FPL_Power_Line_OSHA_Minimum.pdf

PDF 83 KB Posted

Attached to
C-17 Lift Station Replacement.
Solicitation number
B-7-25-40
Issued by
Brevard County, Florida

About this file

This document is a safety standards document from Florida Power & Light Company (FPL) focusing on electrical service safety protocols, specifically the "Safety Six" guidelines for working near power lines. The document provides critical safety instructions for workers and customers to prevent serious injuries and fatalities when operating equipment near electrical infrastructure, detailing specific safety distances and emergency procedures based on power line voltages.

The safety guidelines outline two primary rules: Rule 1 involves maintaining a safe working distance from power lines, with specific OSHA-mandated minimum approach distances ranging from 10 feet for low-voltage lines (0-50 kV) to 35 feet for high-voltage lines (500-750 kV). Rule 2 provides step-by-step instructions for scenarios where equipment contacts a power line, including guidance on staying calm, avoiding movement, calling emergency contacts like FPL's outage line (1-800-4OUTAGE), and taking specific actions to minimize electric shock risk such as jumping away with feet together and avoiding contact with both the equipment and ground simultaneously.

View the file

Other files

File Type Posted
REVISED_B-7-25-40_Notice_of_Award.pdf PDF
B-7-25-40_Notice_of_Award.pdf PDF
Bid_Tabulation_-_Intent_to_Award.pdf PDF
Bid_Tabulation_-_Names_Only.pdf PDF
Bid_Tabulation_-_Names_Only.pdf PDF
Revised_Price_Sheet.pdf PDF
Revised_Price_Sheet.pdf PDF
Addendum_2.pdf PDF
Revised_Price_Sheet.pdf PDF
Addendum_2.pdf PDF
Addendum_2.pdf PDF
FPL_Power_Line_OSHA_Minimum.pdf PDF
Addendum_2.pdf PDF
FPL_Power_Line_OSHA_Minimum.pdf PDF
REVISED_Bid_Set.pdf PDF
Addendum_1.pdf PDF
REVISED_Bid_Set.pdf PDF
REVISED_Bid_Set.pdf PDF
Addendum_1.pdf PDF
B-7-25-40_Inv_&_Specs.pdf PDF
B-7-25-40_Inv_&_Specs.pdf PDF
B-7-25-40_Inv_&_Specs.pdf PDF
B-7-25-40_Inv_&_Specs.pdf PDF
Appendix_B_-_FDEP_Sewer_Permit.pdf PDF
Appendix_B_-_FDEP_Sewer_Permit.pdf PDF
Attachment_B_-_Technical_Specifications.pdf PDF
Attachment_C_-_Drawings.pdf PDF
PRINTING_INSTRUCTIONS.pdf PDF
Attachment_C_-_Drawings.pdf PDF
Appendix_B_-_FDEP_Sewer_Permit.pdf PDF
Appendix_E_-_Geotechnical_Report.pdf PDF
Attachment_C_-_Drawings.pdf PDF
PRINTING_INSTRUCTIONS.pdf PDF
Appendix_C_-_Brevard_County_ROW_Permit.pdf PDF
Appendix_E_-_Geotechnical_Report.pdf PDF
Attachment_A_-_Draft_Contract.pdf PDF
Appendix_A_-_Approved_Manufactures_List.pdf PDF
Appendix_C_-_Brevard_County_ROW_Permit.pdf PDF
Appendix_D_-_FDOT_Utility_Permit.pdf PDF
PRINTING_INSTRUCTIONS.pdf PDF
Appendix_A_-_Approved_Manufactures_List.pdf PDF
Appendix_C_-_Brevard_County_ROW_Permit.pdf PDF
Attachment_C_-_Drawings.pdf PDF
PRINTING_INSTRUCTIONS.pdf PDF
Appendix_E_-_Geotechnical_Report.pdf PDF
Appendix_B_-_FDEP_Sewer_Permit.pdf PDF
Appendix_E_-_Geotechnical_Report.pdf PDF
Attachment_A_-_Draft_Contract.pdf PDF
Attachment_B_-_Technical_Specifications.pdf PDF
Attachment_B_-_Technical_Specifications.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .