U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LAND HIGHWAY DIVISION
VANCOUVER, WASHINGTON
Proposed Granite Entrance Station Architectural Work, For Information Only - To Be Constructed by Others
MOOSE WILSON ROAD PHASE 1
WY NPS GRTE 2017(1)
GRAND TETON NATIONAL PARK
TETON COUNTY, WYOMING
NPS PMIS No. 225661, NPS Drwg. No. 136/167343
W1
W1
S3.0
B C
S3.0
B C
S3.0
S3.0
S3.1
S3.0
CHECK VALVE
2WAY ATC VALVE
3WAY ATC VALVE
BALANCING VALVE
BUTTERFLY VALVE
MECHANICAL LEGEND
PRESSURE REDUCING VALVE
EXISTING ITEMS TO
CONNECTION TO EXISTING
BE DEMOLISHED
EXISTING ITEMS
SAFTEY RELIEF VALVE
BACK FLOW PREVENTER
NEW WORK
PRESSURE SENSOR
THERMOSTAT
METER
P&T TAP
FLOW ARROW
IN LINE PUMP
THERMOMETER
AUTOMATIC AIR VENT
GAUGE
MANUAL AIR VENT
STRAINER
DRAIN VALVE
FLEXIBLE CONNECTION
UNION
CAP
PIPING SERVICES
PIPING SYSTEM COMPONENTS
TEE UP
TEE DOWN
RS/RL
CD
ELBOW DOWN
ELBOW UP
DRAWING NOTATION
CONDENSATE DRAIN
REFRIGERANT SUCTION/LIQUID GATE VALVE
PLUG VALVE
BALL VALVE
VALVES
ECCENTRIC REDUCER
HVAC SYSTEM COMPONENTS
MOTORIZED DAMPER
RECT. RETURN DUCT
RECT. SUPPLY DUCT
SUPPLY DIFFUSER/
DN
RETURN GRILLE
DUCT SLOPE
M
18x12 RECT.
12" ROUND
MANUAL DAMPER
(D) DEMO
(N) NEW
(E) EXISTING
THREE WAY CONTROL VALVE
M
T
P
(E) EXISTING
N.C. NORMALLY CLOSED
N.O. NORMALLY OPEN
RS
RL
GRADE
SIGHT GLASS
FILTER DRYER
COND. DRAINTRAPCONDENSING
UNIT
AC-1
NOTES:
-ROUTE REFRIGERANT PIPING PER MANUFACTURER REQUIREMENTS
-PROVIDE PVC SLEEVE FOR ALL REFRIGERANT PIPING BELOW GRADE
AND UP TO /- 2" ABOVE GRADE.
CONCRETE PAD
W A
LL
STRUCTURE
AUXILIARY DRAIN PAN WITH UL 8
APPROVED WATER LEVEL DETECTION
DEVICE TO SHUTDOWN UNIT PRIOR TO
OVERFLOW
WALL-MOUNTED INDOOR AIR
CONDITIONING UNIT
SOLENOID VALVE (TYP.) WIRED TO AND
CONTROLLED BY UNIT CONTROLLER
SUPPLY LINE
SUMP OVERFLOW
N.C.
N.O.
N.O.
PROVIDE WITH THREADED END FOR YARD
HYDRANT TYPICAL GARDEN HOSE CONNECTION
GRADE
CONCRETE PAD
SUMP DRAIN PIPE TO BE PROVIDED SO THAT
DISCHARGE IS BEYOND CONCRETE PAD
SCALE: NOT TO SCALE
SPLIT SYSTEM DETAIL1
M1. SCALE: NOT TO SCALE
EVAPORATIVE COOLER AUTO DRAIN AND FILL DETAIL2
M1.
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/2
/2
2:
:1
P
MB
IM
://2
-1
- G
RT
E
E S
/21
- G
RT
E
- M
P M
MP .
BG
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
1 3 3
BG
T R
11/3 /2 21 21 3
MECHANICAL AND
PLUMBING COVER
SHEET
GENERAL MECHANICAL NOTES
A. ALL WORK SHALL BE IN ACCORDANCE WITH SMACNA STANDARDS AND SPECIFICATIONS AND AUTHORITY
HAVING URISDICTION.
B. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND NOT INTENDED TO SHOW ALL TRANSITIONS OFFSETS ETC. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND PROVIDE ALL NECESSARY FITTINGS TO COMPLETE THE INTENT OF THE DRAWINGS. ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS SHALL BE REPORTED TO THE CONTRACTING OFFICER (C.O). FOR RESOLUTION. CONTRACTOR MAY LOCATE MECHANICAL EQUIPMENT DIFFERENTLY THAN SHOWN ON DRAWINGS DUE TO CONFLICTS AS LONG AS
FUNCTION AND/OR APPEARANCE ARE NOT AFFECTED.
