This is a Non-Compliant Roadside Safety Hardware Approval document submitted to the Massachusetts Department of Transportation Highway Division for Project No. 613295-133722, involving a bridge deck replacement project on Log Plain Road in Greenfield, Massachusetts. The project scope includes removal and replacement of the existing 7.25-inch deck and concrete railing systems with an 8-inch deck featuring 3 inches of superpave overlay, installation of S3-MTL4 railing systems on safety curb on both sides of the bridge, a 5-foot-6-inch sidewalk on the north side only, replacement of bearings on pier 2 with elastomeric bearings, and MASH-compliant guardrail installation on approaches to the bridge. The project is designed by Jacobs Engineering Group, Inc., with MassDOT Project Manager Muazzam G. Reardon overseeing the work. The 300-foot total project length includes a new 5.5-foot-wide sidewalk on the north side of the bridge and pavement reconstruction including mill and overlay work. The facility serves a roadway with an Annual Average Daily Traffic (AADT) of 879 vehicles (2024) and a design year AADT of 971 (2044), with a posted speed limit and design speed of 25 miles per hour. The design is at 100 percent completion with an advertising date of December 20, 2025.
The document requests approval for non-standard roadside safety hardware due to site constraints at the intersection of Log Plain Road with Severance Street and Newell Pond Road, which does not provide sufficient space for standard bridge rail transitions with guardrail end treatments and trailing anchorages. The preferred alternative (Alternative 1) proposes modified transition-to-bridge-rail installations with a 9:1 taper W-beam panel configuration at both the northeast and southeast quadrants of the bridge, terminating with rounded end units prior to the side street intersection. The design basis incorporates guidance from the AASHTO Roadside Design Guide, MassDOT Project Development and Design Guide Chapter 5, and relevant construction standards, with consideration for the low traffic volume, urban local roadway classification, and surrounding site constraints including residential land and railroad right-of-way. MassDOT approval was granted on September 3, 2025, following the designer's certification on July 28, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GREENFIELD-613295-133722-A-2.pdf | ||
| A00870-613295.pdf | ||
| A00806-613295.pdf | ||
| A00875-613295.pdf | ||
| A00811-613295.pdf | ||
| GREENFIELD-613295-133722-A-3.pdf | ||
| 613295 Bid Items List.txt | TXT text file | |
| A00801-613295.pdf | ||
| A00804-613295.pdf | ||
| A00820-613295.pdf | ||
| 613295 - Plan Holders List 3-17-2026.pdf | ||
| A00808-613295.pdf | ||
| 613295 - Notice to Contractors.pdf | ||
| A00871-613295.pdf | ||
| GREENFIELD-613295-133722-A-1.pdf | ||
| A00802-613295.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Massachusetts Department Of Transportation Highway Division Proposal No. 613295-133722
A00805 - 1
DOCUMENT A00805
NON-COMPLIANT ROADSIDE SAFETY
HARDWARE APPROVAL
Massachusetts Department Of Transportation Highway Division
A00805 - 2
THIS PAGE INTENTIONALLY LEEFT BLANK
MassDOT Highway Division Request and Documentation for the use of
Non-Standard or Non-Compliant Roadside Safety Hardware
Basic Information
Location: Greenfield
Description: Log Plain Road West over G&W Railroad Deck Replacement
Date of Request: 7/28/2025
Project Information
Project File Number: 613295
Designer: Jacobs Engineering Group, Inc.
MassDOT Project Manager: Muazzez G. Reardon
Current Design Stage: 100%
Advertising Date: 12/20/2025
Facility Information
Asset Owner: Massachusetts Department of Transportation
NHS Roadway (Y/N): N
AADT: 879 (2024)
Design Year AADT: 971 (2044)
Target Speed: 25 MPH
Design Speed: 25 MPH
Measured Speed: 40 MPH (85th Percentile)
Posted Speed Limit: 25 MPH
Designer Certification
Date
MassDOT Approval
Chief Engineer Date
7/28/2025
9/3/25
A00805 - 3
Project Description
The proposed bridge preservation project for Bridge No. G-12-022 is to remove and replace the existing exposed 7.25" deck and concrete railing systems with an 8" deck with 3" of superpave overlay and install S3-MTL4 railing systems on safety curb on both sides of the bridge and 5'-6" sidewalk on the north side of the bridge only. The existing buried deck ends will be removed and replaced with buried deck ends utilizing integral abutment stems. Precast highway guardrail transitions will be located at all four corners of the bridge to transition the bridge rail to highway guardrail. The steel girders shall remain and be cleaned and painted. The bearings on pier 2 will be replaced with elastomeric bearings.
