A00808-613295.pdf

PDF 992 KB Posted

Attached to
613295 GREENFIELD FAP No. STP(BR-OFF)-003S(930)X Deck Replacement, G-12-022 (144), Log Plain Road
Solicitation number
BD-26-1030-0H100-0H002-125976
Issued by
Franklin County, Massachusetts

About this file

This is a Project Utility Coordination Form prepared by the Massachusetts Department of Transportation Highway Division for Proposal No. 613295-133722, a deck replacement project on Log Plain Road over the G&W Railroad in Greenfield, Massachusetts (FAP No. STP(BR-OFF)-003S(930)X, G-12-022). The project involves coordination of utility relocations with four utility companies: Eversource, Verizon, Comcast, and GCET. The primary consultant is Jacobs Engineering Group (contact: Matthew Schwartz), with the Resident Engineer identified as Paul Kelly. The utility coordination planning was completed as of December 9, 2025, with a scheduled advertisement date of January 31, 2026. The form documents the relocation of one utility pole set and establishes the sequence and timeline for utility operations based on the consultant's proposed construction staging.

The form outlines a phased relocation schedule requiring contractor enabling work (tree clearing) followed by utility company operations across four main phases involving Verizon and Eversource pole setting, Eversource transformer and streetlight transfers, GCET fiber splicing and activation, and Comcast strand placement and cable work. Total estimated utility work duration is approximately 89 work days, excluding lead times. The contractor must provide 7 calendar days advance notification to the District Construction Office and allow 30 days advance notice-to-proceed for each utility operation. Utility non-work periods include contingency days for New England weather conditions, and seasonal restrictions apply November 15 through March 15 for gas line work and municipally owned utilities. The form specifies that contractors must provide safe and unimpeded access for utility operations, including necessary site preparation such as guard rail removal, barrier removal, tree removal, and grading.

View the file

Other files

File Type Posted
GREENFIELD-613295-133722-A-2.pdf PDF
A00870-613295.pdf PDF
A00806-613295.pdf PDF
A00875-613295.pdf PDF
A00805-613295.pdf PDF
A00811-613295.pdf PDF
GREENFIELD-613295-133722-A-3.pdf PDF
613295 Bid Items List.txt TXT text file
A00801-613295.pdf PDF
A00804-613295.pdf PDF
A00820-613295.pdf PDF
613295 - Plan Holders List 3-17-2026.pdf PDF
613295 - Notice to Contractors.pdf PDF
A00871-613295.pdf PDF
GREENFIELD-613295-133722-A-1.pdf PDF
A00802-613295.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Massachusetts Department Of Transportation Highway Division Proposal No. 613295-133722

A00808 - 1

DOCUMENT A00808

PROJECT UTILITY COORDINATION FORM

Massachusetts Department Of Transportation Highway Division

A00808 - 2

THIS PAGE INTENTIONALLY LEFT BLANK

M ass DO

T PM

Total Poles Relocated:

1/13/2026

PRIN

TED

Yes N o Agreem ent

YES

N O

YES

N

O U

G O

H

Eversource Peter Bednarz peter.bednarz@ eversource.com

X x x x x

VZ

Paul Styspeck

Paul. M . Styspeck (paul.m

.styspeck@ verizon.com

X x x x x

Com cast

Thom as Brow n "Brow n, Thom as H

" <thom as_brow n@ com cast.com

X x x x x

GCET

John Lunt

JLunt@ gcet.net

X x x x x

Suggested Sequence of Relocation (Based on Consultant proposed construction staging)

Resident Engineer:

Scheduled Ad Date:

City/Tow n:

PU

C Com pleted by:

Project File #:

U tility Pole Set:

CO

N

TACTS AN

D GEN

ERAL U

TILITY IN

FO

RM

ATIO

N

Project U tilities Coordination (PU C) Form

12/9/2025

Greenfield 613295

Paul Kelly

VZ

U tilities O n Bridge/Structure

Log Plain Road over G& W

Railroad M

G Reardon 1/31/2026

Consultant:

Contact:

O ffice #

Cell # Em ail m att.schw artz@ jacobs.com

U tilities

U nderground (U

G

/Aerial (O H

Route/Street:

Jacobs Engineering Group M athew Schw artz

Scope, Budget, Duration Subm itted Reim bursem ent

U tility Com pany Contact

O ffice #

Cell # Em ail N on-Reim b'le

N otes

Potential for District Initiated Early Relocation *

The sequence as detailed on the follow ing pages is based on the consultants proposed staging plan. This inform ation w as com piled through m eetings that included all of the utilities listed below along w ith the designer and the (insert M unicipality here). The inform ation provided is the best available inform ation prior to project advertisem ent.

U tility Relocation N otes for M assDO

T Contractor U nless otherw ise noted by Contract, the M assDO T Contractor is to provide the District Construction O ffice w ith 7 Calendar Days advance notification in order to validate the current progress and provide the required 30

Days advance notice-to-proceed for the first U tility - and each subsequent U tility. These advance notifications are to be identified in the Contractor's Schedules (Pre-Con preparation, Baseline, Subnets, and U pdated/M onthly Schedules) as specified in Subsection 8.02 (for DBB Contracts) and/or Section 9 (of DB Contracts). N ote: The durations included below do not include these lead-tim

es. See Additional 'Im portant Basis notes for Contractor' - on last PU C Form page.

Additional notes:

Proposal No. 613295-133722

A00808 - 3 mailto:matt.schwartz@jacobs.com mailto:matt.schwartz@jacobs.com mailto:matt.schwartz@jacobs.com mailto:peter.bednarz@eversource.com mailto:miguel_Quintal@cable.comcast.com mailto:JLunt@gcet.net mailto:matt.schwartz@jacobs.com

Yes o 1/13/2026 x

PRIN

TED

Yes o x

Exclusive U tility on site

Concurrent U tilities

Contractor O ff-Site Contractor Concurrent

C = Contractor U = Utility Co.

Utility working with no other

Utilities in vicinity

Utility working with other

Utilities on site

No Contractor physical construction operations on-site

(while Utility is Contractor and

Utility are working on-site - but NOT in the same vicinity

Stage : 1 Phase : A

C = Con

Task: 1 U

X

X N

O

Task: 2 U x x

N O

U x

U x

Task: 3 U

X

X N

O

U

X

U

X

Task: 3 U

X

X N

O

U

X

U

X

Task: 4 U

X X

N O

U X

X N

O

1234567

PU

C FO

RM

- CO

N

TIN

U

ED

Is 'enabling' (prep) w ork, by the Contractor, necessary prior to the start of the first series of utility relocations:

H as any of the U tility w ork been identified to w ork concurrently

U

TILITY O

PERATIO

N S - _________________

Access Restraint & Lim itations of O perations N otes

Contractor note: In planning and executing the w ork, the

Access Restraints listed in the Special Provisions, takes precedence over the checklist in these 4 colum ns.

Should an AR be considered for the

Contractor ?

Potential Access Restraint (Yes/No)

Reason/Note (optional)

Concurrent / Exclusive U tility W ork

Eversource fram es poles, sets anchor, replaces conductors and guying.

RESPONSIBLE PARTY

DESCRIPTIO

N

- U tility Relocation Phases, Tasks and Activities

Estimated Duration (Work Days) by Utilities (Lead time not included)

U tility Co. VERIZO

N and EVERSO

U

RCE

Verizon and Eversource sets utility poles

Enabling' w ork by the Contractor - ____________The Contractor com pletes tree clearing.

U

TILITY O

PERATIO

N

S - _________________

U tility Co. Eversource

Sub-Total

G CET splices and activate, w reck out old plant G

CET delashes existin g fiber sw ing to new strand and lash

U

TILITY O

PERATIO

N

S - _________________

Eversource transfers transform ers, Street Li ghts

Eversource rem oves old w ire and pole tops

Sub-Total

U tility Co. G

CET

G

CET places new strand , lash new coax

U tility Co. Verizon

Sub-Total rem oves abandoned pole and anchors

Verizon transfers ,splices and rem oves existing cable 16 3

U

TILITY O

PERATIO

N

S - _________________

U

TILITY O

PERATIO

N

S - _________________ U tility Co. Com cast

Com cast places new strand , lash new coax

Com cast delashes existin g fiber sw ing to new strand and lash, Com cast splices and activate, w reck out old plant Sub-Total

Sub-Total

U tility non-w ork periods - For planning purposes, the durations above contain som e non w ork days (contingency) for N ew

England conditions (precipitation, high tem peratures, low tem peratures, snow

, ice). G as line w ork how ever, typically has a seasonal restriction and can N O

T be installed from 15-N ovem ber to 15-M arch. M unicipally O w ned Electric and G as U tilities are also restricted from proceeding from 15-N ovem ber to 15-M arch. The Contractor shall (and the CTD plan) reflect this calendar restriction w ithin the schedule (unless otherw ise note).

Access - U nless otherw ise noted in the Contract, and in addition to the 'enabling' notes above, the Contractor m ust provide safe and unim peded access (for trucks, lifts, cranes, etc.) to the U tilities, to allow for the proposed relocation(s) -including but not lim ited to snow rem oval, clearing and grubbing, guard rail rem oval, barrier rem oval, tree rem oval, and grading.

For all M assDO

T construction contracts issued after January 2014, the new U tility Coordination/docum entation specification is required. This is Section 8.14 in Design-Bid-Build Contracts (see Design-Build index reference for applicable section #).

Prior to starting any and all enabling w ork for U tilities, the Contractor is to plan in advance w ith subm ittals and approved durations.

"Potential Access Restraints" noted w ithin this PU

C Form are for planning purposes. See M assDO T Contract for Contractual Access Restraints (refer to Subsections 8.02, 8.03, and/or 8.06 for Design Bid Build Contracts and Volum e II Section 9 for Design Build Contracts).

U nless otherw ise specified in the M assDO

T Construction Contract, or unless specifically noted w ithin this PU

C Form , these durations (herein) are based upon the Contractor providing unim peded access to the U tility com pany to perform tility relocations (see N ote 5 - Access).

"Concurrent U tilities" operations noted herein, are to signify those U tility Com pany operations that can be w orked concurrently (e.g. U tility A and U tility B w ork on-site together) - M assDO

T and the Contractor are to prepare N TPs to

U tilities accordingly.

A00808 - 4

Exclusive tility on site

Concurrent U tilities

Contractor O ff-Site Contractor Concurrent

C = Contractor U = Utility Co.

Utility working with no other

Utilities in vicinity

Utility working with other

Utilities on site

No Contractor physical construction operations on-site

(while Utility is Contractor and

Utility are working on-site - but NOT in the same vicinity

Access Restraint & Lim itations of O perations N otes

Contractor note: In planning and executing the w ork, the

Access Restraints listed in the Special Provisions, takes precedence over the checklist in these 4 colum ns.

Should an AR be considered for the

Contractor ?

Potential Access Restraint (Yes/No)

Reason/Note (optional)

Concurrent / Exclusive U tility W ork

RESPONSIBLE PARTY

DESCRIPTIO

N

- U tility Relocation Phases, Tasks and Activities

Estimated Duration (Work Days) by Utilities (Lead time not included)

* Potential District Initiated Early U tility Relocation - if noted herein, the District reserves the right to initiate early utility relocation in advance of the Contract N

TP. In subm itting a bid price and in the developm ent/basis of the Baseline Schedule, the Contractor shall not plan the W ork w ith the potential benefit of any form of 'early utility relocation.' As a requirem ent of the Baseline subm ission, unless otherw ise noted in this Specification, the earliest that the first U tility com pany is to receive the 30 days advance notification to m obilize to the site, w ill be 7 calendar days after the pre-construction m eeting and never sooner than 7 days after the Contract N

TP.

A00808 - 5

THIS PAGE IS INTENTIONALLY LEFT BLANK

A00808 - 6

A00808-1 Project Utility Coordination Form
A00808-2 Project Utility Coordination Form
Page 1Contacts & General Info