G14PS00535, Amendment 0001 Revisions and Questions/Responses – RFP Attachment K
1. In specification section 09 91 00 Painting, subsection 3.6, on page 5, the Ptd ‘B’ needs to be corrected (“Stain” should read ”Satin”) as follows :
Ptd ‘B’: Cement Board, Siding, Battens, Trim, Facia, and Soffit:
Primer: Multi Purpose 100% Latex Primer Finish: (2) coats of Super Paint 100% Acrylic Exterior Latex, Alkali Resistant (Siding & Battens: Stain Satin) (Trim, Fasica & Soffit: Gloss)
2. On drawing sheets A101, A102, and A103, the following general note is added for the exterior building elevations: Exterior siding vertical battens shall be installed 16” on center (typical).
3. Question: Reference Drawings A-105, Wall Section, the drawing shoes the walls and ceiling for the new Well buildings (Coburn, Well No. 17, Well No. 18) to be cement board (ceiling) and cement panel (wall). There was no specification section for the cement wall panels and boards, please provide a specification for these items.
Response: The interior walls are the same cement board panel as the exterior siding, except the interior does not receive the battens. That panel is specified in section 07 46 10 Siding, subsection 2.2-A, Hardie Panel HZ5, Cedarmill Vertical siding panel.
4. Questions: Reference Drawings A-105, Wall Section, the cement wall panel and board state that it should be (unfinished), Specfication Section 09 91 90 – Painting, paragraph 3.6 Ptd “B” calls to paint all cement board. Please clarify whether the cement board is painted or remains unfinished.
Response: The interior cement board panels are intended to be un-finished (with no paint) and the exterior cement board panels are intended to be painted in accordance with the PtD ‘B’ notations and the indication on the exterior elevations to paint the siding and battens.
5. Question: Reference drawing A-103, Door Schedule, the door schedule states that all doors are to be Fiberglass (FRP) doors or Overhead Doors. It does not show any Hollow Metal Doors. Please confirm that there are no hollow metals doors on this project and that specification section 08 11 13 – Hollow Metal Doors and Frames does not apply.
Response: Section 08 11 13 Hollow Metal Doors and Frames can be deleted from the specification. The paint system for hollow metal doors found in specification section 09 91 00 Painting, subsection 3.6 – Ptd ‘A’ “Hollow Metal Doors and Frames” can be deleted from the specifications.
6. Question: Please clarify the size of existing yard hydrant on R-30 and R-35 on the drawing C-2 to replace the new one.
Response: Simmons 803SB ¾” yard hydrant.