Memorandum Western Federal Lands Highway Division
610 E. Fifth Street Vancouver, WA 98661-3801
Date: March 17, 2015 Reply Refer To: HFL-17 GM 08-15
From: Dustin Woods Geotechnical Engineer
To: Connie Kratovil Project Manager
Subject: Final Geotechnical Recommendations, WY NPS YELL 10(23), West Thumb to Old Faithful
Geotechnical Memorandum 08-15
INTRODUCTION
This memorandum provides the final geotechnical recommendations for the West Thumb to Old Faithful pavement preservation/rehabilitation project and offers the investigation results and boring logs from the 2014 site investigation. Information contained in this memorandum is intended to supplement the preliminary recommendation memo, GM 01-15. GM 01-15 contains background, scope, and other general project information.
RECOMMENDATIONS
Thermally Insulated Roadway Design
On January 29, 2015 Yellowstone National Park Geologist Henry Heasler and Landscape Architect Daniel Rhodes discussed the proposed Thermal Insulation Locations (Table 6 GM 01-15) with Western Federal Lands’ Geotechnical Engineers Dustin Woods and Nathan Jenks;
and Highway Designer Clinton Choy. The park confirmed the thermally insulated roadway design from station 100+00 to 102+50; however they did not have any concerns or evidence of hot ground or a lack of snow with the section between station 412+00 and 423+00. Because of the lack of evidence, this section is no longer recommended.
The Park did recommend two additional locations within the project limits that need to be insulated that were not identified in the drilling program.
The first additional location is located approximately at the culvert at station 1075+00. This site was not investigated during previous site visits or during the September drilling; therefore, the specific limits of this area are unknown. During the teleconference with the park it was determined that a 50 foot long thermal section in this location would sufficiently cover the area of concern, extending approximately 25 feet on either side of the culvert.
The second additional location is located at the intersection of the Black Sand Road and Grand Loop Road. This section of Grand Loop Road is being omitted from this development effort due to the presence of cement concrete pavement along the mainline; however it is possible that the approach of Black Sand Road will be included in the proposed project. Thermal imagery (Figure 1 attached) was provided by Yellowstone National Park in the absence of subsurface temperature information for this section. It is recommended that if the approach at Black Sand Road is rebuilt, the new section include a type 5 thermal sub-excavation with standard sand.
Table 1 provides the final recommended locations for thermally insulated roadway sections for this project . Please see Figure 2 (attached) for typical sections of a type 5 sub-excavation.
Table 1. Thermal Insulation Locations.
Station Length (ft) Sand Type WidthStart End
100+00 102+50 250 Standard Full 1074+75 1075+25 50 Standard Full
Black Sand Road Intersection 100’ SW 100 Standard Full
Sub-Excavations
The sub-excavation locations have not changed from the preliminary memorandum. For convenience, the locations of these recommendations are listed again below in Table 2. The recommended design details for the subexcavation types are presented in Figure 2.
Table 2. Recommended Sub-Excavation Locations Station Length (ft) Type Width Daylight
Side Collector Pipe Side
Outlet SideStart End
93+00 96+20 320 3 Full LT RT 99+95 101+75 180 3 Full LT RT
116+90 118+00 110 2 Full RT RT 177+65 179+05 140 3 Full RT LT 185+85 187+85 200 3 Full LT RT 196+80 200+55 375 2 Full RT RT
204+00 205+40 140 1 1/2 RT RT
207+00 207+70 70 2 Full LT LT
211+40 213+15 175 2 1/2 LT LT LT
240+80 242+30 150 3 Full LT RT 285+25 286+15 90 3 Full LT RT 286+85 287+65 80 2 Full 290+80 292+00 120 2 Full LT LT
Table 2 Continued. Recommended Sub-Excavation Locations Station Length (ft) Type Width Daylight
Side Collector Pipe Side
Outlet SideStart End
293+05 294+25 120 1 1/2 LT LT
296+40 297+40 100 1 1/2 LT LT
297+40 298+80 140 1 Full LT
299+65 302+50 285 1 1/2 LT LT
344+15 347+80 365 2 1/2 RT
347+80 349+25 145 2 Full
349+25 351+70 245 2 1/2 RT
362+80 367+95 515 2 Full LT RT 375+55 378+30 275 3 Full LT LT 290+80 292+00 120 2 Full LT LT
293+05 294+25 120 1 1/2 LT LT
296+40 297+40 100 1 1/2 LT LT
297+40 298+80 140 1 Full LT
299+65 302+50 285 1 1/2 LT LT
344+15 347+80 365 2 1/2 RT
347+80 349+25 145 2 Full
349+25 351+70 245 2 1/2 RT
362+80 367+95 515 2 Full LT RT 375+55 378+30 275 3 Full LT LT 382+80 384+90 210 3 Full RT LT 386+00 387+80 180 2 Full LT LT 403+15 405+25 210 3 Full LT LT 414+05 415+35 130 2 Full LT RT 416+50 418+80 230 2 Full LT RT 419+90 421+30 140 2 Full LT RT
450+60 452+30 170 2 1/2 RT RT RT
511+70 513+20 150 3 Full LT RT 734+75 736+25 150 2 Full RT RT 784+75 787+05 230 2 Full RT RT
9213+85 9218+70 485 2 Full 3097+82 3099+22 140 2 Full RT RT
Underdrains/Ditches
The underdrain and ditch locations have not changed from the preliminary memorandum; these recommendations are listed in Table 3. Please note that there has not been sufficient design work completed to give a more accurate length to the underdrain located at station 164+00 to 163+75. This length will likely change as the design progresses. See Figure 3 (attached) for details of the underdrain design.
Table 3. Underdrain and Ditch Locations.
Station Length (ft) Type Width Daylight
Side Collector Pipe Side
Outlet SideStart End
164+00 163+75 50 UD RT
412+00 422+50 1050 UD LT LT
3082+50 3086+50 400 Ditch RT
Closing
The Soil and Rock Classification Guidelines (Figure 4) and boring logs (Figure 5) have been attached to this memorandum for informational purposes.
Please contact Dustin Woods at (360) 619-7541 or Dustin.Woods@dot.gov with any questions regarding this memorandum.
CC: Clinton Choy, WFLHD Roadway Design Megan Marshall, WFLHD Materials Malcolm Ulrich, WFLHD Geotechnical Team Lead Geotechnical File
Attachments: Figure 1. Thermal Map of Black Sand Intersection Figure 2. Sub-excavation Typical Sections and Details Figure 3. Underdrain Typical Section and Details Figure 4. Soil and Rock Classification Guidelines
Figure 5. Boring Logs
Figure 1. Thermal Imagery of Black Sand Intersection
131.0 F
105.6
88.3
81.3
77.0
73.6
71.2
69.1
67.1
65.1
63.0
60.1
58.8
56.7
54.5
51.8
Figure 2. Sub-excavation Typical Sections and Details
Figure 2. Sub-excavation Typical Sections and Details
Figure 3. Underdrain Typical Section and Details
SOIL DESCRIPTIVE TERMINOLOGY
CONSISTENCY OF COHESIVE SOILS
SPT N-Value (blows/ft) Consistency Field Identification
0 - 1 Very Soft Easily penetrated several inches by first
2 - 4 Soft Easily penetrated several inches by thumb
5 - 8 Firm Moderate effort required to penetrate several inches by thumb
9 - 15 Stiff Readily indented by thumb but penetrated only with great effort
16 - 30 Very Stiff Readily indented by thumbnail
> 30 Hard Indented with difficulty by thumbnail
RELATIVE DENSITY OF
COHESIONLESS SOILS
SPT N-Value (blows/ft) Relative Density
0 - 4 Very Loose
5 - 10 Loose
11 - 30 Medium Dense
31 - 50 Dense
> 50 Very Dense
PARTICLE SIZE
Term Sieve Size Boulder > 12” (>300mm)
Cobble 3” - 12” (75mm - 300mm)
Gravel – coarse ¾” - 3” (19mm - 75mm)
Gravel – fine #4 - ¾” (4.75mm - 19mm)
Sand – coarse #10 - #4 (2.00mm - 4.75mm)
Sand – medium #40 - #10 (0.425mm - 2.00mm)
Sand – fine #200 - #40 (0.075mm - 0.425mm)
Silt & Clay < #200 (<0.075mm)
MOISTURE CONTENT
Dry Dusty, dry to the touch
Moist Damp, but no visible free water
Wet Visible free water, saturated, over optimum
ROCK DESCRIPTIVE TERMS
ROCK WEATHERING
Field Identification Term Crystals are bright. Discontinuities may show some minor surface staining.
No discoloration in rock fabric. Fresh
Rock mass is generally fresh. Discontinuities are stained and may contain clay. Some discoloration in rock fabric.
Slightly Weathered
Significant portions of rock show discoloration and weathering effects.
Crystals are dull and show visible chemical alteration. Discontinuities are stained and may contain secondary mineral deposits.
Moderately Weathered
Rock can be excavated with geologist’s pick. All discontinuities exhibit secondary mineralization. Complete discoloration of rock fabric. Surface of core is friable and usually pitted due to washing out of highly altered minerals by drilling water.
Highly Weathered
Rock mass is completely decomposed. Original rock “fabric” may be evident. May be reduced to soil with hand pressure. Decomposed
DISCONTINUITY SPACING ROCK QUALITY DESIGNATION (RQD)
Spacing (in) Spacing Term RQD % Designation < 2.5 Very Close 0 - 25 Very poor
2.5 – 8 Close 25 - 50 Poor 8 – 24 Moderately close 50 - 75 Fair 24 – 80 Wide 75 - 90 Good
> 80 Very Wide 90 - 100 Excellent (RQD is the percent of a core run with intact lengths greater than 4 inches excluding breaks caused by drilling.)
INTACT ROCK HARDNESS
Field Identification UCS (psi) Hardness Term Indented by thumbnail. 40 - 150 Extremely Weak (R0) Crumbles under firm blows with point of geological hammer, can be peeled by a pocket knife. 150 - 730 Very Weak (R1)
Can be peeled by a pocket knife with difficulty, shallow indentations made by firm blow with geological hammer.
730 – 3,600 Weak (R2)
Cannot be scraped or peeled with a pocket knife, specimen can be fractured with a single blow of geological hammer.
3,600 – 7,300 Medium Strong (R3)
Specimen requires more than one blow of geological hammer to fracture it. 7,300 – 15,000 Strong (R4)
Specimen requires many blows of geological hammer to fracture it. 15,000 – 36,000 Very Strong (R5)
Specimen can only be chipped with geological hammer. > 36,000 Extremely Strong (R6) (UCS – Unconfined Compressive Strength)