Attach_E_Supplement_to_Specifications.docx

DOCX document 19 KB Posted

Attached to
Upgrade Water and Sewer to Research Areas at PWRC, Laurel, MD
Solicitation number
G15PS00053
Issued by

About this file

Attachment E Supplement to Design Documents

View the file

Other files

File Type Posted
Attach_AB.Amend_0004.A102_red.pdf PDF
Attach_Z.Amend_0004.Revisions_and_Q.A.docx DOCX document
Attach_AE.Amend_0004.CN-02_red.pdf PDF
Attach_AF.Amend_0004.Attic_Ladder.pdf PDF
Attach_AA.Amend_0004.A101_red.pdf PDF
Attach_AC.Amend_0004.A103_red.pdf PDF
Attach_AD.Amend_0004.A106_red.pdf PDF
Sol_G15PS00053_Amd_000004.pdf PDF
Attach_G_Wage_Decision_MD58_030615.Amend_0003.pdf PDF
Sol_G15PS00053_Amd_000003.pdf PDF
Attach_U.Amend_0002.C-20_red.pdf PDF
Attach_Y.Amend_0002.Spec_22_13_53_Facility_Septic_System.pdf PDF
Attach_S.Amend_0002.C-17_red.pdf PDF
Attach_R.Amend_0002.C-16_red.pdf PDF
Attach_M.Amend_0002.Revisions_and_Q.A.docx DOCX document
Attach_V.Amend_0002.CC-4_red.pdf PDF
Attach_W.Amend_0002.CC-7_red.pdf PDF
Attach_P.Amend_0002.C-3_red.pdf PDF
Attach_N.Amend_0002.CN-04_red.pdf PDF
Attach_T.Amend_0002.C-19_red.pdf PDF
Attach_X.Amend_0002.CC-9_red.pdf PDF
Attach_Q.Amend_0002.C-9_red.pdf PDF
Attach_O.Amend_0002.C-1_red.pdf PDF
Sol_G15PS00053_Amd_000002.pdf PDF
Attach_K.Amend_0001.Revisions_and_Q.A.docx DOCX document
Attach_L.Plan_Holders_List.Rev_021815.xlsx XLSX spreadsheet
Sol_G15PS00053_Amd_000001.pdf PDF
Attachment_B.2_Spec_Section_33_36_13.pdf PDF
Attach_H_Release_of_Claims.doc DOC document
Attachment_C.5_Drawings_C20_to_CC-3.pdf PDF
Attachment_C.6_Drawings_CC-4_to_CC-10.pdf PDF
Attach_G_Wage_Decision_MD58_010915.pdf PDF
Attachment_C.2_Drawings_K1_to_C5.pdf PDF
Attach_D_Well_Scope_Clarification.docx DOCX document
Attach_F_Wage_Decision_MD35_010215.pdf PDF
Attachment_C.1_Drawings_A000_to_CN-06.pdf PDF
Attachment_C.4_Drawings_C13_to_C19.pdf PDF
Attachment_C.7_Drawings_CC-11_to_M001.pdf PDF
Attachment_J_Pricing_Breakdown.xlsx XLSX spreadsheet
Attachment_C.8_Drawings_M101_to_E201.pdf PDF
Attachment_C.9_Drawings_E202_to_D-1.pdf PDF
Attachment_C.10_Drawings_PM-1_to_PM-5.pdf PDF
Attachment_B.1_Specifications.pdf PDF
Attach_A_Statement_of_Work.docx DOCX document
Sol_G15PS00053.pdf PDF
Attachment_C.3_Drawings_C6_to_C12.pdf PDF
G15PS00053_presolicitation_notice_amend.121814.docx DOCX document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Supplement to Design Documents

1. All references to ‘Engineer’ within the Design Documents do not authorize an individual other than the Contracting Officer or Contracting Officer’s Representative to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work. See Section G clause 1452.201-70 Authorities and Delegations.

2. The dates at Specification Section 01 35 00, Part 1.8.A.1 are revised to January 15, 2015 through July 31, 2015.

3. The Design Documents may reference 2 generators in the Endangered Species area that are deleted from the project, referenced are:

a. Well #14 Generator

b. Sanitary Lift Station Generator

4. The Coburn Area Pond drawings may list the sand filter model number as Hayward S180T. The correct model number is Hayward S360T2, as provided in specification section 33 48 00.

5. Question: Section 33-21-13-1.3 B. The desired yield from the well is a minimum 50 GPM however the specified pumps for both wells 18 and 19 are 150 GPM units. A final decision regarding casing diameter will be made after the well is drilled and a blown yield is estimated. For the purpose of bidding, the 6” casing as shown on the detail shall be used.

6. Section 33-21-13-3.8 For the purpose of bidding, assume 20’ of screen will be needed for each well.

7. Division 01 - General Requirements

8. The permitting requirements identified in SECTION 01 35 00 SPECIAL PROCEDURES PART 1 – GENERAL paragraph 1.5 will be performed by the project designer. All approvals and inspections shall be coordinated and performed by the contractor.

G15PS00053

Attachment E Supplement to Design Documents

File details come from the government source that posted it. Updated .