g.final_Lower Jo Thin and HP Task Order.pdf

PDF 21 MB Posted

Attached to
Wallowa Whitman/Umatilla National Forests Mechanical and Hand Thinning BPA
Solicitation number
1240BE22Q0028
Issued by

About this file

This solicitation is seeking mechanical and hand thinning treatment services to accomplish fuels reduction or forest health improvement work on the Wallowa Whitman and Umatilla National Forests. The services requested include mechanical thinning, mastication, slash busting, grapple piling of slash and debris, plantation thinning, pullback, pre- and non-commercial thinning, roadside brushing, pruning, hand piling, grapple piling, burning of slash piles, and other similar activities. The purpose is to alter ground and ladder fuels through understory tree densities and debris removal. The contract period is up to 5 years, with locations across both forests. Call orders will specify maps, unit information sheets, and details required. The contractor must provide all labor, supervision, equipment, materials, transportation, supplies, and quality control to complete the specified work in compliance with contract terms and specifications.

View the file

Other files

File Type Posted
Amd003.pdf PDF
Amd002.pdf PDF
Amd0001.b.final_solicitation.doc DOC document
Amd001.pdf PDF
Amd0001.a.quoters_packet.doc DOC document
Amd001.m.final_Little_Dean_Thin_Grapple_Call_Order.pdf PDF
k.final_Bound_TSI_Call_Order.pdf PDF
h.final_Marion Point TSI Task Order.pdf PDF
d.Washington_wage determination.pdf PDF
l.final_Sheep_Creek_Mech_Call_Order.pdf PDF
f.final_Bull_II_Call_Order.pdf PDF
c.Oregon_wage determination.pdf PDF
j.final_Five_Points_Sandbox_Mech_Call_Order.pdf PDF
a.quoters_packet.doc DOC document
i.final_Puderbaugh Mastication Task Order.pdf PDF
e.Fire.Prot.and.Suppression.r6_fs_6300_52[1]UMA.doc DOC document
b.final_solicitation.doc DOC document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALL ORDER NO.

IF THIS ORDER IS GREATER THAN $2,500.00, IT IS

NOT VALID UNTIL SIGNED BY THE CONTRACTING OFFICER

BPA No. 1240BE22A_____ Project Name: 02-FAM LoJo Davis TSI & Hand Pile

County: Wallowa

Contractor: Issuing and Billing Office:

Wallowa-Whitman National Forest PO Box 907 Baker City, OR 97814

Item No.

