Attachment_C_-_Drawings.pdf
PDF 42 MB Posted
- Attached to
- C-17 Lift Station Replacement.
- Solicitation number
- B-7-25-40
- Issued by
- Brevard County, Florida
About this file
This file is a comprehensive set of technical drawings and specifications for the Lift Station C-17 Replacement project by Brevard County Utility Services Department in Florida, prepared by Kimley-Horn and Associates. The project involves relocating the existing Lift Station C-17 to a new 40 ft x 40 ft parcel, abandoning the current infrastructure, and constructing approximately 470 linear feet of 12-inch and 16-inch gravity sewer along N. Courtenay Parkway and Catalina Isle Drive. The new lift station will connect to a 12-inch force main at the intersection of N. Courtenay Parkway and Catalina Isle Drive, with the overall scope including demolition of the existing infrastructure, site preparation, and installation of new utility infrastructure.
The drawings provide extensive technical details across multiple disciplines including civil, mechanical, electrical, and instrumentation plans. The project involves removing the existing wet well, grouting and abandoning existing pipes, and constructing a new lift station with associated mechanical, electrical, and control systems. The documentation includes specific requirements for construction methods, materials, erosion control, stormwater management, and compliance with Brevard County and Florida Department of Transportation (FDOT) standards. The bid set is dated October 2024, suggesting an upcoming construction project with precise engineering specifications for the replacement of the lift station infrastructure.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OWNER:
BREVARD COUNTY UTILITY SERVICES DEPARTMENT
2725 JUDGE FRAN JAMIESON WAY, A-213
VIERA, FL 32940
321-633-2091
ENGINEER:
KIMLEY-HORN AND ASSOCIATES, INC.
7341 OFFICE PARK PLACE, SUITE 102
MELBOURNE, FLORIDA 32940
CONTACT: A. TUCKER HUNTER, P.E.
407-982-3064
PROJECT VICINITY MAP
G-1 REVISIONS DATE BYNo.
BID SET
PREPARED BY
N.T.S.
2024 KIMLEY-HORN AND ASSOCIATES, INC.
7341 OFFICE PARK PLACE, SUITE 102
MELBOURNE, FL 332940
PHONE (321) 430-1138
WWW.KIMLEY-HORN.COM CA 00035106
BOARD OF COUNTY COMMISSIONERS
BREVARD COUNTY
PREPARED FOR:
INDEX OF DRAWINGS
GENERAL
G-1 COVER SHEET
G-2 GENERAL NOTES
G-3 BREVARD COUNTY GENERAL NOTES
G-4 BREVARD COUNTY GENERAL NOTES
G-5 SYMBOLS AND ABBREVIATIONS
DEMO
DE-1 DEMO PLAN
CIVIL
C-1 PLAN AND PROFILE - STA: 10+00 TO 11+76
C-2 PLAN AND PROFILE - STA: 11+76 TO 14+74
G-6
LIFT STATION C-17 SITE PLANC-4
LIFT STATION C-17 GRADING PLANC-5
EXISTING CONDITIONS AND EROSION CONTROL PLANC-6
SWPPP NOTESC-7
EROSION CONTROL DETAILS
MECHANICAL
M-1 LIFT STATION C-17 MECHANICAL PLAN
DETAILS
D-1 STANDARD DETAILS
D-2 STANDARD DETAILS
D-3 D-4 D-5 D-6
D-7 FDOT DETAILS
D-8 D-9
FDOT DETAILS
FDOT DETAILS
STANDARD DETAILS
STANDARD DETAILS
STANDARD DETAILS
STANDARD DETAILS
UTILITY SERVICES DEPARTMENT
BID NO. B-7-25-40
PROJECT NO. 6982461
OCTOBER 2024
LOCATION MAP
LIFT STATION C-17 REPLACEMENT
SITE
C-8
KEY SHEET
ROADWAY RESTORATION PLANC-3
ELECTRICAL
E-1 ELECTRICAL NOTES, SYMBOLS, & ABBREVIATIONS
E-2 LS C-17 ELECTRICAL SITE PLAN
E-3 LIFT STATION C-17 SINGLE LINE DIAGRAM
E-4 E-5
LS C-17 ELEMENTARY DIAGRAM - SHEET 1
E-7 LS C-17 TERMINAL BLOCK LAYOUT
E-8 BILL OF MATERIALS
E-9 LIFT STATION C-17 PUMP CONTROL PANEL DETAIL
E-6
ELECTRICAL RACK DETAILSE-11
ELECTRICAL DETAILSE-12
INSTRUMENTATION
I-1 STANDARD CONTROLWAVE MICRO RTU COVER SHEET
I-2 STANDARD CONTROLWAVE MICRO RTU
DRAWING PACKAGE INDEX SHEET
I-3
I-4
I-5 I-6
I-7 STANDARD CONTROLWAVE MICRO RTU
TERMINAL ASSEMBLY POWER & I/O
I-8 I-9
STANDARD CONTROLWAVE MICRO RTU PANEL FABRICATION
STANDARD CONTROLWAVE MICRO RTU IO WIRING - DIGITAL
OUTPUTS
STANDARD CONTROLWAVE MICRO RTU
GENERAL ARRANGEMENT EXTERNAL
STANDARD CONTROLWAVE MICRO RTU
GENERAL ARRANGEMENT INTERNAL
STANDARD CONTROLWAVE MICRO RTU PANEL ASSEMBLY
STANDARD CONTROLWAVE MICRO RTU WIRING DIAGRAM
LS C-17 ELEMENTARY DIAGRAM - SHEET2
LIFT STATION C-17 ELECTRICAL PLANE-10
LS C-17 ELEMENTARY DIAGRAM - SHEET 3
I-10
I-11
I-12 STANDARD CONTROLWAVE MICRO RTU
IO WIRING - HIGH SPEED COUNTER
I-13 I-14
MODBUS TCP INSTALLATION
LS C-17 IO WIRING & MODBUS DETAILS
BID SET 10/16/2024 CPV0
D-10 FDOT ROADWAY RESTORATION DETAIL
STANDARD CONTROLWAVE MICRO RTU IO WIRING - DIGITAL
INPUTS
STANDARD CONTROLWAVE MICRO RTU IO WIRING - ANALOG
INPUTS
A. TUCKER HUNTER
88634AJC
CPV
SNR
149850012
OCTOBER 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
© GENERAL NOTES
G-2
CPV
SNR
149850012
OCTOBER 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
© BREVARD COUNTY GENERAL NOTES G-3
BREVARD COUNTY PUBLIC WORKS ENGINEERING STANDARD DEVELOPMENT NOTES
GENERAL
1. ALL CONSTRUCTION SHALL CONFORM TO FDOT STANDARD PLANS (FY20-21), FDOT STANDARD SPECIFICATIONS FOR ROAD & BRIDGE CONSTRUCTION (LATEST EDITION), BREVARD COUNTY UTILITY SERVICES CRITERIA FOR WATER AND SANITARY SEWER SYSTEMS, AND
BREVARD COUNTY CODE OF ORDINANCES.
2. ISSUANCE OF CERTIFICATE OF COMPLETION: UPON COMPLETION OF CONSTRUCTION OF THE PROJECT AND PRIOR TO SCHEDULING OF THE FINAL INSPECTION, THE APPLICANT OR THEIR AUTHORIZED REPRESENTATIVE, SHALL PROVIDE THE FOLLOWING DOCUMENTATION TO
BREVARD COUNTY PUBLIC WORKS ENGINEERING:
a. A CERTIFICATE OF COMPLETION - REQUEST FOR FINAL INSPECTION FORM. THE FORM MUST BE FROM A PROFESSIONAL
ENGINEER LICENSED IN THE STATE OF FLORIDA WITH THEIR SEAL AFFIXED. THE FORM CERTIFIES THAT THE IMPROVEMENTS
HAVE BEEN CONSTRUCTED IN CONFORMANCE WITH THE APPROVED CONSTRUCTION PLANS AND SPECIFICATIONS.
b. A COMPLETE SET OF TESTING REPORTS FOR ALL TESTS PERFORMED ON THE PROJECT WITHIN THE COUNTY RIGHT-O- WAY
AND/OR FOR ALL SUBDIVISION CONSTRUCTION REGARDLESS OF PUBLIC OR PRIVATE.
c. THREE SETS OF AS-BUILT DRAWINGS MEETING THE REQUIREMENTS OF SECTION 61G17, F.A.C., AND SIGNED AND SEALED BY A
SURVEYOR LICENSED IN THE STATE OF FLORIDA. AT A MINIMUM, ALL AS-BUILT DRAWINGS MUST INCLUDE:
i. ROAD/PAVEMENT ELEVATIONS; ROADWAY CROSS SLOPES; PAVEMENT WIDTH; PAVEMENT SPOT ELEVATIONS
NECESSARY TO CONFIRM STORMWATER DRAINAGE PATTERNS AT INTERSECTIONS AND SIDEWALKS; CURB SLOPES;
ii. STORMWATER PIPE SIZES AND INVERT ELEVATIONS; LOCATION OF OUTFALL STRUCTURE(S) WITH AS-BUILT ELEVATIONS
FOR ALL CONTROL STRUCTURE & SKIMMER ELEVATIONS SHOWN ON THE APPROVED PLANS; TOP OF BANK, GRADE
BREAKS, BOTTOM ELEVATIONS FOR ALL STORMWATER PONDS OR BERM AREAS;
iii. ANY OTHER ADDITIONAL AS-BUILT DATA THAT IS APPLICABLE TO THE PROJECT TO ENSURE COMPLETION IN
ACCORDANCE WITH THE APPROVED CONSTRUCTION PLANS.
d. PIPE INSPECTION VIDEO PER FDOT REQUIREMENTS. (IF APPLICABLE PER NOTE 4 OF DRAINAGE NOTES)
e. IF A MUNICIPALITY IS ACCEPTING A PUBLIC WATER AND/OR SEWER SYSTEM, THERE MUST BE DOCUMENTATION INDICATING
MUNICIPAL ACCEPTANCE OF THE CONSTRUCTION OF THE WATER AND/OR SEWER SYSTEM.
f. PUBLIC WORKS ENGINEERING WILL NOT SIGN OFF ON A TEMPORARY CERTIFICATE OF OCCUPANCY (TCO) FROM THE BREVARD
COUNTY BUILDING DEPARTMENT UNTIL THE AS-BUILT DRAWINGS AND OTHER DOCUMENTATION LISTED ABOVE HAVE BEEN
SUBMITTED AND REVIEWED BY PUBLIC WORKS ENGINEERING.
g. PROJECTS CONNECTED TO THE BREVARD COUNTY WATER, SANITARY SEWER, AND/OR RECLAIMED WATER SYSTEMS MUST
OBTAIN FINAL APPROVAL FOR THE PROJECT DIRECTLY FROM BREVARD COUNTY UTILITY SERVICES AS OUTLINED IN THE
BREVARD COUNTY CRITERIA FOR WATER AND SANITARY SEWERAGE SYSTEMS.
3. UPON APPROVAL OF FINAL INSPECTION, AN ENGINEER'S CERTIFIED COST ESTIMATE WILL BE REQUIRED ALONG WITH A 2-YEAR MAINTENANCE BOND FOR ALL IMPROVEMENTS WITHIN THE COUNTY RIGHT-OF-WAY AS REQUIRED BY CHAPTER 86 OF THE BREVARD COUNTY CODE OF ORDINANCES. THE MAINTENANCE BOND SHALL BE 25% OF THE ENGINEER'S CERTIFIED COST ESTIMATE.
4. THE CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGE TO THE COUNTY INFRASTRUCTURE DURING CONSTRUCTION. THIS INCLUDES, BUT IS NOT LIMITED TO, THE STRUCTURAL INTEGRITY OF THE ROADWAY ASPHALT, BASE, AND STABILIZED SUB-BASE, SIDEWALKS, STORMWATER DRAINAGE SYSTEM, DRAINAGE STRUCTURES, CURBS, GROUND COVER, WATER SYSTEMS, SANITARY SEWER SYSTEMS, AND RECLAIMED WATER SYSTEMS. ALL REPAIRS SHALL BE COMPLETED IN ACCORDANCE WITH FDOT AND BREVARD COUNTY STANDARDS.
ALL REPAIRS SHALL BE COMPLETED PRIOR TO THE FINAL INSPECTION OF THE PROJECT. SIDEWALK PATCHING WILL NOT BE ACCEPTABLE.
5. A VISUAL OR MECHANICAL INTERIOR INSPECTION OF EXISTING CULVERTS WILL BE REQUIRED PRIOR TO THE FINAL INSPECTION.
6. ALL DISTURBED AREAS WITHIN THE COUNTY RIGHT-OF-WAY SHALL BE SODDED. SEED & MULCH IS NOT ACCEPTABLE. SOD SHALL MATCH EXISTING SOD TYPE. BAHIA SOD SHALL BE USED IN AREAS ADJACENT TO VACANT PROPERTY. DISTURBED AREAS OUTSIDE THE
CONSTRUCTION LIMITS WILL BE SODDED AT THE CONTRACTOR'S EXPENSE.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL SURVEY MONUMENTATION. ANY SURVEY MONUMENTATION DISTURBED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED BY A FLORIDA LICENSED SURVEYOR PRIOR TO ISSUANCE OF A
CERTIFICATE OF COMPLETION FOR THE PROJECT.
8. REGARDLESS OF PRIVATE OR PUBLIC DEDICATION, THERE SHALL BE NO UTILITY CONNECTIONS OR METER BOXES WITHIN PROPOSED OR
EXISTING SIDEWALKS OR DRIVEWAY AREAS.
9. ALL DIRECTIONAL BORES SHALL BE IN ACCORDANCE WITH FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION
SECTION 555, DIRECTIONAL BORES AND THE FDOT UTILITIES ACCOMMODATION MANUAL.
10. ALL DIRECTIONAL BORES MUST EXTEND A MINIMUM OF EIGHT(8) FEET PAST THE EDGE OF PAVEMENT OF ANY ROADWAY OR COMMERCIAL DRIVEWAY. FOR RESIDENTIAL DRIVEWAYS AND SIDEWALKS, THE BORE MUST EXTEND THREE (3) FEET PAST THE EDGE ON EITHER SIDE.
11. THE CONTRACTOR SHALL CONTROL DUST GENERATED BY THIS PROJECT AT ALL TIMES, SHALL PROVIDE STREET SWEEPING AS REQUIRED, AND PREVENT SEDIMENT FROM ENTERING INTO THE EXISTING DRAINAGE SYSTEM AT ALL TIMES.
12. THE CONTRACTOR SHALL NOT EXCEED NOISE LEVELS AS SPECIFIED IN BREVARD COUNTY CODE OF ORDINANCES SECTION 62-2271.
13. ALL STRIPING AND PAVEMENT MARKINGS IN THE COUNTY RIGHT-OF-WAY SHALL BE THERMOPLASTIC AND SHALL NOT BE APPLIED UNTIL A MINIMUM OF 30 DAYS AFTER THE PLACEMENT OF THE FINAL ASPHALT SURFACE. IN THE INTERIM, STRIPING SHALL BE PAINT AND ANY REQUIRED RPM'S INSTALLED PER THE PLANS. DO NOT STRIPE ACROSS MANHOLE LIDS OR DRAINAGE GRATES.
14. REFLECTIVE PAVEMENT MARKINGS (RPM'S) SHALL BE INSTALLED IN ALL LOCATIONS AS REQUIRED BY FDOT STANDARD PLANS (FY20-21).
15. ANY PAVEMENT MARKINGS AND RPM'S THAT ARE DESTROYED, DAMAGED, OR DIMINISHED BY CONSTRUCTION ACTIVITIES FOR UP TO 500 FEET IN EITHER DIRECTION BEYOND THE LIMITS OF CONSTRUCTION SHALL BE REPLACED OR REFURBISHED BY THE CONTRACTOR.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF THE COUNTY RIGHT-OF-WAY FOR THE DURATION OF CONSTRUCTION. AT A MINIMUM, THE CONTRACTOR SHALL MOW THE RIGHT-OF-WAY ON AN AS NEEDED BASIS AND MAINTAIN THE DRAINAGE CONVEYANCE SYSTEM. ADDITIONAL MAINTENANCE MAY BE REQUIRED ON A CASE BY CASE BASIS.
TEMPORARY TRAFFIC CONTROL
1. MOT PLAN REVIEW: A PROJECT-SPECIFIC MAINTENANCE OF TRAFFIC (MOT) PLAN OR ROADWAY CLOSURE MOT/DETOUR PLAN MUST BE
SUBMITTED TO BREVARD COUNTY TRAFFIC OPERATIONS (321-633-2077) FOR APPROVAL A MINIMUM OF TWO (2) WEEKS PRIOR TO START OF CONSTRUCTION. THE MOT PLAN SHALL BE IN ACCORDANCE WITH MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND FDOT STANDARD PLANS (FY20-21) INDEXES 102-601 THROUGH 102-680. PORTABLE CHANGEABLE MESSAGE SIGNS (PCMS OR VMS) MAY BE
REQUIRED TO SUPPLEMENT THE STANDARD MOT SIGNAGE.
2. ROAD CLOSURES: THE CONTRACTOR SHALL NOTIFY BREVARD COUNTY TRAFFIC OPERATIONS (321-633-2077) A MINIMUM OF TWO (2) WEEKS IN ADVANCE OF THE PROPOSED START DATE OF CONSTRUCTION WITHIN THE RIGHT-OF-WAY, FOR EACH PHASE OF CONSTRUCTION, IF APPLICABLE. CONSTRUCTION SHALL NOT BEGIN UNTIL THE MOT PLAN IS APPROVED AND NOTIFICATIONS HAVE BEEN SENT TO AFFECTED AGENCIES. CERTAIN LOCATIONS MAY REQUIRE WORK IN THE RIGHT-OF-WAY TO BE PERFORMED AT NIGHT ONLY.
3. LANE CLOSURES: THE CONTRACTOR SHALL NOTIFY BREVARD COUNTY TRAFFIC OPERATIONS (321-633-2077) A MINIMUM OF ONE (1) WEEK IN ADVANCE OF THE PROPOSED START DATE OF CONSTRUCTION WITHIN THE RIGHT-OF-WAY. CONSTRUCTION SHALL NOT BEGIN UNTIL THE MOT PLAN IS APPROVED AND NOTIFICATIONS HAVE BEEN SENT TO AFFECTED AGENCIES. NO LANE CLOSURES WILL BE PERMITTED
DURING PEAK HOUR TRAFFIC VOLUMES.
4. ALL TRAFFIC CONTROL DEVICES SHALL MEET THE REQUIREMENTS OF THE MUTCD FOR STREETS AND HIGHWAYS, FDOT STANDARDS
(LATEST EDITIONS), AND BREVARD COUNTY LAND DEVELOPMENT EXHIBIT #26.
5. LIMITS OF DISTURBANCE: AT NO TIME SHALL THE CONTRACTOR DISTURB SURROUNDING PROPERTIES OR TRAVEL ON SURROUNDING PROPERTIES WITHOUT WRITTEN CONSENT FROM THE PROPERTY OWNER. REPAIR OR RECONSTRUCTION OF DAMAGED AREAS ON SURROUNDING PROPERTIES SHALL BE PERFORMED BY THE CONTRACTOR ON AN IMMEDIATE BASIS. ALL COSTS FOR REPAIRS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND NO EXTRA COMPENSATION SHALL BE PROVIDED. ALL DISTURBED AREAS SHALL BE
RESTORED TO EQUAL OR BETTER THAN THE CONDITION PRIOR TO CONSTRUCTION.
6. TREE REMOVAL: THE CONTRACTOR SHALL NOTIFY THE OWNER AND ENGINEER WHEN ALL WORK IS LAID OUT (SURVEY STAKED), SO THAT A DETERMINATION MAY BE MADE OF SPECIFIC TREES TO BE REMOVED. NO TREES SHOWN ON THE CONSTRUCTION PLANS AS BEING
SAVED SHALL BE REMOVED WITHOUT PERMISSION FROM THE OWNER AND ENGINEER.
