GRTE 100(1) -Lake Creek Bridge.pdf
PDF 891 KB Posted
- Attached to
- WY NPS 2017(1) MOOSE WILSON ROAD PHASE 1
- Solicitation number
- 69056721R000010
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LAND HIGHWAY DIVISION
VANCOUVER, WASHINGTON
GRTE 100(1) Lake Creek Bridge As-Builts (2004)
MOOSE WILSON ROAD PHASE 1
WY NPS GRTE 2017(1)
GRAND TETON NATIONAL PARK
TETON COUNTY, WYOMING
NPS PMIS No. 225661, NPS Drwg. No. 136/167343
C "O
L
L
"O V, Q. z
GENERAL NOTES:
SPECIF/CATIONS:
DESIGN: AASHTO Standard Specifications for Highway Bridges, 17th Edition, 2002, with current interim CONSTRUCTION: Federal Highway Administration Standard Specificat(ons for Construction of Roads and Bridges on Federal Highway Projects, FP-96 (English).
DEAD LOAD:
CAST-IN-PLACE CONCRETE: 150 lb per cubic feet STRUCTURAL STEEL: 490 lb per cubic feet TIMBER: 50 lb per cubic feet LATERAL EARTH PRESSURE: Equivalent to a fluid weighing 36 pcf.
UV£ LOAD:
DESIGN VEHICLE: HS 20-44 impact, 1- 50/L+l25, where L- span length in feet, maximum impact, !• 307.
SEISMIC: Acceleration coefficient, A- 0./g
CAST-IN-PLACE CONCRETE:
All cast-in-place concrete shall be Structural Concrete Class A(A£J, with minimum 28-day strength f '-4000 psi.
Chamfer exposed edges of all concrete ¾ in, unless shown otherwise on plans. All cast-in-place concrete shall be made with type II cement. All cement shall be low alkali cement. All exposed vertical concrete surfaces shall be given texture finish. See Special Contract Requirements.
REINFORCING STEEL:
All reinforcing steel shall conform to AASHTO M3/, M42, or M53 - Grode 60 deformed. The minimum concrete covering to the face of any bar shall be 2N, unless shown otherwise on the plans.
STRUCTURAL STEEL:
Structural steel for W shape, channels, stiffener plates, and bearing plates shall be high-strength, low alloy, corrosion resistant steel conforming to ASTM A588. Field connections associated with beams are slip critical, Class A contact surfaces, and shall be made with ½H diameter friction type bolts conforming to AASHTO M/64, type 3. Anchor bolts at bearings shall be galvanized and conform to ASTM 307. Welding shall conform to ANSI/ AWS/ AASHTO Bridge Welding Code, current edition. The steel fabricating company shall be fully certified in simple steel bridge structures rs Br), under the A/SC Quality Certification Program.
TIMBER:
All timber shall be Douglas Fir (Coast Region). Glue laminated timber shall conform to ANSI/ A/TC A/90.I, #Specification for Structural Glued Laminated Timbe~. current edition, and shall be fabricated in accordance with A/TC 117-93---Manufacturing, "Standard Specifications for Structural Glued Laminated Timber of Softwood Species1
• Solid sawn lumber for curbs, risers, and running planks shall be No. I or better, graded according to the Western Wood Products Association. All timber members shall be pressure treated with Copper naphthenate, as described in the Special Contract Requirements. All timber deck connection clips and bolts shall be galvanized.
£/astomeric Bearing Pads: £/astomeric pads shall meet the requirements of AASHTO M 251.
ALLOWABLE STRESSES:
Structural Glued Laminated Timber Deck:
Glued laminated timber shall be manufactured from grades of lumber which will produce design values equal to or exceeding the following:
Loaded parallel to the wide faces of the laminations:
Bending (FbyyJ - /450 psi Compression Perpendicular to Grain (Fe .l yyJ - 560 psi Shear Parallel to Grain (FvyyJ = /45 psi Modulus of Elasticity (£) = 160,000 psi
GEOTECHNICAL REPORT:
For geotechnical information see Geotechnical Report No. 27-03, dated November 20, 2003, prepared by TERRACON.
ITEM
NO.
203018
2080/
20802
5520/
5540/
55501
55702
I STATE I
I WY I
PROJECT
PRA-GRTE 100 ll, PRA-GRTE 209( I l, PRA-GRTE 225Cll
SHEET
NUMBER
E.1
ESTIMATE
DESCRIPTION
Removal of bridge
Structure excavation
Foundation fill
Structural concrete, class A(AEJ
Reinforcing steel
Structural steel, furnished, fabricated, and erected
Treated structural timber and lumber
UNIT QUANTITY NOTES
Each I
Cubic yard 380.0 (I)
Cubic yard 227.0
Cubic yard 94.00 (/)( 2 )( 3)
Pound 9760 (/)
Pound 24,852 (/)(4)(5)
MFBM 9.600 (!)(6)(7)
ESTIMATE NOTES:
(IJ Contract quantity.
(2 J Include cost of furnishing and lnstalllng concrete anchor bolts, geocomposite sheet drain, and drain grate.
( 31 Include cost of concrete surf ace texture finish.
(4) Include cost of furnishing, fabricating, and installing all weathering structural steel, which include W shape beams, channels, stiffener plates, guard angles, and galvanized steel bolts.
(5) Include cost of furnishing and installlng e/astomeric bearing pad.
(6) Include cost of furnishing and Installing all treated timbers, which include G/u/am timber deck, timber curb, and timber riser.