Subitem No. Description

Quantity to Date

Quantity Order Unit

Unit Price Amount

1 Thinning

1.1 LoJo Lupine 43 13 Acres $ $

1.2 LoJo Lupine 44 6 Acres $ $

1.3 LoJo Lupine 45 7 Acres $ $

1.4 LoJo Lupine 46 8 Acres $ $

1.5 LoJo Lupine 47 20 Acres $ $

1.6 LoJo Lupine 48 12 Acres $ $

1.7 LoJo Lupine 50 14 Acres $ $

1.8 LoJo Lupine 51 8 Acres $ $

1.9 LoJo Lupine 52 3 Acres $ $

1.10 LoJo Lupine 53 4 Acres $ $

1.11 LoJo Lupine 54 10 Acres $ $

1.12 LoJo Lupine 55 18 Acres $ $

1.13 LoJo Lupine 56 58 Acres $ $

1.14 LoJo Lupine 57 11 Acres $ $

1.15 LoJo Lupine 58 6 Acres $ $

1.16 LoJo Lupine 59 27 Acres $ $

1.17 LoJo Lupine 61 7 Acres $ $

1.18 LoJo Lupine 62 13 Acres $ $

1.19 LoJo Lupine 63 11 Acres $ $

1.20 LoJo Lupine 64 23 Acres $ $

1.21 LoJo Lupine 65 6 Acres $ $

1.22 LoJo Lupine 66 6 Acres $ $

1.23 LoJo Lupine 67 3 Acres $ $

1.24 LoJo Lupine 68 8 Acres $ $

1.25 LoJo Lupine 69 8 Acres $ $

1.26 LoJo Lupine 70 22 Acres $ $

1.27 LoJo Lupine 71 9 Acres $ $

1.28 LoJo Lupine 72 4 Acres $ $

1.29 LoJo Lupine 73 6 Acres $ $

1.30 LoJo Lupine 74 12 Acres $ $

1.31 LoJo Lupine 75 11 Acres $ $

1.32 LoJo Lupine 78 6 Acres $ $

1.33 LoJo Lupine 79 8 Acres $ $

1.34 LoJo Lupine 84 18 Acres $ $

1.35 LoJo Lupine 85 4 Acres $ $

1.36 LoJo Lupine 86 10 Acres $ $

Total 420 Acres XXXX $

2 Hand Piling

2.1 LoJo Lupine 45 7 Acres $ $

2.2 LoJo Lupine 46 8 Acres $ $

2.3 LoJo Lupine 48 12 Acres $ $

2.4 LoJo Lupine 50 14 Acres $ $

2.5 LoJo Lupine 58 6 Acres $ $

2.6 LoJo Lupine 59 27 Acres $ $

2.7 LoJo Lupine 61 7 Acres $ $

2.8 LoJo Lupine 62 13 Acres $ $

2.9 LoJo Lupine 65 6 Acres $ $

2.10 LoJo Lupine 66 6 Acres $ $

2.11 LoJo Lupine 73 6 Acres $ $

2.12 LoJo Lupine 75 11 Acres $ $

2.13 LoJo Lupine 78 6 Acres $ $

2.14 LoJo Lupine 84 18 Acres $ $

2.15 LoJo Lupine 85 4 Acres $ $

2.16 LoJo Lupine 86 10 Acres $ $

Total 161 Acres XXXXX $

Required Delivery Date or Number of Calendar Days: All work shall be completed by 10/31/2022. Work is estimated to begin 06/01/2022.

Total Price: $

Contractor: (Name and Signature)

Requested By: (Name and Signature)

COR /s/ Mark Moeller Fund Authorization: (Name and Signature)

Line Officer Ordered By: (Name and Signature)

Andrea Pollock, Contracting Officer Order Date: Job Code:

Original to CO, CC to Contractor, B&F and COR

DESCRIPTION

This task order is for hand thinning/slashing of 420 acres and hand piling of 161 acres on the Wallowa Valley Ranger District of the Wallowa-Whitman National Forest.

The spacing requirements for each unit are described on the attached Detailed Unit Information Sheet(s).

Slash shall be treated so that any remaining slash meets the requirements as described in the specific tasks section and Detailed Unit Information Sheet(s).

MOTORIZED EQUIPMENT

Use of motorized equipment other than hand-held equipment such as power saws and brush cutters will not be permitted off designated roads in the project area without approval of the Contracting Officer or as provided elsewhere herein.

PROJECT BOUNDARY

Vicinity maps showing project locations and access are attached and made part of this contract. All township and range locations are predicated upon the Willamette Base Meridian.

The Forest Service assumes no obligations to plow or do special maintenance to keep roads open.

Some of the roads in the contract may be blocked to vehicle travel and will remain blocked during the period of the contract.

A. Boundaries

The boundaries, other than for easily identified ground features shown on the contract map(s), have been marked by the Forest Service with cardboard, plastic markers, or other easily identified markers which face into the contract units. Contract boundary markers are supplemented with plastic flagging as needed.

B. Exclusions

Exclusions are non-treatment areas falling within contract unit boundaries that the Contractor shall not enter or work within. Further, Contractor shall exercise care to avoid having trees fall into or toward such areas of exclusion. Exclusions will be: 1) Marked on the ground by use of Boundary of Contract Area signs that will face into the contract area. 2) Contract units that contain exclusions will be identified as having exclusions in the "REMARKS" column of the Detailed Unit Information Sheet(s). 3) Contract maps of units containing exclusions will show the locations of any exclusion(s).

TECHNICAL SPECIFICATIONS

1. SELECTION OF LEAVE-TREES

The technical specifications are based on the overall composition and condition of the stand, and are intended to be guidelines for achieving a high quality final product in a professional manner.

Contractor is expected to use silvicultural knowledge to identify and adjust to variations within the stand.