7. CLEARING AND GRUBBING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEARING AND GRUBBING FOR SITE CONSTRUCTION INCLUDING CLEARING FOR PAVING, UTILITIES, DRAINAGE FACILITIES AND BUILDING CONSTRUCTION. SEE PLANS FOR LIMITS OF CLEARING AND GRUBBING. ALL AREAS TO BE CLEARED SHALL BE FIELD STAKED AND REVIEWED BY THE OWNER AND ENGINEER PRIOR TO ANY
CONSTRUCTION.
8. MATERIAL STORAGE / DEBRIS REMOVAL: ALL MATERIALS EXCAVATED SHALL REMAIN THE PROPERTY OF THE OWNER AND SHALL BE STOCKPILED AT ON-SITE LOCATIONS AS SPECIFIED BY THE OWNER. MATERIALS SHALL BE STOCKPILED SEPARATELY AS TO USABLE (NONORGANIC) FILL STOCKPILES AND ORGANIC (MUCK) STOCKPILES IF MUCK IS ENCOUNTERED.CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL UNSUITABLE FILL MATERIALS FROM THE SITE. ALL CLAY ENCOUNTERED SHALL BE EXCAVATED OUT AND
REPLACED WITH CLEAN GRANULAR FILL MATERIALS.
DRAINAGE - ROADWAYS
1. ALL DRAINAGE SYSTEM CONSTRUCTION SHALL CONFORM TO FDOT STANDARD SPECIFICATIONS AND FDOT STANDARD PLANS (FY20-21).
2. ALL RETICULINE STEEL GRATES SHALL BE HOT DIPPED GALVANIZED AND HAVE A TRAFFIC BEARING H-20 LOAD RATING.
3. ALL GRATES UTILIZED WITHIN THE COUNTY RIGHT-OF-WAY SHALL BE TRAFFIC BEARING H-20 LOADING.
4. ALL STORMWATER PIPING WITHIN THE ROAD RIGHT-OF-WAY, REGARDLESS OF PUBLIC OR PRIVATE, OR STORMWATER PIPING THAT CONVEYS STORMWATER UNDER THE ROADWAY BETWEEN STORMWATER TREATMENT PONDS, SHALL BE INSPECTED PER SECTIONS 430-4.8, 430-4.8.1, AND 430-4.8.2 OF THE FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION,( LATEST EDITION). A COPY OF THE PIPE VIDEO SHALL BE PROVIDED TO THE COUNTY AS PART OF THE SUBMITTAL OF THE CERTIFICATION OF COMPLETION REQUEST FOR FINAL INSPECTION. THE COUNTY SHALL BE NOTIFIED ONE WEEK PRIOR TO THE START OF THE PIPE VIDEO INSPECTION
PROCESS.
5. ALL OPEN CUTS SHALL CONFORM TO LAND DEVELOPMENT EXHIBIT #25. FOR ALL OPEN CUTS, THE FLOWABLE FILL AND TEMPORARY ASPHALT SHALL BE INSTALLED WITHIN TWO (2) DAYS OF THE EXCAVATION (UNLESS OTHERWISE APPROVED IN WRITING BY BREVARD COUNTY PUBLIC WORKS ENGINEERING). PERMANENT ASPHALT INCLUDING MILLING AND RESURFACING, IF NEEDED, SHALL BE
COMPLETED WITHIN THIRTY (30) DAYS OF EXCAVATION.
6. THE CONTRACTOR SHALL REMOVE THE SHOULDER OF THE ROADWAY TO A POINT WHERE THE BASE MATERIAL OF THE EXISTING ROADWAY MEETS THE MINIMUM THICKNESS OF THE PROPOSED ROADWAY/COMMERCIAL DRIVEWAY CONNECTION.
CONCRETE PAVING AND SIDEWALK
1. ALL DRIVEWAYS SHALL BE CONSTRUCTED PER FDOT INDEX 515 AND/OR BREVARD COUNTY STANDARD EXHIBITS UNLESS OTHERWISE
NOTED.
2. ALL CONCRETE SHALL MEET FDOT DESIGN MIX AND SPECIFICATIONS. CURING METHOD SHALL BE IN ACCORDANCE WITH THE FDOT
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION,( LATEST EDITION).
3. ALL SIDEWALKS WITHIN THE COUNTY RIGHT-OF-WAY OR WITHIN A PUBLIC SIDEWALK EASEMENT SHALL BE CONSTRUCTED OF 6-INCH THICK, 3000-PSI CONCRETE WITH FIBER MESH REINFORCEMENT. CONCRETE SIDEWALKS (OR PEDWAYS) AND CONCRETE DRIVEWAY APRONS SHALL BE CONSTRUCTED OVER SOILS COMPACTED TO 98% DENSITY, OF AASHTO T -180. SHOULD EXISTING SOILS BE FOUND UNSUITABLE FOR COMPACTION, ADDITIONAL COMPATIBLE MATERIALS SHALL BE BROUGHT TO THE SITE FOR USE AS SUBGRADE.
ALTERNATE METHODS OF COMPACTION MAY BE REQUIRED TO AVOID DAMAGE TO SURROUNDING PROPERTIES.
4. CONSTRUCT SIDEWALK JOINTS PURSUANT TO FDOT INDEX 310 (LATEST EDITION). EXPANSION JOINTS SHALL BE EVERY 50 FEET, AND
BETWEEN NEW AND OLD CONCRETE.
5. TWO BY FOUR FORM BOARDS SHALL NOT BE USED FOR SIDEWALK/DRIVEWAY CONSTRUCTION. FORM BOARDS SHALL MATCH PROPOSED CONCRETE THICKNESS. SLIP FORMS SHALL NOT BE USED FOR SIDEWALK CONSTRUCTION. FIXED FORMWORK SHALL BE REQUIRED PER
FDOT INDEX 300.
6. THE CONTRACTOR SHALL PROVIDE A 3-FOOT CURB TRANSITION AT ALL CURB TERMINATIONS.
7. ALL SIDEWALK AND ACCESS RAMP CONSTRUCTION SHALL COMPLY WITH THE DEPARTMENT OF JUSTICE 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN, FDOT STANDARD PLANS (FY20-21), AND BREVARD COUNTY DEVELOPMENT REQUIREMENTS.
ASPHALT PAVING AND TESTING
THE FOLLOWING TESTING REQUIREMENTS APPLY TO:
a. ALL PUBLIC AND PRIVATE SUBDIVISION PROJECTS PERMITTED THROUGH BREVARD COUNTY PLANNING AND DEVELOPMENT;
b. ALL SITE PLAN PROJECTS PERMITTED THROUGH BREVARD COUNTY PLANNING AND DEVELOPMENT REQUIRING WORK IN THE
COUNTY RIGHT-OF-WAY;
c. ALL PROJECTS PERMITTED THROUGH BREVARD COUNTY PUBLIC WORKS FOR WORK WITHIN THE COUNTY RIGHT-OF-WAY.
SECTIONS WITHIN THE FDOT STANDARD SPECIFICATIONS LIMITING TESTING REQUIREMENTS BASED ON LOT SIZE, SUB-LOT SIZE, TONNAGE, MINIMUM THICKNESS, OR SPREAD RATE WILL NOT APPLY TO THE PROJECTS LISTED ABOVE. AT A MINIMUM, ONE SET OF TESTS WILL BE
REQUIRED FOR ALL PAVING PROJECTS LARGER THAN 50 TONS TOTAL AND ADDITIONAL TESTING MAY BE REQUIRED ON A CASE BY CASE
EVALUATION OF THE PROJECT. TESTING REQUIREMENTS AT THE ASPHALT PLANT WILL NOT APPLY.
FOR S-TYPE ASPHALT AS SPECIFIED IN THE 2000-2004 FDOT STANDARD SPECIFICATION:
1. THE CONTRACTOR SHALL PROVIDE A DESIGN MIX SIGNED AND SEALED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF
FLORIDA AND APPROVED BY THE ENGINEER OF RECORD FOR THE PROJECT TO PUBLIC WORKS ENGINEERING FIVE BUSINESS DAYS PRIOR TO PAVING. THE MIX DESIGN SHALL MEET FDOT MINIMUM REQUIREMENTS AS OUTLINED IN SECTION 331-4 (2000). DESIGN MIXES BY FDOT
CERTIFIED MIX DESIGNERS WILL NOT BE ACCEPTED.
2. THE CONTRACTOR SHALL PROVIDE EXTRACTION/GRADATION TESTS IN ACCORDANCE WITH SECTION 331-4.4.2 (2000).
3. THE CONTRACTOR SHALL PROVIDE MARSHALL STABILITY TESTING IN ACCORDANCE WITH SECTION 331-5.5.1 (2000).
4. PAVEMENT SURFACE SHALL MEET ALL REQUIREMENTS SPECIFIED IN SECTION 330-13 (2000).
5. THE CONTRACTOR SHALL PROVIDE SURFACE TOLERANCE TESTING FOR ROADWAYS WITH DESIGN SPEEDS OF 35 MPH OR GREATER IN
ACCORDANCE WITH SECTION 330-13.3 (2000).
6. QUALITY CONTROL CORE BORINGS SHALL BE OBTAINED FOR THICKNESS PER SECTION 330-2.2 ROADWAY, (2004) AND DENSITY PER
SECTION 330-11, TABLE 330-3 (2000).
7. ASPHALT TEST RESULTS FOR EACH CORE TAKEN ARE REVIEWED ON AN INDIVIDUAL BASIS FOR THICKNESS AND DENSITY. THICKNESS AND DENSITY AVERAGES WILL NOT BE ACCEPTED. NO UNDER TOLERANCE FOR THE THICKNESS OF EACH ASPHALT CORE WILL BE
ALLOWED.
FOR SUPERPAVE (SP) ASPHALT AS SPECIFIED IN THE 2010 FDOT STANDARD SPECIFICATION:
1. THE CONTRACTOR SHALL PROVIDE AN FDOT APPROVED DESIGN MIX, APPROVED BY THE ENGINEER OF RECORD FOR THE PROJECT, TO
PUBLIC WORKS ENGINEERING FIVE BUSINESS DAYS PRIOR TO PAVING. THE MIX DESIGN SHALL MEET FDOT MINIMUM REQUIREMENTS AS OUTLINED IN SECTION 334-2 & 334-3 (2010). DESIGN MIXES BY FDOT CERTIFIED MIX DESIGNERS THAT ARE NOT FDOT APPROVED WILL NOT
BE ACCEPTED.
