grte201701_Earthwork_AP137_18.pdf

PDF 416 KB Posted

Attached to
WY NPS 2017(1) MOOSE WILSON ROAD PHASE 1
Solicitation number
69056721R000010
Issued by

View the file

Other files

File Type Posted
QA_03-09-2022.pdf PDF
QA_03-07-2022.pdf PDF
Amendment A002.pdf PDF
QA_03-04-2022.pdf PDF
QA_03-02-2022.pdf PDF
Amendment A001.pdf PDF
QA_03-01-2022.pdf PDF
grte201701_ML_HA.pdf PDF
grte201701_Earthwork_ML125_00 to 156_75-Volumes.pdf PDF
grte201701_Earthwork_AP137_26.pdf PDF
grte201701_Plans.pdf PDF
grte201701_Earthwork_PFP-NB.pdf PDF
grte2017(1)_GES-Outbound-Line_VA.pdf PDF
grte201701_ML_VA.pdf PDF
grte201701_Earthwork_ML125_00 to 156_75-NB.pdf PDF
1460-013P Lake Creek Bridge - 2019 Safety Inspection_Redacted.pdf PDF
grte201701_GR 21-20-Geotech Report.pdf PDF
Additional physical data.zip ZIP file
grte2017(1)_GES-Bike-Path_VA.pdf PDF
grte201701_Earthwork_ML159_75 to 234_60-Volumes.pdf PDF
grte2017(1)_Earthwork_GES Inbound Line.pdf PDF
grte2017(1)_GES_XS.pdf PDF
GRTE-PMIS-312456_11-30-2021_Drawings_Final-CDs.pdf PDF
grte2017(1)_Earthwork_GES Outbound Line.pdf PDF
grte201701_Earthwork_AP231_03.pdf PDF
grte201701_Earthwork_ML159_75 to 234_60-NB.pdf PDF
21.11.17 - WY LCGP Compiled SWPPP - Final.pdf PDF
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
grte2017(1)_GES_HA.pdf PDF
grte201701_Earthwork_PFP-Volumes.pdf PDF
grte2017(1)_Earthwork_GES Bike Path.pdf PDF
grte2017(1)_GES-Inbound-Line_VA.pdf PDF
RFP-69056721R000010.pdf PDF
GRTE 100(1) -Lake Creek Bridge.pdf PDF
grte2017(1)_GCTH_Quantities_Report.pdf PDF
grte201701_Earthwork_AP162_16.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LAND HIGHWAY DIVISION

VANCOUVER, WASHINGTON

Earthwork Report Approach 137+18

MOOSE WILSON ROAD PHASE 1

WY NPS GRTE 2017(1)

GRAND TETON NATIONAL PARK

TETON COUNTY, WYOMING

NPS PMIS No. 225661, NPS Drwg. No. 136/167343

Quantities Report by Named Boundary

Report Created: Monday, September 27, 2021 Time: 3:04:13 PM

Named Boundary Group:

AP137+18

Alignment Name: AP137+18

Input Grid Factor:

Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.

1111.885 AP137+18

Baseline: 183.111

XS_TL_Draft-DNC: 533.331

XS_TL_Centerline 1: 294.077

XS_TL_Centerline 2: 294.077

XS_TL_Centerline 3: 294.077

XS_TL_Subgrade: 80.320

XS_TL_Centerline: 294.077

XS_TL_Edge of Pavt 1: 670.709

XS_TL_Edge of Pavt 2: 929.298

XS_TL_Edge of Pavt 3: 653.094

XS_TL_Edge of Pavt: 403.065

AUX_10: 104.764

XS_TL_Edge of Shld: 266.333

XS_TL_Cut: 132.524

XS_TL_Fill: 80.741

XS_TC_Pavement Layer 1: 3832.711 23.359

XS_TC_Fill: 140.969 0.245

XS_TC_Cut: 56.650

XS_TC_Pavement Layer 2: 3910.430 23.839

XS_TC_Pavement Layer 4: 2105.598 38.838

XS_TC_Foreslope: 789.618

XS_TC_Shoulder Foreslope: 746.154 4.050

XS_TC_Pavement Layer 3: 3997.841 40.511

Edge of pavement: 330.869

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 1 of 1Volumes Report

9/27/2021file:///C:/Users/kristina.hossley/AppData/Local/Temp/RPTg5b0yzi0.html

File details come from the government source that posted it. Updated .