C. MECHANICAL WORK SHOWN IS INDICATED DIAGRAMMATICALLY ON THE DRAWINGS. COORDINATE SPACE REQUIREMENTS SUPPORTS AND INSTALLATION OF MECHANICAL WORK PRIOR TO INSTALLATION. FOLLOW ROUTING SHOWN FOR PIPES AND DUCTS AS CLOSELY AS PRACTICABLE PLACE RUNS PARALLEL WITH LINES OF BUILDING. UTILIZE SPACES EFFICIENTLY TO MAXIMIZE ACCESSIBILITY FOR OTHER INSTALLATIONS FOR
MAINTENANCE AND FOR REPAIRS.
D. COMPLY WITH MANUFACTURER S INSTRUCTIONS INCLUDING EACH STEP IN SEQUENCE. SHOULD MANUFACTURERS INSTRUCTIONS CONFLICT WITH THE DRAWINGS REQUEST CLARIFICATION FROM THE C.O.
BEFORE PROCEEDING.
E. DUCT SIZES ARE INSIDE DIMENSION.
F. CONTRACTOR SHALL REVIEW THESE DOCUMENTS CAREFULLY. CONTRACTOR SHALL CONTACT C.O. FOR RESOLUTION OF ANY DISCREPANCIES OMISSIONS OR CLARIFICATIONS BEFORE BID DATE. IN THE EVENT THAT AN INTERPRETATION OF BID DOCUMENTS IS NECESSARY AFTER THE BID DATE THE DECISION OF THE C.O. SHALL
BE FINAL AND BINDING.
G. PRODUCT DELIVERY STORAGE AND HANDLING: PROVIDE EQUIPMENT AND PERSONNEL TO HANDLE PRODUCTS BY METHODS TO PREVENT DAMAGE. PROMPTLY INSPECT SHIPMENTS TO ENSURE THAT PRODUCTS ARE UNDAMAGED. STORE AND PROTECT PRODUCTS IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS.
H. IN THE CASE OF A CONFLICT UNLESS OTHERWISE NOTED KEYNOTES ON MECHANICAL PLANS SHALL
SUPERCEDE ANY GENERAL NOTES ON THE PLANS.
I. CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES AND NOTIFY THE C.O. IF ANY CONFLICTS
OCCUR.
. THERMOSTAT LOCATIONS AND HEIGHTS TO BE COORDINATED AND VERIFIED BY THE C.O. CONTRACTOR TO CALIBRATE ALL THERMOSTATS SHOWN ON THIS PLAN. IT SHALL BE THE GENERAL CONTRACTOR S RESPONSIBILITY TO ENSURE THAT ALL EXISTING THERMOSTATS REMAIN INTACT DURING DEMOLITION. HEATING THERMOSTATS MUST REMAIN OPERATIONAL AT ALL TIMES. IF REQUIRED FOR BETTER PROTECTION
THERMOSTATS MAY BE TEMPORARILY MOUNTED IN THE CEILING PLENUM DURING DEMOLITION.
K. ALL TAKEOFFS RUNOUTS AND FLEX DUCTWORK TO DIFFUSERS SHALL BE THE SAME SIZE AS DIFFUSER
INLET UNLESS OTHERWISE NOTED.
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/2
/2
2:
:1
P
MB
IM
://2
-1
- G
RT
E
E S
/21
- G
RT
E
- M
P M
MP .
BG
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
1 3 3
BG
T R
11/3 /2 21 22 3
MECHANICAL AND
PLUMBING
SCHEDULES
A B C D
B.
2.
FEE
COLLECTION
GENERAL
STORAGE
1 3
OFFICE
1 1
REMIT
MECH
BREAK ROOM
1 8RR
OUTBOUND
CHECK
1 2
CORRIDOR
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/2
/2
2:
:1
P
MB
IM
://2
-1
- G
RT
E
E S
/21
- G
RT
E
- M
P M
M1.
BG
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
1 3 3
BG
T R
11/3 /2 21 23 3
MECHANICAL DEMO
PLAN
M1.
MECHANICAL DEMO PLAN1
KEY NOTES:
EXISTING TO REMAIN UNCHANGED.
DEMOLITION AND REMOVAL OF EXISTING /- OF UNDERGROUND DUCTWORK FROM THIS
POINT BACK TO EXISTING EVAPORATIVE COOLER TO BE DONE BY OTHERS. DUCT STUB TO
REMAIN FOR NEW DUCT CONNECTION. OPEN END OF DUCT STUB TO BE CAPPED. SEE
SHEET M1.1 FOR NEW DUCTWORK CONNECTION.
DEMOLITION AND REMOVAL OF EXISTING EVAPORATIVE COOLER TO BE DONE BY OTHERS.
-GALLON BURIED PROPANE TANK TO BE PROVIDED AND INSTALLED BY OTHERS.
SCALE OF FEET
8 12SCALE A
SCALE A
GENERAL NOTES:
1. CONTRACTOR TO MEASURE AND RECORD EXISTING SUPPLY AIRFLOWS AT EACH DIFFUSER.
DIFFUSERS TO BE BALANCED TO MATCH EXISTING AIRFLOWS.