2. THE CONTRACTOR SHALL PROVIDE GRADATION AND BINDER CONTENT TESTING IN ACCORDANCE WITH SECTION 334-5. (2010) HOWEVER, THE SAMPLE(S) MAY BE TAKEN AT THE PROJECT LOCATION IN LIEU OF AT THE ASPHALT PLANT AS SPECIFIED. RESULTS MUST BE
PROVIDED TO THE COUNTY WITHIN ONE WEEK AFTER THE COMPLETION OF PAVING.
3. THE CONTRACTOR SHALL PROVIDE QUALITY CONTROL, DENSITY, AND THICKNESS TESTING IN ACCORDANCE WITH SECTIONS 334-3, 334-4, 334-5, AND 334-5.2.3 (2010).
4. ASPHALT TESTING RESULTS FOR EACH CORE TAKEN ARE REVIEWED ON AN INDIVIDUAL BASIS FOR THICKNESS AND DENSITY. THICKNESS AND DENSITY AVERAGES, AS NOTED IN TABLE 334-5, NOTE 2, OF SECTION 334-5 (2010) WILL NOT BE ACCEPTED. NO UNDER TOLERANCE
FOR THE THICKNESS OF EACH ASPHALT CORE WILL BE ALLOWED.
5. PAVEMENT SURFACE SHALL MEET ALL REQUIREMENTS SPECIFIED IN SECTION 330-12 (2010).
6. THE CONTRACTOR SHALL PROVIDE QUALITY CONTROL SURFACE TOLERANCE TESTING FOR ROADWAYS WITH DESIGN SPEEDS OF 35 MPH
OR GREATER IN ACCORDANCE WITH 330-12 (2010).
FOR FRICTION COURSE FC-5 AS SPECIFIED IN THE 2010 FDOT STANDARD SPECIFICATION:
1. THE CONTRACTOR SHALL PROVIDE PROVIDE AN FDOT APPROVED DESIGN MIX, APPROVED BY THE ENGINEER OF RECORD FOR THE
PROJECT, TO PUBLIC WORKS ENGINEERING FIVE BUSINESS DAYS PRIOR TO PAVING. THE MIX DESIGN SHALL MEET FDOT MINIMUM REQUIREMENTS AS OUTLINED IN SECTION 337-4 (2010). DESIGN MIXES BY FDOT CERTIFIED MIX DESIGNERS THAT ARE NOT FDOT
APPROVED WILL NOT BE ACCEPTED.
2. THE CONTRACTOR SHALL PROVIDE GRADATION AND BINDER CONTENT TESTING IN ACCORDANCE WITH SECTION 337-5 & 337-6 (2010). THE SAMPLE(S) MAY BE TAKEN AT THE PROJECT LOCATION IN LIEU OF AT THE ASPHALT PLANT AS SPECIFIED. RESULTS MUST BE PROVIDED
TO THE COUNTY WITHIN ONE WEEK AFTER THE COMPLETION OF PAVING.
3. PAVEMENT SURFACE SHALL MEET ALL REQUIREMENTS SPECIFIED IN SECTION 330-12 (2010).
4. QUALITY CONTROL CORE BORINGS SHALL BE OBTAINED FOR THICKNESS TESTING USING SECTION 334-5.2.3 (2010).
5. THE CONTRACTOR SHALL PROVIDE QUALITY CONTROL SURFACE TOLERANCE TESTING FOR ROADWAYS WITH DESIGN SPEEDS OF 35 MPH
OR GREATER IN ACCORDANCE WITH SECTION 330-12 (2010).
FOR SUPERPAVE FRICTION COURSES FC-9.5 & FC-12.5 AS SPECIFIED IN THE 2010 FDOT STANDARD SPECIFICATIONS:
1. THE CONTRACTOR SHALL PROVIDE AN FDOT APPROVED DESIGN MIX, APPROVED BY THE ENGINEER OF RECORD FOR THE PROJECT, TO PUBLIC WORKS ENGINEERING FIVE BUSINESS DAYS PRIOR TO PAVING. THE MIX DESIGN SHALL MEET FDOT MINIMUM REQUIREMENTS AS OUTLINED IN SECTION 337-4 (2010). DESIGN MIXES BY FDOT CERTIFIED MIX DESIGNERS THAT ARE NOT FDOT APPROVED WILL NOT BE
ACCEPTED.
2. THE CONTRACTOR SHALL PROVIDE GRADATION AND BINDER CONTENT TESTING IN ACCORDANCE WITH SECTION 337-5 & 337-6 (2010). THE SAMPLE(S) MAY BE TAKEN AT THE PROJECT LOCATION IN LIEU OF AT THE ASPHALT PLANT, AS SPECIFIED. RESULTS MUST BE PROVIDED
TO THE COUNTY WITHIN ONE WEEK AFTER THE COMPLETION OF PAVING.
3. THE CONTRACTOR SHALL PROVIDE QUALITY CONTROL, DENSITY, AND THICKNESS TESTING IN ACCORDANCE WITH SECTIONS 337-1, 337-3, 337-4, 337-6, 337-8, AND 334-5.2.3 (2010).
4. ASPHALT TESTING RESULTS FOR EACH CORE TAKEN ARE REVIEWED ON AN INDIVIDUAL BASIS FOR THICKNESS AND DENSITY. THICKNESS AND DENSITY AVERAGES, AS NOTED IN TABLE 334-5, NOTE 2, OF SECTION 334-5 (2010) WILL NOT ACCEPTED. NO UNDER TOLERANCE FOR
THE THICKNESS OF EACH ASPHALT CORE WILL BE ALLOWED.
5. PAVEMENT SURFACE SHALL MEET ALL REQUIREMENTS SPECIFIED IN SECTION 330-12 (2010).
6. THE CONTRACTOR SHALL PROVIDE QUALITY CONTROL SURFACE TOLERANCE TESTING FOR ROADWAYS WITH DESIGN SPEEDS OF 35 MPH
OR GREATER IN ACCORDANCE WITH 330-12 (2010).
SUBSURFACE EXPLORATION:
SUBSURFACE EXPLORATION: REFER TO THE SUBSURFACE EXPLORATION REPORT BY TERRACON FOR ADDITIONAL SUBSURFACE
INFORMATION/CONDITIONS.
PLEASE NOTE:
CEMENTED ROCK LAYERS AND WEATHERED COQUINA WERE ENCOUNTERED AT VARIOUS DEPTHS AT ALL OF THE BORING LOCATIONS.
SHALLOW ROCK LAYERS APPEAR TO EXIST IN SOME AREAS WHERE CEMENTATION IS THE GREATEST. THESE LAYERS MAY HINDER EXCAVATION WITH TYPICAL BACKHOE OR SIMILAR EQUIPMENT OR DIRECTIONAL DRILLING. SEE THE SUBSURFACE EXPLORATION REPORT
BY UNIVERSAL ENGINEERING SCIENCES.
CPV
SNR
149850012
OCTOBER 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
© BREVARD COUNTY GENERAL NOTES
FDOT GENERAL NOTES
1. ALL WORK PERFORMED WITHIN THE FDOT RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH 2024/2025 EDITION OF FDOT DESIGN
STANDARDS, 2022 FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND THE 2017 UTILITY ACCOMMODATION
MANUAL.
2. ALL EXCAVATIONS WITHIN TEN (10) FEET OF THE TRAVEL LANES AND GREATER THAN THREE (3) INCHES DEEP MUST BE FILLED IN OR HAVE A SHOULDER TREATMENT PLACED AT THE DROP-OFF PER INDEX #102-600 OF FDOT 2021/22 STANDARDS PLANS INDEXES AT THE END OF
THE WORK DAY.
3. CONTRACTOR SHALL CONTACT FDOT TWO WEEKS IN ADVANCE AND SET UP A PRE-CONSTRUCTION MEETING PRIOR TO STARTING ANY
WORK IN FDOT RIGHT OF WAY.
4. ALL TRAFFIC CONTROL DEVICES MUST BE IN PLACE BEFORE WORK CAN START.
5. MAINTENANCE OF TRAFFIC TO BE SUPERVISED BY A FDOT CERTIFIED WORK TRAFFIC SUPERVISOR.
6. ENGINEER'S CERTIFICATIONS TOGETHER WITH AS-BUILT PLANS ARE REQUIRED TO BE SUBMITTED WITHIN 30 DAYS OF COMPLETION
WORK WITHIN FDOT RIGHT-OF-WAY.
7. IT WILL BE THE RESPONSIBILITY OF THE PERMITTEE TO REPAIR ANY DAMAGE TO FDOT FACILITIES CAUSED BY CONSTRUCTION OF THE
PROJECT.
8. PERMITTEE SHALL NOT BEGIN THE WORK WITHIN THE FDOT RIGHT-OF-WAY UNTIL A FDOT INSPECTOR IS PRESENT AT THE JOB SITE AND
AGREES THAT PROPER PREPARATIONS HAVE BEEN MADE.
9. SOD ALL UNPAVED AREAS WITHIN FDOT RIGHT-OF-WAY THAT ARE DISTURBED BY CONSTRUCTION PER FDOT STANDARDS PLANS INDEX #570-010.
10. SAW CUT ON SHOULDER'S EDGE OF PAVEMENT TO PROVIDE SMOOTHER JOINTS.
11. ALL AFFECTED SIDEWALKS, RAMPS, AND CROSSWALKS, WILL BE BUILT AND INSPECTED TO MEET CURRENT ADA REQUIREMENTS.
12. ALL SIDEWALK TO BE REMOVED AND REPLACED FROM JOINT TO JOINT AND HAVE 12" EXPANSION JOINTS (PREFORMED JOINT FILLER)
PLACED BETWEEN OLD AND NEW SIDEWALK.
13. PERMITTEE SHALL NOT COMMENCE USE OF CONNECTION PRIOR TO FINAL INSPECTION AND FINAL ACCEPTANCE BY DEPARTMENT.
FAILURE TO COMPLY WITH PERMIT CONDITION MAY RESULT IN REVOCATION OF THE PERMIT AND CLOSURE OF DRIVEWAY PER FL RULE
CHAPTER 14-96.
BREVARD COUNTY PUBLIC WORKS GENERAL NOTES
1. CONTRACTOR TO FOLLOW FDOT STANDARD SPECIFICATIONS SECTION 125 EXCAVATION FOR STRUCTURES AND PIPE.
2. SHORING SHALL BE REQUIRED FOR EXCAVATIONS WITHIN 8 FEET FROM THE EDGE OF PAYMENT OR 3 FEET FROM THE EDGE OF
SIDEWALK.
3. CONTRACTOR SHALL UTILIZE DITCHES, PIPES, AND/OR PUMPS AS NECESSARY TO MAINTAIN THE EXISTING DRAINAGE DURING ALL PHASES OF CONSTRUCTION. THE ADJACENT PROPERTIES ARE LOCATED IN UNINCORPORATED BREVARD COUNTY. THE SITE DRAINAGE SHALL NOT ADVERSELY IMPACT HISTORICAL DRAINAGE OR CAUSE DRAINAGE ISSUES FOR THE UNINCORPORATED BREVARD AREAS.
4. IF ANY SIGNAGE IN THE BREVARD COUNTY RIGHT-OF-WAY IS REMOVED, IT SHALL BE REPLACED IN ACCORDANCE WITH B.C.L.D. EXHIBIT 26.
5. ANY SIGN, PAVEMENT MARKINGS, OR RPM'S THAT ARE DAMAGED DURING THE INSTALLATION OF THE NEW FORCE MAIN OR REMOVAL OF THE FORCE MAIN SHALL BE REPLACED, RESTRIPED, OR REINSTALLED AS PART OF THIS PROJECT. IF ANY SIGNS OR POSTS ARE DAMAGED, PLEASE REFER TO B.C.L.D. EXHIBIT 26 FOR THE REPLACEMENT REQUIREMENTS. THIS IS ALSO TO INCLUDE ANY PAVEMENT MARKINGS OR
RPM'S THAT ARE DAMAGED 100 FT TO EITHER SIDE OF THE PROJECT LIMITS.
6. IF ANY STOP SIGNS OR REGULATORY SIGNS ARE REQUIRED TO BE TAKEN DOWN DURING THE WORK DAY HOURS, THEY SHALL BE REINSTALLED OR RELOCATED IMMEDIATELY AND BEFORE THE CONTRACTOR LEAVES THE SITE FOR THE DAY.
7. IF ANY STOP SIGN IS TAKEN DOWN OR RELOCATED, CONTRACTOR IS TO REPLACE SIGN NEXT TO, OR AS CLOSE AS POSSIBLE TO, THE
STOP BAR IT IS PERTAINING TO.
8. CONTRACTOR TO ACQUIRE ALL PERMITS AS REQUIRED FOR STRUCTURAL COMPONENTS INCLUDING, BUT NOT LIMITED TO, RETAINING WALLS, MASONRY WALLS, FENCING, ETC. A BUILDING PERMIT IS REQUIRED FOR ALL STRUCTURAL COMPONENTS.
9. BREVARD COUNTY TRAFFIC OPERATION (SIGNAL AND ITS) SHALL BE CONTACTED 72 HRS. PRIOR TO ANY WORK WITHIN THE R/W OR AROUND THE SIGNAL AT THE SR 3 INTERSECTION. THE CONTACT NUMBER IS (321) 455-1440.
10. ALL PAVEMENT MARKINGS REPLACED WITHIN BREVARD COUNTY RIGHT-OF-WAY MUST BE THERMOPLASTIC.
11. ALL PAVEMENT MARKINGS TO BE REINSTALLED PER FDOT STANDARD PLANS FY 2024-2025 INDEX 711-001 PAVEMENT MARKINGS.
BREVARD COUNTY PUBLIC WORKS ENGINEERING STANDARD DEVELOPMENT NOTES
G-4
(A)ARV (AUTOMATIC) AIR RELEASE VALVE
A/C AIR CONDITIONING
A/VV AIR/VACUUM AIR VALVE
AAV AUTOMATIC AIR VENT
ABAN ABANDON(ED)
ABFV ACTUATED BUTTERFLY VALVE
ABRSV ABRASIVE
ABS ACRYLONITRILE BUTADIENE STYRENE
AB-xx AUGER BORING (e.g. AB-1)
ACCMP ASPHALT-COATED CORRUGATED METAL
PIPE
ACCV AIR CUSHION CHECK VALVE
ACP ASBESTOS CEMENT PIPE
ADH ADHESIVE
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AG AMMONIA GAS
AIR AIR PIPE
AL ALUMINUM
ALT ALTERNATE
AMM AMMONIATOR
AOD ANGLE OF DEFLECTION
APPROX APPROXIMATE
AS AMMONIA SOLUTION
ASSY ASSEMBLY
B/W BOTH WAYS
BCV BALL CHECK VALVE
BF BLIND FLANGE
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BGO BURIED GEAR OPERATOR
BI BLACK IRON
BIP BLACK IRON PIPE
BITUM BITUMINOUS OR BITUMASTIC
BLDG BUILDING
BM BENCH MARK
BOC BACK OF CURB
BOS BOTTOM OF SLAB
BOT BOTTOM
BSP BLACK STEEL PIPE
BTWN BETWEEN
BV BALL VALVE
BW BUTT WELD
BWW BACKWASH WATER
B-xx BORING (e.g. B-1)
C&G CURB AND GUTTER
C.F. CUBIC FOOT
C.I. CUBIC INCH
C.Y. CUBIC YARD
C/C CENTER TO CENTER
CA COMPRESSED AIR
CAP CAPACITY
CATV CABLE TELEVISION
CAV COMBINATION AIR VALVE
CBP CHLORINE BOOSTER PUMP
CCC CHLORINE CONTACT CHAMBER
CE CHLORINATED EFFLUENT
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CI CAST IRON
CIP CAST IRON PIPE
CISP CAST IRON SOIL PIPE
CJ CONSTRUCTION JOINT
CL, ℄ CENTER LINE
CL2 CHLORINE GAS
CLF CHAIN LINK FENCE
CLR CLEAR(ANCE)
CMP CORRUGATED METAL PIPE
CMPA CORRUGATED METAL PIPE ARCH
CO CLEAN OUT
CO2 CARBON DIOXIDE
COAG COAGULANT
CONC CONCENTRATE
CONN CONNECTION
CONSTR CONSTRUCT(ION)
CONT CONTINUATION
COP COPPER PIPE
CP CONCRETE PIPE
CPA CONCRETE PIPE ARCH
CPLG COUPLING
CPP CONCRETE PRESSURE PIPE
CPVC CHLORINATED POLYVINYL CHLORIDE
CR CONCENTRIC REDUCER
CS CHLORINE SOLUTION
CV CHECK VALVE
CYL CYLINDER
D DRAIN
DEG DEGREE
DEMO DEMOLITION
DF DIESEL FUEL
DI DUCTILE IRON
DIA DIAMETER
DIAG. DIAGONAL
DIM DIMENSION
DIP DUCTILE IRON PIPE
DIR DIRECTION
DISCH DISCHARGE
DJ DISMANTLING JOINT
DMH DROP MANHOLE
DN DOWN
DR DIMENSION RATIO
DV DIAPHRAGM VALVE
DW DISINFECTED WATER
DWG DRAWING
DWV DRAIN, WASTE, AND VENT
E EAST(ING)
E.F. EACH FACE
E.W. EACH WAY
EA EACH
ECC ECCENTRIC
EFF EFFLUENT
EGO ELEVATED GEAR OPERATOR
EJ EXPANSION JOINT
EL(EV) ELEVATION
ELAST ELASTOMERIC
ELL ELBOW
EMER EMERGENCY
EOP EDGE OF PAVEMENT
EPDM ETHYLENE PROPYLENE DIENE
MONOMER
EQUIP EQUIPMENT
EST ESTIMATE(D)
EVA ELECTRIC VALVE ACTUATOR
EX(IST) EXISTING
EXP EXPANSION
EXT EXTERIOR
F/F FACE TO FACE
FAB FABRICATE(D)
FC FLEXIBLE COUPLING
FCA FLANGED COUPLING ADAPTER
FCV FLOW-CONTROL VALVE
FD FLOOR DRAIN
FE FILTER(ED) EFFLUENT
FF FINISH FLOOR
FH FIRE HYDRANT
FIG FIGURE
FIN FINISH(ED)
FL FLUORIDE
FLEX FLEXIBLE
FLG FLANGE(D)
FLR FLOOR
FM FORCE MAIN
FO(L)(C) FIBER OPTIC (LINE)(CONDUIT)
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBERGLASS REINFORCED PLASTIC
FT FOOT OR FEET
FV FOOT VALVE
FW FINISHED WATER
GA GAUGE
GAL GALLON(S)
GALV GALVANIZED
GBW GAC BACKWASH
GIP GALVANIZED IRON PIPE
GJ GROOVE JOINT
GND GROUND
GO GEAR OPERATED
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPS GALLONS PER SECOND
GR GRADE
GS GALVANIZED STEEL
GSP GALVANIZED STEEL PIPE
GSR GROUND STORAGE RESERVOIR
GST GROUND STORAGE TANK
GV GATE VALVE
HB HOSE BIBB
HD HEAVY-DUTY
HDD HORIZ. DIRECTIONAL DRILL
HDPE HIGH-DENSITY POLYETHYLENE
HFA HYDROFLUOSILICIC ACID
HFCA HARNESSED FLANGED COUPLING
ADAPTER
HORIZ HORIZONTAL
HP HORSEPOWER
HPA HIGH PRESSURE AIR
HR HOUR
HSP HIGH SERVICE PUMP
HT HEIGHT
HVA HYDRAULIC VALVE ACTUATOR
HVAC HEATING, VENTILATION, AND AIR
CONDITIONING
HW HOT WATER
HWL HIGH WATER LEVEL
HYD HYDRAULIC
ID INSIDE DIAMETER
IN INCH(ES)
INF INFLUENT
INV INVERT
IP IRON PIPE
IPS INTERNATIONAL PIPE STANDARD
IR INTERNAL RECYCLE
IW IRRIGATION WATER
JB JUNCTION BOX
JT JOINT
KGV KNIFE GATE VALVE
L,LT LEFT
LAB LABORATORY
LAM LAMINATE OR LAMINATION
LAT LATERAL
LB(S) POUND(S)
LEN LENGTH
LF LINEAR FEET
LHDPE LINEAR HIGH-DENSITY POLYETHYLENE
LS LIME SLURRY
LSS LIME STABILIZED SLUDGE
LWL LOW WATER LEVEL
MAINT MAINTAIN OR MAINTENANCE
MAN MANUAL(LY)
MAX MAXIMUM
MCC MOTOR CONTROL CENTER
ME(S) MITERED END (SECTION)
MECH MECHANICAL
MF MICROFILTRATION
MFR MANUFACTURE(R)
MG MILLION GALLONS
MGD MILLION GALLONS PER DAY
MH MANHOLE
MI MILE(S)
MIN MINIMUM
MISC MISCELLANEOUS
MJ MECHANICAL JOINT
ML MIXED LIQUOR
MPH MILES PER HOUR
MRPP METAL REINFORCED PLASTIC PIPE
MTD MOUNTED
MV MOTORIZED VALVE
MW MANWAY
MWL MEAN WATER LEVEL
N NORTH(ING)
N.C. NORMALLY CLOSED
N.I.C. NOT IN CONTRACT
N.O. NORMALLY OPEN
N/A NOT APPLICABLE
NaOCl SODIUM HYPOCHLORITE
NE NORTHEAST
NF NANOFILTRATION
NIC NOT IN CONTRACT
NO., # NUMBER
NOM NOMINAL
NPT NATIONAL PIPE TAPER
NPW NON-POTABLE WATER
NSFC NOT SHOWN FOR CLARITY
NTS,N.T.S. NOT TO SCALE
NW NORTHWEST
O&M OPERATION AND MAINTENANCE
O.C. ON CENTERS
O/E OR EQUAL
O/O OUTSIDE TO OUTSIDE
O2 OXYGEN
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OFF OFFSET
OH OVER HEAD
OP ORIFICE PLATE
OPER OPERATOR
OPP OPPOSITE
OPT OPTION(AL)
OVF OVERFLOW
P/L PROPERTY LINE
PA PROCESS AIR
PBV PLASTIC BALL VALVE
PC POINT OF CURVE
PE PLAIN END
PEP POLYETHYLENE PIPE
PERM PERMEATE
PG PRESSURE GAUGE
PGL PROPOSED GRADE LINE
PJ PUSH-ON JOINT
PM PROCESS MECHANICAL
PNV PINCH VALVE
POB POINT OF BEGINNING
POI POINT OF INTERSECTION
POJ PUSH-ON JOINT
POL POLYMER
PPD POUNDS PER DAY
PPM PARTS PER MILLION
PREFAB PREFABRICATED
PRES PRESSURE
PROP PROPOSED
PRV PRESSURE REDUCING VALVE
PRW PROCESS WATER
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT OF TANGENCY
PV PLUG VALVE
PVC POLYVINYL CHLORIDE
PVC-D POLYVINYLCHLORIDE (DOUBLE
CONTAINED)
PVDF POLYVINYLIDENE FLUORIDE (KYNAR)
PVMT PAVEMENT
PW POTABLE WATER
Q FLOW
QTY QUANTITY
R,RT RIGHT
R/W, R.O.W. RIGHT OF WAY
RAD., R. RADIUS
RAS RETURN ACTIVATED SLUDGE
RAW RAW WATER
RCB REINFORCED CONCRETE BOX
RCP REINFORCED CONCRETE PIPE
RCPA REINFORCED CONCRETE PIPE ARCH
RCW RECLAIMED WATER
REBAR REINFORCING STEEL
RED REDUCER
REEW REUSE EFFLUENT WATER
REF REFERENCE
REINF REINFORCE(D)(ING)(MENT)
REJ RO REJECT
REQ'D REQUIRED
REW RETURN EFFLUENT WATER
RJ RESTRAINED JOINT (BELL)
RMJ RESTRAINED MECHANICAL JOINT
RNG RANGE
RO REVERSE OSMOSIS
ROC RADIUS OF CURVATURE
RPM REVOLUTIONS PER MINUTE
RPZBP REDUCED PRESSURE ZONE BACKFLOW
PREVENTER
RR RAILROAD
RS RAW SEWAGE
RW RECLAIMED WATER
RWW RAW WASTEWATER
S SOUTH
S.F. SQUARE FOOT
S.I. SQUARE INCH
S.O. SIDE OPERATED
S.STL STAINLESS STEEL
S.Y. SQUARE YARD
SA SAMPLE LINE
SAN SANITARY
SB-xx SOIL BORING (e.g. SB-1)
SCH SCHEDULE
SCV SILENT CHECK VALVE
SD STORM DRAIN
SDR STANDARD DIMENSION RATIO
SE SOUTHEAST
SEC SECTION
SEFF SECONDARY EFFLUENT
SF SQUARE FOOT OR FEEET
SHT SHEET(ED)(ING)
SIM SIMILAR
SL SLUDGE
SLV SLEEVE
SM SHEET METAL
SOL SOLUTION
SP SOIL PIPE
SPEC(S) SPECIFICATION(S)
SPT-xx STANDARD PENETRATION TEST BORING
(e.g. SPT-1)
SQ SQUARE
SS SANITARY SEWER
SSE SUBSTANDARD EFFLUENT
ST SAMPLE TAP
STA STATION
STD STANDARD
STL STEEL
STORM STORMWATER
STR STRAIGHT
SUP SUPERNATANT
SV SOLENOID VALVE
SVC SERVICE
SVW SERVICE WATER
SW SOUTHWEST
SWD SIDEWATER DEPTH
SYM SYMBOL
SYMM SYMMETRICAL
T&B TOP AND BOTTOM
T.O.C. TOP OF CONCRETE
T.O.S. TOP OF SLAB
T.S. TAPPING SLEEVE
T.V. TAPPING VALVE
TAN TANGENT
TBM TEMPORARY BENCH MARK
TB-xx TEST BORING-xx (e.g. TB-1)
TDH TOTAL DYNAMIC HEAD
TEL TELEPHONE
TEMP TEMPORARY
TH TEST HOLE
THD THREAD(ED)
THK THICK(NESS)
TJ TIED JOINT
TOB TOP OF BANK
TOC TOP OF CURB
TOS TOE OF SLOPE
TS THICKENED SLUDGE
TV TELEVISION
TWP TOWNSHIP
TYP TYPICAL
UD UNDERDRAIN
UG UNDERGROUND
UGE UNDERGROUND ELECTRIC
UON UNLESS OTHERWISE NOTED
UTC UNDERGROUND TELEPHONE CABLE
UTIL UTILITY
UV ULTRAVIOLET
VAC VACUUM
VAR VARIES
VB VALVE BOX
VC VERTICAL CURVE
VCP VITRIFIED CLAY PIPE
VEL VELOCITY
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
VTR VENT THROUGH ROOF
W WEST
W.L. WATER LEVEL
W.P. WALL PIPE (WITH WATER STOP)
W/ WITH
W/O WITHOUT
WAS WASTE ACTIVATED SLUDGE
WCO WALL CLEAN OUT
WF WIDE FLANGE
WH WALL HYDRANT
WM WATER MAIN
WPR WORKING PRESSURE
WS(P) WELDED STEEL (PIPE)
WT WEIGHT
WTF WATER TREATMENT FACILITY
WTP WATER TREATMENT PLANT
WW WASTEWATER
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
WWTF WASTEWATER TREATMENT FACILITY
WWTP WASTEWATER TREATMENT PLANT
XFER TRANSFER
XLHDPE CROSS LINKED HIGH-DENSITY
POLYETHYLENE
YD YARD(S)
YH YARD HYDRANT
YR YEAR(S)
NOTE: THIS LEGEND IS FOR GENERAL REFERENCE. NOT ALL ABBREVIATIONS, SYMBOLS, PROCESSES, MATERIALS, OR FITTINGS MAY BE USED IN THIS DESIGN, NOR IS THIS LEGEND COMPREHENSIVE. REFER TO INDIVIDUAL DRAWING LEGEND(S) IF SYMBOLS ARE NOT LISTED. INDIVIDUAL DISCIPLINE STANDARD LEGENDS SUPERCEDE THIS GENERAL LEGEND, IF PROVIDED.