A. Contractor shall always leave the following trees and disregard them for spacing purposes:

1. Leave all live conifer trees that are shorter than 12 inches in height, unless otherwise specified.

2. Leave all trees exhibiting visible wildlife denning or nesting use. Should an active hawk, eagle, or Pileated woodpecker nest be located, work shall be discontinued within 500 feet of the nest-tree until the CO has been notified and has authorized resumption of work.

3. Leave all shrubs and non-coniferous tree species, except when cutting is necessary to access a coniferous cut tree.

4. Leave all dead trees, except as indicated on the Detailed Unit Information sheet.

5. Leave all trees with fencing attached.

B. Contractor shall leave all conifers that are larger than the maximum cut DBH specified on the Detailed Unit Information sheet, and shall include these trees for spacing purposes.

C. Contractor shall select additional leave-trees, from those live conifers at least 12 inches tall and up to the maximum cut DBH, to achieve average spacing as specified in the Detailed Unit Information sheet.

1. Leave-trees shall be the healthiest, most vigorous, and best-formed trees of the preferred species in the stand, as evidenced by the tallest height, largest crowns and crown ratios, straightest stems, and the least amount of damage or disease.

2. The leave-tree spacing is an average and shall be varied up to 25 percent (wider or tighter) to leave the most desirable trees. It is more important to leave the best trees, than to have uniform spacing. Averaged over the stand, leave tree spacing shall not be materially increased or decreased from what is specified in the Detailed Unit Information sheet.

3. Leave-trees shall be selected within the order of species preference as listed on the Detailed Unit Information sheet. This order of preference only applies if the trees are free of damage or defect.

In most cases tree vigor will help you determine which trees will best inhabit the site.

4. Where undamaged trees are not available, select leave-trees with the least amount of damage.

5. Species preference compensates somewhat for minor differences in size or quality. For example, a smaller but otherwise equal quality ponderosa pine which is 2/3 the height of a Douglas-fir should be left rather than the Douglas-fir. A western larch with minor bole damage would be preferred over an undamaged grand fir.

D. Exceptions

1. When live ponderosa pine or western larch with diameters over 21 inch DBH are encountered, cut all live and dead trees less than the maximum cut DBH that are within 30 feet of these 21+ DBH trees. Check the Detailed Unit Information sheet for units where this is required.

2. When quaking aspen are encountered, the minimum spacing shall be 50 feet off any size of these trees. All live trees under the maximum DBH shall be felled. Check Detailed Unit Information sheets for units for where this is required.

3. All grand fir, juniper, and sub alpine fir under the maximum DBH or DSH listed on the detailed unit information sheet shall be felled regardless of spacing.

2. CUTTING OF TREES

A. Contractor shall exercise extreme care to prevent damage to leave-trees. If the best leave-tree is accidentally cut or damaged, Contractor shall leave a substitute tree. Contractor shall select as the substitute tree, the most healthy, vigorous, and largest tree of a preferred species available within 8 feet of the cut or damaged tree. Substitution will only be an acceptable remedy if encountered infrequently. If frequent, the inspection will indicate deficient trees.

B. Contractor shall exercise extreme care to prevent damage to all physical improvements (fences, telephone lines, established land corners, buildings, ditches, etc.) on the contract area.

Contractor shall be liable for damage to physical improvements and shall make immediate repairs to damaged physical improvements.

C. Trees shall be completely severed from the stump. Cutting shall be below the lowest live limb, except when prevented by obstacles. Stump height shall not exceed 8 inches above ground level or 4 inches above obstacles. All live limbs below the cutting point shall be removed from the bole.

D. All trees required to be fell, shall be felled into the particular project area. Any trees falling outside of the unit boundary shall be pulled back into the project area.

3. SLASH TREATMENT

A. Check Detailed Unit Information sheet for unit specific slash treatment (such as lopping along private land boundaries or open roads.) No additional payment will be made for slash treatment.

The contractor shall not start thinning a new unit until the slash work on the previously thinned unit is completed.

