083

XS_TL_Centerline 1: 149.996

XS_TL_Centerline 2: 149.996

XS_TL_Centerline 3: 149.996

XS_TL_Centerline: 149.996

XS_TL_Edge of Pavt 1: 599.986

XS_TL_Edge of Pavt 2: 899.948

XS_TL_Edge of Pavt 3: 599.907

XS_TL_Edge of Pavt: 299.992

XS_TL_Edge of Shld: 299.992

XS_TL_Cut: 147.693

XS_TL_Fill: 138.441

XS_TC_Pavement Layer 1: 3087.422 18.784

XS_TC_Cut: 481.736

XS_TC_Pavement Layer 2: 3174.038 19.318

XS_TC_Fill: 1499.995 9.944

XS_TC_Foreslope: 942.011

XS_TC_Shoulder Foreslope: 1068.266 8.644

XS_TC_Pavement Layer 3: 3902.316 68.020

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

18359.000 Suitable 17

Volumes_Cut: 1181.834 21.133

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 9 of 56Volumes Report

3289.717 51.367

Baseline: 149.989

XS_TL_Draft-DNC: 1784.616

XS_TL_Centerline 1: 149.978

XS_TL_Centerline 2: 149.978

XS_TL_Centerline 3: 149.978

XS_TL_Centerline: 149.978

XS_TL_Edge of Pavt 1: 599.920

XS_TL_Edge of Pavt 2: 899.753

XS_TL_Edge of Pavt 3: 599.588

XS_TL_Edge of Pavt: 299.956

XS_TL_Edge of Shld: 299.956

XS_TL_Cut: 170.006

XS_TL_Fill: 127.889

XS_TC_Pavement Layer 1: 3088.766 18.775

XS_TC_Fill: 758.357 6.024

XS_TC_Pavement Layer 2: 3175.481 19.310

XS_TC_Cut: 272.811

XS_TC_Foreslope: 938.799

XS_TC_Shoulder Foreslope: 1149.276 8.592

XS_TC_Pavement Layer 3: 3900.554 67.973

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

18508.000 Suitable 18

Volumes_Cut: 705.524 11.282

Volumes_Fill: 3441.840 108.583

Baseline: 149.995

XS_TL_Draft-DNC: 1726.667

XS_TL_Centerline 1: 149.985

XS_TL_Centerline 2: 149.985

XS_TL_Centerline 3: 149.985

XS_TL_Centerline: 149.985

XS_TL_Edge of Pavt 1: 599.946

XS_TL_Edge of Pavt 2: 899.832

XS_TL_Edge of Pavt 3: 599.717

XS_TL_Edge of Pavt: 299.970

XS_TL_Edge of Shld: 299.970

XS_TL_Cut: 161.551

XS_TL_Fill: 80.829

XS_TC_Pavement Layer 1: 3089.499 18.778

XS_TC_Cut: 166.210

XS_TC_Fill: 322.561 2.401

XS_TC_Pavement Layer 2: 3176.202 19.313

XS_TC_Foreslope: 941.034

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 10 of 56Volumes Report

967.621 6.515

XS_TC_Pavement Layer 3: 3903.463 68.016

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

18657.000 Suitable 19

Volumes_Cut: 864.488 10.306

Volumes_Fill: 3181.053 104.198

Baseline: 149.999

XS_TL_Draft-DNC: 1814.747

XS_TL_Centerline 1: 149.998

XS_TL_Centerline 2: 149.998

XS_TL_Centerline 3: 149.998

XS_TL_Centerline: 149.998

XS_TL_Edge of Pavt 1: 599.993

XS_TL_Edge of Pavt 2: 899.973

XS_TL_Edge of Pavt 3: 599.950

XS_TL_Edge of Pavt: 299.996

XS_TL_Edge of Shld: 299.996

XS_TL_Cut: 220.265

XS_TL_Fill: 36.410

XS_TC_Pavement Layer 1: 3087.780 18.785

XS_TC_Cut: 130.194

XS_TC_Fill: 209.960 0.847

XS_TC_Pavement Layer 2: 3174.392 19.319

XS_TC_Foreslope: 943.047

XS_TC_Shoulder Foreslope: 1100.602 6.745

XS_TC_Pavement Layer 3: 3903.689 68.079

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

18806.000 Suitable 20

Volumes_Cut: 505.516 5.715

Volumes_Fill: 4953.001 156.508

Baseline: 149.999

XS_TL_Draft-DNC: 1668.373

XS_TL_Centerline 1: 150.000

XS_TL_Centerline 2: 150.000

XS_TL_Centerline 3: 150.000

XS_TL_Centerline: 150.000

XS_TL_Edge of Pavt 1: 617.018

XS_TL_Edge of Pavt 2: 925.374

XS_TL_Edge of Pavt 3: 616.673

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 11 of 56Volumes Report

308.517

XS_TL_Edge of Shld: 308.488

XS_TL_Cut: 113.296

XS_TL_Fill: 142.726

XS_TC_Pavement Layer 1: 4267.408 26.056

XS_TC_Fill: 403.005 0.888

XS_TC_Cut: 74.298

XS_TC_Pavement Layer 2: 4356.557 26.606

XS_TC_Foreslope: 968.217

XS_TC_Shoulder Foreslope: 859.288 5.163

XS_TC_Pavement Layer 3: 5106.423 90.205

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

18955.000 Suitable 21

Volumes_Cut: 719.492 6.284

Volumes_Fill: 3349.643 115.308

Baseline: 149.998

XS_TL_Draft-DNC: 1727.077

XS_TL_Centerline 1: 149.999

XS_TL_Centerline 2: 149.999

XS_TL_Centerline 3: 149.999

XS_TL_Centerline: 149.999

XS_TL_Edge of Pavt 1: 601.685

XS_TL_Edge of Pavt 2: 902.692

XS_TL_Edge of Pavt 3: 601.974

XS_TL_Edge of Pavt: 300.825

XS_TL_Edge of Shld: 300.883

XS_TL_Cut: 206.244

XS_TL_Fill: 39.557

XS_TC_Pavement Layer 1: 3101.742 18.869

XS_TC_Cut: 106.093

XS_TC_Fill: 191.828 0.623

XS_TC_Pavement Layer 2: 3188.720 19.405

XS_TC_Foreslope: 945.462

XS_TC_Shoulder Foreslope: 1000.197 5.644

XS_TC_Pavement Layer 3: 3921.188 68.322

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

19104.000 Suitable 22

Volumes_Cut: 902.429 13.923

Volumes_Fill: 3209.113 80.990

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 12 of 56Volumes Report

149.999

XS_TL_Draft-DNC: 1836.247

XS_TL_Centerline 1: 149.997

XS_TL_Centerline 2: 149.997

XS_TL_Centerline 3: 149.997

XS_TL_Centerline: 149.997

XS_TL_Edge of Pavt 1: 599.991

XS_TL_Edge of Pavt 2: 899.967

XS_TL_Edge of Pavt 3: 599.940

XS_TL_Edge of Pavt: 299.995

XS_TL_Edge of Shld: 299.995

XS_TL_Cut: 261.725

XS_TL_Fill: 22.466

XS_TC_Pavement Layer 1: 3087.589 18.784

XS_TC_Fill: 324.598 2.125

XS_TC_Pavement Layer 2: 3174.201 19.319

XS_TC_Cut: 197.211