SECTION OR DETAIL
NUMBER/LETTER
SCALE:
A
M-1
DETAIL
N.T.S.DRAWING WHERE
DETAIL IS
REFERENCED
DETAIL/SECTION REFERENCES
DETAIL OR SECTION
NUMBER/LETTER
SHEET WHERE DETAIL
IS FOUND
OPTIONAL HAT
(INDICATES VIEW DIRECTION)
SECTION CUT AND
DIRECTION TAIL (ROTATED
AS REQUIRED)
STANDARD ABBREVIATIONSCIVIL SYMBOLS LEGEND
NOTE (TYP)
ANNOTATION, SINGLE
LEADER (INDICATING
TYPICAL AT MULTIPLE
LOCATIONS)
NOTE
ANNOTATION,
MULTIPLE LEADERS
INDICATING DISCRETE
TARGETS
VIEWPORT OR FEATURE
BREAK INDICATOR
VIEW FRAME EXTENT
(WITH DRAWING LOCATION
REFERENCE)
SEE SHEET xxx
STANDARD NORTH
ARROW (ROTATED AS
REQUIRED)
GRAPHIC SCALE
NORTH ARROW
DRAFTING LEGEND PROCESS PIPING LEGEND (DOUBLE-LINE OR 3D)
SD
SD
PROPOSED CONTOUR
EXISTING CONTOUR
PROPOSED STORM PIPE
EXISTING SPOT ELEVATION
PROPOSED ELEVATION
PROPOSED TOP OF CURB/
PROPOSED GRATE INLET
EXISTING STORM PIPE
PROPOSED CURB INLET
EXISTING GRATE INLET
PROPOSED STORM MANHOLE
PAVEMENT ELEVATION
PROPOSED DIRECTION OF
SURFACE WATER RUNOFF
PROPOSED YARD DRAIN
SHEET FROM WHERE DETAIL IS
FIRST REFERENCED
A M-2
NORTH
(HORIZONTAL AND/OR
VERTICAL AS REQUIRED)
HALF
VIEWPORT
SCALE
FULL
VIEWPORT
SCALE
DOUBLE
VIEWPORT
SCALE
PROCESS PIPING LEGEND (SINGLE-LINE)
EXISTING OVERHEAD LINE
EXISTING WATER MAIN
EXISTING UNDERGROUND TELE.COMM. LINE
PROPOSED SANITARY SEWER
EXISTING REUSE MAIN
EXISTING FORCE MAIN
PROPOSED SANITARY MANHOLE
PROPOSED SANITARY SERVICE
EXISTING FIBER OPTIC LINE
EXISTING NATURAL GAS LINE
UT
W W
OHE
RW RW
FM
FOC
GAS
MECHANICAL JOINT FITTINGS
FLANGED FITTINGS
SOLVENT WELD FITTINGS
BALL VALVE (SOLVENT WELD SHOWN)
GATE VALVE (FLANGED SHOWN)
PLUG VALVE (FLANGED SHOWN)
BUTTERFLY VALVE (FLANGED SHOWN,
WHEEL OPERATED)
BUTTERFLY VALVE (WAFER, LEVER
OPERATED)
GLOBE CHECK VALVE (FLANGED SHOWN)
SWING CHECK VALVE (FLANGED SHOWN)
PIPE COUPLING
EXPANSION JOINT, FLANGED
FLOW CONTROL VALVE (FLANGED SHOWN)
VENTURI FLOW METER (FLANGED SHOWN)
V-CONE FLOW METER (FLANGED SHOWN)
MAGNETIC FLOW METER (FLANGED SHOWN)
PROPELLER FLOW METER (FLANGED SHOWN)
BUTT-WELD FITTINGS (S.STL SHOWN)
SECONDARYPRIMARY SECONDARYPRIMARY
EXISTING SANITARY SEWERS
PROPOSED FORCE MAIN
A. TUCKER HUNTER
88634AJC
CPV
SNR
149850012
OCTOBER 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
SYMBOLS AND
ABBREVIATIONS G-5
CPV
SNR
149850012
OCTOBER 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
NORTH
KEY SHEET G-6
CPV
SNR
149850012
OCTOBER 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
NORTH
DEMO PLAN DE-1
GROUTED
HOPPER
EL. (-)22.0
REMOVE EXISTING
LIFT STATION AND
EQUIPMENT
LIFT STATION C-17
DEMO SECTION
SCALE: N.T.S.
REMOVE TOP 4 FEET
OF EXISTING
LIFT STATION. BACKFILL AND
COMPACT AREA WITH CLEAN
FILL TO EXISTING GRADE
4' -0
" M
IN
(PIPELINES ROTATED FOR CLARITY)
12" PVC SEWER - N.
INV. EL. (-)13.16
(3) 8"DIP SEWER- S
EL. 5.42
EL. 5.41
EL. 5.31
12" PVC SEWER - SW.
INV. EL. (-)11.96
SECTION A-A
TO BE REMOVED AND
GROUTED SMOOTH
TO BE REMOVED AND
GROUTED SMOOTH
ONCE EXISTING LIFT STATION EQUIPMENT
IS REMOVED. PUNCH HOLES IN BOTTOM
OF WET WELL AND BACKFILL EXISTING
LIFT STATION WITH CLEAN SAND
NORTH
TOP
EL. 9.34
D
88634AJC
CPV
SNR
149850012
OCTOBER 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
PLAN AND PROFILE
STA: 10+00 TO 11+76 C-1
N O
R
TH
CPV
SNR
149850012
OCTOBER 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
PLAN AND PROFILE
STA: 11+76 TO 14+74 C-2
D
88634AJC
CPV
SNR
149850012
OCTOBER 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
N O
R
TH
ROADWAY
RESTORATION PLAN C-3
CPV
SNR
149850012
OCTOBER 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
LIFT STATION C-17
SITE PLAN C-4
CPV
SNR
149850012
OCTOBER 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
LIFT STATION C-17
GRADING PLAN C-5
CPV
SNR
149850012
OCTOBER 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
NORTH
EXISTING CONDITIONS AND
EROSION CONTROL PLAN C-6
IP
EXISTING
EXISTING
SEWER MAIN LINE
FORCE MAIN
-CLEANING SUPPLIES
-DETERGENTS
-MASONARY BLOCK/BRICKS
-PAINT
-WOOD
ITEMS REQUIRING POLLUTION PREVENTION
THE FOLLOWING ITEMS ARE EXPECTED TO BE PRESENT ON THE PROJECT SITE:
-ASPHALT
-CONCRETE
-FERTILIZERS
-METAL PIECES
-PETROLEUM BASED PRODUCTS
-TAR
THE FOLLOWING ARE NON-STORM WATER SOURCES THAT WILL BE
ENCOUNTERED AT THE SITE AND SHOULD BE DIRECTED TO THE SEDIMENT BASIN
PRIOR TO DISCHARGE:
-UNCONTAMINATED GROUNDWATER EXPOSED DURING EXCAVATION
-WATER FROM WATER LINE FLUSHING
-PAVEMENT WASH WATERS (WHERE NO SPILLS OR LEAKS OF TOXIC OR
HAZARDOUS MATERIALS HAVE OCCURRED).
SPILL PREVENTION AND CONTROL
THE FOLLOWING ARE THE MATERIAL MANAGEMENT PRACTICES THAT WILL BE
USED TO REDUCE THE RISK OF SPILLS OR OTHER ACCIDENTAL EXPOSURE OF
MATERIALS AND SUBSTANCES TO STORM WATER RUNOFF.
GOOD HOUSEKEEPING
-SUPERINTENDENT SHALL INSPECT PROJECT AREA DAILY FOR PROPER STORAGE,
USE, AND DISPOSAL OF CONSTRUCTION MATERIALS.
-STORE ONLY ENOUGH MATERIAL ON SITE FOR PROJECT COMPLETION.
-ALL SUBSTANCES SHOULD BE USED BEFORE DISPOSAL OF CONTAINER.
-ALL CONSTRUCTION MATERIALS STORED SHALL BE ORGANIZED AND IN THE
PROPER CONTAINER AND IF POSSIBLE, STORED UNDER A ROOF OR PROTECTIVE
COVER.
-PRODUCTS SHALL NOT BE MIXED UNLESS DIRECTED BY THE MANUFACTURER.
-ALL PRODUCTS SHALL BE USED AND DISPOSED OF ACCORDING TO THE
MANUFACTURER'S RECOMMENDATIONS.
HAZARDOUS PRODUCTS
-MATERIALS SHOULD BE KEPT IN ORIGINAL CONTAINER WITH LABELS UNLESS THE
ORIGINAL CONTAINERS CANNOT BE RESEALED. IF ORIGINAL CONTAINERS
CANNOT BE USED, LABELS AND PRODUCT INFORMATION SHALL BE SAVED.
-PROPER DISPOSAL PRACTICES SHALL ALWAYS BE FOLLOWED IN ACCORDANCE
WITH MANUFACTURER AND LOCAL/STATE REGULATIONS.
PRODUCT SPECIFIC PRACTICES
-PETROLEUM PRODUCTS MUST BE STORED IN PROPER CONTAINERS AND
CLEARLY LABELED. VEHICLES CONTAINING PETROLEUM PRODUCTS SHALL BE
PERIODICALLY INSPECTED FOR LEAKS. PRECAUTIONS SHALL BE TAKEN TO AVOID
LEAKAGE OF PETROLEUM PRODUCTS ON SITE.
-THE MINIMUM AMOUNT OF FERTILIZER SHALL BE USED AND MIXED INTO THE SOIL
IN ORDER TO LIMIT EXPOSURE TO STORM WATER. FERTILIZERS SHALL BE
STORED IN A COVERED SHED. THE CONTENTS OF ANY PARTIALLY USED BAGS OF
FERTILIZER SHALL BE TRANSFERRED TO A SEALABLE PLASTIC BIN TO AVOID
SPILLS.
-PAINT CONTAINERS SHALL BE SEALED AND STORED WHEN NOT IN USE. EXCESS
PAINT MUST BE DISPOSED OF IN AN APPROVED MANNER.
-CONCRETE TRUCKS SHALL NOT BE ALLOWED TO WASH OUT OR DISCHARGE
SURPLUS CONCRETE OR DRUM WASH WATER ON THE SITE.
SPILL CONTROL PRACTICES
IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIAL MANAGEMENT
PRACTICES DISCUSSED IN THE PREVIOUS SECTIONS OF THIS PLAN, THE
FOLLOWING PRACTICES SHALL BE FOLLOWED FOR SPILL PREVENTION AND
CLEANUP:
-SPILL CLEANUP INFORMATION SHALL BE POSTED ON SITE TO INFORM
EMPLOYEES ABOUT CLEANUP PROCEDURES AND RESOURCES.
-THE FOLLOWING CLEAN-UP EQUIPMENT MUST BE KEPT ON-SITE NEAR THE
MATERIAL STORAGE AREA: GLOVES, MOPS, RAGS, BROOMS, DUST PANS, SAND,
SAWDUST, LIQUID ABSORBER, GOGGLES, AND TRASH CONTAINERS.
-ALL SPILLS SHALL BE CLEANED UP AS SOON AS POSSIBLE.
-WHEN CLEANING A SPILL, THE AREA SHOULD BE WELL VENTILATED AND THE
EMPLOYEE SHALL WEAR PROPER PROTECTIVE COVERING TO PREVENT INJURY.
-TOXIC SPILLS MUST BE REPORTED TO THE PROPER AUTHORITY REGARDLESS OF
THE SIZE OF THE SPILL.
-AFTER A SPILL, THE PREVENTION PLAN SHALL BE REVIEWED AND CHANGED TO
PREVENT FURTHER SIMILAR SPILLS FROM OCCURRING. THE CAUSE OF THE
SPILL, MEASURES TO PREVENT IT, AND HOW TO CLEAN THE SPILL UP SHALL BE
RECORDED.