(7) Include cost of furnishing and installing timber deck steel clip/bolt and timber curb anchor bolt with plate washer.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GRAND TETON NATIONAL PARK
LAKE CREEK BRIDGE
WYOMING
GENERAL NOTES & ESTIMATE
-g NPS Pkg. No. 22094, 90954, 90953 NPS Drwg. No. 136/80196 ~ ~NO::-."Tl~D""AT~E-~IBY~l-------=R""Ev"'1""s1-=o.,.,NS-------~ IN""O • ..,l~D~A-=T""E-"Tl-:B~Y..,1- - ------,R~E~V"""I s~,o~N-=s-------,,r---,D-=E-=s-=1G"""N~EO~B~Y-T"""l-~DR~A"'W.,.,N..,B~Y~-,---.c~H-=Ec""K""=E""D..,B~Y---.---.. S~C~A""'LE ___ ..,l,...;;P.,,.RO""J""=E""cT""""'=T""EA"""M.,...,.L""EA-=D-=E""R-+---=s""'R""=1D""G""E ""'D'""RA'""w"'I-NG-...... ,..---DA-T""E----,-D-RA_W_I_NG_N_Q __ ... f t---t':---------;--:--t-:-----------............. ------1-:---t:---------,;,:----1:-----------------------i:t---F-.-,-sM-A""'IL ...... _t-l-J-.... D ... E ... M ... EL""'L-0--11--M-... V ... EN_E_,R ... os""'o--t-l----NO_N_E ____ -llt----------------+-.;;.;.;;.;;1.;;.;;.o .. f~-,3----1,1--M-AR.;;,C;,;.H;.;;2 ... o_o_4_+-l....:R;;.;.G;;.;2;;.;.7,;,;8;;.9,;,;-.;;,A:-..-1
N
C
" f
L L
0.. z
" 0 0 ..
NO. DATE
lffDRAUUC DATA:
z tu;• 22°\ 16' 54' fRTJ 0- 53• 39' 43' R- 90.00' T· 17.72' L- :gs .. oO'
Begin bridge Sta. 8+64.d0 El. 6509./2
02-222.00 ft3/s, Vm-6.00 ft/sec, WS E!.-6499.20
050-464.00 ft3/s, Vm-8.00 ft/sec, WS E!.·6500.30
0/00-5/3.00 ft3/s, Vm-8.30 ft/sec, WS E!.-6500.50
Roadway surface
10 x 10 curb, with 6 x 10 risers, treated timber (nominal dimension)
• 0 .
I ' Cl) \
-3./237.
.. :sf / O ·· i G: ·· . . .
50'-0' (Bridge /engt/JJ '
W/ .. ...-·········
PLAN
6¾' thick treated Glulam timber deck
W24 x 117
End bridge Sta. 9+/4.00 El. 6507.56
JOO ft VC tic- 32° 00' 52' fRTJ
. 0- 71° 37' II'
.. · · .. R- 80.00' ··--r ..... 22.95'
L· 44J.Q'.
Bridge
GRADE PROFILE
NOT TO SCALE
STATE
WY
PROJECT
PRA-GRTE I 001 ll, PRA-GRTE 209(1), PRA-GRTE 225(1)
75 ft vc
."t c:, 0
..... l!)
l/) I.O a:: -:
:::,. 4.J l!)
• c:5
~o I./) l!)
I.O I-- Cl. -= :::,. 4.J
SHEET
NUMBER
E.2 rolled weathering steel beam, typ.
~~~~~~:::=:====-----I----... Roadway surf ace
El. 6493.12
Abutment I
BY REVISIONS NO. DATE BY REVISIONS
050 WS / Existing
Finished ground .surface
El. - 6550.30 /__ .. ground
Placed riprap, class 5 El. 6493.06 (See Sheets G.2-3 for detal!sJ
ELEVATION
Abutment 2
• No. 22094, 90953 NPS Drwg. No. 136/80196
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER
F. ISt.AAIL J. DEMELLO t.A. VENEROSO ¼"=1'-0"
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GRAND TETON NATIONAL PARK
LAKE CREEK BRIDGE
WYOMING
PLAN AND ELEVATION
BRIDGE DRAWING DATE DRAWING NO.
2 of 13 t.AARCH 2004 RG2789-B
C i L i L
" 'C
0. z z
··.. C)
Begin bridge\ Sta. 8+64.00 El. 6509./2 I
.. \~•\ \ Beac;n, .. ... \ .. J '.::-§½,;.,":\:\\ ,-.
50'-0n (Bridge length)
··.. t Bridge ··-... ____ l:t Rdwy • . @ · ..-
··· ... _ _/ •ii,' ·-- ·• -- - - - --- __ __ / -- -- -- --- -- --:: '. -
9'-3' /
Abutirlent I
FOUNDATION PLAN
!P.fP
16'-2*
Abutment i ·-... &.
0'0
End bridge Sta. 9+/4.00 El. 6507.56
STATE
WY
PROJECT
PRA- GRTE JOO(I).
PRA-GRTE 209( ll, PRA-GRTE 225< ll
SHEET
NUMBER
E.3
· .. I :
·._I · ..
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GRAND TETON NATIONAL PARK
LAKE CREEK BRIDGE
WYOMING
FOUNDATION PLAN
" ~t-:':'No="'."T""-::":,,,.,,.--,,~~------~=~~------~~~~~~::"!"!"'.,....-----~~===---------,,---=~==---=~-----=~~~N-P_s ..... P_k_g_. ~N~0~-=22,..0~9,..4_ ...... 9_0_9_54_,_9~0~9,..5,..3=--N_P_s_o_r'l"W-!9~--N"'o~. ,..'~3,,,6,_l,..B0.,.,,.19,,,6,,,.,,.+--="""""""""""""""' ..... ----.,.... ..... ----..... -----1
- DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO. gr--;----t--t------------------t--;-----;--;------------------t-----------t----------t--""'"""--------t-------------t--------------==--;1---....... -----~.;;,;.;;....--4------------ff--..;,;,;;.;.;;.;;,;.;;..;.;;;.;..---1 ;;:1---+---+--l----------- --------+--+------j--+------------------f F. !SMAIL J. DEMELLO M. VENEROSO 1/4''=1 '-0" 3 of 13 MARCH 2004 RG2789-C
C ai ..
L
L
"' " i:
::l
VI
0.. z
Bottom footing elevation, typ.
• C\J I
5'-0'
9'-3'
Cast-In-place concrete footing, typ.
•4A5 t.f. & b.f.
Begin bridge @ t Rdwy.
Sta. 8+64.00 End bridge @ t Rdwy.
Sta. 9+14.00
t. Rdwy. @-----...___ :
t Bridge "1
(typ.)
19 spa. @ 12N - /9' -0N •6AI t.f., •4A2 b.f.
9'-9½'
ABUTMENT I FOOTING PLAN
ABUTMENT 2 (SIMILAR)
Backfill with compacted foundation flll
FOOTING EXCAVATION DETAIL u
NOT TO SCALE
• 0 I i:-i +1
6'•
C\J I \0
I C\J
Abbreviation:
f.f. FIii face o.f. Other face b.f. Bottom face t.f. Top face
• -ci
'< I q:i ....:
• "t-
"t-e •
::i . ._ C) -<:: ~-
\0 ~ <(
• C\J I
¼-
Begin bridge Sta. 8+64.00 End bridge Sta. 9+14.00
FOOTNOTE:
STATE
WY
PROJECT
PRA-GRTE 100(1).
PRA-GRTE 209( I),
PRA-GRTE 225(1)
SHEET
NUMBER
E. 4 u Excavate below cast-in-place concrete footing as shown, where loose sand or slit materials are encountered, and as approved by the CO.
U.S. DEPARTMEN_T OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GRAND TETON NATIONAL PARK
LAKE CREEK BRIDGE
WYOMING
FOOTING PLAN
-g~ ~t-N:O~.;.;::::::;::;:::::::::::::::::::::::::::::::;:::~::::::~:::~:::::::::::::::::::::::::::::::;::::::~~::::;:::::::::N:f':S:~P~k:g:. :N:o:·:2:2:0:9:4:• :;:::::9:0:9:5:3::N:P:S::D:r;w1g3. :N:o:·::13:6:/:8:0:19:6:;:~~==:::::::::::::::~~====::::::::;::::::::::::~ DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO.
> ;f t---+----+----+-----------------+---+-----+---+-----------------<1 F. ISMAIL J. DEMELLO M. VENEROSO ½"= l'- 0" 4 of 13 MARCH 2004 RG2789-D
N
V o/
N
C
" f
'-0
"' " 0
Steel guard angle, see detail
I , ,,,,,,,,,- t. Rdwy. @ I' t.. Bridge
Begin bridge Sta. 8+64.00 End bridge Sta. 9+14.00
--t- --ID- -- -- -- -~- -- '- -- ~- - -- -- ---m --~ < a,a,lng J ·,r I 2' -½' i 5'-2' i 2'-7' i 2'-7' i 5'-2' 2'-½ • I -
~ • 2 :/ ~- • • -~ -~
t. Beam o~' t. Beam c~' t. Beam B t. Beam A
L 3"x3"x¾"
1fo.. ¢> holes at \ 4'-0"± c-c in vertical leg only _
ABUTMENT I PLAN VIEW
ABUTMENT 2 (SIMILAR)
8'-5" 8'-5" typ, H
½ .. ¢, anchors @ 12" ELEVATION typ.
c-c each leg, staggered
GUARD ANGLE DETAIL ( 4 REQUIRED)
STATE
WY
PROJECT
PRA-G'RTE I 00(1),
PRA-GRTE 209(1),
PRA-GRTE 225(1)
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GRAND TETON NATIONAL PARK
LAKE CREEK BRIDGE
SHEET
NUMBER
E.5
~ WYOMING
~ ABUTMENT I & ABUTMENT 2 .
~ PLAN VIEW
~ t-:N~O:""". r--:D~A,:,-:TE,--,-:B~Y-,------==~-----~:-::-f--:::~--,,""::'"::'~-----==~-----"T""~==~:--'T"""---:=:::-:-:::-::N~P-S_P,..k_.g_. :::-N::e:o::-::. ,:,:2::-20~9::-4 ... , ...,...-....... 9~0~9~53~_N_PS_D_,,rr-wg~·~No~·-13~6~/B~0"":!1~96~-t----:=~==---r--~=-=---.....,--..,.,,,.,.,~---f
- REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO. ot---t----t---+---------------1--t----t-----t----------------1--------t--~----t------.....----------1~-------t---------+----------+--------------t > :f t---+-----+----+-----------------1--+----+---+----------------1 F. ISMAIL J. DEMELLO M. VENEROSO ½"= l'-0" 5 of 13 MARCH 2004 RG2789-E
C
"' " 't "ii ..
L
L
"' " i:
:l 0..
z b I n: 6509.12
Bearing elevation £!. 6506.11
I lO
' <.o I
Bottom footing ~
£/. 6493.12
19'-r
/9 spa. @ 12' - l9'-0' •4a3 o.r., •4a4
17 spa. @ i2' - l7'-0' ·685 f.f.
r-A f B l B
1 ..,,,,,,,- 2 spa. @ 12' - 2'-0 ..
/ •486 o.f., •687 f.f.
1-_.-.,_-_-..,t,_-_-_-_-_-_-_-_-_-:,_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-:,_-_-_-_-_-_-_-:,_-_-:,_-_-_-_-_-_-_-_-_-_-:_--11----... "t---i--=--=--=--=-t--=-=========.:t
/I
'r-------------------------------{ I
I :
I I I I
>- I I
I I I I I I I I I I
3½'
3'-6'
FIii face--.---~
'/II'/,.\\ V I'/,.\ \
r 3' ¢ weep hole, typ.
I I I.\\'/ I I I.\\'\
19 spa. @ 12' - l9'-0' •781 f.f., •4a2 o.f.
I 6' -3½'
ABUTMENT I ELEVATION
SCALE: ½'-l'-0'
•1c1
8' x 8' fl/let, •4c2
•4C6
-TB!
SECTION C-C
SCALE: ¼'-l'-0' f C
I I
I
I I I I I I I I I I I i.._ A l C
I iB ' <.o ~.
e....:
ci ~
Concrete surface texture finish, all exposed vertical faces, typ. See Special Contract Requirements
SECTION 8-8
SCALE: ¾'-l'-0'
•4c2
2'-2*
1~(4~1
·685
·687
Fill face
Geocomposite sheet drain. Attach to wall per manufacturer's instructions
Abbreviation:
f.f. Fill face o.f. Other face b.f. Bottom face t.f. Top face
9' -3H
SECTION A-A
SCALE: ½'-l'-0'
·488
·488
STATE
WY
PROJECT
PRA-GRTE IOO(I),
PRA-GRTE 209(1),
PRA-GRTE 225(1)
£1. 6509.12
Bearing El. 6506./1
3*¢ weephole with drain grate connection as recommended by the manufacturer, typ.
Slope 27. to drain
2* x 4H continuous shear key
Bottom footing El. 6493./2
U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION WESTERN FEDERAL LANDS HIGHWAY DIVISION
GRAND TETON NATIONAL PARK
LAKE CREEK BRIDGE
WYOMING
ABUTMENT
SHEET NUMBER
E.6
!~:No~.~::o:A:TE::;:s:y~:::::::::::::R::;E:v:1s:10:N::s::::::::::::~:N~o:. ~:o:A:T:E:~:s:Y:~::::::::::::::RE:v:1s:1:0N:s:::::::::::::~:::DE:s:1G:N:ED~:s:Y::~::::D::RA::w:N:B~~=P=S~~P~k~g~·:c~~;:~:KE~
D ~s~t
~s~~;~~:E:N~P=S~~D~rtwj~~~~o~~;~~=Tj
1;~;~~t8~~~~!t!~ES:R:~::~s3R:1D~G:E~D3R:;'.Aw;:;1~NG~==~~====~D:;'.AT~E:::::~::~D;:RA~W;:;1~NGZ:;:;N~O.::::
½ "=1'-0" EXCEPT AS NOTED
~ t----+---+---+------------------1--+------l--+-----------------t F. ISMAIL J. DEMELLO M. VENEROSO 6 of 13 MARCH 2004 RG2J89-F
V r N
C D "O i5
:e L D i5
:e L D
" " D "O i:
:'.l
"' C1.
£/. 6509./2
4 spa. @ •6C3 f.f
12" - 4'-0" --- ., •4c4 o.f.
• 0 I
Bottom footing £!. 6493./2
1----------,
• 0 ....: I cl 0)
@ ..l
,;:; l!)
Cl. (J
"'~ • 0)
t) 3"
3"
15'-0" .
// f..W /If..\\\
14 spa. @ 12" - 14'-0" •1c1 f.f.
15 spa. @ 12" - 15'-0" •4c2 o.f.
Begin bridge Sta. 8+64.00 ucture not or clarity
I El. 6509.12 y-superstr
I I .
I I I I I I ~N I ~ I I I I I I I I I
//f..W//f..\\Y..
shown f
Bearing £/. 6506./1
I'--- Concrete s urface texture exposed vertical
See Special equi re men ts finish, all faces, typ.
Contract R
ABUTMENT I D/S WINGWALL ELEVATION
ABUTMENT I U/S WINGWALL SIMILAR
Geocomposite sheet drain.
Attach to wall per manufacturers instructions
I
0)
Fl/I face
9'-0"
SECTION A-A
Abbreviation:
f.f. Fill face o.f. Other face b.f. Bottom face t.f. Top face
STATE
2" x 4" continuous shear key
WY
I
~ Bottom footing -
£1. 6493.12
PROJECT
PRA-GRTE 100(1),
PRA-GRTE 209(1),
PRA-GRTE 225(1) -
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GRAND TETON NATIONAL PARK
LAKE CREEK BRIDGE
WYOMING
ABUTMENT WINGWALL
SHEET
NUMBER
E. 7 z "O
~ ~N~O!"'. T"""!!"DA~T~E--,,-:B~Y-r------~~=~------,.=--,--~=-~~,-------~~~~------~~=~~"""T-~~~~N-P_S_PT"k"'"g_.~N~o~.=22~0~9~4-• ""T"'-----9-=0~95~3-=-_N_PS_D_r'l'"w-:g~. ~N~o~. ~13!!"6~/!"'80~1~9~6=-+----,,.,,.,,, ..... ..,.......,,....._..,... _ __,....., ...... ________ __, ~ REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO. g ~-r---;,---,--------------------• -.,...----;---i----------------r------------------t---------t-------------t------....... ------t----=----....... ---....... • -...,;,;_,;;,;;;;....__,;_,;,; ..... --t---=----+-_,;;.==~;;
;;:1---+----+--+----------------+---+----+--+-----------------< F. ISMAIL J. DEMELLO M. VENEROSO ½"=l'-0" 7 of 13 MARCH 2004 RG2789-G
"' 0
C
"' " f L
:e L
" "' " i:
V>
0. z .,.
3½ ..
l'-3½ ..
El. 6507.56
Bearing elevation El. 6504.59
'<t
I U")
Bottom footing El. 6493.06
3½ ..
r-A /9'-7'
19 spa. @ 12 .. - l9'-0 ..
•403 o.f., •404
17 spa. @ ,2 .. - l7'-0 ..
•505 f.f.
f B
I ----------------------------------/ i'r------------------- .-----------{ I I I I r 3"'91 weepho/e, I I typ.
I I I 0 I I I I I I I I I I I I I I I I I I
I I
'///>-,\\ V !>-. \ \ ///.,\VIII\\,,
19 spa. @ 12 .. - l9'-0' •101 f.f., •402 o.f.
3'-6 .. 6'-3½ .. I 6'-3½ ..
ABUTMENT 2 ELEVATION
SCALE: ½•-r-0'
FIii face-,...__
8' x 8' fl/let, SECTION C-C
SCALE: ¾'-1'-Q'
f C
I~
3'-6 ..
i.._ A
3½ ..
l'-3½ ..
l B
• '<t
• tr)
• 0 ....:
l I
0) "--
C 0) I C) ci ci ~
0) •
2 spa. @ 12" - 2'-0" "4D6 o.f., "607 f.f.
"" ~ 3½ ..
Concrete sur face texture xposed vertical See Special uirements finish, all e faces, typ.
Contract Req
SECTION 8-8
SCALE: ¾'-f-Q'
•505
"6D7
Fill face
~--'----------'91
Geocomposite sheet drain. Attach to wall per manufacturer's instructions
SECTION A-A
SCALE: ½'-l'-0'
Abbreviat fon:
f.f. Fill face o.f. Other face b.f. Bottom face t.f. Top face
ST A TE PROJECT
WY PRA-GRTE 100( ll.
PRA-GRTE 209(1),
PRA-GRTE 225( ll
El. 6507.56
Bearing El. 6504.59
3"¢ weephole with drain grate connection as recommended by the manufacturer, typ.
Slope 2X to drain
Bottom footing El. 6493.06
2" x 4" continuous shear key
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL °LANDS HIGHWAY DIVISION
GRAND TETON NATIONAL PARK
LAKE CREEK BRIDGE
WYOMING
ABUTMENT 2
SHEET
NUMBER
E.8
-g~ 0 ~:-::,!iO~-~=~D:"":'~';!:lE::;-::.!!~l~:::::::::::::::::;:~:::::::::::::::~:::;:::::~=~=::;::::::::::::::~:~::::::::::::::::;::~~'.:;:~~~:::~:::~:::::::~::NP:S:· ~P~k~g=. ::N::;o~.:~22=0~9::4~•:9;0:9:5:4~, :9;029~5;;;3:::NP:S::D:r;w1g:. rN:o~·::::' 3:;6:/:8::0:19:6~::~:::::::::::::::~~====::::::::::~:::::;::::::::~ .-- REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO.
> ½"=1'-0" ;;:--+-~-+--+-----------------1-----+-----1---+------------------ F. ISMAIL J. DEMELLO M. VENEROSO EXCEPT AS NOTED 8 of 13 MARCH 2004 RG2789-H
V
C
L
L
" " "' " i:
V) Q_ z
£/. 6507.56
4 spa. @ /2" - 4'-0" ---- •6£3 f.f., •4£4 o.f. ------
End bridge Sta. 9+/4.00 l5'-0" I / El. 6507.56
I/
_,,,,-,---- Superstructure not V shown for clarity
-~---< ____ B_ea_r_ing £/. 6504.59
I I . ~ +-------------------------, ~ ' ~ ~------------------------+-1---e
' I.O I i
7 spa. @ 12" - 7'-0" __ I____________, •6£5 f.f., •4£6 o.f.
Bottom footing £!. 6493.06
I I
I'---'- I
I ~
: ~ Concrete surface texture 1 finish, all exposed vertical faces, typ. See Special
~ +---------------------------' Contract Requirements
3"
----------------,-/1, !""' f..\Slcn'.l /"1 / ---,-----,---,//...,..,1, f..""'"\,\J"<r'./rr /1, /, 14 spa. @ 12" - l4' -0" •1£1 f.f.
15 spa. @ 12" - 15'-0" •4£2 o.f.
ABUTMENT 2 U/S WINGWALL ELEVATION
ABUTMENT 2 D/S WINGWALL SIMILAR
Geocomposite sheet drain.
Attach to wall per manufacturers instructions
~ Fill face to
SECTION A-A
Abbreviation:
f.f. Fill face o.f. Other face b.f. Bottom face t.f. Top face
·• 0 I
STATE
WY
PROJECT
PRA-GRTE 100(1),
PRA- GRTE 209( ll, PRA-GRTE 225( I) .
Bottom footing £1. 6493.06
U.S. DEPARTt.4ENT OF TRANSPORTATION FEDERAL HIGHWAY ADt.41NISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GRAND TETON NATIONAL PARK
LAKE CREEK BRIDGE
WYOMING
ABUTMENT 2 WINGWALL
SHEET
NUt.4BER
E,9
" -g °::,~N:o:-..:.;:~2,A~T!":!'!_:~~B:::-1.~:::::::::::::~::~~=:::::::::::;::~~=~:~=~=~:;:::::::::::::;::;:;:~::::::::::::::~==~;:~~~~:;:::~:::~::::::::~::N:P:S:P;k:g:·~N~o~.:~22:0~9:4:•:~:::::9:0~95:3;;::N:PS::D:r;w1g:.~N~o2.::::13;6:/:80;;;1~9:6~=::::~:~:;:::::::::~::::~:::::::::~::::;::~::~:::: ,--- REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAt.4 LEADER BRIDGE DRAWING DATE DRAWING NO.
;f t---t------+--+-----------------+-+----t--t-------------------1 F. 1St.4AIL J. DEt.4ELLO t.4. VENEROSO ½"= l'-0" 9 of 13 t.4ARCH 2004 RG2789-I
C> ;
L C> L C> m C> u i:
"' ll.
t. Bearing Abutment I t. Bearing Abutment 2 l5'-7"' 15'-7"
t. Beam A - - - ------ -~------------~~-----------~~-----~----~-+-!
t. Bridge @
t. Roadway
t. Beam B - - - ------ -~~-----~-----~~---~--------~----------~~, -- --{ -- -- ---~---- -- -- ---- -t - -- -t~-----r - ~ --- --- -
t. Beam C
t. Beam D
Begin bridge Sta. 8+64.00
!Ox/0 (nominal dimension) treated timber curb
6x/O rnomfnol dimension) treated timber riser
6¾" thick Glulom deck
2'-½" I
t. Beam
End diaphragm and transverse W 24xll7, typ.
stiffeners (typ. 2 places). See See details Sheet RG2789-K for details
9'-0'
FRAMING PLAN
SCALE: ¼"-l'-0" l9'-7'
I ~ ~Bridge@ / "- Roadway
. 1. 9' -0"
14'-0"
End bridge Sta. 9+/4.00
Intermediate diaphragm and stiffeners (typ. 2 places). See Sheet RG2789-K for details
3x/2 (nominal dimension), S2E treated timber running plank, typ.
---- W 24xll7, typ.
5'-2* 5'-2' 5'- 2" I 2'-½"
t. Beam B_)
BRIDGE CROSS-SECTION
SCALE: ½"-l'-0"
"'---r. Beam D Beam C ty p. --~ typ. >---+->-----
STATE
WY
Flange
Stiffener
PROJECT
PRA-GRTE I 00(1),
PRA-GRTE 209< ll, PRA- GRTE 2251 ll
NOTE: Cope all transverse bearing stiffeners top and bottom as shown above.
STIFFENER COPE AND WELD DETAIL
NO SCALE
U. S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GRAND TETON NATIONAL PARK
LAKE CREEK BRIDGE
WYOMING
FRAM I NG PLAN
SHEET
NUMBER
E.I0 z / u
O ~:, ~N:o,-.:.;:::::~::~::::::::::::::::::::::::::::::;::~::::::~::;:::::::::::::::::::::::::::::~~=::::::::::~:::::::::::N:P:S:P;k~g:.:N:o:.::22:0:9:4:, :;:::::9:0:95:3:::N:PS::D:r;w1g:. ~N~o~. :1:::3:6:/8:0:1:9::6:::::::::::::::::::;::::::::::::;::::::;::::::: .- DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO.
[ t---+-------+--+----------------;---+----t--+-----------------t F. ISMAIL J. DEMELLO AS SHOWN 10 of 13 MARCH 2004 RG2789-J
C> ,, f
L C> ai L C>
C> ,, "l ..., "' Q. z c:: 2' j : ~t. Bearing
ct) V) '/
! /'-6½' t. Bearing~
End of beam~ I 7' Intermediate diaphragm, typ. l'-6½' ! q-i-- (perpendicular to t. beam).
10- •:•::O;~;:n~ r ,~= = = = - = = = = ~ r:n:f:r= s~,:~: = = = = = = = = = - f,;;~, f,~"' RG27 89-J for Bridge grade -3.12 3X
_1, ___ I ___ ,,,,,,,,,- End of beam
Bockwo/1 ~ - = = = = = = = = = = = =. = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = ~ f1 A
10' backwa/1 thickness
~I. 6507.64
Beveled bearing plate.
See details, typ.
rr~r================J=========~::::~~::---~==~-L-~~~------------~:..,,,u I Bockwo/1 / I I l
W 24xl/7, typ. B I I B
STATE PROJECT
WY PRA-GRTE 100(1),
~.,..,..----<typ.
Transfer stiffeners
SHEET NUMBER E.11
I .. 9½' .. I Bearing plate, typ.
SEG_TION A-A (SHOWN)
SECTION 8-8 (OPP. HAND)
SCALE: J½'-1'-<r NOTE, At end of girders, all stiffeners are vertical. Fabricate girders along grade shown. Dimensions along girder must be longer than the level dimensions shown on framing pion, to occomodote the bridge grade.
BEAM ELEVATION
( 4 REQUIRED)
SCALE: J'-l'-0'
t. Beam ~ . Beveled steel
~ bearing plate
2' 2' I' typ. typ. typ.
t. Beam
Beam A
2' 2 1 I' typ. typ, typ.
t. Beam
~t. Beam A
5' x'/2' stiffeners, typ.
See stiffener cope and weld detail on RG2789-J
½,'¢ bolt in 'o/i5 '¢ hole, typ.
Beam B
END DIAPHRAGM
SCALE: ¾'-J'-0'
5' x½' stiffeners, typ.
See stiffener cope and weld detail on RG2789-_
½,'¢ bolt in 15/,6 "¢ hole, typ.
~t. Beam B
INTERMEDIATE DIAPHRAGM
SCALE: ¾'-l'-0'
C l2x20.7 typ.
Beam C
C l2x20.7 typ.
Beam C lo
' \0
' \0
~t.
' \0
, Plate\. . _ -:- . -G (5/sn x 2¾" slotted hole @ expansion ends 13/a' standard hole @ fixed
"I--•
0) t.
Beam D
Girder~
5n .I.
I
6' end, typ.
£/ostomerlc bearing pod.
Bond to top of concrete bearing surface with approved adhesive
t. Bearing\'¼-_ - - - - _ _ - ~ - - - - - ' cc, I ..
2 layers @ 0.25' (top and bott.J and I layer @ 0.350' (60 hardness)
Beam D
I
12'
1/s I cl. all around
.. I /4 gage steel shims
ELASTOMERIC BEARING PAD DETAILS
(8 REQUIRED)
SCALE: 3'-J'-0'
"I-
8' 2'
BEARING DETAILS
SCALE: l½'-1'-<r
Heavy hex nut with beveled plate washer.
Tighten nut finger tight and deform threads
Bf}aring elevation
I¼' dla. golv. A307 anchor bolt, typ.
3'x3'x¼' plate washer, typ.
U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION WESTERN FEDERAL LANDS HIGHWAY DIVISION
GRAND TETON NATIONAL PARK
LAKE CREEK BRIDGE
WYOMING
STEEL BEAMS & DIAPHRAGM
~ NPS Pkg. No. 22094, 90953 NPS Drwg, No. 136/80196 j ~:No:.:::0A:T:E:::s;:Y:::::::::::::::RE:v:1s:1:0N:s::::::::::::::N:o.:::o:A:TE:::;:sY:;::::::::::::R:E::v;:1s:10:N:s ::::::::::::~::o;:E:s1:GN:E:o:s:Y::~:::::o:RA:w:N:s:Y:::~:::c:H:Ec::;K:Eo::sY:~::::::::s:c:A:LE::::::~:P:R:o::JE:c:T:T:E:AM::L:EA;:D:ER:~~==:sR:1:oG:E:D:R:A:w:1N:G ==~~====~DA:T:E::::~~::D:R:A:w1:NG::N:o.::~
;;:t----+----+--+----------------t---+----+--t-----------------1 F. ISMAIL J, DEMELLO AS SHOWN II of 13 MARCH 2004 RG2789-K o/ N
C
T 0 ,,, 'Q ,,, u i:
"l
VI
0.. z ,,, t Beam A t Beam B t Beam C t Beam D
A l
9'-6½"
½H gap typ.
Stagger splice location 10"
6" typ.
1----~--~
1------- .s minimum 3'-0" g k.l -----''------L.J 7------r--- ~ § ----------,- 1----~--. Q-------
------,---- ,>< i =====~===~~~:
,I--,------'--- I<) ~ _____ __,...-
"C" deck clip bolt, typ . Curb anchor bolts, typ.
II - 6¾" x 4'-0" x /9'-7" deck panels - 44'-0"
6¾" X 4'-3¼,. X 14'-7" deck panel DECK PLAN
SCALE: ¼'-l'-0"
24'-/"
48'-3¼"
5'-1¼"
CURB ELEVATION A-A
(2 PLACES, TYP.J
SCALE: :JJ'-l'-0"
9'-6½ ..
24'-!"
½" gap typ.
B j
A j
\_ /"¢, dome head bolt w/lock nut: 3 .. x 3" x %" plate washer, both ends, typ.
3° x 12" running planks
51/e H deck
W 2/xlll
Countersink bolts
STATE
WY
bridge
PROJECT
PRA-GRTE IOO(I),
PRA-GRTE 209( I>,
PRA-GRTE 225(1)
SECTION 8-8
NOTE: Cut running planks and Glulam deck panels at begin and end bridge vertical.
SCALE: l'-J'-0"
51/e" thick treated Glulam deck panel
"Bolt and bolt spacing per manufacturer's recommendation
//~/ CLIP DETAIL
NO SCALE
NOTE:
SHEET
NUMBER
E.12
I. Nail 3" x /2 .. running plank to 51/e .. , deck panels with two rows of 30d spikes, each plank, @ 2'-0" on center, each row, staggered. Minimum length of running plank is B'-0".
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GRAND TETON NATIONAL PARK
LAKE CREEK BRIDGE
WYOMING
DECK PLAN u
~~No:-_-,-~'='="'"""T"~-,---------====------"T":':":"'"r--=:":"'"""l""'::":'!"'"r--------.==~-------,....--===:"""::'~""T---:::~::-:--:~N~f'-S....,-."=N'='o~. :--::2'='2-=0~9~4._, ..,9r-0_9_5_4,..,_9-:0~9~53~_N_P_S_Dr.,w~·~N'='o~. :-l-=-3~6~/:-80~1~9-=-6~+--==~~~r--""""l"- --,,-,.,,.,,.--...... ---,,.,,..,.-.,,...,.,.,,.----t ~ DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO. ot----l'---;,--;,----------------t--1----;,--;-----------------+-------t-------t-------+---------t------------+------------------0-----------+------------------t
~1---+---+---+-----------------t--+------+--+------------------1 F. ISMAIL J. DEMELLO AS SHOWN 12 of 13 MARCH 2004 RG2789-L
I STATE I PROJECT I SHEET
NUMBER
I WY I PRA-GRTE 100< ll, I E.13 PRA-GRTE 209( ll, PRA-GRTE 225( ll
C
REINFORCING STEEL
LOCATION MARK SIZE NO. LENGTH TYPE LOCATION MARK SIZE NO. LENGTH TYPE
I I] ABT. I & ABT. 2 FOOTING ABT. I WING WALL
t.f. Al •5 40 8'-11" Straight Vert/col f.f. Cl •7 30 l7'-2" Bent
I. ..I b.f. A2 •4 40 8'-11" Straight Vertical o.f. C2 •4 32 l7'-2" Bent • l9'-3"
CX)
t.f. A3 •5 72 8'-8" Straight Horizontal f.f. C3 ·6 /0 l6'-3" Bent I
~ • B6, D6 CX)
I b.f. A4 •4 56 8'-8" Straight Horizontal o.f. C4 •4 /0 l6'-0" Bent ~ -t.f. and b.f. A5 •4 72 l6'-0' Straight Horizontal f.f. C5 ·6 20 l7'-2' Bent
I rn t.f. and b.f. A6 •4 4 20'-0" Straight Horizontal o.f. C6 •4 20 l6'-2" Straight --t.f. and b.f. Al •4 4 21'-0N Straight ABT. 2 VERTICAL WALL /'-6" .. I I.
t.f. and b.f. AB •4 4 22'-2" Straight Vertical f.f. DI •7 20 l2'-8" Bent -- I. l9'-3" ..I Bl, B2
/'-6:I I. t.f. and b.f. A9 •4 4 23'-3" Straight Vertical o.f. 02 •4 20 l2'-8" Bent BB, DB t.f. and b.f. A/0 •4 4 24'-5" Straight Vertical o.f. 03 •4 20 3'-0" Straight Cl, C2 l'-/0" t.f. and b.f. All •4 4 25'-7' Straight Bearing 04 •4 20 4'-8" Bent I• • I t.f. and b.f. A/2 •4 4 26'-9' Straight Vertical f.f. 05 ·6 /8 4'-2" Straight ~I~M -t.f. and b.f. A/3 •4 4 27'-I/" Straight Horizontal o. f. 06 •4 3 24'-3" Bent
-~5• t.f. and b.f. A/4 •4 4 29'-0" Straight Horizontal f.f. 07 •5 3 l9'-3" Straight -
ABT. I VERTICAL WALL Horizontal o.f. 08 •4 12 26'-7' Bent
Vertical f.f. Bl •7 20 l4'-2" Bent Horizontal f.f. 09 ·6 II 19'-3" Straight B4, D4 Fi C\J ,, I ,, fh ~ • ~ Vertical o.f. 82 •4 20 14'-2" Bent ABT. 2 WING WALL ~ ' C\J
Vert/cal o.f. 83 •4 20 4'-0' Straight Vertical f.f. El •7 30 l5'-8' Bent 30° 30° 30° ~
Bearing 84 •4 20 4'-8" Bent Vertical o.f. £2 •4 32 l5'-8' Bent
Vertical f.f. 85 •5 18 4'-2' Straight Horizontal f.f. £3 •5 /0 /6'-3" Bent ~~ -- Horizontal o.f. 86 •4 3 24'-3' - Bent Horizontal o.f. £4 •4 10 l6'-0' Bent ,2,. I I. ,2,, .. I I. ,2, .. I I. /'-6· .. I I. /'-6" .. I I.
N
Horizon ta/ f.f. 87 ·6 3 /9'-3" Straight Horizon ta/ f.f. £5 ·6 16 l7'-2" Bent ~ C3, E3 C4, E4 CS, ES DI, D2 El, E2 .., Horizon ta/ o.f. 88 •4 13 26'-7' Bent Horizontal o. f. £6 •4 /6 l6'-2' Straight 0
89 •5 12 l9'-3" Straight ,.. Horizon ta/ f.f. · • All dimensions are out to out "" 1 N
C "O
U.S. DEPARTMENT OF TRANSPORTATION 0
0 FEDERAL HIGHWAY ADMINISTRATION ai
+- WESTERN FEDERAL LANDS HIGHWAY DIVISION
L
0 Abbreviation: GRAND TETON NATIONAL PARK 0 ai +- f.f. Fill face L LAKE CREEK BRIDGE 0 / o.f. Other face "' = b.f. Bottom face 0 "O ;: t.f. Top face WYOMING ::l V, Q. REINFORCING STEEL z "O
NPS Pkg. No. 22094, 90954, 90953 NPS Drwg. No. 136/80196 0 ' 0
= NO. I DATE I BY I REVISIONS I NO. I DATE I BY I· REVISIONS I DESIGNED BY I DRAWN BY I CHECKED BY I SCALE I PROJECT TEAM LEADER BRIDGE DRAWING I DATE I DRAWING NO. ~
I I I I I I I I I I I I > I I ;f I I I I I I I I F. ISMAIL J. DEMELLO M. VENEROSO AS SHOWN 13 of 13 MARCH 2004 RG2789-M
File details come from the government source that posted it. Updated .