B. No thinning slash shall be left suspended by, or lean against, a leave tree; whether it is dead or alive.

C. Thinning slash shall be pulled back from the following areas:

1. Roads - No slash shall be left within 5 feet of the outside edge of the road shoulders. In areas with cut and fill construction, this distance shall be measured from 5 feet beyond the top of the bank to 5 feet beyond the point where the shoulder meets the fill slope. (i.e., hinge point of road shoulder and fill slope.) All open roads shall be kept free of thinning slash.

2. Developed recreation sites/trails - No slash shall be left in established recreation sites or trails.

3. Cultural Resource Sites - The Contractor shall notify the CO of any suspected cultural resource sites prior to working the area. If slash is felled onto a cultural resource site, the Contractor shall discontinue work in the general area until the CO has been notified.

4. All Other Improvements - No slash shall be left within 10 feet of any physical improvement including but not limited to; Fences, spring tanks, Sign etc.

5. Private Land - See Detailed Unit Information sheet.

6. Fire Lines - No thinning slash shall be left in existing fire lines as designated on contract map.

7. Unit boundaries.

8. Streams, ponds, bogs, or wallows.

D. Additional Slash Treatment

1. All slash will be lopped to within 12 inches of the ground.

Units may require all thinning slash to be treated so that the depth and length of the slash does not exceed certain parameters as listed on the Detailed Unit Information sheet.

PRIORITIZATION OF WORK

The Contracting Officer may elect to prioritize work by area or unit. Work with limited performance periods are shown on the Detailed Unit Information Sheet. Work on some units may be limited to July 1- November 15 depending on the potential for beetle problems in thinning created slash.

DETAILED UNIT INFORMATION SHEET

02 FAM LoJo Lupine TSI and Hand Pile

Species retention is prioritized as follows: 1) western larch 2) ponderosa pine 3) Douglas-fir 4) Engelmann spruce, 5) lodgepole pine. Selected leave trees shall exhibit attributes of good health and vigor, and subordinate species may be selected for retention over a primary retention species (wester larch & ponderosa pine) that exhibits indicators of poor health, form, and vigor. Larger size is not a reason to select a subordinate species.

• Leave Tree spacing 20-foot variable. Variable is an average taken over the entire unit that can vary up to 25%.

• Healthy, well-formed understory trees <9-inch DBH can be left on a variable spacing if they pose no fire ladder risk to large leave trees.

o When live western larch, ponderosa pine or Douglas fir with diameters over 21-inch DBH are encountered, cut all live and dead trees less than the maximum cut DBH that are within 30 feet of these 21+ DBH trees, unless western larch or ponderosa pine are present then leave at standard spacing.

• Do not cut Aspen trees. Cut all trees under the DBH limit within 50’ of Aspen trees.

• Cut all grand fir, juniper, and sub alpine fir under the maximum DBH.

• Remove all species of trees whose bole is within 20’ of a road edge up to the 9” DBH limit.

• Flagging and boundary tags may not be present when the unit boundary follows a road.

• Hand pile all new slash and existing dead and down up to 10” diameter.

• Cover all piles with plastic sheeting.

• No piles under 4 feet tall or 5 feet wide.

• Do not leave any new or existing slash up to 10” diameter within 10’ of roads, fences, or existing improvements.

• Any trees falling outside of the unit boundaries shall be pulled back into the project area.

• Follow instruction in Remarks below.

UNIT ACRES FUEL

TREATMENT

MAX

DBH CUT

(INCHES)

LEAVE

TREE

SPACING

(FEET)

MAX

STUMP

HEIGHT

(inches)

BOUNDARIES SLOPE

(PERCENT)

LOP

LENGTH

MAX.

(feet)

ACCESS Location (Township

Range Section)

REMARKS

LoJo Lupine

13 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging

10-20% 6’ 46rd to 4650 to 065 spur.

Gate at 060and 065 jct.

