This General Scope of Services document outlines the comprehensive planning consultant services required by the Greater Orlando Aviation Authority (GOAA) for the Capital Program at Orlando International Airport (MCO) and Orlando Executive Airport (ORL) in Florida. The scope encompasses concept and master planning services, including airport layout plan updates, feasibility and assessment studies, environmental and economic impact analyses, capital improvement plan support, and operational and security studies. Additional services include preliminary engineering and advanced planning up to 15% geometric design concepts, surveys, geotechnical investigations, utility planning, and cost estimating. Public agency coordination is required with the Federal Aviation Administration (FAA), Transportation Security Administration (TSA), Florida Department of Transportation (FDOT), Army Corps of Engineers (ACOE), Florida Department of Environmental Protection (FDEP), and various water management districts. The consultant will provide support to GOAA committees including the Design Review Team, Construction Finance Oversight Committee, and Construction Committee, as well as technical advisory services for public-private partnership (P3) projects. The contract, awarded through a Request for Statement of Qualifications (RFSQ) with solicitation number W00567, has a non-mandatory pre-submittal conference scheduled for December 12, 2025, at 9:00 a.m. via Microsoft Teams, with questions due by December 23, 2025, at 5:00 p.m., and proposals due January 15, 2026, at 2:00 p.m.

The estimated annual project value ranges from $1 million to $2 million, with the contract being non-exclusive and subject to successful negotiations and funding availability with the highest-ranked responsive respondent. The solicitation requires respondents to hold a Professional Engineer (P.E.) license in Florida and provide references from similar contracts within the past five years. Insurance requirements include Commercial General Liability coverage of $5 million per occurrence, Automobile Liability, Workers' Compensation, and Professional Liability coverage. Funding for the Capital Improvement Program at MCO totals $5.92 billion for 2025-2030, with ORL's CIP at $84.15 million, supported through FAA grants, Passenger Facility Charges, Authority Funds, bonds, and federal discretionary grants. The solicitation emphasizes small business participation through the Office of Business Opportunity & Exchange (BOeX) program, requiring good faith efforts to engage certified small business firms in meaningful roles, with task orders evaluated to maximize small business participation. Respondents must comply with E-Verify participation, drug-free workplace certification, and scrutinized companies certifications.

View the file

Other files

File Type Posted
Planning_Consultant_Services_(W00567)_(Addendum_#4_Revision).pdf PDF
Planning_Consultant_Services_(W00567)_(Addendum_#3_Revision).pdf PDF
Planning_Consultant_Services_(W00567)_(Addendum_#2_Revision).pdf PDF
Planning_Consultant_Services_(W00567)_(Addendum_#2_Revision).pdf PDF
Attachment_A-Sample_Professional_Services_Agreement_for_Planning_Consultant_Services_(federal)_(2).pdf PDF
Attachment_A-Sample_Professional_Services_Agreement_for_Planning_Consultant_Services_(federal)_(2).pdf PDF
Attachment_A-Sample_Professional_Services_Agreement_for_Planning_Consultant_Services_(federal)_(2).pdf PDF
Attachment_E-_List_of_Potential_Projects.pdf PDF
Attachment_D-Easement_Atlas_Book_ZHA_Inc_April_2_2001.pdf PDF
Attachment_D-Easement_Atlas_Book_ZHA_Inc_April_2_2001.pdf PDF
Attachment_D-Easement_Atlas_Book_ZHA_Inc_April_2_2001.pdf PDF
Attachment_E-_List_of_Potential_Projects.pdf PDF
Attachment_E-_List_of_Potential_Projects.pdf PDF
Attachment_D-Easement_Atlas_Book_ZHA_Inc_April_2_2001.pdf PDF
Attachment_C-MCO_11-16-2020-.pdf PDF
Attachment_C-MCO_11-16-2020-.pdf PDF
Attachment_C-MCO_11-16-2020-.pdf PDF
Attachment_C-MCO_11-16-2020-.pdf PDF
26-139_Risk_Assessment_Procurement_On-Call_Planning_Consulting_Services.docx DOCX document
26-139_Risk_Assessment_Procurement_On-Call_Planning_Consulting_Services.docx DOCX document
26-139_Risk_Assessment_Procurement_On-Call_Planning_Consulting_Services.docx DOCX document
Attachment_B-_Capital_Improvement_Plan-2025-2030.pdf PDF
Attachment_B-_Capital_Improvement_Plan-2025-2030.pdf PDF
Attachment_B-_Capital_Improvement_Plan-2025-2030.pdf PDF
Sample_Agreement_for_Continuing_Prof_Svcs_May_2024.pdf PDF
Sample_Agreement_for_Continuing_Prof_Svcs_May_2024.pdf PDF
Sample_Agreement_for_Continuing_Prof_Svcs_May_2024.pdf PDF
Sample_Contract_-_will_be_issued_via_an_Addendum.pdf PDF
Sample_Contract_-_will_be_issued_via_an_Addendum.pdf PDF
Sample_Contract_-_will_be_issued_via_an_Addendum.pdf PDF
Sample_Contract_-_will_be_issued_via_an_Addendum.pdf PDF
RE__On-Call_Planning_Consulting_Services.pdf PDF
RE__On-Call_Planning_Consulting_Services.pdf PDF
26-139_On_Call_Planning_Consulting_BOE_Memo_10.17.25.pdf PDF
26-139_On_Call_Planning_Consulting_BOE_Memo_10.17.25.pdf PDF
RE__On-Call_Planning_Consulting_Services.pdf PDF
26-139_On_Call_Planning_Consulting_BOE_Memo_10.17.25.pdf PDF
General_Scope_-_Attachment_A.pdf PDF
RE__On-Call_Planning_Consulting_Services.pdf PDF
General_Scope_-_Attachment_A.pdf PDF
BOE-BOX_Program_Goals_(3).docx DOCX document
Potential_Projects_-_Attachment_B.pdf PDF
Potential_Projects_-_Attachment_B.pdf PDF
BOE-BOX_Program_Goals_(3).docx DOCX document
Potential_Projects_-_Attachment_B.pdf PDF
BOE-BOX_Program_Goals_(3).docx DOCX document
Potential_Projects_-_Attachment_B.pdf PDF
26-139_On_Call_Planning_Consulting_BOE_Memo_10.17.25.pdf PDF
BOE-BOX_Program_Goals_(3).docx DOCX document
General_Scope_-_Attachment_A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL SCOPE OF SERVICES

‘ATTACHMENT A’

The general scope of services to be performed by the On-Call Planning Consultant is as defined in the Advertisement, and shall include, but not be limited to:

Concept and Master Planning

• Concept Design

• Master Planning and Airport Layout Plan (ALP) updates

• Project scope definition and packaging

• Project envisioning, renderings, and animations

• Landscape Master Plans

Studies and Analysis

• Feasibility studies

• Assessment studies

• Planning & environmental studies (NEPA)

• Economic impact & financial studies

• Capital Improvement Plan (CIP) support

• Operational & security studies

• Future technology assessments / evaluations (autonomous vehicles, advanced air mobility, etc.)

• Site planning and facility space program development

• Facility demand capacity analysis

• Aviation activity forecasting, analysis, and development of gated planning day flight schedules

• Grading and paving plans

• Wayfinding and signage plan development

• Construction feasibility assessment/phasing plan development

• Airspace planning

• Noise planning and support

• Line of sight analysis

• Airfield layout/facilities planning to include runways, taxiways, taxi lanes, aircraft holding areas, support facilities and navigation aids

• Aircraft parking and gate area planning

• Airfield safety and compliance with FAA regulations

• Airline and airport support facilities planning

• Terminal planning, including check-in, security, baggage handling systems, tenant spaces, and passenger services

• Airline relocation and new entrant facilities planning

• Passenger conveyance and circulation planning, including automated transit systems

• Technical support in responding to stakeholder questions and project proposals regarding airport facilities and operations

• Public relations support

• Project management support

• Exhibit A support

• Geospatial, digital twin and GIS support

• Asset management

• General planning support

• Other studies and analysis for the development, management and operation of existing and future Greater Orlando Aviation Authority (GOAA) facilities

Preliminary Engineering and Advanced Planning

• Geometric design concepts (up to 15%)

• Preliminary environmental impact analysis

• Surveys and geotechnical

• Infrastructure planning, including site preparation/construction phasing, capacity/routing of utilities onsite and off-site

• Utility investigations

• Cost estimating

Public Agency Coordination

• Coordination with the Federal Aviation Administration (FAA), Transportation Security Administration (TSA), Florida Department of Transportation (FDOT), ACOE, Florida Department of Environmental Protection (FDEP), South Florida Water Management District (SFWMD), St. Johns Regional Water Management District (SJRWMD), and other governmental agencies and jurisdictions as applicable

• Preparation of documents required by governmental agencies

• Public agency involvement activities

GOAA Committee and Miscellaneous Support

• Design Review Team

• Construction Finance Oversight Committee

• Construction Committee

• Procurement Committee

• And other committees as established by GOAA

Public Private Partnership (P3) Technical Advisory

Provide high-level oversight, technical input, strategy formulation, and overall guidance to GOAA and other advisory team members during all phases of work leading up to the construction phase of P3 projects. The primary role is inclusive of:

• General project management services through pre-development agreement (PDA).

• Developing various project designs, which are essential to inform cost estimates

• Preparing construction, operation, maintenance and lifecycle costs and assumptions

• Providing technical input into the P3 business case

• Advising on the technical aspects of the procurement documentation

• Support analysis and assessment of unsolicited proposals, to include compatibility with the airport’s infrastructure plans

Key activities and responsibilities include:

• Preparing bridging documents for the P3 projects, such as but not limited to:

A schematic level design.

A cost report (including cost estimates for construction, operations, maintenance, and lifecycle, if needed) Developing plans, project constraints, reference materials, and applicable quality requirements (of funding or other regulatory agencies)

• Supporting the financial advisor in the development of the risk workshop and risk matrix, identifying project-specific risks, impacts, and mitigation strategies, and undertaking risk analysis for the P3 contract

• Structuring the technical aspects of the P3 documentation, including RFQ, RFP

• Evaluating and negotiating the technical aspects of P3 bids