AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A003 12/06/2021 N/A See Box 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X 69056721R000008
9B. DATED (SEE ITEM 11)
11/15/2021
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A D OTHER (Specify type of modification and authority)
N/A E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WY NPS YELL 10(23), Grand Loop Road-Old Faithful to West Thumb
See page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
WY NPS YELL 10(23)
Grand Loop Road-Old Faithful to West Thumb
Amendment No. A003, dated 12-06-2021 Solicitation No. 69056721R000008
REVISIONS ARE AS FOLLOWS:
CONTRACT CLAUSES
Pages C-22. FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work (Apr 1984) Alternate I (Apr 1984). Revises the notice to proceed date.
SPECIAL CONTRACT REQUIREMENTS
Page E-20, Subsection 107.02, Protection and Restoration of Property and Landscape.
Revises requirements.
Pages E-28 through E-29, Subsection 107.12, Contractors Camp and Housing (Added Subsection). Revises requirements.
Pages E-60j, Subsection 155.12, Acceptance. Revises schedule requirements.
PLANS
Plan Sheets G.1 through G.6 Revises allowable pipe material and cover information.
Plan Sheet J.1 Revises water meter quantity, and Adds water valve quantity.
Plan Sheet J.11 Revises water main callout, and Adds callouts for water meter and water valves.
ENCLOSURES
Pages:
C-22 E-20 / E-28 through E-29 / E-60j
Plan Sheets:
G.1 through G.6 J.1 / J.11
C-22
(2) Through another subsidiary of a parent corporation.
(b) If the contractor reorganizes as an inverted domestic corporation or becomes a subsidiary of an inverted domestic corporation at any time during the period of performance of this contract, the Government may be prohibited from paying for Contractor activities performed after the date when it becomes an inverted domestic corporation or subsidiary. The Government may seek any available remedies in the event the Contractor fails to perform in accordance with the terms and conditions of the contract as a result of Government action under this clause.
(c) Exceptions to this prohibition are located at 9.108-2.
(d) In the event the Contractor becomes wither an inverted domestic corporation, or a subsidiary of an inverted domestic corporation during contract performance, the Contractor shall give written notice to the Contracting Officer within five business days from the date of the inversion event.
52.210-1 – Market Research (Apr 2011)
(a) Definition. As used in this clause-- “Commercial item and nondevelopmental item” have the meaning contained in Federal acquisition Regulation 2.101.
(b) Before awarding subcontracts over the simplified acquisition threshold for items other than commercial items, the Contractor shall conduct market research to--
(1) Determine if commercial items or, to the extent commercial items suitable to meet the agency’s needs are not available, nondevelopmental items are available that—
(i) Meet the agency’s requirements;
(ii) Could be modified to meet the agency’s requirements; or
(iii) Could meet the agency’s requirements if those requirements were modified to a reasonable extent; and
(2) Determine the extent to which commercial items or nondevelopmental items could be incorporated at the component level.
52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) Alternate I (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 11/02/2023 subject to such extensions as may be authorized. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 2/10/2022 1/06/2022. The completion date will be extended by the number of calendar days after the above date that the contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
52.211-12 Liquidated Damages—Construction (Sep 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of: See Special Contract Requirements, Subsection 108.04.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.211-18 Variation in Estimated Quantity (Apr 1984)
Revised by Amendment A003
Contract Clauses Project: WY NPS YELL 10(23), Grand Loop Rd - Old Faithful to West Thumb
E-20 DIVISION 100
Special Contract Requirements Project: WY NPS YELL 10(23), Grand Loop Road - Old Faithful to West Thumb
(g) Contractor selected sites. Prepare separate SWPPP and file separate NOI for all Contractor-selected sources and all waste, borrow, and staging sites not included in the contract. These SWPPP(s) and NOI(s) are solely the responsibility of the Contractor. Do not submit to CO for approval or for signature.
107.02 Protection and Restoration of Property and Landscape. Amend as follows:
Delete the third paragraph and substitute the following:
Do not disturb any area outside the construction limits unless authorized according to Subsections 105.02(c) and 107.10(d). Replace trees, shrubs, or vegetated areas outside the construction limits damaged by construction operations as directed and at no cost to the Government. Only remove damaged limbs of existing trees when directed by an approved arborist.
Add the following to the fourth paragraph:
Paleontological remains and archeological specimens found within the construction area are the property of the National Park Service and will be removed only by the National Park Service or designated representatives. Notify the CO within 1 hour of any discovery. Include a brief statement of the location and details of the finding.
