GRTE-PMIS-312456_11-30-2021_Drawings_Final-CDs.pdf

PDF 6 MB Posted

Attached to
WY NPS 2017(1) MOOSE WILSON ROAD PHASE 1
Solicitation number
69056721R000010
Issued by

View the file

Other files

File Type Posted
QA_03-09-2022.pdf PDF
QA_03-07-2022.pdf PDF
Amendment A002.pdf PDF
QA_03-04-2022.pdf PDF
QA_03-02-2022.pdf PDF
Amendment A001.pdf PDF
QA_03-01-2022.pdf PDF
grte201701_ML_HA.pdf PDF
grte201701_Earthwork_ML125_00 to 156_75-Volumes.pdf PDF
grte201701_Earthwork_AP137_26.pdf PDF
grte201701_Plans.pdf PDF
grte201701_Earthwork_PFP-NB.pdf PDF
grte2017(1)_GES-Outbound-Line_VA.pdf PDF
grte201701_ML_VA.pdf PDF
grte201701_Earthwork_ML125_00 to 156_75-NB.pdf PDF
1460-013P Lake Creek Bridge - 2019 Safety Inspection_Redacted.pdf PDF
grte201701_GR 21-20-Geotech Report.pdf PDF
Additional physical data.zip ZIP file
grte2017(1)_GES-Bike-Path_VA.pdf PDF
grte201701_Earthwork_ML159_75 to 234_60-Volumes.pdf PDF
grte2017(1)_Earthwork_GES Inbound Line.pdf PDF
grte2017(1)_GES_XS.pdf PDF
grte2017(1)_Earthwork_GES Outbound Line.pdf PDF
grte201701_Earthwork_AP231_03.pdf PDF
grte201701_Earthwork_ML159_75 to 234_60-NB.pdf PDF
21.11.17 - WY LCGP Compiled SWPPP - Final.pdf PDF
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
grte201701_Earthwork_AP137_18.pdf PDF
grte2017(1)_GES_HA.pdf PDF
grte201701_Earthwork_PFP-Volumes.pdf PDF
grte2017(1)_Earthwork_GES Bike Path.pdf PDF
grte2017(1)_GES-Inbound-Line_VA.pdf PDF
RFP-69056721R000010.pdf PDF
GRTE 100(1) -Lake Creek Bridge.pdf PDF
grte2017(1)_GCTH_Quantities_Report.pdf PDF
grte201701_Earthwork_AP162_16.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LAND HIGHWAY DIVISION

VANCOUVER, WASHINGTON

Proposed Granite Entrance Station Architectural Work, For Information Only - To Be Constructed by Others

MOOSE WILSON ROAD PHASE 1

WY NPS GRTE 2017(1)

GRAND TETON NATIONAL PARK

TETON COUNTY, WYOMING

NPS PMIS No. 225661, NPS Drwg. No. 136/167343

W1

W1

S3.0

B C

S3.0

B C

S3.0

S3.0

S3.1

S3.0

CHECK VALVE

2WAY ATC VALVE

3WAY ATC VALVE

BALANCING VALVE

BUTTERFLY VALVE

MECHANICAL LEGEND

PRESSURE REDUCING VALVE

EXISTING ITEMS TO

CONNECTION TO EXISTING

BE DEMOLISHED

EXISTING ITEMS

SAFTEY RELIEF VALVE

BACK FLOW PREVENTER

NEW WORK

PRESSURE SENSOR

THERMOSTAT

METER

P&T TAP

FLOW ARROW

IN LINE PUMP

THERMOMETER

AUTOMATIC AIR VENT

GAUGE

MANUAL AIR VENT

STRAINER

DRAIN VALVE

FLEXIBLE CONNECTION

UNION

CAP

PIPING SERVICES

PIPING SYSTEM COMPONENTS

TEE UP

TEE DOWN

RS/RL

CD

ELBOW DOWN

ELBOW UP

DRAWING NOTATION

CONDENSATE DRAIN

REFRIGERANT SUCTION/LIQUID GATE VALVE

PLUG VALVE

BALL VALVE

VALVES

ECCENTRIC REDUCER

HVAC SYSTEM COMPONENTS

MOTORIZED DAMPER

RECT. RETURN DUCT

RECT. SUPPLY DUCT

SUPPLY DIFFUSER/

DN

RETURN GRILLE

DUCT SLOPE

M

18x12 RECT.

12" ROUND

MANUAL DAMPER

(D) DEMO

(N) NEW

(E) EXISTING

THREE WAY CONTROL VALVE

M

T

P

(E) EXISTING

N.C. NORMALLY CLOSED

N.O. NORMALLY OPEN

RS

RL

GRADE

SIGHT GLASS

FILTER DRYER

COND. DRAINTRAPCONDENSING

UNIT

AC-1

NOTES:

-ROUTE REFRIGERANT PIPING PER MANUFACTURER REQUIREMENTS

-PROVIDE PVC SLEEVE FOR ALL REFRIGERANT PIPING BELOW GRADE

AND UP TO /- 2" ABOVE GRADE.

CONCRETE PAD

W A

LL

STRUCTURE

AUXILIARY DRAIN PAN WITH UL 8

APPROVED WATER LEVEL DETECTION

DEVICE TO SHUTDOWN UNIT PRIOR TO

OVERFLOW

WALL-MOUNTED INDOOR AIR

CONDITIONING UNIT

SOLENOID VALVE (TYP.) WIRED TO AND

CONTROLLED BY UNIT CONTROLLER

SUPPLY LINE

SUMP OVERFLOW

N.C.

N.O.

N.O.

PROVIDE WITH THREADED END FOR YARD

HYDRANT TYPICAL GARDEN HOSE CONNECTION

GRADE

CONCRETE PAD

SUMP DRAIN PIPE TO BE PROVIDED SO THAT

DISCHARGE IS BEYOND CONCRETE PAD

SCALE: NOT TO SCALE

SPLIT SYSTEM DETAIL1

M1. SCALE: NOT TO SCALE

EVAPORATIVE COOLER AUTO DRAIN AND FILL DETAIL2

M1.

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/2

/2

2:

:1

P

MB

IM

://2

-1

- G

RT

E

E S

/21

- G

RT

E

- M

P M

MP .

BG

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

1 3 3

BG

T R

11/3 /2 21 21 3

MECHANICAL AND

PLUMBING COVER

SHEET

GENERAL MECHANICAL NOTES

A. ALL WORK SHALL BE IN ACCORDANCE WITH SMACNA STANDARDS AND SPECIFICATIONS AND AUTHORITY

HAVING URISDICTION.

B. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND NOT INTENDED TO SHOW ALL TRANSITIONS OFFSETS ETC. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND PROVIDE ALL NECESSARY FITTINGS TO COMPLETE THE INTENT OF THE DRAWINGS. ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS SHALL BE REPORTED TO THE CONTRACTING OFFICER (C.O). FOR RESOLUTION. CONTRACTOR MAY LOCATE MECHANICAL EQUIPMENT DIFFERENTLY THAN SHOWN ON DRAWINGS DUE TO CONFLICTS AS LONG AS

FUNCTION AND/OR APPEARANCE ARE NOT AFFECTED.

C. MECHANICAL WORK SHOWN IS INDICATED DIAGRAMMATICALLY ON THE DRAWINGS. COORDINATE SPACE REQUIREMENTS SUPPORTS AND INSTALLATION OF MECHANICAL WORK PRIOR TO INSTALLATION. FOLLOW ROUTING SHOWN FOR PIPES AND DUCTS AS CLOSELY AS PRACTICABLE PLACE RUNS PARALLEL WITH LINES OF BUILDING. UTILIZE SPACES EFFICIENTLY TO MAXIMIZE ACCESSIBILITY FOR OTHER INSTALLATIONS FOR

MAINTENANCE AND FOR REPAIRS.

D. COMPLY WITH MANUFACTURER S INSTRUCTIONS INCLUDING EACH STEP IN SEQUENCE. SHOULD MANUFACTURERS INSTRUCTIONS CONFLICT WITH THE DRAWINGS REQUEST CLARIFICATION FROM THE C.O.

BEFORE PROCEEDING.

E. DUCT SIZES ARE INSIDE DIMENSION.

F. CONTRACTOR SHALL REVIEW THESE DOCUMENTS CAREFULLY. CONTRACTOR SHALL CONTACT C.O. FOR RESOLUTION OF ANY DISCREPANCIES OMISSIONS OR CLARIFICATIONS BEFORE BID DATE. IN THE EVENT THAT AN INTERPRETATION OF BID DOCUMENTS IS NECESSARY AFTER THE BID DATE THE DECISION OF THE C.O. SHALL

BE FINAL AND BINDING.

G. PRODUCT DELIVERY STORAGE AND HANDLING: PROVIDE EQUIPMENT AND PERSONNEL TO HANDLE PRODUCTS BY METHODS TO PREVENT DAMAGE. PROMPTLY INSPECT SHIPMENTS TO ENSURE THAT PRODUCTS ARE UNDAMAGED. STORE AND PROTECT PRODUCTS IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS.

H. IN THE CASE OF A CONFLICT UNLESS OTHERWISE NOTED KEYNOTES ON MECHANICAL PLANS SHALL

SUPERCEDE ANY GENERAL NOTES ON THE PLANS.

I. CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES AND NOTIFY THE C.O. IF ANY CONFLICTS

OCCUR.

. THERMOSTAT LOCATIONS AND HEIGHTS TO BE COORDINATED AND VERIFIED BY THE C.O. CONTRACTOR TO CALIBRATE ALL THERMOSTATS SHOWN ON THIS PLAN. IT SHALL BE THE GENERAL CONTRACTOR S RESPONSIBILITY TO ENSURE THAT ALL EXISTING THERMOSTATS REMAIN INTACT DURING DEMOLITION. HEATING THERMOSTATS MUST REMAIN OPERATIONAL AT ALL TIMES. IF REQUIRED FOR BETTER PROTECTION

THERMOSTATS MAY BE TEMPORARILY MOUNTED IN THE CEILING PLENUM DURING DEMOLITION.

K. ALL TAKEOFFS RUNOUTS AND FLEX DUCTWORK TO DIFFUSERS SHALL BE THE SAME SIZE AS DIFFUSER

INLET UNLESS OTHERWISE NOTED.

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/2

/2

2:

:1

P

MB

IM

://2

-1

- G

RT

E

E S

/21

- G

RT

E

- M

P M

MP .

BG

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

1 3 3

BG

T R

11/3 /2 21 22 3

MECHANICAL AND

PLUMBING

SCHEDULES

A B C D

B.

2.

FEE

COLLECTION

GENERAL

STORAGE

1 3

OFFICE

1 1

REMIT

MECH

BREAK ROOM

1 8RR

OUTBOUND

CHECK

1 2

CORRIDOR

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/2

/2

2:

:1

P

MB

IM

://2

-1

- G

RT

E

E S

/21

- G

RT

E

- M

P M

M1.

BG

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

1 3 3

BG

T R

11/3 /2 21 23 3

MECHANICAL DEMO

PLAN

M1.

MECHANICAL DEMO PLAN1

KEY NOTES:

EXISTING TO REMAIN UNCHANGED.

DEMOLITION AND REMOVAL OF EXISTING /- OF UNDERGROUND DUCTWORK FROM THIS

POINT BACK TO EXISTING EVAPORATIVE COOLER TO BE DONE BY OTHERS. DUCT STUB TO

REMAIN FOR NEW DUCT CONNECTION. OPEN END OF DUCT STUB TO BE CAPPED. SEE

SHEET M1.1 FOR NEW DUCTWORK CONNECTION.

DEMOLITION AND REMOVAL OF EXISTING EVAPORATIVE COOLER TO BE DONE BY OTHERS.

-GALLON BURIED PROPANE TANK TO BE PROVIDED AND INSTALLED BY OTHERS.

SCALE OF FEET

8 12SCALE A

SCALE A

GENERAL NOTES:

1. CONTRACTOR TO MEASURE AND RECORD EXISTING SUPPLY AIRFLOWS AT EACH DIFFUSER.

DIFFUSERS TO BE BALANCED TO MATCH EXISTING AIRFLOWS.

2. THIS SHEET IS FOR REFERENCE ONLY. ALL DEMOLITION WORK IS TO BE DONE BY OTHERS.

B.

2.

FEE

COLLECTION

GENERAL

STORAGE

1 3

OFFICE

1 1

OUTBOUND

CHECK

1 2

RR

CORRIDOR

REMIT

MECH

BREAK ROOM

1 8

(N) AC-1

(N) CU-1

(N) EC-1

(N) EC-2

(E) BURIED

PROPANE TANK

RS/RL

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/2

/2

2:

:1

P

MB

IM

://2

-1

- G

RT

E

E S

/21

- G

RT

E

- M

P M

M1.1

BG

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

1 3 3

BG

T R

11/3 /2 21 2 3

MAIN BUILDING

MECHANICAL NEW

PLAN

M1.1

MAIN BUILDING MECHANICAL PLAN1

KEY NOTES:

EXISTING DUCT STUB TO REMAIN AND CONNECTION TO NEW UNDERGROUND DUCTWORK

TO BE DONE BY OTHERS.

PROVIDE AND INSTALL NEW THERMOSTAT AT SAME HEIGHT AS EXISTING LIGHT SWITCH AND

A MAXIMUM OF 8" AFF.

CONNECTION OF NEW UNDERGROUND DUCTWORK TO EXISTING UNDERGROUND

DUCTWORK AT THIS LOCATION TO BE DONE BY OTHERS.

PROVIDE AND INSTALL NEW CONDENSING UNIT (CU-1) ON GRADE-MOUNTED CONCRETE

PAD. CONCRETE PAD TO BE PROVIDED BY OTHERS.

PROVIDE AND INSTALL NEW WALL-MOUNTED AIR CONDITIONING UNIT (AC-1). INSTALL AS

HIGH AS POSSIBLE IN ACCORDANCE WITH MANUFACTURER S CLEARANCES.

PROVIDE AND INSTALL NEW GRADE-MOUNTED EVAPORATIVE COOLING UNIT AT EDGE OF

PARKING LOT ON GRADE-MOUNTED CONCRETE PAD. CONCRETE PAD TO BE PROVIDED BY

OTHERS. CONNECT NEW UNIT SUPPLY DISCHARGE TO EXISTING STUB OF NONMETAL

DUCTWORK ROUTED UNDERGROUND. UNDERGROUND ROUTING AND STUB UP OF

NONMETAL DUCTWORK TO BE DONE BY OTHERS.

NEW DUCTWORK FROM NEW MECHANICAL EQUIPMENT UNDERGROUND AS ROUND

NONMETAL DUCT TO BE PROVIDED BY OTHERS.

ROUTE 3/ " CONDENSATE DRAIN FROM AC-1 AS HIGH AS POSSIBLE AND TIGHT TO CEILING.

CONDENSATE DRAIN TO FOLLOW SAME ROUTING AS RS/RL. CONDENSATE DRAIN TO ROUTE

DOWN TIGHT TO EXTERIOR WALL OF MECHANICAL ROOM PENETRATE EXTERIOR WALL

LOW AND DISCHARGE OUTSIDE ONTO A SPLASH PAD.

REFRIGERANT SUCTION AND LIQUID (RS/RL) LINES TO BE ROUTED FROM CU-1

UNDERGOUND THROUGH PVC SLEEVE. CONTINUATION OF RS/RL LINES TO RISE UP FROM

BELOW GRADE AT EXTERIOR WALL INSIDE MECHANICAL ROOM. EXACT ROUTE TO BE

COORDINATED IN FIELD TO MAINTAIN UNOBSTRUCTED CLEARANCE IN FRONT OF THE FACE

OF THE EXISTING EXTERIOR WALL LOUVER. IN MECHANICAL ROOM RS/RL LINES TO ROUTE

AS HIGH AS POSSIBLE AND TIGHT TO CEILING TO INDOOR AC-1. CONTRACTOR TO

COORDINATE UNDERGROUND ROUTE WITH EXISTING LPG PIPING AND PROVIDE CODE

REQUIRED CLEARANCES.

-GALLON BURIED PROPANE TANK TO BE PROVIDED AND INSTALLED BY OTHERS.

EXISTING DAMPER IN MECHANICAL ROOM FOR UNDERGROUND DUCTWORK TO REMAIN

UNCHANGED. SEE M . FOR SEQUENCE OF OPERATIONS.

SCALE OF FEET

SCALE A

SCALE A

GENERAL NOTES:

1. CONTRACTOR TO MEASURE AND RECORD EXISTING SUPPLY AIRFLOWS AT EACH

DIFFUSER. DIFFUSERS TO BE BALANCED TO MATCH EXISTING AIRFLOWS.

B C D

KIOSK

STATION FF

1 - "

T.O. EXISTING

FRAMING

1 8 - 8"

T.O. STONE

1 3 - 3 1/2"

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/2

/2

2:

:1

P

MB

IM

://2

-1

- G

RT

E

E S

/21

- G

RT

E

- M

P M

M1.2

BG

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

1 3 3

BG

T R

11/3 /2 21 2 3

KIOSK MECHANICAL

PLAN

M1.2

KIOSK MECHANICAL PLAN1

KEY NOTES:

PROVIDE AND INSTALL NEW SURFACE MOUNTED SUPPLY DIFFUSER (TAG-A). BALANCE

SUPPLY DIFFUSER AIRFLOWS EVENLY.

NEW DUCTWORK FROM NEW MECHANICAL EQUIPMENT TO BE ROUTED UNDERGROUND AS

ROUND NONMETAL DUCTWORK AND TO BE PROVIDED BY OTHERS.

NEW 1 x1 " SHEET METAL DUCT TO CONNECT TO ROUND DUCTWORK STUB IN KIOSK

MECHANICAL CHASE AT THIS LOCATION BEFORE ROUTING ABOVE KIOSK CEILING. STUB UP

FROM UNDERGROUND NONMETAL DUCTWORK TO BE DONE BY OTHERS.

PROVIDE AND INSTALL NEW ELECTRIC BASEBOARD (EBB-1). CENTER BASEBOARD ON WALL

BETWEEN CASEWORK AND MECHANICAL CHASE.

PROVIDE AND INSTALL NEW ELECTRIC RADIANT HEATER (ERH-1). CENTER RADIANT HEATER

ON WALL AND INSTALL AS HIGH AS POSSIBLE IN ACCORDANCE WITH MANUFACTURER S

CLEARANCES.

PROVIDE AND INSTALL NEW LOUVER (L-1) IN EXTERIOR FACE OF KIOSK AS RELIEF PLENUM

DISCHARGE. CENTER LOUVER ON KIOSK EXTERIOR WALL AND COORDINATE FINAL

INSTALLATION HEIGHT TO BE ABOVE CEILING.

PROVIDE AND INSTALL NEW 12x2 " SURFACE MOUNTED RETURN GRILLE (TAG-B).

SCALE OF FEET

SCALE A

SEE SHEET M1.1

FOR CONTINUATION

SCALE A

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/2

/2

2:

:1

P

MB

IM

://2

-1

- G

RT

E

E S

/21

- G

RT

E

- M

P M

M1.2

BG

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

1 3 3

BG

T R

11/3 /2 21 2 3

KIOSK MECHANICAL

PLAN

M1.2

KIOSK ELEVATION VIEW2

PROVIDE AND INSTALL THREE (3) NEW THERMOSTATS FOR EC-2 ERH-1 AND EBB-1

CONTROL. PROVIDE AT SAME HEIGHT AS LIGHT SWITCH AND A MAXIMUM OF 8" AFF.

PROVIDE AND INSTALL ACCESS PANEL WITHIN VERTICAL SECTION OF KIOSK CHASE FOR

ACCESS TO CHASE AND DUCT FITTING. PROVIDE ADDITIONAL ACCESS PANEL IN DUCTWORK

WITHIN THE FOOTPRINT OF THE CHASE ACCESS PANEL.

SCALE A

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/2

/2

2:

:1

P

MB

IM

://2

-1

- G

RT

E

E S

/21

- G

RT

E

- M

P M

M .

BG

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

1 3 3

BG

T R

11/3 /2 21 2 3

SEQUENCE OF

OPERATIONS

MAIN BUILDING EVAPORATIVE COOLER (EC-1) SEQUENCE OF OPERATIONS:

EVAPORATIVE COOLER TO BE PROGRAMMED TO INTERLOCK WITH SUMMER CONDITIONS DUCT

DAMPER AND MAIN BUILDING FURNACE.

WHEN EXISTING MAIN BUILDING FURNACE ENABLES AND IF UNDERGROUND DUCTWORK

DAMPER IS OPEN THEN EVAPORATIVE COOLER SHALL ENABLE. IF EITHER THE FURNACE

DISABLES OR UNDERGROUND DUCTWORK DAMPER IS CLOSED EVAPORATIVE COOLER SHALL

DISABLE.

EVAPORATIVE COOLING TO BE ENABLED WHEN OUTSIDE AIR TEMPERATURE IS ABOVE DEG F

(AD .). WHEN THE SPACE TEMPERATURE IS ABOVE THE COOLING SETPOINT OF DEG F (AD .)

SPRAY PUMP SHALL START/STOP TO MAINTAIN A SPACE TEMPERATURE OF DEG F (AD .).

WHEN THE SPACE TEMPERATURE IS BELOW THE HEATING SETPOINT OF DEG F (AD .)

EVAPOARITVE COOLER BASIN TO ENABLE AUTOMATIC DRAINDOWN.

EVAPORATIVE COOLER TO ENABLE AUTOMATIC DRAINDOWN WHEN OUTSIDE AIR TEMPERATURE

IS BELOW DEG F (AD .). PARK STAFF TO ENSURE YARD HYDRANT IS CLOSED TO PREVENT

FREEZING AT YARD HYDRANT.

KIOSK BUILDING EVAPORATIVE COOLER (EC-2) SEQUENCE OF OPERATIONS:

EVAPORATIVE COOLER TO BE PROGRAMMED FOR STANDALONE OPERATION AND SHALL BE

PROVIDED WITH A LOCAL PROGRAMMABLE THERMOSTAT IN THE KIOSK BUILDING FOR UNIT

CONTROL.

EVAPORATIVE COOLER FAN SHALL ENABLE UPON A SCHEDULE CALL AND TO OPERATE IN

EITHER OCCUPIED OR UNOCCUPIED MODE.

DURING OCCUPIED MODE THE SUPPLY FAN SHALL RUN CONTINUOUSLY AND OUTSIDE AIR

DAMPER SHALL OPEN. EVAPORATIVE COOLING TO BE ENABLED WHEN OUTSIDE AIR

TEMPERATURE IS ABOVE DEG F (AD .). WHEN THE SPACE TEMPERATURE IS ABOVE THE

OCCUPIED COOLING SETPOINT OF DEG F (AD .) SPRAY PUMP SHALL START/STOP TO

MAINTAIN A SPACE TEMPERATURE OF DEG F (AD .). WHEN THE SPACE TEMPERATURE IS

BELOW THE OCCUPIED HEATING SETPOINT OF DEG F (AD .) EVAPOARITVE COOLER BASIN TO

ENABLE AUTOMATIC DRAINDOWN AND THE GAS-FIRED FURNACE SHALL MODULATE TO

MAINTAIN A SPACE TEMPERATURE OF DEG F (AD .).

DURING UNOCCUPIED MODE THE SUPPLY FAN SHALL BE DISABLED AND THE OUTSIDE AIR

DAMPER SHALL BE CLOSED. WHEN THE SPACE TEMPERATURE IS BELOW THE UNOCCUPIED

HEATING SETPOINT OF DEG F (AD .) THE SUPPLY FAN SHALL ENABLE AND THE GAS-FIRED

FURANCE SHALL MODULATE TO MAINTAIN A SPACE TEMPERATURE OF DEG F (AD .). WHEN

THE UNOCCUPIED HEATING SETPOINT IS MAINTAINED THE GAS-FIRED FURNACE SHALL

MODULATE CLOSED AND THE SUPPLY FAN SHALL DISABLE. WHEN THE SPACE TEMPERATURE IS

ABOVE THE UNOCCUPIED COOLING SETPOINT OF 8 DEG F (AD .) THE SUPPLY FAN SHALL

ENABLE AND THE SPRAY PUMP SHALL START/STOP TO MAINTAIN UNOCCUPIED COOLING

SETPOINT.

EVAPORATIVE COOLER TO ENABLE AUTOMATIC DRAINDOWN WHEN OUTSIDE AIR TEMPERATURE

IS BELOW DEG F (AD .). PARK STAFF TO ENSURE YARD HYDRANT IS CLOSED TO PREVENT

FREEZING AT YARD HYDRANT.

AIR CONDITIONING (AC-1) SEQUENCE OF OPERATION:

AIR CONDITIONING SPLIT SYSTEM TO BE PROGRAMMED FOR STANDALONE OPERATION AND

SHALL BE PROVIDED WITH LOCAL THERMOSTAT FOR EQUIPMENT OPERATION.

AIR CONDITIONER SHALL ENABLE UPON A CALL FOR COOLING AND TO OPERATE IN EITHER

OCCUPIED OR UNOCCUPIED MODE.

DURING OCCUPIED MODE IF THE SPACE TEMPERATURE IS ABOVE THE OCCUPIED COOLING

SETPOINT OF DEG F (AD .) THE INDOOR AIR CONDITIONING UNIT AND ASSOCIATED

OUTDOOR CONDENSING UNIT SHALL ENABLE. WHEN THE OCCUPIED COOLING SETPOINT

HAS BEEN MAINTAINED THE INDOOR AIR CONDITIONING UNIT AND ASSOCIATED OUTDOOR

CONDENSING UNIT SHALL DISABLE.

THE EQUIPMENT SHALL NOT RUN DURING UNOCCUPIED MODE.

ELECTRIC BASEBOARD HEATING (EBB-1) SEQUENCE OF OPERATION:

ELECTRIC BASEBOARD TO BE PROGRAMMED FOR STANDALONE OPERATION AND SHALL BE

PROVIDED WITH LOCAL PROGRAMMABLE THERMOSTAT FOR EQUIPMENT OPERATION.

BASEBOARD SHALL ENABLE UPON A CALL FOR HEATING AND TO OPERATE IN EITHER

OCCUPIED OR UNOCCUPIED MODE.

DURING OCCUPIED MODE IF THE SPACE TEMPERATURE IS BELOW THE OCCUPIED HEATING

SETPOINT OF DEG F (AD .) THE BASEBOARD HEATING ELEMENT SHALL ENABLE. WHEN

THE OCCUPIED HEATING SETPOINT HAS BEEN MAINTAINED THE ELECTRIC BASEBOARD

SHALL DISABLE.

DURING UNOCCUPIED MODE IF THE SPACE TEMPERATURE IS BELOW THE UNOCCUPIED

HEATING SETPOINT OF DEG F (AD .) THE BASEBOARD HEATING ELEMENT SHALL ENABLE.

WHEN THE UNOCCUPIED HEATING SETPOINT HAS BEEN MAINTAINED THE ELECTRIC

BASEBOARD SHALL DISABLE.

ELECTRIC RADIANT HEATING (ERH-1) SEQUENCE OF OPERATION:

ELECTRIC RADIATOR TO BE PROGRAMMED FOR STANDALONE OPERATION AND SHALL BE

PROVIDED WITH LOCAL PROGRAMMABLE THERMOSTAT FOR EQUIPMENT OPERATION.

ELECTRIC RADIATOR SHALL ENABLE UPON A CALL FOR HEATING AND TO OPERATE IN

EITHER OCCUPIED OR UNOCCUPIED MODE.

DURING OCCUPIED MODE IF THE SPACE TEMPERATURE IS BELOW THE OCCUPIED HEATING

SETPOINT OF DEG F (AD .) THE ELECTRIC RADIATOR SHALL ENABLE. WHEN THE

OCCUPIED HEATING SETPOINT HAS BEEN MAINTAINED THE ELECTRIC RADIATOR SHALL

DISABLE.

DURING UNOCCUPIED MODE IF THE SPACE TEMPERATURE IS BELOW THE UNOCCUPIED

HEATING SETPOINT OF DEG F (AD .) THE ELECTRIC RADIATOR SHALL ENABLE. WHEN THE

UNOCCUPIED HEATING SETPOINT HAS BEEN MAINTAINED THE ELECTRIC RADIATOR SHALL

DISABLE.

B.

2.

CAPPED

(N) AC-1

(N) CU-1

(E) BURIED

PROPANE TANK

(E)

(E) YH-1

(N) EC-1

(N) EC-2

(E

(E)

(E)

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/2

/2

2:

:2

P

MB

IM

://2

-1

- G

RT

E

E S

/21

- G

RT

E

- M

P M

P1.

BG

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

1 3 3

BG

T R

11/3 /2 21 2 3

PLUMBING PLAN

P1.

PLUMBING PLAN1

KEY NOTES:

-GALLON BURIED PROPANE TANK TO BE PROVIDED AND INSTALLED BY OTHERS.

1" CW CONNECTION TO EXISTING CW PIPING IN THIS AREA TO BE DONE BY OTHERS. ROUTE

PIPING UNDERGROUND TO CONNECT TO YARD HYDRANT SERVICE PIPING. UNDERGROUND

PIPING FOR YARD SERVICE PROVIDED BY OTHERS.

PROVIDE AND INSTALL NEW WYE FITTING TO EXISTING GRADE-MOUNTED YARD HYDRANT

FOR GARDEN HOSE CONNECTION.

TIE IN TO EXISTING 1/2" LPG UNDERGROUND PIPE TO BE DONE BY OTHERS. 1/2" LPG PIPE

ROUTED UNDERGROUND BY OTHERS TO NEW GAS-FIRED SECTION OF EVAPORATIVE

COOLER (EC-2). PROVIDE CONNECTION FROM EXISTING LPG STUB OUT TO NEW

EVAPORATIVE COOLER.

/- OF UNDERGROUND PROPANE PIPING TO MAIN BUILDING FURNACES PROVIDED BY

OTHERS.

CAPPED UNDERGROUND DOMESTIC COLD WATER LINE TO BE DONE BY OTHERS.

REFER TO MECHANICAL SHEET M1.1 FOR CONDENSATE PIPING FROM INDOOR AIR

CONDITIONING UNIT.

SCALE OF FEET

SCALE A

SCALE A

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/29

/20

4:

:47 P

MB

IM

0:/

/20

-1

- G

RT

E En try S tat ion

/52

.00

GR

TE

E ntr y S tat ion

- E lec tric al Ce ntr al.

rvt

E0.0

BJL/BDJ/KMD

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

167343

312456

BJL/BDJ/KMD

BJJ/JEB

11/30/2021 28 43

ELECTRICAL COVER

SHEET

E0.0

DEVICE MOUNTING HEIGHT1

11/30/2021

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/29

/20

4:

:47 P

MB

IM

0:/

/20

-1

- G

RT

E En try S tat ion

/52

.00

GR

TE

E ntr y S tat ion

- E lec tric al Ce ntr al.

rvt

E0.1

BJL/BDJ/KMD

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

167343

312456

BJL/BDJ/KMD

BJJ/JEB

11/30/2021 29 43

ELECTRICAL

GENERAL NOTES

BIKE PATH

INBOUND LANE

INBOUND LANE

GEN ER AL N OTES

1.

2.

3.

4.

5.

R EFER TO SHEET G0.1 FOR WALL TYPES.

R EFER TO SHEET A6.0 FOR W IN D OW AND D OOR

ELEVATION S.

D IMENSION S AR E TO FAC E OF STRU CTUR E U ON .

D OOR D IMENSION S ARE TO C EN TER LINE.

R EFER TO STRU CTU RAL MECH AN IC AL PLU MBINGAND ELECTR IC AL D RAW IN GS FOR MORE

IN FORMATION.

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/29

/20

4:

:48 P

MB

IM

0:/

/20

-1

- G

RT

E En try S tat ion

/52

.00

GR

TE

E ntr y S tat ion

- E lec tric al Ce ntr al.

rvt

E0.2

BJL/BDJ/KMD

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

167343

312456

BJL/BDJ/KMD

BJJ/JEB

11/30/2021 30 43

ELECTRICAL SITE

PLAN

E0.2

ELECTRICAL SITE PLAN1

SCALE OF FEET

2010010

KEYNOTE LEGEND

SITE GENERAL NOTES

A B C D

B.5

2.5

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/29

/20

4:

:48 P

MB

IM

0:/

/20

-1

- G

RT

E En try S tat ion

/52

.00

GR

TE

E ntr y S tat ion

- E lec tric al Ce ntr al.

rvt

E1.0

BJL/BDJ/KMD

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

167343

312456

BJL/BDJ/KMD

BJJ/JEB

11/30/2021 31 43

ELECTRICAL POWER

PLAN

E1.0

POWER PLAN1

SCALE OF FEET

POWER GENERAL NOTES

KEYNOTE LEGEND

A B C D

B.5

2.5

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/29

/20

4:

:50 P

MB

IM

0:/

/20

-1

- G

RT

E En try S tat ion

/52

.00

GR

TE

E ntr y S tat ion

- E lec tric al Ce ntr al.

rvt

E2.0

BJL/BDJ/KMD

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

167343

312456

BJL/BDJ/KMD

BJJ/JEB

11/30/2021 32 43

ELECTRICAL

LIGHTING PLANE2.0

LIGHTING PLAN1

SCALE OF FEET

LIGHTING GENERAL NOTES

KEYNOTE LEGEND

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/29

/20

4:

:51 P

MB

IM

0:/

/20

-1

- G

RT

E En try S tat ion

/52

.00

GR

TE

E ntr y S tat ion

- E lec tric al Ce ntr al.

rvt

E4.0

BJL/BDJ/KMD

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

167343

312456

BJL/BDJ/KMD

BJJ/JEB

11/30/2021 33 43

ELECTRICAL

ONE-LINE DIAGRAM

E4.0

ELECTRICAL ONE-LINE DIAGRAM1

MECHANICAL EQUIPMENT SCHEDULE

MECHANICAL EQUIPMENT GENERAL NOTES

MECHANICAL EQUIPMENT SPECIFIC NOTES

LIGHTING FIXTURE SCHEDULE

LIGHTING CONTROL DEVICES

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/29

/20

4:

:51 P

MB

IM

0:/

/20

-1

- G

RT

E En try S tat ion

/52

.00

GR

TE

E ntr y S tat ion

- E lec tric al Ce ntr al.

rvt

E5.0

BJL/BDJ/KMD

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

167343

312456

BJL/BDJ/KMD

BJJ/JEB

11/30/2021 34 43

ELECTRICAL

SCHEDULES

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/29

/20

4:

:51 P

MB

IM

0:/

/20

-1

- G

RT

E En try S tat ion

/52

.00

GR

TE

E ntr y S tat ion

- E lec tric al Ce ntr al.

rvt

T0.0

BJL/BDJ/KMD

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

167343

312456

BJL/BDJ/KMD

BJJ/JEB

11/30/2021 35 43

TECHNOLOGY COVER

SHEET

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/29

/20

4:

:52 P

MB

IM

0:/

/20

-1

- G

RT

E En try S tat ion

/52

.00

GR

TE

E ntr y S tat ion

- E lec tric al Ce ntr al.

rvt

T0.1

BJL/BDJ/KMD

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

167343

312456

BJL/BDJ/KMD

BJJ/JEB

11/30/2021 36 43

TECHNOLOGY

GENERAL NOTES

T0.1

DEVICE MOUNTING HEIGHT1

BIKE PATH

INBOUND LANE

INBOUND LANE

GEN ER AL N OTES

1.2.

3.

4.

5.

R EFER TO SHEET G0.1 FOR WALL TYPES.R EFER TO SHEET A6.0 FOR W IN D OW AND D OOR

ELEVATION S.

D IMENSION S AR E TO FAC E OF STRU CTUR E U ON .

D OOR D IMENSION S ARE TO C EN TER LINE.