4N 45E Section 11

Leave all western larch

LoJo Lupine

6 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging

5-10% 6’ 46rd to 4650 to 065 spur

4N 45E Section 11

Leave all western larch, fence in between unit and 065 spur

LoJo Lupine

7 Thinning, bucking and hand piling

9” 20’ variable

6” White Tags and pink and black striped flagging flat 6’ 46rd to 4650 to 065 spur

4N 45E Section 14

Leave all western larch, fence line on eastern boarder

LoJo Lupine

8 Thinning, bucking and hand piling

9” 20’ variable

6” White Tags and pink and black striped flagging

10-15% 6’ 46rd to 4650 to 065 spur

4N 45E Section 11

N boundary is 50’ stream buffer

LoJo Lupine

20 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging

5-15% 6’ 46rd to 4650 to 065 spur

4N 45E Section 11 and 14

SE corner is stream buffer

LoJo Lupine

12 Thinning, bucking and hand piling

7” 20’ variable

6” White Tags and pink and black striped flagging

10-35% 6’ 46rd to 4650 4N 45E Section 14

Leave all western larch, cut everything less than 7”

DBH to rd. cut bank top

LoJo Lupine

14 Thinning, bucking and hand piling

9” 20’ variable

6” White Tags and pink and black striped flagging

25-35% 6’ 46rd to 4650 4N 45E Section 14

Okay to cut willows/brush

LoJo Lupine

8 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging

0-5% 6’ 46rd to 4650 to 080 and 081 spur

4N 45E Section 14

No boundary flags or tags along roads

LoJo Lupine

3 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging

0-5% 6’ 46rd to 4650 to 080 and 081 spur

4N 45E Section 14

No boundary flags or tags along 080 road

LoJo Lupine

4 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging flat 6’ 46rd to 4650 to 050 to 081 spur

4N 45E Section 14

S boundary is 081 road

LoJo Lupine

10 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging

0-10% 6’ 46rd to 4650 to 050 to 081 spur

4N 45E Section 14 none

LoJo Lupine

18 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging

5-15% 6’ 46rd to 4650 to 083 spur

4N 45E Section 14

N boundary is

LoJo Lupine

58 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging

10-20% 6’ 46rd to 4650 4N 46E Section 7

Boundary on 4650 is not tagged or flagged.

Fence in unit LoJo

Lupine

11 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging

10-25% 6’ 46rd to 4650 4N 46E Section 7

Boundary on 4650 is not tagged or flagged.

LoJo Lupine

6 Thinning, bucking and hand piling

9” 20’ variable

6” White Tags and pink and black striped flagging

5-15% 6’ 46rd to 4650 to 505 spur

4N 46E Section 7

Boundary on 4650 is not tagged or flagged.

Fence in unit

LoJo Lupine

27 Thinning, bucking and hand piling

9” 20’ variable

6” White Tags and pink and black striped flagging

10-20% 6’ 46rd to 4650 4N 46E Section 7

Don’t cut Yew trees. Both sides of 4655 road

LoJo Lupine

7 Thinning, bucking and hand piling

9” 20’ variable

6” White Tags and pink and black striped flagging

20-30% 6’ 46rd to 4650 to 505 spur

4N 46E Section 7

E boundary 505 rd. not tagged or flagged LoJo

Lupine

13 Thinning, bucking and hand piling

9” 20’ variable

6” White Tags and pink and black striped flagging

15-30% 6’ 46rd to 4650 to 505 spur

4N 46E Section 7

No tags or flags on 505 road

LoJo Lupine

11 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging

10-20% 6’ 46rd to 4650 to 040 spur

4N 45E Section 12

Adjacent to unit 64, fence separates

LoJo Lupine

23 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging

10-25% 6’ 46rd to 4650 to 040 spur

4N 45E Section 12

Adjacent to 63, fence separates

LoJo Lupine

6 Thinning, bucking and hand piling

9” 20’ variable

6” White Tags and pink and black striped flagging

10-20% 6’ 46rd to 4650 4N 45E Section 10

Fence in middle of unit

LoJo Lupine

6 Thinning, bucking and hand piling

9” 20’ variable

6” White Tags and pink and black striped flagging

25-35% 6’ 46rd to 4650 4N 45E Section 15

No Flags or tags along

LoJo Lupine

3 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging flat 6’ 46rd to 4650 to 4655

4N 45E Section 1 none

8 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging

0-5% 6’ 46rd to 4650 to 4655

4N 45E Section 1

Do not cut western larch. No flags or tags on 4655

LoJo Lupine

8 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging

0-10% 6’ 46rd to 4650 to 4655

4N 46E Section 6

Do not cut western larch. No tags or flags along

LoJo

Lupine

22 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging

5-15% 6’ 46rd to 4650 to 4655

5N 46E Section 31

Do not cut western larch. Unit on both sides or road.

LoJo

Lupine

9 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging

0-10% 6’ 46rd to 4650 to 4655

5N 46E Section 31

Do not cut western larch. No tags or flags on

LoJo

Lupine

4 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging

0-5% 6’ 46rd to 4650 to 4655

5N 46E Section 30

Do not cut western larch. Both sides of 4655

LoJo Lupine

6 Thinning, bucking and hand piling

9” 20’ variable

6” White Tags and pink and black striped flagging

Average 30%

Max 65%

6’ 46rd to 4650 to 555 spur

4N 46E Section 6

Steep incline on roadside.

LoJo Lupine

12 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging

Flat 6’ 46rd to 4650 to 4655 to 045 spur

4N 45E Section 1

Boarders 045 on eastside

LoJo Lupine

11 Thinning, bucking and hand piling

9” 20’ variable

6” White Tags and pink and black striped flagging

Average 10%

Max 30%

6’ 46rd to 4650 to 4655 to 045 spur

5N 45E Section 36

West boarder 045 road.

6 Thinning, bucking and hand piling

9” 20’ variable

6” White Tags and pink and black striped flagging

5-15% 6’ 46rd to 4650 to 4655 to 045 to 050 spur

5N 45E Section 36

No tags or flags along 045 road.

LoJo Lupine

8 Thinning and bucking

9” 20’ variable

6” White Tags and pink and black striped flagging

0-10% 6’ 46rd to 4650 to 4655 to 045 to 060 spur

5N 45E Section 36 none

LoJo Lupine

18 Thinning, bucking and hand piling

9” 20’ variable

6” White Tags and pink and black striped flagging

Average 10%

Max 25%

6’ 46rd to 4650 to 4655 to 045 to 060 spur

5N 45E Section 36 none

LoJo Lupine

4 Thinning, bucking and hand piling

9” 20’ variable

6” White Tags and pink and black striped flagging

10-20% 6’ 46rd to 4650 to 4655 to 045 to 060 spur

5N 45E Section 36 none

LoJo Lupine

10 Thinning, bucking and hand piling

9” 20’ variable

6” White Tags and pink and black striped flagging

Average 35%

Max 45+%

6’ 46rd to 4650 to 505 spur

4N 46E Section 6

Both sides of 505 road.

Steep

4650000

4600000

4600505

4665000

4600430

4655050

4650060

4665060

4655045

4655150

4665050

4665020

4650120

4655095

4600560

4600437

4655025

4655155

4665055

4650080

4600599

4600405

4650030

4650070

4665200

4600381

4600390

4650055

4650150

4655048

4600570

4600435

4600595

4655060

4650130

4655160

4655052

4650081

4600460

4665080

4600433

PVT-0000644

4655117

4650032

4655098

4600495

4670055

4655120

4600445

4600458

4670030

4655112

4650125

4655056

4665210

4650057

466507146

4600510

4650045

4665030

4655085

4665344

4600442

4600477

4600429

4600392

4655105

4600511

4600578

4650075

4650040

4665025

4650027

4665345

4655103

4650170

4650082

4655051

4665021

4655070

4655165

4600432

4600371

4655140

4665015

4600190

4655027

4665069

4665057

04655047

4665075

4600440

4665250

4665082

4650052

4655026

4600474

X1

4600473

4665029

4665265

4650015

4665205

X19934665052

49 52

LoJo Lupine_Unit Map Road LoJo Lupine Thinning

43 6277

LoJo Lupine_Vacinity Map LoJo Lupine Thinning

LoJo Task Order.pdf
02-LoJo Lupine TSI and Hand Pile_Unit Description
LoJo Lupine_Map Package
LoJo Lupine_Unit Map
LoJo Lupine_Vacinity Map

File details come from the government source that posted it. Updated .