Add the following to the sixth paragraph:
The plans show approximate locations of existing utilities. These utility locations have been determined from prior utility locates requested by the Government and as-built plans from past projects spanning the project limits. Before starting any excavation, locate utilities within the project limits. Provide 7 days’ notice to the CO before executing any utility disruption for construction of the Grant Contractor Camp. Limit utility disruption for power and sewer between the hours of 8:00 am and 4:00 pm, Monday through Friday. Perform work without disrupting water services.
For non-NPS utility locates:
Contact “One Call of Wyoming” at least 3 working days before starting any excavation. The utility notification phone number for Wyoming area is 1-800-849-2476.
For NPS utility locates:
Underground utility locates are required anytime the ground is disturbed in developed areas.
Contact Deb Guernsey at debra_guernsey@nps.gov or 307-344-2470 for instructions on how to submit your Locate request. Provide clear and accurate maps of the location of your dig. Clearly mark the specific area on your map. Email the map to debra_guernsey@nps.gov or bret_deyoung@nps.gov. Mark all dig locations with white paint or white flags BEFORE submitting your locate request. Submit all NPS locate requests to the park at least 7 days in advance. Call 307-344-2470 or 307-344-2070 if you have questions.
Coordinate work on the following Park Utilities with the listed Park Contact.
Park Facilities (Abandoned Sewer, Water, Power, Sewer Connections):
Yellowstone National Park
E-28 DIVISION 100
Project: WY NPS YELL 10(23), Grand Loop Road - Old Faithful to West Thumb initial entrance into the Park; subsequent entries will not require cleaning unless equipment is used at another job site, or are originating from a material source that is not certified to be weed free. Notify the CO, a minimum of 48 hours before the entry of vehicles and equipment to the Park. The CO will make arrangements for the inspections. See requirements for equipment conveying or coming in contact with waters in Subsection 107.10(e).
(b) Protect sensitive resource sites within project limits. Install temporary plastic fence to delineate sites listed below and as shown on the plans prior to construction activities in these areas:
Around trees, wetlands, archaeological or culturally significant sites, and any other sensitive areas within, or directly adjacent to, the construction limits as shown in the Plans or as identified by the CO.
(c) Do not allow equipment to idle for longer than 15 minutes.
(d) Sleeping in vehicles or camping within the Park boundaries will not be allowed except as designated in Subsection 107.12.
(e) Notify the CO at least 7 days before starting work in the critical geothermal area from 3005+35 to 3102+00.
(f) Blasting is not allowed.
(g) Ensure all vehicles and equipment have functioning mufflers meeting manufacturer’s recommendations.
107.12 Contractors Camp and Housing. (Added Subsection).
A Contractor trailer camps located at Canyon Contractors Camp providing 30 trailer sites, and Norris Contractors Camp providing 14 trailer sites for use in 2022 is available to Contractor employees and their immediate families only. A rental fee of $ 322.30 per site, per month in 2022 will be assessed and is payable to Yellowstone National Park. The 2022 trailer sites listed above are not available for use in 2023, but sites constructed at the Grant Contractor Camp may be used at the same rental fee specified above.
Utilities available include water, sewer, electric and trash facilities at all sites. To connect securely to the sewer hookups at this site, contractor employees are required to have an appropriate adapter.
Sewer hookup adapters shall securely connect using a tight-fitting, threaded fitting. Submit adapter for approval prior to connection to the Park sewer system. Disposal of trash from the receptacles will be performed by the NPS.
The Grant Contractor Camp will be constructed adjacent to the existing trailer camp at Grant Village as part of this contract. If the contractor wishes to occupy trailer sites before construction is complete submit a plan for approval to the CO to occupy the Grant Contractor Camp before completion.
E-29 DIVISION 100
Project: WY NPS YELL 10(23), Grand Loop Road - Old Faithful to West Thumb
Enter into a utility agreement with Yellowstone National Park for utilities at the sites. Utilities will be metered and charges assessed, per month, payable to Yellowstone National Park. Utilities at this site will be shut off and drained no later than October 21 of each year. An extension to this date may be considered if requested 30 days in advance of October 21.
Comply with the following requirements:
(a) Designate an on-site camp boss to ensure the Contractor Camp operation remains in compliance with Park regulations. Submit the name and phone number of the camp boss to the CO. The responsibilities of the camp boss include, but not be limited to, food handling and storage, solid waste storage and disposal, management of camp facilities, and acting as the contact for NPS personnel involved in bear management, parking, and camping.
