GREENFIELD-613295-133722-A-2.pdf

PDF 572 KB Posted

Attached to
613295 GREENFIELD FAP No. STP(BR-OFF)-003S(930)X Deck Replacement, G-12-022 (144), Log Plain Road
Solicitation number
BD-26-1030-0H100-0H002-125976
Issued by
Franklin County, Massachusetts

About this file

This document is Addendum No. 2 issued by the Massachusetts Department of Transportation Highway Division for a bridge deck replacement project in Greenfield, Massachusetts. The project, Federal Aid Project No. STP(BR-OFF)-003S(930)X, involves the deck replacement of Bridge G-12-022 (144) over Log Plain Road West spanning the G&W Railroad. The addendum transmits contract document changes including revised pages for Documents 00010, A00801, and the deletion of Documents 00719, B00853, B00854, B00855, and B00856. The proposal is scheduled to open and be read on Tuesday, March 31, 2026, at 2:00 p.m. The addendum addresses bidder questions regarding concrete protective coating, anti-graffiti coating applications, and Disadvantaged Business Enterprise (DBE) requirements, clarifying that both coatings will be compensated under Item 992.1 Alteration to Bridge No. G-12-022 (144) and that there is no DBE goal for this project.

Item 992.1, which encompasses the bridge alteration work, is a lump sum contract item requiring the contractor to furnish and install preformed joint fillers, cast-in-place concrete elements including deck slab and sidewalks with steel reinforcement, shear connectors, bearings, mechanical reinforcing bar splicers, metal bridge railing, concrete protective coating, anti-graffiti coating, precast highway guardrail transitions, and membrane waterproofing. The specifications establish detailed requirements for surface preparation, erection procedures with specified tolerances, lifting device installation and removal, and anti-graffiti coating application including a minimum of two coats with engineer approval and performance testing. The contractor is responsible for all survey control, utility location, and measurements necessary for accurate construction placement. Payment for incidental materials and items not separately itemized in the proposal shall be included in the unit price of their respective components.

View the file

Other files

File Type Posted
A00870-613295.pdf PDF
A00806-613295.pdf PDF
A00875-613295.pdf PDF
A00805-613295.pdf PDF
A00811-613295.pdf PDF
GREENFIELD-613295-133722-A-3.pdf PDF
613295 Bid Items List.txt TXT text file
A00801-613295.pdf PDF
A00804-613295.pdf PDF
A00820-613295.pdf PDF
613295 - Plan Holders List 3-17-2026.pdf PDF
A00808-613295.pdf PDF
613295 - Notice to Contractors.pdf PDF
A00871-613295.pdf PDF
GREENFIELD-613295-133722-A-1.pdf PDF
A00802-613295.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 mass.gov/massdot

March 24, 2026

613295-133722

ADDENDUM NO. 2

To Prospective Bidders and Others on:

GREENFIELD

Federal Aid Project No. STP(BR-OFF)-003S(930)X

Deck Replacement, G-12-022 (144), Log Plain Road West over G&W Railroad

THIS PROPOSAL TO BE OPENED AND READ: TUESDAY, MARCH 31, 2026, AT 2:00 P.M.

Transmitting changes to the Contract Documents as follows:

QUESTIONS AND RESPONSES: 1 page.

DOCUMENT 00010: Revised pages 1 and 2.

DOCUMENT 00719: Deleted document in its entirety

DOCUMENT A00801: Revised pages 89 and 94, inserted new pages 94A and 94B.

DOCUMENT B00853: Deleted document in its entirety.

DOCUMENT B00854: Deleted document in its entirety.

DOCUMENT B00855: Deleted document in its entirety.

DOCUMENT B00856: Deleted document in its entirety

Please take note of the above, substitute the revised pages for the originals, delete documents indicated, insert new pages in proper order, and acknowledge Addendum No.

2 in your Expedite Proposal file before submitting your bid.

Very truly yours, Eric M. Cardone, P.E.

Construction Contracts Engineer

JPB

cc: Muazzez Reardon, Project Manager

THIS PAGE INTENTIONALLY LEFT BLANK

GREENFIELD

Federal Aid Project No. STP(BR-OFF)-003S(930)X

Deck Replacement, G-12-022 (144), Log Plain Road West over G&W Railroad (613295-133722)

Questions and Responses Addendum No. 2, March 24, 2026

Northern Construction e-mail dated March 20, 2026 @ 1:44 P.M.

Question 4.) Please reference Sheet 2 of 28 General Notes. The notes call out concrete protective coating and anti- graffiti coating – see below:

CONCRETE PROTECTIVE COATING:

CONCRETE PROTECTIVE COATING SHALL BE APPLIED TO ALLL

EXPOSED CONCRETE SURFACES OF THE ABUTMENTS AND

WINGWALLS. IT SHALL ALSO BE APPLIED TO THE EXTERIOR FACES

OF BRIDGE RAIL AND DECK FASCIA AS SHOWN ON SHEET 17.

ANTI-GRAFFITI COATING:

ANTI-GRAFFITI COATING SHALL BE APPLIED TO ALL EXPOSED

SURFACES ON AN AS-NEED BASIS, WTTH APPROVAL OF THE

ENGINEER, IN ACCORDANCE WITH THE SPECIFICATIONS.

CONTRACTOR TO ENSURE AND VERIFY WITH THE ENGINEER THAT

THE ANTI-GRAFFITI COATING IS COMPATIBLE WITH THE CONCRETE

PROTECTIVE COATING MATERIAL.

I do not see a detail referenced in the note for the protective coating on sheet 17.

Please provide a detail if required. If both the protective and Anti-Graffiti coatings are required, under what bid item will the contractor be compensated for this work?

Response 4.) No detail is required. Please refer to Subsection 901.41 and M4.13.0 of the 2026 Standard Specifications 2026 Edition. Both coatings will be compensated under item 992.1 ALTERATION TO BRIDGE NO. G-12-022 (144). See revised pages A00801-89, A00801-94, and new pages A00801-94A and A00801-94B.

E. T. & L. Corp e-mail dated March 21, 2026 @ 10:24 A.M.

Question 5.) Good morning, E.T. & L. Corp. has the following bid question with regards to 613295-133722 Deck Replacement, G-12-022 (144), Log Plain Road West over G&W Railroad: Please confirm that 12% DBE is required for this project.

Response 5.) The goal is revised there is no DBE goal for this project see revised pages 00010-1 and 00010-2.

Massachusetts Department Of Transportation Highway Division Proposal No. 613295-133722

00010 - 1

DOCUMENT 00010

TABLE OF CONTENTS

DOCUMENT 00010

TABLE OF CONTENTS ........................................................................................................... 00010-1 through 2

DOCUMENT 00104

NOTICE TO CONTRACTORS ................................................................................................ 00104- 1 through 4

DOCUMENT 00210

REQUIREMENTS OF MASSACHUSETTS GENERAL

LAWS CHAPTER 30 SECTION 39R; CHAPTER 30, SECTION 39O ................................... 00210-1 through 4

DOCUMENT 00331

LOCUS MAP ............................................................................................................................. 00331-1 through 2

DOCUMENT 00439

CONTRACTOR PROJECT EVALUATION FORM ................................................................ 00439-1 through 2

DOCUMENT 00440

SUBCONTRACTOR PROJECT EVALUATION FORM ........................................................ 00440-1 through 2

DOCUMENT 00710

GENERAL CONTRACT PROVISIONS................................................................................... 00710-1 through 2

DOCUMENT 00760

REQUIRED CONTRACT PROVISIONS FOR FEDERAL-AID

CONSTRUCTION CONTRACTS ........................................................................................... 00760-1 through 14

DOCUMENT 00811

MONTHLY PRICE ADJUSTMENT FOR HOT MIX ASPHALT

(HMA) MIXTURES ................................................................................................................... 00811-1 through 2

DOCUMENT 00812

MONTHLY PRICE ADJUSTMENT FOR DIESEL FUEL AND GASOLINE ........................ 00812-1 through 2

DOCUMENT 00813

PRICE ADJUSTMENT FOR STRUCTURAL STEEL

AND REINFORCING STEEL .................................................................................................. 00813-1 through 4

DOCUMENT 00814

PRICE ADJUSTMENT FOR PORTLAND CEMENT CONCRETE MIXES .......................... 00814-1 through 2

DOCUMENT 00820

THE COMMONWEALTH OF MASSACHUSETTS

SUPPLEMENTAL EQUAL EMPLOYMENT OPPORTUNITY,

NON-DISCRIMINATION AND AFFIRMATIVE ACTION PROGRAM ............................... 00820-1 through 6

DOCUMENT 00821

ELECTRONIC REPORTING REQUIREMENTS

CIVIL RIGHTS PROGRAM AND CERTIFIED PAYROLL ................................................... 00821-1 through 2

DOCUMENT 00859

CONTRACTOR/SUBCONTRACTOR CERTIFICATION FORM .......................................... 00859-1 through 2

DOCUMENT 00860

COMMONWEALTH OF MASSACHUSETTS PUBLIC EMPLOYMENT LAWS ................ 00860-1 through 2

DOCUMENT 00719 DELETED

Addendum No. 2, March 24, 2026

00010 - 2

TABLE OF CONTENTS (Continued)

DOCUMENT 00861

STATE PREVAILING WAGE RATES .................................................................................. 00861-1 through 36

DOCUMENT 00870

STANDARD FEDERAL EQUAL EMPLOYMENT OPPORTUNITY

CONSTRUCTION CONTRACT SPECIFICATIONS .............................................................. 00870-1 through 8

DOCUMENT 00880

MINIMUM WAGES FOR FEDERAL AND FEDERALLY

ASSISTED CONTRACTS ......................................................................................................... 00880-1 through 8

DOCUMENT A00801

SPECIAL PROVISIONS ...................................................................................................... A00801-1 through 98

DOCUMENT A00802

DETAIL SHEETS ................................................................................................................... A00802-1 through 6

DOCUMENT A00804

RAILROAD GRADE CROSSING APPLICATION AND LICENSE

AGGREEMENT FOR PRIVATE GRADE CROSSING ...................................................... A00804-1 through 22

DOCUMENT A00805

NON-COMPLIANT ROADSIDE SAFETY HARDWARE APPROVAL ............................. A00805-1 through 8

DOCUMENT A00806

RAILROAD SPECIFICATIONS

BERKSHIRE AND EASTERN RR (BERX) PPM April 2019 ............................................. A00806-1 through 46

DOCUMENT A00808

PROJECT UTILITY COORDINATION FORM .................................................................... A00808-1 through 6

DOCUMENT A00811

WATERING LOG FOR MASSDOT PLANTINGS ............................................................... A00811-1 through 2

DOCUMENT A00820

REQUEST FOR RELEASE OF MASSDOT AUTOCAD FILES FORM .............................. A00820-1 through 2

DOCUMENT A00870

USFWS NLAA CONCURRENCE VERIFICATION LETTER........................................... A00870-1 through 16

DOCUMENT A00871

BAT HABITAT INSPECTION REPORT ............................................................................ A00871-1 through 16

DOCUMENT A00875

POLICY DIRECTIVE P-22-001 AND POLICY DIRECTIVE P-22-002 .............................. A00875-1 through 8

DOCUMENT B00420

PROPOSAL............................................................................................................................ B00420-1 through 12

DOCUMENTS B00853, B00854, B00855 AND B00856 DELETED

A00801 - 89

ITEM 992.1 ALTERATION TO BRIDGE NO. G-12-022 (144) LUMP SUM

The work under this Item shall conform to the relevant provisions of Subsection 995 of the Standard Specifications and the following:

Work included in this item shall consist of constructing bridge elements in accordance with the designs and to the lines and grades shown on the plans, and in accordance with these specifications complete in place including the furnishing and installation of all materials that are part of the structures. The work under this Item shall include all materials, equipment and labor needed to construct the following:

• Preformed joint filler and bonded closed cell joint systems used between concrete elements;

• Cast-in-place concrete buried deck ends, wingwalls, deck slab, and sidewalks and all the steel reinforcement for these items;

• Shear connectors, laminated elastomeric bearings, mechanical reinforcing bar splicers, Type 1 protective screen, and S3-MTL4 metal bridge railing;

• Concrete Protective Coating and Anti-Graffiti Coating.

• Precast Highway Guardrail Transitions;

• Membrane waterproofing for bridge decks, and Damp-proofing

• All items included hereinafter under Basis for Partial Payments.

It shall be the responsibility of the Contractor to provide all survey control necessary to assure accurate placement of all excavation and foundations. This responsibility shall further include, but not be limited to; locating of utilities, drainage, curbs, copings and railing. The Contractor shall be responsible for making all measurements of angles, bearings, distances, and elevations from the original transverse line to the places of construction, as shown on the Plans and/or furnished by the Engineer within the limits of project. The Contractor shall make all data and reference points established in the course of the control surveys available to the Engineer for review and use by State survey parties.

The work does not include any items listed separately in the proposal. Payment for materials shown on the Plans as being part of this bridge structure or which may be incidental to its construction and are not specifically included for payment under another Item shall be considered incidental to the work performed under this Item and shall be included in the unit price of the component of which they are a part.

PREFORMED JOINT FILLER & BONDED CLOSED CELL JOINT SYSTEMS

The work to be done under this Item shall include furnishing and installing preformed joint filler at expansion joints between concrete elements and the proposed sidewalk, and bonded closed cell joint system between concrete elements including, but not limited to, highway transition barrier, wingwall joints, and other joints to separate precast or prefabricated elements as specified in the plans.

A00801 - 94

ITEM 992.1 (CONTINUED)

D. Preparation of Closure Pours and Grouted Keyways.

Immediately prior to erecting the PRECAST HIGHWAY GUARDRAIL TRANSITIONS, the closure pours and grouted keyways shall be cleaned at the job site of all dust, dirt, carbonation, laitance, and other potentially detrimental materials which may interfere with the bonding of the closure pour concrete or grout and precast concrete using a high-pressure water blast. Any exposed reinforcing steel in the precast concrete shall be protected from damage during the cleaning of the keyways. Damaged epoxy coating of steel reinforcement shall be repaired, and the reinforcing steel shall be cleaned as directed by the Engineer. The surfaces of the closure pours and grouted keyways shall be wetted so that the surfaces shall have a Saturated Surface Dry (SSD) condition for at least 24 hours prior to the placement of the closure pour concrete.

E. Erection.

The elements shall be placed in the sequence and according to the methods outlined in the Erection Procedure. As the erection proceeds, the Contractor shall constantly monitor the assembly to ensure that the precast concrete bridge element is within proper horizontal and vertical location and tolerances prior to releasing it from the crane and setting the next unit. The Contractor may use shims to maintain proper setting tolerances.

The concrete elements shall be lifted only by the lifting devices, and the utmost care shall be taken to prevent distortion of the elements during handling, transportation or storage.

This approval will be contingent on the Contractor demonstrating by calculations, prepared by a Professional Engineer registered in Massachusetts, that the elements will not be damaged by the non- vertical lifting force and by documentation that the capacity of the lifting devices is adequate for the non-vertical lifting force.

After all PRECAST HIGHWAY GUARDRAIL TRANSITIONS have been placed, the actual overall dimensions of the structure both horizontal and vertical, as laid out shall not deviate from the nominal dimensions shown on the plans beyond a tolerance of +0 inches and -1 inches. Once the layout of PRECAST HIGHWAY GUARDRAIL TRANSITIONS has been accepted by the Engineer, the Contractor shall cut all lifting devices off below the surfaces of the elements.

F. Filling of Blockouts for Lifting Devices and Threaded inserts.

If the blockouts in the PRECAST HIGHWAY GUARDRAIL TRANSITIONS where the lifting devices were located will be exposed and visible after assembly is complete, the Contractor shall fill these blockouts with Mortar (M4.04.5).

After the formwork has been removed, all threaded inserts that have been cast into the precast concrete bridge deck for support of the formwork shall be filled with a grout of the same color as that of the precast concrete.

A00801 - 94A

ITEM 992.1 (CONTINUED)

ANTI-GRAFFITI COATING

This work shall consist of applying of marking repellent anti-graffiti protective coating to painted and/or unpainted surfaces of steel, concrete, and/or masonry structures owned by MassDOT that have either been cleaned from graffiti or any other areas determined by the Engineer to be susceptible to be graffitied. The work shall be done to the acceptance of the Engineer.

The limits of such application shall be as directed by the Engineer.

MATERIALS

The protective coating shall be a breathable, clear non-sacrificial urethane or acrylic water-based formulation designed as an anti-graffiti solution. The coating product shall be compatible with the surface/substrate it will be used on as per the manufacturer's data sheet. It shall also be a mixture developed from non-toxic and non-corrosive substances.

The Contractor shall provide the manufacturer’s product literature including surface preparation data, mixing, application, spread rates, storage and Volatile Organic Compounds (VOC) compliance certification.

Acceptance of the coating compound will be based on the manufacturer’s certification that the material conforms to the requirements of this specification. A list of anti-graffiti coating materials, conforming to the type and nature of application shall be submitted to the Engineer in order to make appropriate selection.

Any product approved by the Engineer shall comply with the volatile organic compound (VOC) requirements of the Massachusetts Department of Environmental Protection (MassDEP) regulation 310 CMR 7.25(11), Architectural and Industrial Maintenance (AIM) Coatings. The product selected for anti-graffiti applications shall be consistent with the recommendations of the coating manufacturer.

CONSTRUCTION DETAILS

1. The Contractor shall submit the application method, cut sheets of coating equipment, the anti-graffiti compound for the Engineer’s approval.

2. The substrate surfaces shall be thoroughly cleaned before applying coating. All dust, dirt, oil, grease, and other substances which might prevent the adhesion of the paint to the substrate shall be removed. This cleaning shall be considered incidental to the work under this Item.

A00801 - 94B

ITEM 992.1 (CONTINUED)

3. At the beginning of the anti-graffiti application operation at each assigned location, the Contractor shall apply the chosen material on a 3’ by 3’ test area to demonstrate its effectiveness, compatibility with existing surface, and the final appearance to the Engineer for approval. Upon the review of the result, the Engineer may require the Contractor to modify the application method to suit the situation on hand. The cost associated with performing the test area shall be considered incidental to this Item.

4. The anti-graffiti coating material shall be applied as per manufacturer's specification. A minimum of two coats shall be applied. The contractor shall provide product data and manufacturer’s recommendations for use by the Engineer for approval at least two weeks prior to starting of work.

5. The thoroughness of the anti-graffiti application is subject to the approval of the Engineer. If the Engineer establishes the work requires additional application, the Contractor shall remedy at no additional cost to the State. The Contractor shall also take appropriate precautions to prevent any coating chemical from falling onto traffic.

6. The surface preparation and application procedure shall be consistent with the recommendations of the anti-graffiti coating manufacturer. If after application is completed, and the cleaned surface becomes soiled as a result of the Contractor’s operations, it shall be re-cleaned, at the expense of the Contractor.

7. Surfaces receiving anti-graffiti coating shall be tested on selected locations by the Engineer to prove that the surfaces are anti-graffiti and leaves no mark when a paint is applied. The Contractor shall supply the Engineer with commonly used spray paints used by graffiti artists along with manpower and equipment to do the test. The cost of the test and associated supply of material, manpower and equipment shall be incidental to the pay item.

MECHANICAL REINFORCING BAR SPLICER

The work under this heading shall conform to the applicable provisions of Subsection 901 and M8.01.9 of the Standard Specifications and shall be selected from the Qualified Construction Materials List.

Cvr sheet 613295 Add #2
Questions and Responses 613295 Add #2
A00801 SP Add#2.pages 89 94 94A 94B
2026-03-24T14:23:32-0400
Eric M. Cardone