XS_TC_Foreslope: 942.561

XS_TC_Shoulder Foreslope: 1104.882 7.650

XS_TC_Pavement Layer 3: 3903.017 68.047

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

19253.000 Suitable 23

Volumes_Cut: 140.745 1.030

Volumes_Fill: 4061.470 85.437

Baseline: 149.997

XS_TL_Draft-DNC: 1557.878

XS_TL_Centerline 1: 149.991

XS_TL_Centerline 2: 149.991

XS_TL_Centerline 3: 149.991

XS_TL_Centerline: 149.991

XS_TL_Edge of Pavt 1: 599.967

XS_TL_Edge of Pavt 2: 899.905

XS_TL_Edge of Pavt 3: 599.849

XS_TL_Edge of Pavt: 299.982

XS_TL_Edge of Shld: 299.982

XS_TL_Cut: 42.116

XS_TL_Fill: 238.638

XS_TC_Pavement Layer 1: 3086.576 18.782

XS_TC_Cut: 37.985

XS_TC_Fill: 327.999 0.492

XS_TC_Pavement Layer 2: 3173.183 19.317

XS_TC_Foreslope: 940.854

XS_TC_Shoulder Foreslope: 596.467 3.582

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 13 of 56Volumes Report

3900.345 68.020

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

19402.000 Suitable 24

Volumes_Cut: 147.168 0.882

Volumes_Fill: 3973.969 82.620

Baseline: 149.996

XS_TL_Draft-DNC: 1518.763

XS_TL_Centerline 1: 149.989

XS_TL_Centerline 2: 149.989

XS_TL_Centerline 3: 149.989

XS_TL_Centerline: 149.989

XS_TL_Edge of Pavt 1: 599.961

XS_TL_Edge of Pavt 2: 899.880

XS_TL_Edge of Pavt 3: 599.799

XS_TL_Edge of Pavt: 299.979

XS_TL_Edge of Shld: 299.979

XS_TL_Cut: 70.305

XS_TL_Fill: 149.614

XS_TC_Pavement Layer 1: 3086.573 18.780

XS_TC_Fill: 189.161 0.146

XS_TC_Cut: 49.366

XS_TC_Pavement Layer 2: 3173.178 19.315

XS_TC_Foreslope: 941.105

XS_TC_Shoulder Foreslope: 540.093 2.987

XS_TC_Pavement Layer 3: 3900.619 68.044

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

19551.000 Suitable 25

Volumes_Cut: 394.090 4.659

Volumes_Fill: 4115.066 98.610

Baseline: 149.994

XS_TL_Draft-DNC: 1651.356

XS_TL_Centerline 1: 149.993

XS_TL_Centerline 2: 149.993

XS_TL_Centerline 3: 149.993

XS_TL_Centerline: 149.993

XS_TL_Edge of Pavt 1: 599.975

XS_TL_Edge of Pavt 2: 899.913

XS_TL_Edge of Pavt 3: 599.846

XS_TL_Edge of Pavt: 299.986

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 14 of 56Volumes Report

299.986

XS_TL_Cut: 133.317

XS_TL_Fill: 154.738

XS_TC_Pavement Layer 1: 3086.905 18.782

XS_TC_Cut: 96.248

XS_TC_Fill: 631.333 0.858

XS_TC_Pavement Layer 2: 3173.519 19.317

XS_TC_Foreslope: 941.092

XS_TC_Shoulder Foreslope: 755.234 4.742

XS_TC_Pavement Layer 3: 3900.912 68.015

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

19700.000 Suitable 26

Volumes_Cut: 1502.392 28.528

Volumes_Fill: 2840.539 42.104

Baseline: 149.999

XS_TL_Draft-DNC: 2000.893

XS_TL_Centerline 1: 149.998

XS_TL_Centerline 2: 149.998

XS_TL_Centerline 3: 149.998

XS_TL_Centerline: 149.998

XS_TL_Edge of Pavt 1: 599.994

XS_TL_Edge of Pavt 2: 899.978

XS_TL_Edge of Pavt 3: 599.962

XS_TL_Edge of Pavt: 299.996

XS_TL_Edge of Shld: 299.996

XS_TL_Cut: 250.340

XS_TL_Fill: 34.582

XS_TC_Pavement Layer 1: 3088.174 18.785

XS_TC_Pavement Layer 2: 3174.802 19.320

XS_TC_Fill: 725.045 6.363

XS_TC_Cut: 348.072

XS_TC_Foreslope: 942.733

XS_TC_Shoulder Foreslope: 1402.326 11.193

XS_TC_Pavement Layer 3: 3903.754 68.047

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

19849.000 Suitable 27

Volumes_Cut: 720.379 7.628

Volumes_Fill: 3404.916 59.775

Baseline: 149.997

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 15 of 56Volumes Report

1626.332

XS_TL_Centerline 1: 149.995

XS_TL_Centerline 2: 149.995

XS_TL_Centerline 3: 149.995

XS_TL_Centerline: 149.995

XS_TL_Edge of Pavt 1: 599.980

XS_TL_Edge of Pavt 2: 899.937

XS_TL_Edge of Pavt 3: 599.892

XS_TL_Edge of Pavt: 299.989

XS_TL_Edge of Shld: 299.989

XS_TL_Cut: 134.317

XS_TL_Fill: 118.827

XS_TC_Pavement Layer 1: 3087.247 18.783

XS_TC_Cut: 106.593

XS_TC_Pavement Layer 2: 3173.854 19.317

XS_TC_Fill: 226.854 0.856

XS_TC_Foreslope: 942.292

XS_TC_Shoulder Foreslope: 744.504 4.426

XS_TC_Pavement Layer 3: 3902.432 68.066

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

19998.000 Suitable 28

Volumes_Cut: 76.919 0.293

Volumes_Fill: 4903.718 246.099

Baseline: 149.992

XS_TL_Draft-DNC: 1515.795

XS_TL_Centerline 1: 149.992

XS_TL_Centerline 2: 149.992

XS_TL_Centerline 3: 149.992

XS_TL_Centerline: 149.992

XS_TL_Edge of Pavt 1: 599.970

XS_TL_Edge of Pavt 2: 899.897

XS_TL_Edge of Pavt 3: 599.819

XS_TL_Edge of Pavt: 299.983

XS_TL_Edge of Shld: 299.983

XS_TL_Cut: 51.581

XS_TL_Fill: 217.161

XS_TC_Pavement Layer 1: 3089.740 18.782

XS_TC_Fill: 1065.133 0.009

XS_TC_Cut: 16.187

XS_TC_Pavement Layer 2: 3176.441 19.317

XS_TC_Foreslope: 941.508

XS_TC_Shoulder Foreslope: 594.686 3.051

XS_TC_Pavement Layer 3: 3904.130 68.012

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 16 of 56Volumes Report

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

20147.000 Suitable 29

Volumes_Cut: 774.657 16.310

Volumes_Fill: 3735.222 133.605

Baseline: 149.998

XS_TL_Draft-DNC: 1710.069

XS_TL_Centerline 1: 149.997

XS_TL_Centerline 2: 149.997

XS_TL_Centerline 3: 149.997

XS_TL_Centerline: 149.997

XS_TL_Edge of Pavt 1: 599.989