(b) To prevent unnatural attractants to bears, no foods, pet foods, garbage, drinks, trash, or food and drink containers are allowed outside vehicles, pickups, trailers, or buildings except during actual use. Specific guidelines will be further outlined during Park orientation sessions presented by the NPS. Notify the CO of any grizzly bear or gray wolf encounters within the camp area.
(c) Notify CO two weeks before starting work so orientation sessions with Yellowstone National Park representatives can be coordinated. All Contractor and subcontractor employees, and their immediate families who will reside with them in the park are required to attend Park orientation sessions specific to the trailer camp, before commencing work.
(d) Any mishandling of garbage, trash, food, and other potential bear attractants described above will result in Yellowstone National Park issuing the appropriate level of law enforcement to the responsible person, or Contractor. Repetition of mishandling or any case of deliberate feeding of wildlife will result in loss of in-park residence privileges. If mishandling occurs and a specific individual is not determined, the Contractor will be held responsible.
E-60j DIVISION 150
Project: WY NPS YELL 10(23), Grand Loop Road - Old Faithful to West Thumb
155.12 Acceptance.
Schedule submittals will be evaluated under Subsection 106.02 and 106.03. The Government will complete its review of schedule submittals by the latter of the following: 14 days of initial receipt (when no schedule meeting is planned), 7 days following final receipt (from the schedule meeting), or 7 days following a resubmittal (if a submittal is rejected).
Approval/rejection of the schedule submittal will be solely based on the contract requirements.
The CO may review activity durations and resource allocations using historical data, industry productivity standards, or equivalents, to determine whether activity durations or the CPM BCM schedule, as a whole, appears to be practicable and comment accordingly. Address, as appropriate, provided comments when preparing resubmittals or future schedule submittals.
Work with the CO to obtain full approval when approved schedule submittals are “Accepted as Noted”.
Approval does not relieve the Contractor of the responsibility to schedule the work in a practicable manner that meets the contract requirements. Failure to include elements of work in the schedule submittal required for performance of the contract, even if previously approved by the CO, does not excuse the Contractor from being responsible for completion of the work by the contract completion date.
Failure to receive approval of a prior schedule submittal does not relieve the Contractor of the responsibility to meet the requirement to provide schedule update submittals.
Meeting minutes will be evaluated under Subsection 106.02.
CDR’s will be evaluated under Subsection 106.02 and 106.03.
Measurement
155.13 Measurement.
Measure the Section 155 items listed in the bid schedule according to Subsection 109.02.
Revised by Amendment A001
10.4 x 16 20301 -1900
20301 -2000
20301 -2800
20303 -1200
25101 -0100
60201 -0300
60201 -0800
60201 -0900
60202 -0200
60210 -0800
60406 -0000
60409 -0000
60704 -0000
60707 -0700
60801 -0200
60815 -0200
62011 -0500
62028 -1000
Station
R E M
O V A L
O F
PI
PE
C U
LV
E R T
R E M
O V A L
O F
PI
PE
E N
D
S E C T
IO
N
R E M
O V A L
O F
S T R
U C T U
R E S A
O
B S T R U
C T
IO
N S
S
LO
