Attach_Z.Amend_0004.Revisions_and_Q.A.docx

DOCX document 21 KB Posted

Attached to
Upgrade Water and Sewer to Research Areas at PWRC, Laurel, MD
Solicitation number
G15PS00053
Issued by

About this file

Attachment Z.Amend 0004.Revisions and Q.A

View the file

Other files

File Type Posted
Attach_AB.Amend_0004.A102_red.pdf PDF
Attach_AE.Amend_0004.CN-02_red.pdf PDF
Attach_AF.Amend_0004.Attic_Ladder.pdf PDF
Attach_AA.Amend_0004.A101_red.pdf PDF
Attach_AC.Amend_0004.A103_red.pdf PDF
Attach_AD.Amend_0004.A106_red.pdf PDF
Sol_G15PS00053_Amd_000004.pdf PDF
Attach_G_Wage_Decision_MD58_030615.Amend_0003.pdf PDF
Sol_G15PS00053_Amd_000003.pdf PDF
Attach_U.Amend_0002.C-20_red.pdf PDF
Attach_Y.Amend_0002.Spec_22_13_53_Facility_Septic_System.pdf PDF
Attach_S.Amend_0002.C-17_red.pdf PDF
Attach_R.Amend_0002.C-16_red.pdf PDF
Attach_M.Amend_0002.Revisions_and_Q.A.docx DOCX document
Attach_V.Amend_0002.CC-4_red.pdf PDF
Attach_W.Amend_0002.CC-7_red.pdf PDF
Attach_P.Amend_0002.C-3_red.pdf PDF
Attach_N.Amend_0002.CN-04_red.pdf PDF
Attach_T.Amend_0002.C-19_red.pdf PDF
Attach_X.Amend_0002.CC-9_red.pdf PDF
Attach_Q.Amend_0002.C-9_red.pdf PDF
Attach_O.Amend_0002.C-1_red.pdf PDF
Sol_G15PS00053_Amd_000002.pdf PDF
Attach_K.Amend_0001.Revisions_and_Q.A.docx DOCX document
Attach_L.Plan_Holders_List.Rev_021815.xlsx XLSX spreadsheet
Sol_G15PS00053_Amd_000001.pdf PDF
Attachment_B.2_Spec_Section_33_36_13.pdf PDF
Attach_H_Release_of_Claims.doc DOC document
Attachment_C.5_Drawings_C20_to_CC-3.pdf PDF
Attachment_C.6_Drawings_CC-4_to_CC-10.pdf PDF
Attach_G_Wage_Decision_MD58_010915.pdf PDF
Attachment_C.2_Drawings_K1_to_C5.pdf PDF
Attach_D_Well_Scope_Clarification.docx DOCX document
Attach_F_Wage_Decision_MD35_010215.pdf PDF
Attachment_C.1_Drawings_A000_to_CN-06.pdf PDF
Attachment_C.4_Drawings_C13_to_C19.pdf PDF
Attachment_C.7_Drawings_CC-11_to_M001.pdf PDF
Attachment_J_Pricing_Breakdown.xlsx XLSX spreadsheet
Attachment_C.8_Drawings_M101_to_E201.pdf PDF
Attachment_C.9_Drawings_E202_to_D-1.pdf PDF
Attachment_C.10_Drawings_PM-1_to_PM-5.pdf PDF
Attachment_B.1_Specifications.pdf PDF
Attach_A_Statement_of_Work.docx DOCX document
Sol_G15PS00053.pdf PDF
Attach_E_Supplement_to_Specifications.docx DOCX document
Attachment_C.3_Drawings_C6_to_C12.pdf PDF
G15PS00053_presolicitation_notice_amend.121814.docx DOCX document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G15PS00053, Amendment 0004 Revisions and Questions/Responses – RFP Attachment Z Questions and Responses:

1. Question: Spec raceway and boxes 260533 3.1 A Outdoors: 1 & 2 are asking for ENT type conduit . Spec raceway and boxes 260533 3.1 B Indoors: 1, 2 & 3 are asking for ENT type conduit . Drawings E101, E201, E202, ES101 & ES102 notes state: All wiring shall be run in PVC conduit . Please confirm which conduit to use, the two conduits are different Articles within the code . If ENT conduit remains please provide a spec and or part number, the NEC is very vague on this type of conduit.

Response: All wiring shall be run in PVC Conduit.

Specification Section 260533, 3.1, A 1&2: Change ENT to read PVC
Specification Section 260533, 3.1, B 1,2,3&5: Change ENT to read PVC
Specification Section 263600, 2.3,E,1: Delete
Specification Section 263600, 2.4: Delete

2. Question: Comparing / Reviewing drawings E001 thru ES102 with PM-1 thru PM-5 there seems to be info missing (conduit/control wiring/power for controls) from the electrical drawings to make this a complete operational system. Drawing PM-1 well #7 plan view shows a 6” flow meter located in the middle of the room. Also pressure switch panel detail shows a H/O/A switch panel located in the electric room with control wiring between the two .(who provided the H/O/A switch). Same for Well #18

Response: The contractor is to provide the HOA. Wiring diagrams for the HOA and pressure switches are shown on drawing E302. This drawing includes calling out all wiring to be installed in conduit.

3. Question: Drawing PM-1 Coburn Treatment BLDG shows three flow meters and the pressure switch panel detail as well.

Response: Add note to drawing E101 Power Plan for Coburn Water Treatment Building: Provide 120V power from circuit RPC-9 to Chemical Chart recorder install pulse output cable from each flow meter in conduit. Location of Chart recorder and flow meters are shown on drawing PM-3.

4. Question: Drawing ES102 Duck Drive Pumps please provide control wiring and will each one need a rack to support the disconnects.

Response: These are actually the grinder pumps and they are specified with a complete control package. Mount control panel and disconnects independent of tank. Provide 2” galvanized steel posts with caps encased to 30 inches below grade. Extend between the two posts the necessary galvanized steel conduit required to mount equipment. All hardware to be stainless steel.

5. Question: Reference drawings A101, A102, and A103, the Floor Plans call for a fold down attic access ladder in the Coburn Water Treatment Building, the ESA Well No. 7 Building, and the ESA Well No. 18 Building. There are currently no specifications on these ladders, please provide any required specifications.

Response: Each ladder is to be a Werner AH2512 - 25”W x 66” L x 12’ H Ceiling Aluminum Attic Ladder (see attached cut sheet). See revised Drawings A101, A102 and A103 (revision #3 dated 3-4-15) that show the revised location of the attic ladders. Also see new Attic Plan Drawing A106 (revision #3 dated 3-4-15) which shows the revised location of the attic ladders as well as additional plywood sheathing in the attic space.

6. Question: Reference: Drawing CN-02, Drawing C-1 thru C-9 and detail 2 on drawing C-22: Detail 2 on drawing C-22 is not part of this contract. Therefore, the total number of hydrants on this project should be 37, which includes 28 blow off yard hydrants and 9 replacement yard hydrants. However, Drawing CN-02 Materials list for ESA lists 324 yard hydrants. Please clarify the correct amount of yard hydrants.

Response: The correct number of yard hydrants is (37) and the correct number of Curb stop w/ Curb box is (0). See the attached revised drawing CN-02 (Revision #3 dated 3-4-2015)

7. Question: Reference detail sheet number C-22. The Water Cup and Drain is crossed out. However, almost every other sheet -1 thru Sheet 8 requires us to Retrofit Existing Water Cup See Detail C-22. So I’m afraid not to price the 289 Water Cups that have LOD marked around them, yet I don’t want to price something that’s not included.

Response: The Water Cups and Drain Detail as shown on C-22 have been deleted from this project.

Revisions:

1. Change: Drawing SW-1- The Title of Detail #2 “Recycle Pump and Treatment System” To Read: “Recycle Pump and Treatment System Typical of (9)”

2. Add: On Drawing ES102 add a dedicated 1P-120V circuit to each one of the (9) 1500 watt heaters in the fiberglass enclosure as shown on detail #2 on drawing SW-1from Panel DDP. Panel DDP on E202 shall be double width.

G15PS00053

Attachment Z.Amendment 0004.Revisions and Q.A

File details come from the government source that posted it. Updated .