XS_TL_Edge of Pavt 2: 899.961

XS_TL_Edge of Pavt 3: 599.932

XS_TL_Edge of Pavt: 299.994

XS_TL_Edge of Shld: 299.994

XS_TL_Cut: 117.896

XS_TL_Fill: 87.389

XS_TC_Pavement Layer 1: 3090.732 18.784

XS_TC_Fill: 668.626 3.393

XS_TC_Cut: 207.721

XS_TC_Pavement Layer 2: 3177.435 19.317

XS_TC_Foreslope: 943.285

XS_TC_Shoulder Foreslope: 880.311 6.524

XS_TC_Pavement Layer 3: 3906.839 68.023

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

20296.000 Suitable 30

Volumes_Cut: 101.166 1.122

Volumes_Fill: 6376.820 270.280

Baseline: 149.993

XS_TL_Draft-DNC: 1576.970

XS_TL_Centerline 1: 149.997

XS_TL_Centerline 2: 149.997

XS_TL_Centerline 3: 149.997

XS_TL_Centerline: 149.997

XS_TL_Edge of Pavt 1: 613.871

XS_TL_Edge of Pavt 2: 920.738

XS_TL_Edge of Pavt 3: 613.693

XS_TL_Edge of Pavt: 306.933

XS_TL_Edge of Shld: 306.933

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 17 of 56Volumes Report

28.435

XS_TL_Fill: 228.631

XS_TC_Pavement Layer 1: 3559.964 21.691

XS_TC_Fill: 2099.009 0.411

XS_TC_Cut: 26.517

XS_TC_Pavement Layer 2: 3648.731 22.239

XS_TC_Foreslope: 961.184

XS_TC_Shoulder Foreslope: 585.297 3.436

XS_TC_Pavement Layer 3: 4392.664 76.984

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

20445.000 Suitable 31

Volumes_Cut: 514.958 12.184

Volumes_Fill: 5173.732 164.743

Baseline: 149.989

XS_TL_Draft-DNC: 1706.756

XS_TL_Centerline 1: 149.996

XS_TL_Centerline 2: 149.996

XS_TL_Centerline 3: 149.996

XS_TL_Centerline: 149.996

XS_TL_Edge of Pavt 1: 601.467

XS_TL_Edge of Pavt 2: 902.125

XS_TL_Edge of Pavt 3: 601.268

XS_TL_Edge of Pavt: 300.731

XS_TL_Edge of Shld: 300.731

XS_TL_Cut: 111.255

XS_TL_Fill: 189.114

XS_TC_Pavement Layer 1: 3816.151 23.271

XS_TC_Fill: 1173.219 3.638

XS_TC_Pavement Layer 2: 3903.139 23.807

XS_TC_Cut: 170.999

XS_TC_Foreslope: 942.439

XS_TC_Shoulder Foreslope: 894.202 6.431

XS_TC_Pavement Layer 3: 4632.695 81.520

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

20594.000 Suitable 32

Volumes_Cut: 3748.740 106.773

Volumes_Fill: 680.962 2.494

Baseline: 149.993

XS_TL_Draft-DNC: 2003.978

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 18 of 56Volumes Report

149.990

XS_TL_Centerline 2: 149.990

XS_TL_Centerline 3: 149.990

XS_TL_Centerline: 149.990

XS_TL_Edge of Pavt 1: 599.962

XS_TL_Edge of Pavt 2: 899.881

XS_TL_Edge of Pavt 3: 599.800

XS_TL_Edge of Pavt: 299.979

XS_TL_Edge of Shld: 299.979

XS_TL_Cut: 281.527

XS_TL_Fill: 8.601

XS_TC_Pavement Layer 1: 3089.097 18.781

XS_TC_Cut: 513.835

XS_TC_Pavement Layer 2: 3175.782 19.315

XS_TC_Fill: 693.088 8.632

XS_TC_Foreslope: 941.158

XS_TC_Shoulder Foreslope: 1411.411 11.256

XS_TC_Pavement Layer 3: 3903.153 68.032

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

20743.000 Suitable 33

Volumes_Cut: 3746.153 51.424

Volumes_Fill: 874.654 8.759

Baseline: 149.999

XS_TL_Draft-DNC: 1810.310

XS_TL_Centerline 1: 149.998

XS_TL_Centerline 2: 149.998

XS_TL_Centerline 3: 149.998

XS_TL_Centerline: 149.998

XS_TL_Edge of Pavt 1: 599.990

XS_TL_Edge of Pavt 2: 900.000

XS_TL_Edge of Pavt 3: 600.029

XS_TL_Edge of Pavt: 299.995

XS_TL_Edge of Shld: 299.995

XS_TL_Cut: 185.449

XS_TL_Fill: 52.147

XS_TC_Pavement Layer 1: 3089.522 18.785

XS_TC_Cut: 430.252

XS_TC_Pavement Layer 2: 3176.164 19.319

XS_TC_Fill: 633.904 3.581

XS_TC_Foreslope: 944.640

XS_TC_Shoulder Foreslope: 1115.604 7.459

XS_TC_Pavement Layer 3: 3906.959 68.094

XS_TL_Slopes:

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 19 of 56Volumes Report

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

20892.000 Suitable 34

Volumes_Cut: 4002.133 37.042

Volumes_Fill: 178.980 1.340

Baseline: 149.997

XS_TL_Draft-DNC: 1846.647

XS_TL_Centerline 1: 149.992

XS_TL_Centerline 2: 149.992

XS_TL_Centerline 3: 149.992

XS_TL_Centerline: 149.992

XS_TL_Edge of Pavt 1: 599.967

XS_TL_Edge of Pavt 2: 899.938

XS_TL_Edge of Pavt 3: 599.932

XS_TL_Edge of Pavt: 299.983

XS_TL_Edge of Shld: 299.983

XS_TL_Cut: 231.083

XS_TL_Fill: 37.807

XS_TC_Pavement Layer 1: 3086.526 18.781

XS_TC_Pavement Layer 2: 3173.101 19.316

XS_TC_Fill: 373.919 1.632

XS_TC_Cut: 190.302

XS_TC_Foreslope: 942.810

XS_TC_Shoulder Foreslope: 1121.845 7.565

XS_TC_Pavement Layer 3: 3902.217 68.070

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

21041.000 Suitable 35

Volumes_Cut: 2987.692 31.276

Volumes_Fill: 1124.744 5.769

Baseline: 150.000

XS_TL_Draft-DNC: 1898.983

XS_TL_Centerline 1: 150.000

XS_TL_Centerline 2: 150.000

XS_TL_Centerline 3: 150.000

XS_TL_Centerline: 150.000

XS_TL_Edge of Pavt 1: 599.998

XS_TL_Edge of Pavt 2: 900.003

XS_TL_Edge of Pavt 3: 600.012

XS_TL_Edge of Pavt: 299.999

XS_TL_Edge of Shld: 299.999

XS_TL_Cut: 258.499

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 20 of 56Volumes Report

3087.244 18.786

XS_TC_Cut: 207.764

XS_TC_Pavement Layer 2: 3173.828 19.320

XS_TC_Foreslope: 943.664

XS_TC_Shoulder Foreslope: 1158.056 7.896

XS_TC_Pavement Layer 3: 3903.751 68.092

XS_TC_Fill: 302.769 1.514

XS_TL_Fill:

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

21190.000 Suitable 36

Volumes_Cut: 3234.616 38.064

Volumes_Fill: 778.217 2.492

Baseline: 150.000

XS_TL_Draft-DNC: 1719.059

XS_TL_Centerline 1: 150.000

XS_TL_Centerline 2: 150.000

XS_TL_Centerline 3: 150.000

XS_TL_Centerline: 150.000

XS_TL_Edge of Pavt 1: 600.000

XS_TL_Edge of Pavt 2: 900.000

XS_TL_Edge of Pavt 3: 600.000

XS_TL_Edge of Pavt: 300.000

XS_TL_Edge of Shld: 300.000

XS_TL_Cut: 190.502

XS_TL_Fill: 50.002

XS_TC_Pavement Layer 1: 3087.226 18.786

XS_TC_Cut: 80.383

XS_TC_Fill: 90.582 0.108

XS_TC_Pavement Layer 2: 3173.812 19.320

XS_TC_Foreslope: 943.480

XS_TC_Shoulder Foreslope: 948.805 5.609

XS_TC_Pavement Layer 3: 3903.555 68.091

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

21339.000 Suitable 37

Volumes_Cut: 4093.689 105.546

Volumes_Fill: 149.800 0.329

Baseline: 150.000

XS_TL_Draft-DNC: 1768.918

XS_TL_Centerline 1: 150.000

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 21 of 56Volumes Report

150.000

XS_TL_Centerline 3: 150.000

XS_TL_Centerline: 150.000

XS_TL_Edge of Pavt 1: 600.000

XS_TL_Edge of Pavt 2: 900.000

XS_TL_Edge of Pavt 3: 600.000

XS_TL_Edge of Pavt: 300.000

XS_TL_Edge of Shld: 300.000

XS_TL_Cut: 244.831

XS_TC_Pavement Layer 1: 3087.568 18.786

XS_TC_Cut: 305.943

XS_TC_Fill: 460.473 5.322

XS_TC_Pavement Layer 2: 3174.164 19.320

XS_TC_Foreslope: 943.576

XS_TC_Shoulder Foreslope: 1064.717 7.854

XS_TC_Pavement Layer 3: 3903.988 68.091

XS_TL_Fill:

XS_TL_Slopes:

XS_TL_Subgrade:

AUX_10:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

21488.000 Suitable 38

Volumes_Cut: 1274.883 38.892

Volumes_Fill: 4475.806 335.302

Baseline: 149.994

XS_TL_Draft-DNC: 1617.182

XS_TL_Centerline 1: 149.989

XS_TL_Centerline 2: 149.989

XS_TL_Centerline 3: 149.989

XS_TL_Centerline: 149.989

XS_TL_Edge of Pavt 1: 601.199

XS_TL_Edge of Pavt 2: 901.789

XS_TL_Edge of Pavt 3: 601.264

XS_TL_Edge of Pavt: 300.599

Slope Stake Limits Transition: 55.067

XS_TL_Edge of Shld: 300.598

XS_TL_Cut: 65.811

XS_TL_Fill: 224.487

XS_TC_Pavement Layer 1: 3127.785 19.020

XS_TC_Cut: 80.439

XS_TC_Pavement Layer 2: 3214.536 19.555

XS_TC_Fill: 1994.565 1.222

XS_TC_Foreslope: 809.843

XS_TC_Shoulder Foreslope: 625.303 3.946

XS_TC_Pavement Layer 3: 3799.643 66.904

XS_TL_Slopes:

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 22 of 56Volumes Report

XS_TC_Surface 1 Symbology:

21637.000 Suitable 39

Volumes_Cut: 4.641 0.003

Volumes_Fill: 4820.889 512.792

Baseline: 149.998

XS_TL_Draft-DNC: 991.027

XS_TL_Centerline 1: 124.995

XS_TL_Centerline 2: 124.995

XS_TL_Centerline 3: 124.995

XS_TL_Subgrade: 103.939

XS_TL_Centerline: 124.995

XS_TL_Edge of Pavt 1: 448.356

XS_TL_Edge of Pavt 2: 646.560

XS_TL_Edge of Pavt 3: 448.364

XS_TL_Edge of Pavt: 250.156

XS_TL_Slopes: 52.012

Slope Stake Limits Transition: 129.380

AUX_10: 25.978

XS_TL_Edge of Shld: 198.201

XS_TL_Fill: 199.716

XS_TC_Pavement Layer 1: 2613.917 15.950

XS_TC_Fill: 1826.983 2.602

XS_TC_Pavement Layer 2: 2671.210 16.303

XS_TC_Pavement Layer 4: 519.583 9.163

XS_TC_Foreslope: 468.467

XS_TC_Shoulder Foreslope: 248.861 1.331

XS_TC_Pavement Layer 3: 2520.795 43.681

XS_TL_Cut:

XS_TC_Cut:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

21786.000 Suitable 40

Volumes_Cut: 1615.728 14.418

Volumes_Fill: 2902.853 92.612

Baseline: 149.998

XS_TL_Draft-DNC: 1546.688

XS_TL_Centerline 1: 149.997

XS_TL_Centerline 2: 149.997

XS_TL_Centerline 3: 149.997

XS_TL_Centerline: 149.997

XS_TL_Edge of Pavt 1: 599.988

XS_TL_Edge of Pavt 2: 899.964

XS_TL_Edge of Pavt 3: 599.974

XS_TL_Edge of Pavt: 299.993

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 23 of 56Volumes Report

299.993

XS_TL_Cut: 110.741

XS_TL_Fill: 163.715

XS_TC_Pavement Layer 1: 3087.721 18.784

XS_TC_Fill: 680.790 0.059

XS_TC_Pavement Layer 2: 3174.343 19.318

XS_TC_Cut: 39.095

XS_TC_Foreslope: 865.771

XS_TC_Shoulder Foreslope: 697.105 3.535

XS_TC_Pavement Layer 3: 3820.328 66.980

XS_TL_Subgrade:

XS_TL_Slopes:

Slope Stake Limits Transition:

AUX_10:

XS_TC_Pavement Layer 4:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

21935.000 Suitable 41

Volumes_Cut: 4207.571 74.182

Volumes_Fill: 100.101 0.152

Baseline: 150.000

XS_TL_Draft-DNC: 2099.250

XS_TL_Centerline 1: 150.000

XS_TL_Centerline 2: 150.000

XS_TL_Centerline 3: 150.000

XS_TL_Centerline: 150.000

XS_TL_Edge of Pavt 1: 599.999

XS_TL_Edge of Pavt 2: 899.994

XS_TL_Edge of Pavt 3: 599.989

XS_TL_Edge of Pavt: 299.999

XS_TL_Edge of Shld: 299.999

XS_TL_Cut: 300.018

XS_TC_Pavement Layer 1: 3087.269 18.785

XS_TC_Pavement Layer 2: 3173.859 19.320

XS_TC_Cut: 404.192

XS_TC_Foreslope: 943.358

XS_TC_Shoulder Foreslope: 1576.768 12.348

XS_TC_Pavement Layer 3: 3903.480 68.088

XS_TC_Fill: 739.260 6.739

XS_TL_Fill:

XS_TL_Subgrade:

XS_TL_Slopes:

Slope Stake Limits Transition:

AUX_10:

XS_TC_Pavement Layer 4:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 24 of 56Volumes Report

Suitable 42

Volumes_Cut: 2971.820 36.843

Volumes_Fill: 1586.420 18.842

Baseline: 149.998

XS_TL_Draft-DNC: 1736.940

XS_TL_Centerline 1: 149.998

XS_TL_Centerline 2: 149.998

XS_TL_Centerline 3: 149.998

XS_TL_Centerline: 149.998

XS_TL_Edge of Pavt 1: 599.993

XS_TL_Edge of Pavt 2: 899.974

XS_TL_Edge of Pavt 3: 599.952

XS_TL_Edge of Pavt: 299.996

XS_TL_Edge of Shld: 299.996

XS_TL_Cut: 118.395

XS_TL_Fill: 127.825

XS_TC_Pavement Layer 1: 3087.311 18.786

XS_TC_Cut: 207.336

XS_TC_Pavement Layer 2: 3173.915 19.322

XS_TC_Fill: 754.836 3.290

XS_TC_Foreslope: 942.504

XS_TC_Shoulder Foreslope: 924.842 6.574

XS_TC_Pavement Layer 3: 3902.681 68.031

XS_TL_Subgrade:

XS_TL_Slopes:

Slope Stake Limits Transition:

AUX_10:

XS_TC_Pavement Layer 4:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

22233.000 Suitable 43

Volumes_Cut: 116.732 0.619

Volumes_Fill: 3901.181 42.431

Baseline: 149.993

XS_TL_Draft-DNC: 1499.920

XS_TL_Centerline 1: 149.991

XS_TL_Centerline 2: 149.991

XS_TL_Centerline 3: 149.991

XS_TL_Centerline: 149.991

XS_TL_Edge of Pavt 1: 599.968

XS_TL_Edge of Pavt 2: 899.898

XS_TL_Edge of Pavt 3: 599.825

XS_TL_Edge of Pavt: 299.983

XS_TL_Edge of Shld: 299.983

XS_TL_Cut: 71.012

XS_TL_Fill: 203.285

XS_TC_Pavement Layer 1: 3087.230 18.782

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 25 of 56Volumes Report

3173.854 19.317

XS_TC_Fill: 96.521

XS_TC_Cut: 19.585

XS_TC_Foreslope: 941.162

XS_TC_Shoulder Foreslope: 604.045 2.929

XS_TC_Pavement Layer 3: 3901.305 68.024

XS_TL_Subgrade:

XS_TL_Slopes:

Slope Stake Limits Transition:

AUX_10:

XS_TC_Pavement Layer 4:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

22382.000 Suitable 44

Volumes_Cut: 1485.707 7.504

Volumes_Fill: 2673.525 19.435

Baseline: 150.000

XS_TL_Draft-DNC: 1589.605

XS_TL_Centerline 1: 149.999

XS_TL_Centerline 2: 149.999

XS_TL_Centerline 3: 149.999

XS_TL_Centerline: 149.999

XS_TL_Edge of Pavt 1: 599.997

XS_TL_Edge of Pavt 2: 899.991

XS_TL_Edge of Pavt 3: 599.985

XS_TL_Edge of Pavt: 299.998

XS_TL_Edge of Shld: 299.998

XS_TL_Cut: 113.234

XS_TL_Fill: 125.527

XS_TC_Pavement Layer 1: 3087.218 18.786

XS_TC_Fill: 227.583 0.216

XS_TC_Cut: 79.128

XS_TC_Pavement Layer 2: 3173.815 19.321

XS_TC_Foreslope: 942.675

XS_TC_Shoulder Foreslope: 762.504 3.979

XS_TC_Pavement Layer 3: 3902.742 68.042

XS_TL_Subgrade:

XS_TL_Slopes:

Slope Stake Limits Transition:

AUX_10:

XS_TC_Pavement Layer 4:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

22531.000 Suitable 45

Volumes_Cut: 1398.418 18.602

Volumes_Fill: 2930.442 19.091

Baseline: 149.999

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 26 of 56Volumes Report

1826.061

XS_TL_Centerline 1: 149.999

XS_TL_Centerline 2: 149.999

XS_TL_Centerline 3: 149.999

XS_TL_Centerline: 149.999

XS_TL_Edge of Pavt 1: 599.995

XS_TL_Edge of Pavt 2: 899.977

XS_TL_Edge of Pavt 3: 599.955

XS_TL_Edge of Pavt: 299.997

XS_TL_Edge of Shld: 299.997

XS_TL_Cut: 179.873

XS_TL_Fill: 85.187

XS_TC_Pavement Layer 1: 3087.714 18.785

XS_TC_Cut: 257.959

XS_TC_Fill: 592.677 4.607

XS_TC_Pavement Layer 2: 3174.331 19.320

XS_TC_Foreslope: 942.460

XS_TC_Shoulder Foreslope: 1089.843 8.601

XS_TC_Pavement Layer 3: 3903.031 68.048

XS_TL_Subgrade:

XS_TL_Slopes:

Slope Stake Limits Transition:

AUX_10:

XS_TC_Pavement Layer 4:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

22680.000 Suitable 46

Volumes_Cut: 1584.984 8.394

Volumes_Fill: 2473.426 15.722

Baseline: 149.999

XS_TL_Draft-DNC: 1727.827

XS_TL_Centerline 1: 149.997

XS_TL_Centerline 2: 149.997

XS_TL_Centerline 3: 149.997

XS_TL_Centerline: 149.997

XS_TL_Edge of Pavt 1: 599.988

XS_TL_Edge of Pavt 2: 899.955

XS_TL_Edge of Pavt 3: 599.917

XS_TL_Edge of Pavt: 299.993

XS_TL_Edge of Shld: 299.993

XS_TL_Cut: 191.798

XS_TL_Fill: 33.781

XS_TC_Pavement Layer 1: 3087.149 18.784

XS_TC_Cut: 122.187

XS_TC_Pavement Layer 2: 3173.750 19.318

XS_TC_Fill: 169.750 0.640

XS_TC_Foreslope: 942.500

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 27 of 56Volumes Report

890.165 5.525

XS_TC_Pavement Layer 3: 3902.534 68.072

XS_TL_Subgrade:

XS_TL_Slopes:

Slope Stake Limits Transition:

AUX_10:

XS_TC_Pavement Layer 4:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

22829.000 Suitable 47

Volumes_Cut: 816.488 5.472

Volumes_Fill: 3319.892 40.451

Baseline: 149.998

XS_TL_Draft-DNC: 1603.856

XS_TL_Centerline 1: 149.996

XS_TL_Centerline 2: 149.996

XS_TL_Centerline 3: 149.996

XS_TL_Centerline: 149.996

XS_TL_Edge of Pavt 1: 599.987

XS_TL_Edge of Pavt 2: 899.952

XS_TL_Edge of Pavt 3: 599.911

XS_TL_Edge of Pavt: 299.993

XS_TL_Edge of Shld: 299.993

XS_TL_Cut: 164.554

XS_TL_Fill: 91.866

XS_TC_Pavement Layer 1: 3089.627 18.784

XS_TC_Fill: 225.395 0.330

XS_TC_Cut: 70.878

XS_TC_Pavement Layer 2: 3176.299 19.318

XS_TC_Foreslope: 943.117

XS_TC_Shoulder Foreslope: 817.547 4.431

XS_TC_Pavement Layer 3: 3905.595 68.067

XS_TL_Subgrade:

XS_TL_Slopes:

Slope Stake Limits Transition:

AUX_10:

XS_TC_Pavement Layer 4:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

22978.000 Suitable 48

Volumes_Cut: 4187.324 103.196

Volumes_Fill: 587.476 11.985

Baseline: 149.993

XS_TL_Draft-DNC: 1891.789

XS_TL_Centerline 1: 149.992

XS_TL_Centerline 2: 149.992

XS_TL_Centerline 3: 149.992

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 28 of 56Volumes Report

149.992

XS_TL_Edge of Pavt 1: 599.969

XS_TL_Edge of Pavt 2: 899.906

XS_TL_Edge of Pavt 3: 599.844

XS_TL_Edge of Pavt: 299.983

XS_TL_Edge of Shld: 299.983

XS_TL_Cut: 221.937

XS_TL_Fill: 66.992

XS_TC_Pavement Layer 1: 3086.705 18.782

XS_TC_Pavement Layer 2: 3173.314 19.316

XS_TC_Fill: 1102.254 10.215

XS_TC_Cut: 442.740

XS_TC_Foreslope: 941.006

XS_TC_Shoulder Foreslope: 1394.346 11.105

XS_TC_Pavement Layer 3: 3900.628 68.029

XS_TL_Subgrade:

XS_TL_Slopes:

Slope Stake Limits Transition:

AUX_10:

XS_TC_Pavement Layer 4:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

23127.000 Suitable 49

Volumes_Cut: 2910.220 43.586

Volumes_Fill: 2331.326 24.899

Baseline: 188.045

XS_TL_Centerline 1: 300.643

XS_TL_Centerline 2: 300.643

XS_TL_Centerline 3: 300.643

XS_TL_Subgrade: 150.648

XS_TC_Pavement Layer 1: 4203.004 25.701

XS_TC_Pavement Layer 2: 4272.230 26.128

XS_TC_Pavement Layer 3: 4846.464 93.307

XS_TC_Pavement Layer 4: 1133.378

XS_TL_Draft-DNC: 1366.184

XS_TL_Centerline: 149.995

XS_TL_Edge of Pavt 1: 539.057

XS_TL_Edge of Pavt 2: 778.158

XS_TL_Edge of Pavt 3: 539.092

XS_TL_Edge of Pavt: 299.991

AUX_10: 61.405

XS_TL_Edge of Shld: 239.074

XS_TL_Cut: 126.101

XS_TL_Fill: 94.204

XS_TC_Cut: 116.124

XS_TC_Fill: 488.856 2.002

XS_TC_Foreslope: 743.030

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 29 of 56Volumes Report

797.251 5.194

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

23276.000 Suitable 50

Volumes_Cut: 863.959 8.205

Volumes_Fill: 3138.655 48.491

Baseline: 149.998

XS_TL_Centerline 1: 212.905

XS_TL_Centerline 2: 212.905

XS_TL_Centerline 3: 212.905

XS_TL_Subgrade: 62.909

XS_TC_Pavement Layer 1: 3108.194 18.928

XS_TC_Pavement Layer 2: 3187.069 19.414

XS_TC_Pavement Layer 3: 3846.671 67.547

XS_TC_Pavement Layer 4: 27.757

XS_TL_Draft-DNC: 1597.512

XS_TL_Centerline: 149.997

XS_TL_Edge of Pavt 1: 572.465

XS_TL_Edge of Pavt 2: 845.026

XS_TL_Edge of Pavt 3: 572.613

XS_TL_Edge of Pavt: 299.993

AUX_10: 28.268

XS_TL_Edge of Shld: 272.486

XS_TL_Cut: 194.658

XS_TC_Cut: 149.137

XS_TC_Foreslope: 852.325

XS_TC_Shoulder Foreslope: 1014.375 6.226

XS_TC_Fill: 197.459 1.356

XS_TL_Fill:

XS_TL_Slopes:

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

23425.000 Suitable 51

Volumes_Cut: 1403.624 27.890

Volumes_Fill: 2623.841 25.159

Baseline: 149.984

XS_TL_Draft-DNC: 1594.493

XS_TL_Centerline 1: 149.972

XS_TL_Centerline 2: 149.972

XS_TL_Centerline 3: 149.972

XS_TL_Centerline: 149.972

XS_TL_Edge of Pavt 1: 599.897

XS_TL_Edge of Pavt 2: 876.058

XS_TL_Edge of Pavt 3: 558.260

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 30 of 56Volumes Report

299.945

XS_TL_Edge of Shld: 299.945

XS_TL_Cut: 105.122

XS_TL_Fill: 109.702

XS_TC_Pavement Layer 1: 3087.489 18.771

XS_TC_Cut: 111.975

XS_TC_Fill: 254.890 1.444

XS_TC_Pavement Layer 2: 3173.896 19.304

XS_TC_Foreslope: 890.552

XS_TC_Shoulder Foreslope: 808.905 5.604

XS_TC_Pavement Layer 3: 3853.818 67.540

XS_TL_Subgrade:

XS_TC_Pavement Layer 4:

AUX_10:

XS_TL_Slopes:

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

23574.000 Suitable 52

Volumes_Cut: 972.513 23.938

Volumes_Fill: 11.172 0.029

Baseline: 149.989

XS_TL_Draft-DNC: 450.011

XS_TL_Centerline 1: 35.496

XS_TL_Centerline 2: 35.496

XS_TL_Centerline 3: 35.496

XS_TL_Centerline: 35.496

XS_TL_Edge of Pavt 1: 142.225

XS_TL_Edge of Pavt 2: 213.347

XS_TL_Edge of Pavt 3: 142.255

XS_TL_Edge of Pavt: 71.111

XS_TL_Edge of Shld: 71.111

XS_TL_Cut: 52.696

XS_TL_Fill: 2.892

XS_TC_Pavement Layer 1: 710.178 4.312

XS_TC_Pavement Layer 2: 730.404 4.437

XS_TC_Fill: 130.817 1.445

XS_TC_Cut: 76.335

XS_TC_Foreslope: 222.741

XS_TC_Shoulder Foreslope: 297.073 2.315

XS_TC_Pavement Layer 3: 901.554 15.681

XS_TL_Subgrade:

XS_TC_Pavement Layer 4:

AUX_10:

XS_TL_Slopes:

Slope Stake Limits Transition:

XS_TC_Leveling:

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 31 of 56Volumes Report

23723.000 Suitable 53

Baseline: 149.994

Volumes_Cut:

Volumes_Fill:

XS_TL_Draft-DNC:

XS_TL_Centerline 1:

XS_TL_Centerline 2:

XS_TL_Centerline 3:

XS_TL_Centerline:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

XS_TL_Edge of Pavt 3:

XS_TL_Edge of Pavt:

XS_TL_Edge of Shld:

XS_TL_Cut:

XS_TL_Fill:

XS_TC_Pavement Layer 1:

XS_TC_Pavement Layer 2:

XS_TC_Fill:

XS_TC_Cut:

XS_TC_Foreslope:

XS_TC_Shoulder Foreslope:

XS_TC_Pavement Layer 3:

XS_TL_Subgrade:

XS_TC_Pavement Layer 4:

AUX_10:

XS_TL_Slopes:

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

23872.000 Suitable 54

Baseline: 149.992

Volumes_Cut:

Volumes_Fill:

XS_TL_Draft-DNC:

XS_TL_Centerline 1:

XS_TL_Centerline 2:

XS_TL_Centerline 3:

XS_TL_Centerline:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

XS_TL_Edge of Pavt 3:

XS_TL_Edge of Pavt:

XS_TL_Edge of Shld:

XS_TL_Cut:

XS_TL_Fill:

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 32 of 56Volumes Report

XS_TC_Pavement Layer 2:

XS_TC_Fill:

XS_TC_Cut:

XS_TC_Foreslope:

XS_TC_Shoulder Foreslope:

XS_TC_Pavement Layer 3:

XS_TL_Subgrade:

XS_TC_Pavement Layer 4:

AUX_10:

XS_TL_Slopes:

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

24021.000 Suitable 55

Baseline: 150.000

Volumes_Cut:

Volumes_Fill:

XS_TL_Draft-DNC:

XS_TL_Centerline 1:

XS_TL_Centerline 2:

XS_TL_Centerline 3:

XS_TL_Centerline:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

XS_TL_Edge of Pavt 3:

XS_TL_Edge of Pavt:

XS_TL_Edge of Shld:

XS_TL_Cut:

XS_TL_Fill:

XS_TC_Pavement Layer 1:

XS_TC_Pavement Layer 2:

XS_TC_Fill:

XS_TC_Cut:

XS_TC_Foreslope:

XS_TC_Shoulder Foreslope:

XS_TC_Pavement Layer 3:

XS_TL_Subgrade:

XS_TC_Pavement Layer 4:

AUX_10:

XS_TL_Slopes:

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

24170.000 Suitable 56

Baseline: 150.000

Volumes_Cut:

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 33 of 56Volumes Report

XS_TL_Draft-DNC:

XS_TL_Centerline 1:

XS_TL_Centerline 2:

XS_TL_Centerline 3:

XS_TL_Centerline:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

XS_TL_Edge of Pavt 3:

XS_TL_Edge of Pavt:

XS_TL_Edge of Shld:

XS_TL_Cut:

XS_TL_Fill:

XS_TC_Pavement Layer 1:

XS_TC_Pavement Layer 2:

XS_TC_Fill:

XS_TC_Cut:

XS_TC_Foreslope:

XS_TC_Shoulder Foreslope:

XS_TC_Pavement Layer 3:

XS_TL_Subgrade:

XS_TC_Pavement Layer 4:

AUX_10:

XS_TL_Slopes:

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

24319.000 Suitable 57

Baseline: 149.996

Volumes_Cut:

Volumes_Fill:

XS_TL_Draft-DNC:

XS_TL_Centerline 1:

XS_TL_Centerline 2:

XS_TL_Centerline 3:

XS_TL_Centerline:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

XS_TL_Edge of Pavt 3:

XS_TL_Edge of Pavt:

XS_TL_Edge of Shld:

XS_TL_Cut:

XS_TL_Fill:

XS_TC_Pavement Layer 1:

XS_TC_Pavement Layer 2:

XS_TC_Fill:

XS_TC_Cut:

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 34 of 56Volumes Report

XS_TC_Shoulder Foreslope:

XS_TC_Pavement Layer 3:

XS_TL_Subgrade:

XS_TC_Pavement Layer 4:

AUX_10:

XS_TL_Slopes:

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

24468.000 Suitable 58

Baseline: 149.999

Volumes_Cut:

Volumes_Fill:

XS_TL_Draft-DNC:

XS_TL_Centerline 1:

XS_TL_Centerline 2:

XS_TL_Centerline 3:

XS_TL_Centerline:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

XS_TL_Edge of Pavt 3:

XS_TL_Edge of Pavt:

XS_TL_Edge of Shld:

XS_TL_Cut:

XS_TL_Fill:

XS_TC_Pavement Layer 1:

XS_TC_Pavement Layer 2:

XS_TC_Fill:

XS_TC_Cut:

XS_TC_Foreslope:

XS_TC_Shoulder Foreslope:

XS_TC_Pavement Layer 3:

XS_TL_Subgrade:

XS_TC_Pavement Layer 4:

AUX_10:

XS_TL_Slopes:

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

24617.000 Suitable 59

Baseline: 149.992

Volumes_Cut:

Volumes_Fill:

XS_TL_Draft-DNC:

XS_TL_Centerline 1:

XS_TL_Centerline 2:

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 35 of 56Volumes Report

XS_TL_Centerline:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

XS_TL_Edge of Pavt 3:

XS_TL_Edge of Pavt:

XS_TL_Edge of Shld:

XS_TL_Cut:

XS_TL_Fill:

XS_TC_Pavement Layer 1:

XS_TC_Pavement Layer 2:

XS_TC_Fill:

XS_TC_Cut:

XS_TC_Foreslope:

XS_TC_Shoulder Foreslope:

XS_TC_Pavement Layer 3:

XS_TL_Subgrade:

XS_TC_Pavement Layer 4:

AUX_10:

XS_TL_Slopes:

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

24766.000 Suitable 60

Baseline: 149.992

Volumes_Cut:

Volumes_Fill:

XS_TL_Draft-DNC:

XS_TL_Centerline 1:

XS_TL_Centerline 2:

XS_TL_Centerline 3:

XS_TL_Centerline:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

XS_TL_Edge of Pavt 3:

XS_TL_Edge of Pavt:

XS_TL_Edge of Shld:

XS_TL_Cut:

XS_TL_Fill:

XS_TC_Pavement Layer 1:

XS_TC_Pavement Layer 2:

XS_TC_Fill:

XS_TC_Cut:

XS_TC_Foreslope:

XS_TC_Shoulder Foreslope:

XS_TC_Pavement Layer 3:

XS_TL_Subgrade:

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 36 of 56Volumes Report

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

24915.000 Suitable 61

Baseline: 149.996

Volumes_Cut:

Volumes_Fill:

XS_TL_Draft-DNC:

XS_TL_Centerline 1:

XS_TL_Centerline 2:

XS_TL_Centerline 3:

XS_TL_Centerline:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

XS_TL_Edge of Pavt 3:

XS_TL_Edge of Pavt:

XS_TL_Edge of Shld:

XS_TL_Cut:

XS_TL_Fill:

XS_TC_Pavement Layer 1:

XS_TC_Pavement Layer 2:

XS_TC_Fill:

XS_TC_Cut:

XS_TC_Foreslope:

XS_TC_Shoulder Foreslope:

XS_TC_Pavement Layer 3:

XS_TL_Subgrade:

XS_TC_Pavement Layer 4:

AUX_10:

XS_TL_Slopes:

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

25064.000 Suitable 62

Baseline: 149.994

Volumes_Cut:

Volumes_Fill:

XS_TL_Draft-DNC:

XS_TL_Centerline 1:

XS_TL_Centerline 2:

XS_TL_Centerline 3:

XS_TL_Centerline:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 37 of 56Volumes Report

XS_TL_Edge of Pavt:

XS_TL_Edge of Shld:

XS_TL_Cut:

XS_TL_Fill:

XS_TC_Pavement Layer 1:

XS_TC_Pavement Layer 2:

XS_TC_Fill:

XS_TC_Cut:

XS_TC_Foreslope:

XS_TC_Shoulder Foreslope:

XS_TC_Pavement Layer 3:

XS_TL_Subgrade:

XS_TC_Pavement Layer 4:

AUX_10:

XS_TL_Slopes:

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

25213.000 Suitable 63

Baseline: 149.997

Volumes_Cut:

Volumes_Fill:

XS_TL_Draft-DNC:

XS_TL_Centerline 1:

XS_TL_Centerline 2:

XS_TL_Centerline 3:

XS_TL_Centerline:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

XS_TL_Edge of Pavt 3:

XS_TL_Edge of Pavt:

XS_TL_Edge of Shld:

XS_TL_Cut:

XS_TL_Fill:

XS_TC_Pavement Layer 1:

XS_TC_Pavement Layer 2:

XS_TC_Fill:

XS_TC_Cut:

XS_TC_Foreslope:

XS_TC_Shoulder Foreslope:

XS_TC_Pavement Layer 3:

XS_TL_Subgrade:

XS_TC_Pavement Layer 4:

AUX_10:

XS_TL_Slopes:

Slope Stake Limits Transition:

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 38 of 56Volumes Report

XS_TC_Surface 1 Symbology:

25362.000 Suitable 64

Baseline: 149.998

Volumes_Cut:

Volumes_Fill:

XS_TL_Draft-DNC:

XS_TL_Centerline 1:

XS_TL_Centerline 2:

XS_TL_Centerline 3:

XS_TL_Centerline:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

XS_TL_Edge of Pavt 3:

XS_TL_Edge of Pavt:

XS_TL_Edge of Shld:

XS_TL_Cut:

XS_TL_Fill:

XS_TC_Pavement Layer 1:

XS_TC_Pavement Layer 2:

XS_TC_Fill:

XS_TC_Cut:

XS_TC_Foreslope:

XS_TC_Shoulder Foreslope:

XS_TC_Pavement Layer 3:

XS_TL_Subgrade:

XS_TC_Pavement Layer 4:

AUX_10:

XS_TL_Slopes:

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

25511.000 Suitable 65

Baseline: 149.998

Volumes_Cut:

Volumes_Fill:

XS_TL_Draft-DNC:

XS_TL_Centerline 1:

XS_TL_Centerline 2:

XS_TL_Centerline 3:

XS_TL_Centerline:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

XS_TL_Edge of Pavt 3:

XS_TL_Edge of Pavt:

XS_TL_Edge of Shld:

XS_TL_Cut:

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 39 of 56Volumes Report

XS_TC_Pavement Layer 1:

XS_TC_Pavement Layer 2:

XS_TC_Fill:

XS_TC_Cut:

XS_TC_Foreslope:

XS_TC_Shoulder Foreslope:

XS_TC_Pavement Layer 3:

XS_TL_Subgrade:

XS_TC_Pavement Layer 4:

AUX_10:

XS_TL_Slopes:

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

25660.000 Suitable 66

Baseline: 149.996

Volumes_Cut:

Volumes_Fill:

XS_TL_Draft-DNC:

XS_TL_Centerline 1:

XS_TL_Centerline 2:

XS_TL_Centerline 3:

XS_TL_Centerline:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

XS_TL_Edge of Pavt 3:

XS_TL_Edge of Pavt:

XS_TL_Edge of Shld:

XS_TL_Cut:

XS_TL_Fill:

XS_TC_Pavement Layer 1:

XS_TC_Pavement Layer 2:

XS_TC_Fill:

XS_TC_Cut:

XS_TC_Foreslope:

XS_TC_Shoulder Foreslope:

XS_TC_Pavement Layer 3:

XS_TL_Subgrade:

XS_TC_Pavement Layer 4:

AUX_10:

XS_TL_Slopes:

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

25809.000 Suitable 67

Baseline: 149.990

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 40 of 56Volumes Report

Volumes_Fill:

XS_TL_Draft-DNC:

XS_TL_Centerline 1:

XS_TL_Centerline 2:

XS_TL_Centerline 3:

XS_TL_Centerline:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

XS_TL_Edge of Pavt 3:

XS_TL_Edge of Pavt:

XS_TL_Edge of Shld:

XS_TL_Cut:

XS_TL_Fill:

XS_TC_Pavement Layer 1:

XS_TC_Pavement Layer 2:

XS_TC_Fill:

XS_TC_Cut:

XS_TC_Foreslope:

XS_TC_Shoulder Foreslope:

XS_TC_Pavement Layer 3:

XS_TL_Subgrade:

XS_TC_Pavement Layer 4:

AUX_10:

XS_TL_Slopes:

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

25958.000 Suitable 68

Baseline: 149.994

Volumes_Cut:

Volumes_Fill:

XS_TL_Draft-DNC:

XS_TL_Centerline 1:

XS_TL_Centerline 2:

XS_TL_Centerline 3:

XS_TL_Centerline:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

XS_TL_Edge of Pavt 3:

XS_TL_Edge of Pavt:

XS_TL_Edge of Shld:

XS_TL_Cut:

XS_TL_Fill:

XS_TC_Pavement Layer 1:

XS_TC_Pavement Layer 2:

XS_TC_Fill:

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 41 of 56Volumes Report

XS_TC_Foreslope:

XS_TC_Shoulder Foreslope:

XS_TC_Pavement Layer 3:

XS_TL_Subgrade:

XS_TC_Pavement Layer 4:

AUX_10:

XS_TL_Slopes:

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

26107.000 Suitable 69

Baseline: 149.996

Volumes_Cut:

Volumes_Fill:

XS_TL_Draft-DNC:

XS_TL_Centerline 1:

XS_TL_Centerline 2:

XS_TL_Centerline 3:

XS_TL_Centerline:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

XS_TL_Edge of Pavt 3:

XS_TL_Edge of Pavt:

XS_TL_Edge of Shld:

XS_TL_Cut:

XS_TL_Fill:

XS_TC_Pavement Layer 1:

XS_TC_Pavement Layer 2:

XS_TC_Fill:

XS_TC_Cut:

XS_TC_Foreslope:

XS_TC_Shoulder Foreslope:

XS_TC_Pavement Layer 3:

XS_TL_Subgrade:

XS_TC_Pavement Layer 4:

AUX_10:

XS_TL_Slopes:

Slope Stake Limits Transition:

XS_TC_Leveling:

XS_TC_Surface 1 Symbology:

26256.000 Suitable 70

Baseline: 149.999

Volumes_Cut:

Volumes_Fill:

XS_TL_Draft-DNC:

XS_TL_Centerline 1:

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 42 of 56Volumes Report

XS_TL_Centerline 3:

XS_TL_Centerline:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

XS_TL_Edge of Pavt 3:

XS_TL_Edge of Pavt:

XS_TL_Edge of Shld:

XS_TL_Cut:

XS_TL_Fill:

XS_TC_Pavement Layer 1:

XS_TC_Pavement Layer 2:

XS_TC_Fill:

XS_TC_Cut:

XS_TC_Foreslope:

XS_TC_Shoulder Foreslope:

XS_TC_Pavement Layer 3:

XS_TL_Subgrade:

XS_TC_Pavement…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .