QA_11-30-2021.pdf

PDF 101 KB Posted

Attached to
WY NPS YELL 10(23), Grand Loop Road - Old Faithful to West Thumb
Solicitation number
69056721R000008
Issued by

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WY NPS YELL 10(23)

Grand Loop Road ‐ Old Faithful to West Thumb

# General Technical Question Answer Date

1 X

Does the government know which area they plan on using for the plant site on the project listed above? For the amount of quantity it seems that the area would have to be significantly larger than the Pumice Point pit currently is.

The plans are in the preliminary phase, and will be finalized with other documents to specify the plant requirements within the solicitation documents that the Government intends to post in the future.

6/28/21

2 X

Plan sheet H.5 shows two types of guard rail posts and blocks. One shows the post notched to accept a square block, the other shows a round post with a concave block.

Please clarify which style is required.

The details on Sheet H.5 show a round post with a radius cut into the block.

11/18/21

3 X

I was inquiring about the guardrail on this project. It calls for MGS wood posts. I was wanting to know if we would be allowed to use steel posts.

Steel posts are not allowed since wood posts are specified in the Section 617 pay items, and Sheet H.5 shows project specific guardrail details.

11/18/21

4 X

Within the G sheets there are new culverts that do not line up with any estimated max cover, for example Sheet G.2 culvert at 180+96 does not have a max cover listed but the culvert to be cleaned at 186+21 shows estimated upstream and downstream covers and this culvert is not being replaced. Please advise.

This will be addressed under Amendment A003.

11/30/21

Check General or Technical

5 X Sheet G.1 at station 3099+25 there is not a listing for allowable type of pipe material.

Please advise.

This will be addressed under Amendment A003.

11/30/21

6 X

On Page E.28, SCR 107.12 states that the contractor can occupy the sites being built to extend the Grant Contractor Camp, however, it does not address other contracts in the area that may be utilizing the other contractor sites already existing and how a tie in to the existing systems will be possible when the other sites are being occupied. Please advise.

This will be addressed under Amendment A003.

11/30/21

7 X

On Page E.28, SCR 107.12 states that the contractors camp at Canyon will provide 30 sites in 2022 and the Norris Camp will provide 14 trailers for use in 2022. 2023 is not addressed.

Are we to assume no sites or trailers are provided in 2023? Is the rental fee the same for the sites as the trailers. What size are the trailers at the Norris Contractors Camp available for use?

This will be addressed under Amendment A003.

11/30/21

File details come from the government source that posted it. Updated .