This file is a Capital Improvement Plan (CIP) attachment from the Greater Orlando Aviation Authority identifying potential projects for the period 2025-2030, directly supporting a Professional Services Agreement solicitation (W00567) for Planning Consultant Services in Florida. The document lists comprehensive capital projects across two primary facilities: Orlando International Airport and Orlando Executive Airport. Projects span multiple categories including terminal baggage handling systems, security enhancements, passenger processing improvements, building renovations, runway and taxiway rehabilitations, ground transportation facilities, parking improvements, fiber infrastructure development, and airfield improvements. The potential projects range from design-phase initiatives to full construction projects, with some representing multi-phase undertakings such as taxiway rehabilitations (Phases 1 & 2) and ramp rehabilitation work at Orlando Executive Airport. The Planning Consultant Services agreement will provide professional services including planning, engineering, surveying, assessments, studies, master planning, concept development, design-build criteria packages, and stakeholder engagement for these identified projects as well as future amendments and additional projects the Aviation Authority may request.
The planning consultant will support the Aviation Authority's capital program management and coordinate with multiple federal, state, and local agencies including the Federal Aviation Administration (FAA), Transportation Security Administration (TSA), Florida Department of Transportation (FDOT), Orlando Utilities Commission (OUC), City of Orlando, and Orange County, Florida. The consultant will serve as an extension of staff, providing technical expertise in project development, facility management, and operational support across existing and future facilities. Specific responsibilities include assisting Aviation Authority committees, preparing required documentation for regulatory agencies, and supporting external governmental agency outreach and stakeholder engagement initiatives. The scope encompasses both near-term projects identified in the current CIP and future projects that may arise from subsequent CIP updates or organizational goals established by the Aviation Authority.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIST OF POTENTIAL PROJECTS
‘ATTACHMENT B’
The list of potential projects, as identified below, was compiled from the Greater Orlando
Aviation Authority’s 2025-2030 Capital Improvement Plan (CIP). Any future projects may be derived from any future CIP or organizational goals as established by the Authority.
Orlando International Airport
Terminals A & B
Baggage Program Enhancements Baggage Handling System
Baggage Handling System (East Side - Phase 1) CCTV Projects
Changing Regulatory Requirements
Airside 2 and 4 Automated People Mover (APM) System Updates Airside 2 and 4 APM System Replacement
Airside 2 and 4 APM System Replacement North Terminal Security Checkpoints
Passenger Processing Efficiency Systems
Airline Terminal Improvement Account Security Enhancement Program (incl. Access Control)
Terminal Signage Health & Safety Renovations - General Health & Safety Renovations - Virtual Ramp Control (VRC)
Health & Safety Renovations - Self Service Bag Drop Projects North Terminal Buildings' Roof Replacement
North Terminal Vertical Circulation Improvements North Terminal Renovations
North Terminal Building System Upgrade
Passenger Boarding Bridges (PBB) North Terminal Rental Car (RAC) APM Access Improvements
Airside 2 Wing Expansion Utilities Infrastructure Improvements
Checkpoint B & C Improvements East Terminal Passenger Circulation Improvements
Terminal C
Terminal C Phase 2 Terminal C Phase 2 Design Concept Terminal C Phase 2 Site & Apron Projects
Terminal C ASC Gates C250-C253
Terminal C Gates C250-C253 Ramp & Airfield Improvements Terminal C Enhancement Projects
Airfield
Taxiways G & H Rehabilitation - Phases 1 & 2 (Design and Construction) Taxiways E & F Rehabilitation - Phases 1 & 2 (Design and Construction)
Airfield Single Mode Fiber (Design and Construction) New Cat II/III Infrastructure for Runway 36L (Design and Construction)
Select Airside 1, 2, 3 & 4 Apron Rehabilitation Replace 17L/35R In-pavement Lighting w/LED Taxiway C - Phase 1 (Design and Construction)
Taxiway B - Phase 1 & 2 (Design and Construction)
Ground Transportation
RAC Quick Turn Around (QTA) Projects
RAC Terminal Improvements Roadway Improvement Program
RAC & Parking Expansion Program RAC Expansion - Ground Transportation Center, Parking, and Garage
RAC Expansion - Roads and APM Roadway Signage North Employee Parking Lot Improvements
North Employee Parking Lot Improvements South Employee Parking Lot Improvements
North Terminal Parking Garage Rehab Ground Transportation Facility Pedestrian Bridge Roadway Congestion Management Projects
Overall Parking Improvements
Other
Fiber Infrastructure Program
Wildlife Attractant Removal (East Airfield) Building Renovations
Security Detection System Improvement Advanced Budget, Schedule and Scoping Analysis GOAA Office Expansion & Parking
GOAA Infrastructure Development for Tenant Projects Airport Power Systems Upgrades
Executive Lobby/Conference/Office Area Renovations Advanced Air Mobility (AAM) Heintzelman Blvd. Infrastructure & Development
Checkpoint Alpha Improvements New Centralized Receiving & Distribution Cetner (CRDC)
Mud Lake Access Terminal Nomenclature
Orlando Executive Airport
Airfield
Runway 7-25 Rehabilitation (Last Rehabilitation in 2002) Runway 13-31 Rehabilitation (Design and Construction) Taxiway A, B & E4 Rehabilitation
East Ramp Rehabilitation Phase 1a, Design (Western/CBP Area) East Ramp Rehabilitation Phase 1b, Design (Balance of Original Phase 1)
East Ramp Rehabilitation Phase 1, Construction (Combined Phase 1a & 1b) Taxiway A Rehabilitation (Eastern Section - Design and Construction) Taxiway A Connectors (Design & Construction)
Taxiway E Rehabilitation (South of Runway 7-25) NEW East Ramp Rehabilitation, Phase 2
Parallel Taxiway (South of Rwy 7-25) - Environmental & Design NEW Airport Lighting Control and Monitoring System
Terminal
Generator Installation - Administration & Maintenance Bldgs. and CBP
Land Development, Roadway, and Other
ORL Master Plan Update
Colonial Promenade Improvements Stormwater Restoration Project (Phase 1)
Airport Beacon Utilities Infrastructure Improvements (on airport property) Stormwater Assessment, Phase 1
CIP Unallocated