2. THIS SHEET IS FOR REFERENCE ONLY. ALL DEMOLITION WORK IS TO BE DONE BY OTHERS.
B.
2.
FEE
COLLECTION
GENERAL
STORAGE
1 3
OFFICE
1 1
OUTBOUND
CHECK
1 2
RR
CORRIDOR
REMIT
MECH
BREAK ROOM
1 8
(N) AC-1
(N) CU-1
(N) EC-1
(N) EC-2
(E) BURIED
PROPANE TANK
RS/RL
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/2
/2
2:
:1
P
MB
IM
://2
-1
- G
RT
E
E S
/21
- G
RT
E
- M
P M
M1.1
BG
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
1 3 3
BG
T R
11/3 /2 21 2 3
MAIN BUILDING
MECHANICAL NEW
PLAN
M1.1
MAIN BUILDING MECHANICAL PLAN1
KEY NOTES:
EXISTING DUCT STUB TO REMAIN AND CONNECTION TO NEW UNDERGROUND DUCTWORK
TO BE DONE BY OTHERS.
PROVIDE AND INSTALL NEW THERMOSTAT AT SAME HEIGHT AS EXISTING LIGHT SWITCH AND
A MAXIMUM OF 8" AFF.
CONNECTION OF NEW UNDERGROUND DUCTWORK TO EXISTING UNDERGROUND
DUCTWORK AT THIS LOCATION TO BE DONE BY OTHERS.
PROVIDE AND INSTALL NEW CONDENSING UNIT (CU-1) ON GRADE-MOUNTED CONCRETE
PAD. CONCRETE PAD TO BE PROVIDED BY OTHERS.
PROVIDE AND INSTALL NEW WALL-MOUNTED AIR CONDITIONING UNIT (AC-1). INSTALL AS
HIGH AS POSSIBLE IN ACCORDANCE WITH MANUFACTURER S CLEARANCES.
PROVIDE AND INSTALL NEW GRADE-MOUNTED EVAPORATIVE COOLING UNIT AT EDGE OF
PARKING LOT ON GRADE-MOUNTED CONCRETE PAD. CONCRETE PAD TO BE PROVIDED BY
OTHERS. CONNECT NEW UNIT SUPPLY DISCHARGE TO EXISTING STUB OF NONMETAL
DUCTWORK ROUTED UNDERGROUND. UNDERGROUND ROUTING AND STUB UP OF
NONMETAL DUCTWORK TO BE DONE BY OTHERS.
NEW DUCTWORK FROM NEW MECHANICAL EQUIPMENT UNDERGROUND AS ROUND
NONMETAL DUCT TO BE PROVIDED BY OTHERS.
ROUTE 3/ " CONDENSATE DRAIN FROM AC-1 AS HIGH AS POSSIBLE AND TIGHT TO CEILING.
CONDENSATE DRAIN TO FOLLOW SAME ROUTING AS RS/RL. CONDENSATE DRAIN TO ROUTE
DOWN TIGHT TO EXTERIOR WALL OF MECHANICAL ROOM PENETRATE EXTERIOR WALL
LOW AND DISCHARGE OUTSIDE ONTO A SPLASH PAD.
REFRIGERANT SUCTION AND LIQUID (RS/RL) LINES TO BE ROUTED FROM CU-1
UNDERGOUND THROUGH PVC SLEEVE. CONTINUATION OF RS/RL LINES TO RISE UP FROM
BELOW GRADE AT EXTERIOR WALL INSIDE MECHANICAL ROOM. EXACT ROUTE TO BE
COORDINATED IN FIELD TO MAINTAIN UNOBSTRUCTED CLEARANCE IN FRONT OF THE FACE
OF THE EXISTING EXTERIOR WALL LOUVER. IN MECHANICAL ROOM RS/RL LINES TO ROUTE
AS HIGH AS POSSIBLE AND TIGHT TO CEILING TO INDOOR AC-1. CONTRACTOR TO
COORDINATE UNDERGROUND ROUTE WITH EXISTING LPG PIPING AND PROVIDE CODE
REQUIRED CLEARANCES.
-GALLON BURIED PROPANE TANK TO BE PROVIDED AND INSTALLED BY OTHERS.
EXISTING DAMPER IN MECHANICAL ROOM FOR UNDERGROUND DUCTWORK TO REMAIN
UNCHANGED. SEE M . FOR SEQUENCE OF OPERATIONS.
SCALE OF FEET
SCALE A
SCALE A
GENERAL NOTES:
1. CONTRACTOR TO MEASURE AND RECORD EXISTING SUPPLY AIRFLOWS AT EACH
DIFFUSER. DIFFUSERS TO BE BALANCED TO MATCH EXISTING AIRFLOWS.