Roadway work associated with the bridge work includes installing MASH-compliant guardrail on the approaches to the bridge, pavement reconstruction to accommodate profile raise, pavement mill & overlay, and minor intersection modifications at Newell Pond Road/Log Plain Road at
Severance Street. The proposed 30-foot-wide roadway includes two 15 ft wide travel lanes to match the existing conditions. The proposed project will include a new 5.5-foot-wide sidewalk on the north side of the bridge. There are no proposed sidewalks outside of the project limits.
The total project length including the bridge is 300 feet.
Required Safety Hardware
In accordance with the MassDOT Project Development and Design Guide (PDDG) Chapter 5
Section 5.6.2.4, roadside barrier is required due to the 2:1 embankment slope, proposed bridge railing, and the presence of trees/utility poles. The following guardrail items are required for the approaches to the bridge:
- Transition to Bridge Rail (Back of Sidewalk) (MassDOT Construction Standard 628.24.1)
- Transition to Bridge Rail (Face of Curb) (MassDOT Construction Standard 628.24.2)
- Guardrail, TL-2 (MassDOT Construction Standard 620.12.1)
- Guardrail Tangent End Treatment (MassDOT Construction Standard 627.0.1)
- Guardrail Trailing Anchorage (MassDOT Construction Standard 627.1.1)
Description of Problem(s)
The close proximity of the intersection of Log Plain Road with Severance Street/Log Plain Road
(as it continues north) and Bridge No. G-12-022 over the G&W railroad does not provide sufficient space to install standard bridge rail transitions with guardrail end treatments and/or trailing anchorages in the northeast and southeast quadrants of the bridge. Modifications to the standard bridge rail transitions and treatments are proposed.
A00805 - 4
Proposed Solution(s)
The proposed solution, as shown in Appendix A, proposes to attach a modified Transition to
Bridge Rail from the precast concrete highway guard transition on both sides of the roadway to the east of the bridge. In the northeast quadrant, the 12’-6” Thrie Beam Panel (Nested) and 6’-
3” Thrie Beam Transition Panel shall be installed parallel to the roadway at back of sidewalk in accordance with MassDOT Construction Standard 628.24.1. The following 12’-6” W-Beam
Panel shall be installed at a 9:1 taper away from the back of sidewalk with 3’-1 ½” post spacing and terminated with a rounded end unit prior to the side street intersection. With this layout, the rounded end unit will be located approximately 6’-8” feet from the edge of travel lane of approaching traffic. There shall be a 6” vertical granite curb and sidewalk in between the edge of travel lane and the proposed guardrail.
In the southeast quadrant, the 12’-6” Thrie Beam Panel (Nested) and 6’-3” Thrie Beam
Transition Panel shall be installed parallel to the roadway at face of curb in accordance with
MassDOT Construction Standard 628.24.2. The following 12’-6” W-Beam Panel shall be installed at a 9:1 taper away from the back of sidewalk with 3’-1 ½” post spacing and terminated with a rounded end unit prior to the side street intersection. With this layout, the rounded end unit will be located 16’-10” feet from the edge of travel lane of approaching traffic.
Basis of Proposed Design
The proposed design was developed from guidance in Chapter 5 of the AASHTO Roadside Design
Guide, Chapter 5 of the MassDOT PDDG, and. Relevant information from design references includes:
• The maximum suggested flare rate for guardrail along a road with a 30 mph is 7:1 per
MassDOT PDDG Figure 5-31.
• The Recommend Clear Zone for this roadway is 10-12 feet per MassDOT PDDG Exhibit 5-
19 (Design Speed of 30 mph, ADT = 879 vehicles per day).
• MassDOT Construction Standards 628.24.1 and 628.24.2 are used for the proposed design and are slightly modified in accordance with the PDDG.
Alternate Designs Reviewed
Five design alternatives were considered and reviewed. Below are descriptions of these alternatives and the sketch for the preferred alternative can be viewed in Appendix A.
Alternative 1 (Preferred)
This alternative is described above under Proposed Solution(s).
Alternative 2
This alternative proposes a guardrail transition from the northeast precast highway guardrail transition. The beginning 27’-6” of this piece will be tangential, with the remaining 6’-3” section requiring curved guardrail (radius of 17 feet). This connects to curved TL-3 guardrail, which then
A00805 - 5 transitions to a tangent end treatment with an impact head terminal. To the east of the intersection, a 60-foot length of guardrail has been proposed on the north side of the roadway.
The intent of this run of guardrail is to deflect errant vehicles from potentially entering the wooded area/train tracks. Due to the low traffic volumes on the roadway, this alternative was not selected.
Alternative 3
This alternative proposes an impact attenuator at the northeast corner of the bridge. To connect the impact attenuator to the bridge rail, the standard precast highway guard transition shown in
MassDOT Construction Standard 628.24.1 would need to be modified. In addition, the impact attenuator requires a concrete pad underneath the system. This alternative would increase the project costs while providing similar safety measures as the preferred alternative.
Alternative 4
This alternative proposes a relocation of the intersection with Newell Pond Road and Severance
Street to provide space for standard highway guardrail treatments in accordance with current design standards. Due to limited right-of-way and surrounding residential land, this alternative is not feasible.
Alternative 5
This alternative proposes to provide no guardrail protection along the northeastern side of the roadway. Due to hazards posed by the blunt end of the bridge rail and the roadside slopes down to the railroad tracks, this alternative was not selected.
Recommendation
In consideration of the roadside safety design practices in the AASHTO Roadside Design Guide, the MassDOT PDDG, and the context of the roadway and project area, including the low traffic volume, posted speed of 25 mph, urban local roadway classification of the road, and site constraints, the recommendation is to install bridge transitions and guardrail as described in the
Proposed Solution(s) section of this request.
The proposed solution represents a constructible guardrail system which offers improved roadside safety in comparison to the existing guardrails and does not require extensive site disturbance nor reconstruction/realignment of the side streets.
A00805 - 6
APPENDIX A
A00805 - 7
LO
G
PLAIN RO
AD
(PUBLIC~VARIABLE W
IDTH)
NEWELL POND ROAD
(PUBLIC~66' WIDE)
LOG PLAIN ROAD
(PUBLIC~VARIABLE WIDTH)
SEVER
A
N C
E STR
EET
(PU
B
LIC
~60' W
ID
E)
C O
N N
EC
TIC
U T R
IVER
M
A
IN
LIN
E
C O
N N
EC
TIC
U T R
IVER
M
A
IN
LIN
E
PC +59.96
PC
+62.04
PT +81.61
PT +81.36
16+75
PR
O P. C
O N
ST. B
BEG
IN
PR
O
JEC
T
BEG
IN
M
ILL AN
D O
VER
LAY
STA. 12+50
N
: 3060739.0903 E: 366306.5151 M
ATC
H
EXISTIN
G
L
PR
O
P. PR
EC
AST H
IG
H W
AY
G
U
AR
D
TR
AN
SITIO
N
PR
O
P. 33'-9" TAN
G
EN
T H
IG
H
W
AY G
U
AR
D
TR
AN
SITIO
N G
U
AR
D R
AIL SEC
TIO
N
PR
O
P. PR
EC
AST H
IG
H W
AY
G
U
AR
D
TR
AN
SITIO
N
PR
O P. 33'-9" H
IG
H
W
AY
G U
AR
D
TR
AN
SITIO
N
G U
AR
D
R
AIL SEC
TIO
N
PR
O
P. R O
U N
D
ED
EN
D
U N
IT
PR
O
P. R O
U N
D
ED
EN
D
U N
IT
N
NAD 83
SC
ALE: 1" = 20'
FED
. AID
PR
O
J. N O
SH
EET
N
O
TO
TAL
SH
EETS
STATE
M A
PR
O
JEC
T FILE N
O
613295_HD (GUARDRAIL ALT 1).DWG 14-Jul-2025 1:59 PMPlotted on
PR
EFER
R
ED
A
LTER
N A
TIVE
613295
X X
LO
G
PLA
IN
R O
A D
W
EST O
VER
B
ER
X R
A
ILR
O A
D G
R
EEN
FIELD
P R
O P
. T R
A N
S
IT
IO
N
T O
B R
ID
G
E R
A
IL (B
A C
K O
F S
ID
E
W A
LK
S E
E M
A S
S D
O T
C O
N S
T R
U C
T
IO
N S
T A
N D
A R
D 628.24.1
T A
P E
R 12'-6" W
-B E
A M
P A
N E
L A T
9:1
P R
O P
. T R
A N
S
IT
IO
N
T O
B R
ID
G
E R
A
IL (F
A C
E O
F C
U R
B
S E
E M
A S
S D
O T
C O
N S
T R
U C
T
IO
N S
T A
N D
A R
D 628.24.2
T A
P E
R 12'-6" W
-B E
A M
P A
N E
L A T
9:1
P R
O P
. P R
E C
A S
T H
IG
H
W A
Y G
U A
R D
T R
A N
S
IT
IO
N
Propsal No. 613295-CCCCCC
A00805 - 8
| A00805 Non-Compliant Safety Hardware Approval |
| A00805 Non-Compliant Safety Hardware Approval |
File details come from the government source that posted it. Updated .