R EFER TO STRU CTU RAL MECH AN IC AL PLU MBING

AND ELECTR IC AL D RAW IN GS FOR MORE

IN FORMATION.

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/29

/20

4:

:53 P

MB

IM

0:/

/20

-1

- G

RT

E En try S tat ion

/52

.00

GR

TE

E ntr y S tat ion

- E lec tric al Ce ntr al.

rvt

T0.2

BJL/BDJ/KMD

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

167343

312456

BJL/BDJ/KMD

BJJ/JEB

11/30/2021 37 43

TECHNOLOGY SITE

PLAN

T0.2

TECHNOLOGY SITE PLAN1

TECHNOLOGY GENERAL NOTES

KEYNOTE LEGEND

SCALE OF FEET

2010010

A B C D

B.5

2.5

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/29

/20

4:

:56 P

MB

IM

0:/

/20

-1

- G

RT

E En try S tat ion

/52

.00

GR

TE

E ntr y S tat ion

- E lec tric al Ce ntr al.

rvt

T1.0

BJL/BDJ/KMD

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

167343

312456

BJL/BDJ/KMD

BJJ/JEB

11/30/2021 38 43

TECHNOLOGY PLAN

T1.0

TECHNOLOGY PLAN1

TECHNOLOGY GENERAL NOTES

KEYNOTE LEGEND

SCALE OF FEET

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/29

/20

4:

:57 P

MB

IM

0:/

/20

-1

- G

RT

E En try S tat ion

/52

.00

GR

TE

E ntr y S tat ion

- E lec tric al Ce ntr al.

rvt

T5.0

BJL/BDJ/KMD

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

167343

312456

BJL/BDJ/KMD

BJJ/JEB

11/30/2021 39 43

TECHNOLOGY

SCHEDULES

T5.0

RACK011

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/29

/20

4:

:57 P

MB

IM

0:/

/20

-1

- G

RT

E En try S tat ion

/52

.00

GR

TE

E ntr y S tat ion

- E lec tric al Ce ntr al.

rvt

T6.0

BJL/BDJ/KMD

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

167343

312456

BJL/BDJ/KMD

BJJ/JEB

11/30/2021 40 43

TECHNOLOGY

DETAILS

T6.0

4 PORT FACEPLATE1

T6.0

ACCESS CONTROL RESPONSIBILITY DETAIL4

T6.0

DOOR ROUGH-IN:

ACCESS CONTROLLED DOOR3

T6.0

TELECOMMUNICATIONS

OUTLET BOX DETAILS (TYPICAL)2

T6.0

CAMERA INTERIOR HARDLID CEILING MOUNTING DETAIL5

T6.0

CAMERA EXTERIOR WALL MOUNTING DETAIL6

T6.0

CAMERA INTERIOR WALL MOUNTING DETAIL7

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/29

/20

4:

:58 P

MB

IM

0:/

/20

-1

- G

RT

E En try S tat ion

/52

.00

GR

TE

E ntr y S tat ion

- E lec tric al Ce ntr al.

rvt

T6.1

BJL/BDJ/KMD

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

167343

312456

BJL/BDJ/KMD

BJJ/JEB

11/30/2021 41 43

TECHNOLOGY

DETAILS

T6.1

TYPICAL CABLE IDENTIFICATION SCHEME1

T6.1

TELECOMMUNICATIONS CONDUIT

IDENTIFICATION SCHEME2

T6.1

CEILING TELECOM OUTLET

IDENTIFICATION SCHEME (TYPICAL)3

T6.1

PATCH PANEL LABELING (TYPICAL)4

T6.1

TELECOMMUNICATIONS EQUIPMENT

RACK IDENTIFICATION SCHEME5

T6.1

PATCH PANEL LABELING DETAIL6

T6.1

RACK ID TAG DETAIL7

T6.1

BACKBONE FIBER LABELING DETAIL8

T6.1

HORIZONTAL COPPER CABLE LABELING9

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/29

/20

4:

:59 P

MB

IM

0:/

/20

-1

- G

RT

E En try S tat ion

/52

.00

GR

TE

E ntr y S tat ion

- E lec tric al Ce ntr al.

rvt

T6.2

BJL/BDJ/KMD

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

167343

312456

BJL/BDJ/KMD

BJJ/JEB

11/30/2021 42 43

TECHNOLOGY

DETAILS

T6.2

TELECOMMUNICATIONS

GROUNDING BUS BAR (TYPICAL)1

T6.2

GROUND NOTES5

T6.2

BONDING CONDUCTOR SIZING CHART6

T6.2

BONDING CONDUCTOR WARNING LABEL2

T6.2

BONDING CONDUIT3

T6.2

BONDING H-TAP DETAIL4

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF11

/29

/20

4:

:59 P

MB

IM

0:/

/20

-1

- G

RT

E En try S tat ion

/52

.00

GR

TE

E ntr y S tat ion

- E lec tric al Ce ntr al.

rvt

T6.3

BJL/BDJ/KMD

GRANITE ENTRANCE STATION

GRAND TETON NATIONAL PARK

167343

312456

BJL/BDJ/KMD

BJJ/JEB

11/30/2021 43 43

TECHNOLOGY

DETAILS

T6.3

CABLE DRESSING IN RACK3

T6.3

TYPICAL PULLBOX GUIDELINES1

T6.3

PATCH PANEL PATCHING DETAIL2