B C D
KIOSK
STATION FF
1 - "
T.O. EXISTING
FRAMING
1 8 - 8"
T.O. STONE
1 3 - 3 1/2"
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/2
/2
2:
:1
P
MB
IM
://2
-1
- G
RT
E
E S
/21
- G
RT
E
- M
P M
M1.2
BG
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
1 3 3
BG
T R
11/3 /2 21 2 3
KIOSK MECHANICAL
PLAN
M1.2
KIOSK MECHANICAL PLAN1
KEY NOTES:
PROVIDE AND INSTALL NEW SURFACE MOUNTED SUPPLY DIFFUSER (TAG-A). BALANCE
SUPPLY DIFFUSER AIRFLOWS EVENLY.
NEW DUCTWORK FROM NEW MECHANICAL EQUIPMENT TO BE ROUTED UNDERGROUND AS
ROUND NONMETAL DUCTWORK AND TO BE PROVIDED BY OTHERS.
NEW 1 x1 " SHEET METAL DUCT TO CONNECT TO ROUND DUCTWORK STUB IN KIOSK
MECHANICAL CHASE AT THIS LOCATION BEFORE ROUTING ABOVE KIOSK CEILING. STUB UP
FROM UNDERGROUND NONMETAL DUCTWORK TO BE DONE BY OTHERS.
PROVIDE AND INSTALL NEW ELECTRIC BASEBOARD (EBB-1). CENTER BASEBOARD ON WALL
BETWEEN CASEWORK AND MECHANICAL CHASE.
PROVIDE AND INSTALL NEW ELECTRIC RADIANT HEATER (ERH-1). CENTER RADIANT HEATER
ON WALL AND INSTALL AS HIGH AS POSSIBLE IN ACCORDANCE WITH MANUFACTURER S
CLEARANCES.
PROVIDE AND INSTALL NEW LOUVER (L-1) IN EXTERIOR FACE OF KIOSK AS RELIEF PLENUM
DISCHARGE. CENTER LOUVER ON KIOSK EXTERIOR WALL AND COORDINATE FINAL
INSTALLATION HEIGHT TO BE ABOVE CEILING.
PROVIDE AND INSTALL NEW 12x2 " SURFACE MOUNTED RETURN GRILLE (TAG-B).
SCALE OF FEET
SCALE A
SEE SHEET M1.1
FOR CONTINUATION
SCALE A
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/2
/2
2:
:1
P
MB
IM
://2
-1
- G
RT
E
E S
/21
- G
RT
E
- M
P M
M1.2
BG
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
1 3 3
BG
T R
11/3 /2 21 2 3
KIOSK MECHANICAL
PLAN
M1.2
KIOSK ELEVATION VIEW2
PROVIDE AND INSTALL THREE (3) NEW THERMOSTATS FOR EC-2 ERH-1 AND EBB-1
CONTROL. PROVIDE AT SAME HEIGHT AS LIGHT SWITCH AND A MAXIMUM OF 8" AFF.
PROVIDE AND INSTALL ACCESS PANEL WITHIN VERTICAL SECTION OF KIOSK CHASE FOR
ACCESS TO CHASE AND DUCT FITTING. PROVIDE ADDITIONAL ACCESS PANEL IN DUCTWORK
WITHIN THE FOOTPRINT OF THE CHASE ACCESS PANEL.
SCALE A
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/2
/2
2:
:1
P
MB
IM
://2
-1
- G
RT
E
E S
/21
- G
RT
E
- M
P M
M .
BG
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
1 3 3
BG
T R
11/3 /2 21 2 3
SEQUENCE OF
OPERATIONS
MAIN BUILDING EVAPORATIVE COOLER (EC-1) SEQUENCE OF OPERATIONS:
EVAPORATIVE COOLER TO BE PROGRAMMED TO INTERLOCK WITH SUMMER CONDITIONS DUCT
DAMPER AND MAIN BUILDING FURNACE.
WHEN EXISTING MAIN BUILDING FURNACE ENABLES AND IF UNDERGROUND DUCTWORK
DAMPER IS OPEN THEN EVAPORATIVE COOLER SHALL ENABLE. IF EITHER THE FURNACE
DISABLES OR UNDERGROUND DUCTWORK DAMPER IS CLOSED EVAPORATIVE COOLER SHALL
DISABLE.
EVAPORATIVE COOLING TO BE ENABLED WHEN OUTSIDE AIR TEMPERATURE IS ABOVE DEG F
(AD .). WHEN THE SPACE TEMPERATURE IS ABOVE THE COOLING SETPOINT OF DEG F (AD .)
SPRAY PUMP SHALL START/STOP TO MAINTAIN A SPACE TEMPERATURE OF DEG F (AD .).
WHEN THE SPACE TEMPERATURE IS BELOW THE HEATING SETPOINT OF DEG F (AD .)
EVAPOARITVE COOLER BASIN TO ENABLE AUTOMATIC DRAINDOWN.
EVAPORATIVE COOLER TO ENABLE AUTOMATIC DRAINDOWN WHEN OUTSIDE AIR TEMPERATURE
IS BELOW DEG F (AD .). PARK STAFF TO ENSURE YARD HYDRANT IS CLOSED TO PREVENT
FREEZING AT YARD HYDRANT.