PE
D
R A
IN
R E M
O V A L
O F
PA
V
W
A T E R W
A Y
A S
PH
A
LT
PL
A C E D
R
IP
R A P, M E T H
O D
A
C
LA
S S
-I
N C H
P
IP
E C
U
LV
E R
T
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
E Q
U
IV
A
LE
T
IA
M E T E R A
R C
H O
R E
LL
IP
T
IC
A L
PI
PE
C U
LV
E R T
E N
D S
E C T
IO
N F
O R
-I
N C H
PI
PE
C
U
LV
E R T
IN
LE
T A
D
JU
S T M
E N
T
IN
LE
T T
O P, M E T A L
FR
A M
E A
G
R A T E M
O D
IF
IC
A T
IO
N
C
LE
A N
IN
G
C U
LV
E R T I
N P
LA
C E
LI
N
IN
G
-I
N C
H P
IP
E C
U
LV
E R T
PA
V E D
W A T E R
W A Y
T Y
PE
R E C O
N D
IT
IO
N P
A V
T E R W
A Y
T Y
PE
S T O
N E M
A S O
N R Y H
E A D
W
LL
FO
-I
N C H
P
IP
E C
U
LV
E R
T
R E M
O V E A
N D
R E S E T S
T O
M
S O
N R
Y H
E A D
W A
LL
A llo w ab le P ip e
M at er ia l (S ee k ey b el o w
E S T
IM
A T E D
U
PS
T R
E A M
C O
V
(F
E S T
IM
A T E D
D O
W N
S T R E
V E R
FT
REMARKS
See below for numbered notes
EACH EACH EACH SQYD CUYD LNFT LNFT LNFT LNFT EACH EACH EACH EACH LNFT SQYD SQYD EACH EACH
3016+71 1 2 53 2 VCP 3 3.5
3017+27 20 5 20 x/C RT 3018+25 10 x/C 3037+10 1 x/C 3044+70 1 x/C 3067+75 7 5 10 x/C RT 3068+26 13 5 20 x/C LT 3078+97 20 5 20 x/C LT 3078+97 20 5 20 x/C RT 3081+74 20 5 20 x/C LT
3081+74 20 5 20 RT
3082+08 1 2 55 2 VCP 2 3
3092+14 1 2 67 2 2 VCP 3 3
3095+52 1 1 62 1 1 VCP 3.5 4.5
3099+25 1 58 2 VCP 1 1.5
x/C 1+40 1 17+98 1 2 80 2 x/C 4.5 4.5 18+13 20 5 20 x/C LT 36+51 1 x/C 41+58 2 x/C 41+96 8 5 8 x/C RT 45+57 1 x/C 58+76 1 2 80 2 x/C 9.5 12.5 66+38 1 x/C 67+80 1 x/C 69+71 1 x/C 73+16 1 5 34 x/C RT 75+55 1 5 20 x/C RT 77+35 6 5 7 x/C RT 86+30 6 5 8 x/C RT 89+16 1 2 26 2 x/C 0.7 0.7 101+05 1 56 1 x/C 2.5 5 Drop inlet upstream 113+66 1 74 x/C 6.5 8 Drop inlet upstream
CUMULATIVE TOTAL 10 13 2 170 65 0 611 0 0 11 0 0 10 0 227 0 4 4
Allowable Pipe Material
NOTE: A Aluminum
1. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for AS Aluminized steel all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. C Concrete
VCP Vitrified Clay Pipe P Plastic
Revised by Amendment A003 (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES (Schedule A) c:
\p w
-w or k\ d ye ll0
G
A T ab le s.
xl sx
]S h ee t -N ov -2
:3
B ab b /2
D es ig n ed b y:
C h ec ke d b y:
STATE PROJECT
G.1
SHEET
NUMBER
NPS YELL 10(23)WY
NPS PMIS No. 54348 NPS Drwg. No. 101/109186
Note: The quantities shown hereon are approximate and are subject to field adjustments.
-1900
20301 -2000
20301 -2800
20303 -1200
25101 -0100
60201 -0300
60201 -0800
60201 -0900
60202 -0200
60210 -0800
60406 -0000
60409 -0000
60704 -0000
60707 -0700
60801 -0200
60815 -0200
62011 -0500
62028 -1000
Station
R E M
O V A L
O F
PI
PE
C U
LV
E R T
R E M
O V A L
O F
PI
PE
E
C T
IO
N
R E M
O V A L
O F
S T R
U C T U
R E S A
S T R U
C T
IO
N S
S
LO
PE
D
R A
IN
R E M
O V A L
O F
PA
V
T E R W
A Y
A S
PH
A
LT
PL
A C E D
R
IP
R A P, M E T H
O D
A
C
LA
S S
-I
N C H
P
IP
E C
U
LV
E R
T
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
E Q
U
IV
A
LE
M E T E R A
R C
H O
R E
LL
IP
T
IC
A L
PI
PE
C U
LV
E R T
E N
D S
E C T
IO
N F
O R
-I
N
C
U
LV
E R T
IN
LE
T A
D
JU
S T M
E N
T
IN
LE
T T
O P, M E T A L
FR
A M
E A
A T E M
O D
IF
IC
A T
IO
N
C
LE
A N
IN
G
C U
LV
E R T I
N P
LA
C E
LI
N
IN
G
-I
N C
H P
IP
E C
U
LV
E R T
PA
V E D
W A T E R
W A Y
T Y
PE
R E C O
N D
IT
IO
N P
A V
T E R W
A Y
T Y
PE
S T O
N E M
A S O
N R Y H
E A D
W
-I
N C H
P
IP
E C
U
LV
E R
T
R E M
O V E A
N D
R E S E T S
T O
S O
N R
Y H
E A D
W A
LL
A llo w ab le P ip e
M at er ia l (S ee k ey b el o w
E S T
IM
A T E D
U
PS
T R
E A M
C O
V
E S T
IM
A T E D
D O
W N
S T R E
V E R
FT
) R
E M
A R K S
S ee b el o w f o r n u m b er ed n o te s
EACH EACH EACH SQYD CUYD LNFT LNFT LNFT LNFT EACH EACH EACH EACH LNFT SQYD SQYD EACH EACH
PREVIOUS SHEET: 10 13 2 170 65 611 11 10 227 4 4
116+91 1 61 2 x/C 2 5.5 119+17 1 x/C 121+65 1 x/C 122+34 1 x/C 123+80 1 x/C 126+80 1 x/C 127+29 1 x/C 127+77 1 x/C 146+79 1 x/C 159+72 1 x/C 165+65 1 x/C 167+70 1 x/C 4 2.5 174+68 148 x/C 20 23 180+96 1 108 1 x/C 4 2.5 186+21 1 x/C 237+93 1 1 95 1 1 x/C 5 6.5 243+61 80 2 x/C UNK UNK New culvert 248+62 75 2 x/C UNK UNK New culvert 250+10 1 x/C Scaup Lake Pullout 251+66 1 x/C Scaup Lake Pullout 255+65 1 x/C 257+77 1 x/C 264+35 1 x/C 268+35 1 x/C 301+13 1 x/C 316+17 1 x/C 332+40 1 x/C 1.5 8 338+83 1 1 82 1 1 x/C 1.5 8 369+55 1 x/C 375+30 1 x/C 378+65 1 1 x/C 385+93 1 x/C 402+42 1
CUMULATIVE TOTAL 14 15 2 170 65 0 1112 0 0 17 2 2 33 148 227 0 4 9
Allowable Pipe Material
NOTE: A Aluminum
1. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for AS Aluminized steel all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. C Concrete
VCP Vitrified Clay Pipe P Plastic
Revised by Amendment A003 (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES (Schedule A) c:
\p w
-w or k\ d ye ll0
G
A T ab le s.
xl sx
]S h ee t (2
-N ov -2
:3
E B ab b /2
D es ig n ed b y:
C h ec ke d b y:
STATE PROJECT
G.2
SHEET
NUMBER
NPS YELL 10(23)WY
NPS PMIS No. 54348 NPS Drwg. No. 101/109186
Note: The quantities shown hereon are approximate and are subject to field adjustments.
5 6.5
-1900
20301 -2000
20301 -2800
20303 -1200
25101 -0100
60201 -0300
60201 -0800
60201 -0900
60202 -0200
60210 -0800
60406 -0000
60409 -0000
60704 -0000
60707 -0700
60801 -0200
60815 -0200
62011 -0500
62028 -1000
Station
R E M
O V A L
O F
PI
PE
C U
LV
E R T
R E M
O V A L
O F
PI
PE
E
C T
IO
N
R E M
O V A L
O F
S T R
U C T U
R E S A
S T R U
C T
IO
N S
S
LO
PE
D
R A
IN
R E M
O V A L
O F
PA
V
T E R W
A Y
A S
PH
A
LT
PL
A C E D
R
IP
R A P, M E T H
O D
A
C
LA
S S
-I
N C H
P
IP
E C
U
LV
E R
T
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
E Q
U
IV
A
LE
M E T E R A
R C
H O
R E
LL
IP
T
IC
A L
PI
PE
C U
LV
E R T
E N
D S
E C T
IO
N F
O R
-I
N
C
U
LV
E R T
IN
LE
T A
D
JU
S T M
E N
T
IN
LE
T T
O P, M E T A L
FR
A M
E A
A T E M
O D
IF
IC
A T
IO
N
C
LE
A N
IN
G
C U
LV
E R T I
N P
LA
C E
LI
N
IN
G
-I
N C
H P
IP
E C
U
LV
E R T
PA
V E D
W A T E R
W A Y
T Y
PE
R E C O
N D
IT
IO
N P
A V
T E R W
A Y
T Y
PE
S T O
N E M
A S O
N R Y H
E A D
W
-I
N C H
P
IP
E C
U
LV
E R
T
R E M
O V E A
N D
R E S E T S
T O
S O
N R
Y H
E A D
W A
LL
A llo w ab le P ip e
M at er ia l (S ee k ey b el o w
E S T
IM
A T E D
U
PS
T R
E A M
C O
V
E S T
IM
A T E D
D O
W N
S T R E
V E R
FT
REMARKS
See below for numbered notes
EACH EACH EACH SQYD CUYD LNFT LNFT LNFT LNFT EACH EACH EACH EACH LNFT SQYD SQYD EACH EACH
PREVIOUS SHEET: 14 15 2 170 65 1112 17 2 2 33 148 227 4 9
406+49 1 x/C 3 15 418+14 1 1 9 10 60 1 x/C 3 15 Drop inlet upstream 446+53 1 x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C x/C
PROJECT TOTAL 15 16 2 170 74 10 1172 0 0 18 2 2 35 148 227 0 4 9
Allowable Pipe Material A Aluminum
NOTE: AS Aluminized steel
1. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for C Concrete all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. VCP Vitrified Clay Pipe
P Plastic (blank) Any appropriate material
Revised by Amendment A003 x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES (Schedule A) c:
\p w
-w or k\ d ye ll0
G
A T ab le s.
xl sx
]S h ee t (3
-N ov -2
B ab b /2
D es ig n ed b y:
C h ec ke d b y:
STATE PROJECT
G.3
SHEET
NUMBER
NPS YELL 10(23)WY
NPS PMIS No. 54348 NPS Drwg. No. 101/109186
Note: The quantities shown hereon are approximate and are subject to field adjustments.
-1900
20301 -2000
20301 -2800
20303 -1200
25101 -0100
60201 -0300
60201 -0800
60201 -0900
60202 -0200
60210 -0800
60406 -0000
60409 -0000
60704 -0000
60707 -0600
60707 -0700
60801 -0200
60815 -0200
62011 -0500
62028 -1000
Station
R E M
O V A L
O F
PI
PE
C U
LV
E R T
R E M
O V A L
O F
PI
PE
E
C T
IO
N
R E M
O V A L
O F
S T R
U C T U
R E S A
S T R U
C T
IO
N S
S
LO
PE
D
R A
IN
R E M
O V A L
O F
PA
V
T E R W
A Y
A S
PH
A
LT
PL
A C E D
R
IP
R A P, M E T H
O D
A
C
LA
S S
-I
N C H
P
IP
E C
U
LV
E R
T
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
E Q
U
IV
A
LE
M E T E R A
R C
H O
R E
LL
IP
T
IC
A L
PI
PE
C U
LV
E R T
E N
D S
E C T
IO
N F
O R
-I
N
C
U
LV
E R T
IN
LE
T A
D
JU
S T M
E N
T
IN
LE
T T
O P, M E T A L
FR
A M
E A
A T E M
O D
IF
IC
A T
IO
N
C
LE
A N
IN
G
C U
LV
E R T I
N P
LA
C E
LI
N
IN
G
-I
N C
H P
IP
E C
U
LV
E R T
LI
N
IN
G
-I
N C
H P
IP
E C
U
LV
E R T
PA
V E D
W A T E R
W A Y
T Y
PE
R E C O
N D
IT
IO
N P
A V
T E R W
A Y
T Y
PE
S T O
N E M
A S O
N R Y H
E A D
W
-I
N C H
P
IP
E C
U
LV
E R
T
R E M
O V E A
N D
R E S E T S
T O
S O
N R
Y H
E A D
W A
LL
A llo w ab le P ip e
M at er ia l (S ee k ey b el o w
E S T
IM
A T E D
U
PS
T R
E A M
C O
V
E S T
IM
A T E D
D O
W N
S T R E
V E R
FT
REMARKS
See below for numbered notes
EACH EACH EACH SQYD CUYD LNFT LNFT LNFT LNFT EACH EACH EACH EACH LNFT LNFT SQYD SQYD EACH EACH 0 0 Schedule A Totals 15 16 2 170 74 10 1172 18 2 2 35 148 227 4 9
471+00 1 x/C 472+29 1 x/C 480+26 1 x/C 480+37 5 20 x/C RT 485+04 5 20 x/C RT 485+50 5 30 x/C RT 500+27 1 x/C 501+79 5 20 x/C RT 509+21 5 24 x/C RT 512+00 1 30 65 1 x/C 2 6 523+00 1 x/C 528+57 9 5 x/C LT 531+73 2 5 4 x/C RT 532+00 1 x/C 534+44 5 15 x/C
537+00 1 5 17 RT
548+70 1 x/C 10 18 562+21 1 567+68 1 118 1 1 x/C 10 18 571+05 1 x/C 574+17 5 20 x/C RT 575+08 1 x/C 578+08 1 x/C 578+58 5 27 x/C RT 581+69 5 20 x/C RT 581+85 1 x/C 592+10 1 x/C 594+41 1 x/C 599+61 1 x/C 603+80 1 x/C 609+70 1 x/C 618+00 1 x/C
CUMULATIVE TOTAL 17 16 2 182 134 40 1290 0 65 19 2 2 52 0 148 263 181 5 11
Allowable Pipe Material
NOTE: A Aluminum
1. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for AS Aluminized steel all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. C Concrete
VCP Vitrified Clay Pipe P Plastic
Revised by Amendment A003 (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES (Schedule B) c:
\p w
-w or k\ d ye ll0
G
B T ab le s.
xl sx
]S h ee t -N ov -2
:4
B ab b /2
D es ig n ed b y:
C h ec ke d b y:
STATE PROJECT
G.4
SHEET
NUMBER
NPS YELL 10(23)WY
NPS PMIS No. 54348 NPS Drwg. No. 101/109186
Note: The quantities shown hereon are approximate and are subject to field adjustments.
-1900
20301 -2000
20301 -2800
20303 -1200
25101 -0100
60201 -0300
60201 -0800
60201 -0900
60202 -0200
60210 -0800
60406 -0000
60409 -0000
60704 -0000
60707 -0600
60707 -0700
60801 -0200
60815 -0200
62011 -0500
62028 -1000
Station
R E M
O V A L
O F
PI
PE
C U
LV
E R T
R E M
O V A L
O F
PI
PE
E
C T
IO
N
R E M
O V A L
O F
S T R
U C T U
R E S A
S T R U
C T
IO
N S
S
LO
PE
D
R A
IN
R E M
O V A L
O F
PA
V
T E R W
A Y
A S
PH
A
LT
PL
A C E D
R
IP
R A P, M E T H
O D
A
C
LA
S S
-I
N C H
P
IP
E C
U
LV
E R
T
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
E Q
U
IV
A
LE
M E T E R A
R C
H O
R E
LL
IP
T
IC
A L
PI
PE
C U
LV
E R T
E N
D S
E C T
IO
N F
O R
-I
N
C
U
LV
E R T
IN
LE
T A
D
JU
S T M
E N
T
IN
LE
T T
O P, M E T A L
FR
A M
E A
A T E M
O D
IF
IC
A T
IO
N
C
LE
A N
IN
G
C U
LV
E R T I
N P
LA
C E
LI
N
IN
G
-I
N C
H P
IP
E C
U
LV
E R T
LI
N
IN
G
-I
N C
H P
IP
E C
U
LV
E R T
PA
V E D
W A T E R
W A Y
T Y
PE
R E C O
N D
IT
IO
N P
A V
T E R W
A Y
T Y
PE
S T O
N E M
A S O
N R Y H
E A D
W
-I
N C H
P
IP
E C
U
LV
E R
T
R E M
O V E A
N D
R E S E T S
T O
S O
N R
Y H
E A D
W A
LL
A llo w ab le P ip e
M at er ia l (S ee k ey b el o w
E S T
IM
A T E D
U
PS
T R
E A M
C O
V
E S T
IM
A T E D
D O
W N
S T R E
V E R
FT
REMARKS
See below for numbered notes
EACH EACH EACH SQYD CUYD LNFT LNFT LNFT LNFT EACH EACH EACH EACH EACH EACH SQYD SQYD EACH EACH 0 0 PREVIOUS SHEET: 17 16 2 182 134 40 1290 65 19 2 2 52 148 263 181 5 11 x/C
621+00 1 x/C 627+66 1 x/C 640+80 1 x/C 644+24 5 20 x/C RT 646+00 1 x/C 662+00 1 x/C LT 676+15 1 x/C 678+12 5 20 x/C LT 685+35 1 x/C 688+20 1 x/C 703+65 1 x/C 705+65 1 x/C 710+10 1 x/C 720+30 1 x/C LT 729+60 1 x/C 741+00 5 20 x/C LT 782+25 1 x/C
784+72 1 20 136 x/C 30.0+30.0+ Replace 20' section at upstream end prior to lining
785+40 1 x/C RT 785+40 1 x/C LT 818+18 1 81 1 x/C 6.5 7 830+15 1 x/C 843+15 1 x/C 845+35 1 x/C 848+00 1 x/C 859+85 1 x/C 873+90 1 x/C 884+00 1 x/C 890+85 1 x/C
912+91 1 2 110 2 VCP 5 7
PROJECT TOTAL 20 18 2 182 149 40 1481 20 65 21 2 2 76 136 148 263 241 5 12
Allowable Pipe Material
NOTE: A Aluminum
1. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for AS Aluminized steel all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. C Concrete
VCP Vitrified Clay Pipe P Plastic
Revised by Amendment A003 (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES (Schedule B) c:
\p w
-w or k\ d ye ll0
G
B T ab le s.
xl sx
]S h ee t (2
-N ov -2
:4 P
M E B ab b /2
D es ig n ed b y:
C h ec ke d b y:
STATE PROJECT
G.5
SHEET
NUMBER
NPS YELL 10(23)WY
NPS PMIS No. 54348 NPS Drwg. No. 101/109186
Note: The quantities shown hereon are approximate and are subject to field adjustments.
-1900
20301 -2000
20301 -2800
20303 -1200
25101 -0100
60201 -0300
60201 -0800
60201 -0900
60202 -0200
60210 -0800
60406 -0000
60409 -0000
60704 -0000
60707 -0600
60707 -0700
60801 -0200
60815 -0200
62011 -0500
62028 -1000
Station
R E M
O V A L
O F
PI
PE
C U
LV
E R T
R E M
O V A L
O F
PI
PE
E
C T
IO
N
R E M
O V A L
O F
S T R
U C T U
R E S A
S T R U
C T
IO
N S
S
LO
PE
D
R A
IN
R E M
O V A L
O F
PA
V
T E R W
A Y
A S
PH
A
LT
PL
A C E D
R
IP
R A P, M E T H
O D
A
C
LA
S S
-I
N C H
P
IP
E C
U
LV
E R
T
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
E Q
U
IV
A
LE
M E T E R A
R C
H O
R E
LL
IP
T
IC
A L
PI
PE
C U
LV
E R T
E N
D S
E C T
IO
N F
O R
-I
N
C
U
LV
E R T
IN
LE
T A
D
JU
S T M
E N
T
IN
LE
T T
O P, M E T A L
FR
A M
E A
A T E M
O D
IF
IC
A T
IO
N
C
LE
A N
IN
G
C U
LV
E R T I
N P
LA
C E
LI
N
IN
G
-I
N C
H P
IP
E C
U
LV
E R T
LI
N
IN
G
-I
N C
H P
IP
E C
U
LV
E R T
PA
V E D
W A T E R
W A Y
T Y
PE
R E C O
N D
IT
IO
N P
A V
T E R W
A Y
T Y
PE
S T O
N E M
A S O
N R Y H
E A D
W
-I
N C H
P
IP
E C
U
LV
E R
T
R E M
O V E A
N D
R E S E T S
T O
S O
N R
Y H
E A D
W A
LL
A llo w ab le P ip e
M at er ia l (S ee k ey b el o w
E S T
IM
A T E D
U
PS
T R
E A M
C O
V
E S T
IM
A T E D
D O
W N
S T R E
V E R
FT
R E M
A R K S
S ee b el o w f o r n u m b er ed n o te s
EACH EACH EACH SQYD CUYD LNFT LNFT LNFT LNFT EACH EACH EACH EACH LNFT LNFT SQYD SQYD EACH EACH 0 0 Schedule A & B Totals 20 18 2 182 149 40 1481 20 65 21 2 2 76 136 148 263 241 5 12
1009+40 1 x/C 1010+80 1 x/C 1015+44 5 20 x/C LT
1015+44 5 20 15 18 RT
1016+00 1 2 125 2 VCP 15 18
1016+25 20 RT
1027+12 5 20 x/C RT 1041+25 1 x/C 1051+50 5 20 x/C RT 1053+35 1 x/C 2 3 1076+23 1 2 59 2 x/C 2 3 1076+38 1 1 44 1 x/C 1 1.5 Headwall at outlet 1097+50 1 x/C 4 5
1099+47 1 2 86 2 VCP 4 5
1102+95 1 2 141 2 x/C 7 7 Headwall at inlet 9220+75 1
PROJECT TOTAL 25 27 2 182 169 40 1936 20 65 29 2 2 82 136 148 283 321 6 12
Allowable Pipe Material
NOTE: A Aluminum
1. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for AS Aluminized steel all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. C Concrete
VCP Vitrified Clay Pipe P Plastic
Revised by Amendment A003 (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES (Schedule C) c:
\p w
-w or k\ d ye ll0
G
C Ta b le s.
xl sx ]S h ee t -N ov -2
K ru m b ei n /2
D es ig n ed b y:
C h ec ke d b y:
STATE PROJECT
G.6
SHEET
NUMBER
NPS YELL 10(23)WY
NPS PMIS No. 54348 NPS Drwg. No. 101/109186
Note: The quantities shown hereon are approximate and are subject to field adjustments.
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| A003 |
| Sheets G.1 through G.6.pdf |
| G.1 |
| G.2 |
| G.3 |
| G.4 |
| G.5 |
| G.6 |
File details come from the government source that posted it. Updated .