Attachment_J_Pricing_Breakdown.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Upgrade Water and Sewer to Research Areas at PWRC, Laurel, MD
Solicitation number
G15PS00053
Issued by

About this file

Attachment J Pricing Breakdown

View the file

Other files

File Type Posted
Attach_AB.Amend_0004.A102_red.pdf PDF
Attach_Z.Amend_0004.Revisions_and_Q.A.docx DOCX document
Attach_AE.Amend_0004.CN-02_red.pdf PDF
Attach_AF.Amend_0004.Attic_Ladder.pdf PDF
Attach_AA.Amend_0004.A101_red.pdf PDF
Attach_AC.Amend_0004.A103_red.pdf PDF
Attach_AD.Amend_0004.A106_red.pdf PDF
Sol_G15PS00053_Amd_000004.pdf PDF
Attach_G_Wage_Decision_MD58_030615.Amend_0003.pdf PDF
Sol_G15PS00053_Amd_000003.pdf PDF
Attach_U.Amend_0002.C-20_red.pdf PDF
Attach_Y.Amend_0002.Spec_22_13_53_Facility_Septic_System.pdf PDF
Attach_S.Amend_0002.C-17_red.pdf PDF
Attach_R.Amend_0002.C-16_red.pdf PDF
Attach_M.Amend_0002.Revisions_and_Q.A.docx DOCX document
Attach_V.Amend_0002.CC-4_red.pdf PDF
Attach_W.Amend_0002.CC-7_red.pdf PDF
Attach_P.Amend_0002.C-3_red.pdf PDF
Attach_N.Amend_0002.CN-04_red.pdf PDF
Attach_T.Amend_0002.C-19_red.pdf PDF
Attach_X.Amend_0002.CC-9_red.pdf PDF
Attach_Q.Amend_0002.C-9_red.pdf PDF
Attach_O.Amend_0002.C-1_red.pdf PDF
Sol_G15PS00053_Amd_000002.pdf PDF
Attach_K.Amend_0001.Revisions_and_Q.A.docx DOCX document
Attach_L.Plan_Holders_List.Rev_021815.xlsx XLSX spreadsheet
Sol_G15PS00053_Amd_000001.pdf PDF
Attachment_B.2_Spec_Section_33_36_13.pdf PDF
Attach_H_Release_of_Claims.doc DOC document
Attachment_C.5_Drawings_C20_to_CC-3.pdf PDF
Attachment_C.6_Drawings_CC-4_to_CC-10.pdf PDF
Attach_G_Wage_Decision_MD58_010915.pdf PDF
Attachment_C.2_Drawings_K1_to_C5.pdf PDF
Attach_D_Well_Scope_Clarification.docx DOCX document
Attach_F_Wage_Decision_MD35_010215.pdf PDF
Attachment_C.1_Drawings_A000_to_CN-06.pdf PDF
Attachment_C.4_Drawings_C13_to_C19.pdf PDF
Attachment_C.7_Drawings_CC-11_to_M001.pdf PDF
Attachment_C.8_Drawings_M101_to_E201.pdf PDF
Attachment_C.9_Drawings_E202_to_D-1.pdf PDF
Attachment_C.10_Drawings_PM-1_to_PM-5.pdf PDF
Attachment_B.1_Specifications.pdf PDF
Attach_A_Statement_of_Work.docx DOCX document
Sol_G15PS00053.pdf PDF
Attach_E_Supplement_to_Specifications.docx DOCX document
Attachment_C.3_Drawings_C6_to_C12.pdf PDF
G15PS00053_presolicitation_notice_amend.121814.docx DOCX document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Materials/Labor SubtotalGeneral ConiditionsSubtotalOH/ProfitTotal
Coburn Research Area
1Foundations: footings, slab-on-grade, pipe and tank supports (shown on PM dwgs)

2 Superstructure:carpentry and wood trusses; metal roofing; cement siding; tubular daylights; FRP doors; overhead doors; louvers; paint

3 Plumbing: process piping labor and material; filter skimmer; sand filter; grinder station; UV prefilter; FRP enclosures; duplex iron and carbon filters; feed pump; quad sanitary pump station; 72” well tank.

4 HVAC:equipment;ductwork;balancing;

5 Electrical:interior electrical;generator for Well 14

6 Demoltion: PCB removal,asbestos,removal of small building

7 Site improvements: staging area; layout, engineering and survey; site demolition including removal of utility poles; site clearing; mass excavation; erosion controls; asphalt patching; gravel access road; fuel pad; generator pad; bollards; duck area mechanical pads; seeding; topsoil amendment.

8 Mechanical utilities: temporary tanks; waterline; 2” and 4” PVC piping in duck areas; valve vaults; sewer lines; 2000g ST1; pond work including removal and reinstallation of fencing, overhead netting and posts; sand in duck ponds; liner; pumps for wells 5,13 and 19

9 Site electrical utilities: electrical site

Endangered Species Area
10Foundations: footings, slab-on-grade, pipe and tank supports (shown on PM dwgs)

11 Superstructure: carpentry and wood trusses; metal roofing; cement siding; tubular daylights; FRP doors; overhead doors; louvers; paint

12 Plumbing:interior piping;well tank;mag meter;process piping

13 HVAC: interior mechanical;sheetmetal work at wells

14 Electrical:building electrical

15 Site improvements: staging area; layout, engineering and survey; site demolition; removal of small buildings; mass excavation; erosion controls; asphalt patching; gravel access road; fuel pad; generator pad; bollards;seeding

16 Mechanical utilities:bypass piping; waterlines; meters and test pits; blowoff yard hydrants; curb stop with box; force main; inline flush vaults; lift station; 3” pressure sewer and drainfield; storm lines; SWM; well #18; well 7 (pump only)

17 Site electrical: site electrical

18 Demolition

G15PS00053

Attachment J Pricing Breakdown &P of &N

Sheet2

Sheet3

File details come from the government source that posted it. Updated .