KIOSK BUILDING EVAPORATIVE COOLER (EC-2) SEQUENCE OF OPERATIONS:
EVAPORATIVE COOLER TO BE PROGRAMMED FOR STANDALONE OPERATION AND SHALL BE
PROVIDED WITH A LOCAL PROGRAMMABLE THERMOSTAT IN THE KIOSK BUILDING FOR UNIT
CONTROL.
EVAPORATIVE COOLER FAN SHALL ENABLE UPON A SCHEDULE CALL AND TO OPERATE IN
EITHER OCCUPIED OR UNOCCUPIED MODE.
DURING OCCUPIED MODE THE SUPPLY FAN SHALL RUN CONTINUOUSLY AND OUTSIDE AIR
DAMPER SHALL OPEN. EVAPORATIVE COOLING TO BE ENABLED WHEN OUTSIDE AIR
TEMPERATURE IS ABOVE DEG F (AD .). WHEN THE SPACE TEMPERATURE IS ABOVE THE
OCCUPIED COOLING SETPOINT OF DEG F (AD .) SPRAY PUMP SHALL START/STOP TO
MAINTAIN A SPACE TEMPERATURE OF DEG F (AD .). WHEN THE SPACE TEMPERATURE IS
BELOW THE OCCUPIED HEATING SETPOINT OF DEG F (AD .) EVAPOARITVE COOLER BASIN TO
ENABLE AUTOMATIC DRAINDOWN AND THE GAS-FIRED FURNACE SHALL MODULATE TO
MAINTAIN A SPACE TEMPERATURE OF DEG F (AD .).
DURING UNOCCUPIED MODE THE SUPPLY FAN SHALL BE DISABLED AND THE OUTSIDE AIR
DAMPER SHALL BE CLOSED. WHEN THE SPACE TEMPERATURE IS BELOW THE UNOCCUPIED
HEATING SETPOINT OF DEG F (AD .) THE SUPPLY FAN SHALL ENABLE AND THE GAS-FIRED
FURANCE SHALL MODULATE TO MAINTAIN A SPACE TEMPERATURE OF DEG F (AD .). WHEN
THE UNOCCUPIED HEATING SETPOINT IS MAINTAINED THE GAS-FIRED FURNACE SHALL
MODULATE CLOSED AND THE SUPPLY FAN SHALL DISABLE. WHEN THE SPACE TEMPERATURE IS
ABOVE THE UNOCCUPIED COOLING SETPOINT OF 8 DEG F (AD .) THE SUPPLY FAN SHALL
ENABLE AND THE SPRAY PUMP SHALL START/STOP TO MAINTAIN UNOCCUPIED COOLING
SETPOINT.
EVAPORATIVE COOLER TO ENABLE AUTOMATIC DRAINDOWN WHEN OUTSIDE AIR TEMPERATURE
IS BELOW DEG F (AD .). PARK STAFF TO ENSURE YARD HYDRANT IS CLOSED TO PREVENT
FREEZING AT YARD HYDRANT.
AIR CONDITIONING (AC-1) SEQUENCE OF OPERATION:
AIR CONDITIONING SPLIT SYSTEM TO BE PROGRAMMED FOR STANDALONE OPERATION AND
SHALL BE PROVIDED WITH LOCAL THERMOSTAT FOR EQUIPMENT OPERATION.
AIR CONDITIONER SHALL ENABLE UPON A CALL FOR COOLING AND TO OPERATE IN EITHER
OCCUPIED OR UNOCCUPIED MODE.
DURING OCCUPIED MODE IF THE SPACE TEMPERATURE IS ABOVE THE OCCUPIED COOLING
SETPOINT OF DEG F (AD .) THE INDOOR AIR CONDITIONING UNIT AND ASSOCIATED
OUTDOOR CONDENSING UNIT SHALL ENABLE. WHEN THE OCCUPIED COOLING SETPOINT
HAS BEEN MAINTAINED THE INDOOR AIR CONDITIONING UNIT AND ASSOCIATED OUTDOOR
CONDENSING UNIT SHALL DISABLE.
THE EQUIPMENT SHALL NOT RUN DURING UNOCCUPIED MODE.
ELECTRIC BASEBOARD HEATING (EBB-1) SEQUENCE OF OPERATION:
ELECTRIC BASEBOARD TO BE PROGRAMMED FOR STANDALONE OPERATION AND SHALL BE
PROVIDED WITH LOCAL PROGRAMMABLE THERMOSTAT FOR EQUIPMENT OPERATION.
BASEBOARD SHALL ENABLE UPON A CALL FOR HEATING AND TO OPERATE IN EITHER
OCCUPIED OR UNOCCUPIED MODE.
DURING OCCUPIED MODE IF THE SPACE TEMPERATURE IS BELOW THE OCCUPIED HEATING
SETPOINT OF DEG F (AD .) THE BASEBOARD HEATING ELEMENT SHALL ENABLE. WHEN
THE OCCUPIED HEATING SETPOINT HAS BEEN MAINTAINED THE ELECTRIC BASEBOARD
SHALL DISABLE.
DURING UNOCCUPIED MODE IF THE SPACE TEMPERATURE IS BELOW THE UNOCCUPIED
HEATING SETPOINT OF DEG F (AD .) THE BASEBOARD HEATING ELEMENT SHALL ENABLE.
WHEN THE UNOCCUPIED HEATING SETPOINT HAS BEEN MAINTAINED THE ELECTRIC
BASEBOARD SHALL DISABLE.
ELECTRIC RADIANT HEATING (ERH-1) SEQUENCE OF OPERATION:
ELECTRIC RADIATOR TO BE PROGRAMMED FOR STANDALONE OPERATION AND SHALL BE
PROVIDED WITH LOCAL PROGRAMMABLE THERMOSTAT FOR EQUIPMENT OPERATION.
ELECTRIC RADIATOR SHALL ENABLE UPON A CALL FOR HEATING AND TO OPERATE IN
EITHER OCCUPIED OR UNOCCUPIED MODE.
DURING OCCUPIED MODE IF THE SPACE TEMPERATURE IS BELOW THE OCCUPIED HEATING
SETPOINT OF DEG F (AD .) THE ELECTRIC RADIATOR SHALL ENABLE. WHEN THE
OCCUPIED HEATING SETPOINT HAS BEEN MAINTAINED THE ELECTRIC RADIATOR SHALL
DISABLE.
DURING UNOCCUPIED MODE IF THE SPACE TEMPERATURE IS BELOW THE UNOCCUPIED
HEATING SETPOINT OF DEG F (AD .) THE ELECTRIC RADIATOR SHALL ENABLE. WHEN THE
UNOCCUPIED HEATING SETPOINT HAS BEEN MAINTAINED THE ELECTRIC RADIATOR SHALL
DISABLE.
B.
2.
CAPPED
(N) AC-1
(N) CU-1
(E) BURIED
PROPANE TANK
(E)
(E) YH-1
(N) EC-1
(N) EC-2
(E
(E)
(E)
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/2
/2
2:
:2
P
MB
IM
://2
-1
- G
RT
E
E S
/21
- G
RT
E
- M
P M
P1.
BG
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
1 3 3
BG
T R
11/3 /2 21 2 3
PLUMBING PLAN
P1.
PLUMBING PLAN1
KEY NOTES:
-GALLON BURIED PROPANE TANK TO BE PROVIDED AND INSTALLED BY OTHERS.
1" CW CONNECTION TO EXISTING CW PIPING IN THIS AREA TO BE DONE BY OTHERS. ROUTE
PIPING UNDERGROUND TO CONNECT TO YARD HYDRANT SERVICE PIPING. UNDERGROUND
PIPING FOR YARD SERVICE PROVIDED BY OTHERS.
PROVIDE AND INSTALL NEW WYE FITTING TO EXISTING GRADE-MOUNTED YARD HYDRANT
FOR GARDEN HOSE CONNECTION.
TIE IN TO EXISTING 1/2" LPG UNDERGROUND PIPE TO BE DONE BY OTHERS. 1/2" LPG PIPE
ROUTED UNDERGROUND BY OTHERS TO NEW GAS-FIRED SECTION OF EVAPORATIVE
COOLER (EC-2). PROVIDE CONNECTION FROM EXISTING LPG STUB OUT TO NEW
EVAPORATIVE COOLER.
/- OF UNDERGROUND PROPANE PIPING TO MAIN BUILDING FURNACES PROVIDED BY
OTHERS.
CAPPED UNDERGROUND DOMESTIC COLD WATER LINE TO BE DONE BY OTHERS.
REFER TO MECHANICAL SHEET M1.1 FOR CONDENSATE PIPING FROM INDOOR AIR
CONDITIONING UNIT.
SCALE OF FEET
SCALE A
SCALE A
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/29
/20
4:
:47 P
MB
IM
0:/
/20
-1
- G
RT
E En try S tat ion
/52
.00
GR
TE
E ntr y S tat ion
- E lec tric al Ce ntr al.
rvt
E0.0
BJL/BDJ/KMD
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
167343
312456
BJL/BDJ/KMD
BJJ/JEB
11/30/2021 28 43
ELECTRICAL COVER
SHEET
E0.0
DEVICE MOUNTING HEIGHT1
11/30/2021
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/29
/20
4:
:47 P
MB
IM
0:/
/20
-1
- G
RT
E En try S tat ion
/52
.00
GR
TE
E ntr y S tat ion
- E lec tric al Ce ntr al.
rvt
E0.1
BJL/BDJ/KMD
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
167343
312456
BJL/BDJ/KMD
BJJ/JEB
11/30/2021 29 43
ELECTRICAL
GENERAL NOTES
BIKE PATH
INBOUND LANE
INBOUND LANE
GEN ER AL N OTES
1.
2.
3.
4.
5.
R EFER TO SHEET G0.1 FOR WALL TYPES.
R EFER TO SHEET A6.0 FOR W IN D OW AND D OOR
ELEVATION S.
D IMENSION S AR E TO FAC E OF STRU CTUR E U ON .
D OOR D IMENSION S ARE TO C EN TER LINE.
R EFER TO STRU CTU RAL MECH AN IC AL PLU MBINGAND ELECTR IC AL D RAW IN GS FOR MORE
IN FORMATION.
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/29
/20
4:
:48 P
MB
IM
0:/
/20
-1
- G
RT
E En try S tat ion
/52
.00
GR
TE
E ntr y S tat ion
- E lec tric al Ce ntr al.
rvt
E0.2
BJL/BDJ/KMD
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
167343
312456
BJL/BDJ/KMD
BJJ/JEB
11/30/2021 30 43
ELECTRICAL SITE
PLAN
E0.2
ELECTRICAL SITE PLAN1
SCALE OF FEET
2010010
KEYNOTE LEGEND
SITE GENERAL NOTES
A B C D
B.5
2.5
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/29
/20
4:
:48 P
MB
IM
0:/
/20
-1
- G
RT
E En try S tat ion
/52
.00
GR
TE
E ntr y S tat ion
- E lec tric al Ce ntr al.
rvt
E1.0
BJL/BDJ/KMD
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
167343
312456
BJL/BDJ/KMD
BJJ/JEB
11/30/2021 31 43
ELECTRICAL POWER
PLAN
E1.0
POWER PLAN1
SCALE OF FEET
POWER GENERAL NOTES
KEYNOTE LEGEND
A B C D
B.5
2.5
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/29
/20
4:
:50 P
MB
IM
0:/
/20
-1
- G
RT
E En try S tat ion
/52
.00
GR
TE
E ntr y S tat ion
- E lec tric al Ce ntr al.
rvt
E2.0
BJL/BDJ/KMD
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
167343
312456
BJL/BDJ/KMD
BJJ/JEB
11/30/2021 32 43
ELECTRICAL
LIGHTING PLANE2.0
LIGHTING PLAN1
SCALE OF FEET
LIGHTING GENERAL NOTES
KEYNOTE LEGEND
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/29
/20
4:
:51 P
MB
IM
0:/
/20
-1
- G
RT
E En try S tat ion
/52
.00
GR
TE
E ntr y S tat ion
- E lec tric al Ce ntr al.
rvt
E4.0
BJL/BDJ/KMD
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
167343
312456
BJL/BDJ/KMD
BJJ/JEB
11/30/2021 33 43
ELECTRICAL
ONE-LINE DIAGRAM
E4.0
ELECTRICAL ONE-LINE DIAGRAM1
MECHANICAL EQUIPMENT SCHEDULE
MECHANICAL EQUIPMENT GENERAL NOTES
MECHANICAL EQUIPMENT SPECIFIC NOTES
LIGHTING FIXTURE SCHEDULE
LIGHTING CONTROL DEVICES
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/29
/20
4:
:51 P
MB
IM
0:/
/20
-1
- G
RT
E En try S tat ion
/52
.00
GR
TE
E ntr y S tat ion
- E lec tric al Ce ntr al.
rvt
E5.0
BJL/BDJ/KMD
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
167343
312456
BJL/BDJ/KMD
BJJ/JEB
11/30/2021 34 43
ELECTRICAL
SCHEDULES
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/29
/20
4:
:51 P
MB
IM
0:/
/20
-1
- G
RT
E En try S tat ion
/52
.00
GR
TE
E ntr y S tat ion
- E lec tric al Ce ntr al.
rvt
T0.0
BJL/BDJ/KMD
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
167343
312456
BJL/BDJ/KMD
BJJ/JEB
11/30/2021 35 43
TECHNOLOGY COVER
SHEET
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/29
/20
4:
:52 P
MB
IM
0:/
/20
-1
- G
RT
E En try S tat ion
/52
.00
GR
TE
E ntr y S tat ion
- E lec tric al Ce ntr al.
rvt
T0.1
BJL/BDJ/KMD
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
167343
312456
BJL/BDJ/KMD
BJJ/JEB
11/30/2021 36 43
TECHNOLOGY
GENERAL NOTES
T0.1
DEVICE MOUNTING HEIGHT1
BIKE PATH
INBOUND LANE
INBOUND LANE
GEN ER AL N OTES
1.2.
3.
4.
5.
R EFER TO SHEET G0.1 FOR WALL TYPES.R EFER TO SHEET A6.0 FOR W IN D OW AND D OOR
ELEVATION S.
D IMENSION S AR E TO FAC E OF STRU CTUR E U ON .
D OOR D IMENSION S ARE TO C EN TER LINE.
R EFER TO STRU CTU RAL MECH AN IC AL PLU MBING
AND ELECTR IC AL D RAW IN GS FOR MORE
IN FORMATION.
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/29
/20
4:
:53 P
MB
IM
0:/
/20
-1
- G
RT
E En try S tat ion
/52
.00
GR
TE
E ntr y S tat ion
- E lec tric al Ce ntr al.
rvt
T0.2
BJL/BDJ/KMD
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
167343
312456
BJL/BDJ/KMD
BJJ/JEB
11/30/2021 37 43
TECHNOLOGY SITE
PLAN
T0.2
TECHNOLOGY SITE PLAN1
TECHNOLOGY GENERAL NOTES
KEYNOTE LEGEND
SCALE OF FEET
2010010
A B C D
B.5
2.5
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/29
/20
4:
:56 P
MB
IM
0:/
/20
-1
- G
RT
E En try S tat ion
/52
.00
GR
TE
E ntr y S tat ion
- E lec tric al Ce ntr al.
rvt
T1.0
BJL/BDJ/KMD
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
167343
312456
BJL/BDJ/KMD
BJJ/JEB
11/30/2021 38 43
TECHNOLOGY PLAN
T1.0
TECHNOLOGY PLAN1
TECHNOLOGY GENERAL NOTES
KEYNOTE LEGEND
SCALE OF FEET
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/29
/20
4:
:57 P
MB
IM
0:/
/20
-1
- G
RT
E En try S tat ion
/52
.00
GR
TE
E ntr y S tat ion
- E lec tric al Ce ntr al.
rvt
T5.0
BJL/BDJ/KMD
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
167343
312456
BJL/BDJ/KMD
BJJ/JEB
11/30/2021 39 43
TECHNOLOGY
SCHEDULES
T5.0
RACK011
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/29
/20
4:
:57 P
MB
IM
0:/
/20
-1
- G
RT
E En try S tat ion
/52
.00
GR
TE
E ntr y S tat ion
- E lec tric al Ce ntr al.
rvt
T6.0
BJL/BDJ/KMD
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
167343
312456
BJL/BDJ/KMD
BJJ/JEB
11/30/2021 40 43
TECHNOLOGY
DETAILS
T6.0
4 PORT FACEPLATE1
T6.0
ACCESS CONTROL RESPONSIBILITY DETAIL4
T6.0
DOOR ROUGH-IN:
ACCESS CONTROLLED DOOR3
T6.0
TELECOMMUNICATIONS
OUTLET BOX DETAILS (TYPICAL)2
T6.0
CAMERA INTERIOR HARDLID CEILING MOUNTING DETAIL5
T6.0
CAMERA EXTERIOR WALL MOUNTING DETAIL6
T6.0
CAMERA INTERIOR WALL MOUNTING DETAIL7
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/29
/20
4:
:58 P
MB
IM
0:/
/20
-1
- G
RT
E En try S tat ion
/52
.00
GR
TE
E ntr y S tat ion
- E lec tric al Ce ntr al.
rvt
T6.1
BJL/BDJ/KMD
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
167343
312456
BJL/BDJ/KMD
BJJ/JEB
11/30/2021 41 43
TECHNOLOGY
DETAILS
T6.1
TYPICAL CABLE IDENTIFICATION SCHEME1
T6.1
TELECOMMUNICATIONS CONDUIT
IDENTIFICATION SCHEME2
T6.1
CEILING TELECOM OUTLET
IDENTIFICATION SCHEME (TYPICAL)3
T6.1
PATCH PANEL LABELING (TYPICAL)4
T6.1
TELECOMMUNICATIONS EQUIPMENT
RACK IDENTIFICATION SCHEME5
T6.1
PATCH PANEL LABELING DETAIL6
T6.1
RACK ID TAG DETAIL7
T6.1
BACKBONE FIBER LABELING DETAIL8
T6.1
HORIZONTAL COPPER CABLE LABELING9
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/29
/20
4:
:59 P
MB
IM
0:/
/20
-1
- G
RT
E En try S tat ion
/52
.00
GR
TE
E ntr y S tat ion
- E lec tric al Ce ntr al.
rvt
T6.2
BJL/BDJ/KMD
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
167343
312456
BJL/BDJ/KMD
BJJ/JEB
11/30/2021 42 43
TECHNOLOGY
DETAILS
T6.2
TELECOMMUNICATIONS
GROUNDING BUS BAR (TYPICAL)1
T6.2
GROUND NOTES5
T6.2
BONDING CONDUCTOR SIZING CHART6
T6.2
BONDING CONDUCTOR WARNING LABEL2
T6.2
BONDING CONDUIT3
T6.2
BONDING H-TAP DETAIL4
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/29
/20
4:
:59 P
MB
IM
0:/
/20
-1
- G
RT
E En try S tat ion
/52
.00
GR
TE
E ntr y S tat ion
- E lec tric al Ce ntr al.
rvt
T6.3
BJL/BDJ/KMD
GRANITE ENTRANCE STATION
GRAND TETON NATIONAL PARK
167343
312456
BJL/BDJ/KMD
BJJ/JEB
11/30/2021 43 43
TECHNOLOGY
DETAILS
T6.3
CABLE DRESSING IN RACK3
T6.3
TYPICAL PULLBOX GUIDELINES1
T6.3
PATCH PANEL PATCHING DETAIL2