-THE SUPERINTENDENT SHALL BE THE SPILL PREVENTION AND CLEANUP
COORDINATOR AND IS RESPONSIBLE FOR THE DAY TO DAY SITE OPERATIONS.
THE SUPERINTENDENT ALSO OVERSEES THE SPILL PREVENTION PLAN AND SHALL
BE RESPONSIBLE FOR EDUCATING THE EMPLOYEES ABOUT SPILL PREVENTION
AND CLEANUP PROCEDURES.
STORMWATER POLLUTION PREVENTION PLAN
MAINTENANCE AND INSPECTION PRACTICES
THE FOLLOWING ARE MAINTENANCE AND INSPECTION PRACTICES THAT SHALL BE
COMPLETED BY THE CONTRACTOR:
-ALL SEDIMENT AND EROSION CONTROL METHODS SHALL BE CHECKED AT A
MINIMUM OF EVERY 7 DAYS AND WITHIN 24 HOURS OF EACH 0.5 INCH OR
GREATER RAINFALL BY THE SUPERINTENDENT OR SOMEONE UNDER HIS/HER
DIRECT SUPERVISION.
-ALL SEDIMENT AND EROSION CONTROL METHODS SHALL BE KEPT IN GOOD
CONDITION. REPAIRS MUST BE MADE WITHIN 24 HOURS OF REPORT.
-THE SILT FENCE SHALL BE INSPECTED AT A MINIMUM OF EVERY 7 DAYS AND
WITHIN 24 HOURS OF A 0.5" OR GREATER RAIN EVENT FOR HEIGHT OF SEDIMENT
AND CONDITION OF FENCE.
-THE SILT FENCE SHALL BE CLEARED OF SEDIMENT WHEN SEDIMENT MEASURES
ONE-THIRD THE HEIGHT OF THE FENCE.
-THE SEDIMENT BASINS/DITCHES SHALL BE CHECKED AT A MINIMUM OF EVERY 7
DAYS AND WITHIN 24 HOURS OF A 0.5" OR GREATER RAIN EVENT FOR DEPTH OF
SEDIMENT. THEY SHALL BE CLEANED WHEN SEDIMENT REACHES 10% OF TOTAL
CAPACITY AND AFTER CONSTRUCTION IS COMPLETE.
-DIVERSION DIKES SHALL BE INSPECTED AT A MINIMUM OF EVERY 7 DAYS AND
WITHIN 24 HOURS OF A 0.5" OR GREATER RAIN EVENT. ANY BREACHES SHALL BE
PROMPTLY REPAIRED.
-ALL SEEDING SHALL BE CHECKED FOR PROPER GROWTH AND UNIFORMITY.
UNSTABALIZED AREAS SHALL BE RE-SODDED.
-A MAINTENANCE REPORT SHALL BE COMPLETED DAILY AFTER EACH INSPECTION
OF THE SEDIMENT AND EROSION CONTROL METHODS. THE REPORTS SHALL BE
FILED IN AN ORGANIZED MANNER AND RETAINED ON-SITE DURING
CONSTRUCTION. AFTER CONSTRUCTION IS COMPLETED, THE REPORTS SHALL BE
SAVED FOR AT LEAST THREE YEARS. THE REPORTS SHALL BE AVAILABLE FOR
ANY AGENCY THAT HAS JURISDICTION OVER EROSION CONTROL.
-THE SUPERINTENDENT SHALL ORGANIZE THE TRAINING FOR INSPECTION
PROCEDURES AND PROPER EROSION CONTROL METHODS FOR EMPLOYEES
THAT COMPLETE INSPECTIONS AND REPORTS.
POLLUTION PREVENTION PLAN CERTIFICATION
I CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL
ATTACHMENTS WERE PREPARED UNDER MY DIRECTION OR SUPERVISION IN
ACCORDANCE WITH A SYSTEM DESIGNED TO ASSURE THAT QUALIFIED
PERSONNEL PROPERLY GATHERED AND EVALUATED THE INFORMATION
SUBMITTED. BASED ON MY INQUIRY OF THE PERSON OR PERSONS WHO MANAGE
THE SYSTEM, OR THOSE PERSONS DIRECTLY RESPONSIBLE FOR GATHERING THE
INFORMATION, THE INFORMATION SUBMITTED IS, TO THE BEST OF MY
KNOWLEDGE AND BELIEF, TRUE, ACCURATE, AND COMPLETE. I AM AWARE THAT
THERE ARE SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION,
INCLUDING THE POSSIBILITY OF FINE AND IMPRISONMENT FOR KNOWING
VIOLATIONS.
SIGNED: _____________________________________ DATE:__________________
A. TUCKER HUNTER
FLORIDA REGISTRATION NUMBER: 88634
PROFESSIONAL ENGINEER
CONTRACTOR'S CERTIFICATION
I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND, SHALL COMPLY WITH,
THE TERMS AND CONDITIONS OF THE STATE OF FLORIDA GENERIC PERMIT FOR
STORMWATER DISCHARGE FORM LARGE AND SMALL CONSTRUCTION ACTIVITIES
AND THIS STORMWATER POLLUTION PREVENTION PLAN PREPARED
THEREUNDER.
EROSION AND SEDIMENT CONTROLS
BEST MANAGEMENT PRACTICES SHALL BE USED FOR THIS PROJECT TO CONTROL
EROSION AND TURBIDITY CAUSED BY STORM WATER RUN-OFF. THE LOCATION AND
DETAILS OF EROSION CONTROL METHODS ARE SHOWN ON THE PLANS. THE
CONTRACTOR IS RESPONSIBLE FOR PLACING AND MAINTAINING THESE CONTROL
METHODS AS SHOWN ON THE PLANS OR AS REQUIRED. HE/SHE SHALL ALSO PROVIDE
THE REQUIRED EROSION PROTECTION AS REQUIRED BY LOCAL, STATE AND FEDERAL
LAW.
STORM WATER MANAGEMENT
STORMWATER RUNOFF FROM THE PROPOSED SITE WILL BE MANAGED BY SWALE TO
PROVIDE THE REQUIRED TREATMENT (QUALITY) AND ATTENUATION (QUANTITY)
VOLUMES. THE STORMWATER MANAGEMENT SYSTEM WAS DESIGNED TO MEET OR
EXCEED ALL THE REQUIREMENTS OF NORTHWEST FLORIDA WATER MANAGEMENT
DISTRICT (NWFWMD) AND BREVARD COUNTY, FL.
STABILIZATION PRACTICES:
TEMPORARY STABILIZATION - TOPSOIL STOCK PILES AND DISTURBED PORTIONS OF THE
SITE WHERE CONSTRUCTION ACTIVITY TEMPORARILY OR PERMANENTLY CEASE, SHALL
BE STABILIZED WITH TEMPORARY SEED AND MULCH WITHIN 7 DAYS OF THE LAST
CONSTRUCTION ACTIVITY IN THAT AREA. THE TEMPORARY SEED REQUIRED CAN BE
FOUND IN TABLE 1.65 A OF THE FLORIDA DEVELOPMENT MANUAL. PRIOR TO SEEDING,
WHERE SOILS ARE ACIDIC 2 TONS OF PULVERIZED AGRICULTURAL LIMESTONE SHOULD
BE ADDED PER ACRE AND 450 POUNDS OF 10-20-20 FERTILIZER SHALL BE APPLIED TO
EACH ACRE. AFTER SEEDING, EACH AREA SHALL BE IMMEDIATELY MULCHED WITH
STRAW OR EQUIVALENT EQUAL. AREAS OF THE SITE WHICH ARE TO BE PAVED SHALL
BE TEMPORARILY STABILIZED BY APPLYING GEOTEXTILE AND STONE SUB-BASE UNTIL
BITUMINOUS PAVEMENT CAN BE APPLIED.
PERMANENT STABILIZATION - DISTURBED PORTIONS OF THE SITE WHERE
CONSTRUCTION ACTIVITIES PERMANENTLY CEASE SHALL BE STABILIZED WITH
PERMANENT SEED NO LATER THAN 7 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY.
THE APPROPRIATE PERMANENT SEED MIX CAN BE FOUND IN TABLES 1.66A, 1.66B AND
1.66C OF THE FLORIDA DEVELOPMENT MANUAL. PRIOR TO SEEDING, 2 TONS/ACRE OF
FINELY GROUND AGRICULTURAL LIMESTONE AND THE PROPER FERTILIZER BASED ON
THE TYPE OF SEEDING SHALL BE APPLIED TO EACH ACRE TO PROVIDE PLANT
NUTRIENTS. AFTER SEEDING, EACH AREA SHALL BE MULCHED IMMEDIATELY.
STRUCTURAL PRACTICES:
EARTH DIKE - IF REQUIRED, AN EARTH DIKE SHALL BE CONSTRUCTED ALONG THE SITE
PERIMETER. A PORTION OF THE DIKE SHALL DIVERT RUN-ON AROUND THE
CONSTRUCTION SITE. THE REMAINING PORTION OF THE DIKE SHALL COLLECT RUNOFF
FROM THE DISTURBED AREA AND DIRECT THE RUNOFF TO THE SEDIMENT BASIN.
SEDIMENT BASIN - A SEDIMENT BASIN SHALL BE CONSTRUCTED IN THE COMMON
DRAINAGE AREA FOR THE SITE. ALL SEDIMENT COLLECTED IN THE BASIN MUST BE
REMOVED FROM THE BASIN UPON COMPLETION OF CONSTRUCTION. SEDIMENT FROM
THE BASIN MAY BE USED AS FILL ON THE SITE IF IT IS SUITABLE SOIL.
WASTE DISPOSAL
WASTE MATERIALS - ALL WASTE MATERIALS SHALL BE COLLECTED AND STORED IN A
METAL DUMPSTER WITH A SECURE LID IN ACCORDANCE WITH ALL LOCAL AND STATE
LAWS. ALL TRASH AND CONSTRUCTION DEBRIS FROM THE SITE SHALL BE DEPOSITED
IN THE DUMPSTER. THE SUPERINTENDENT SHALL COORDINATE WITH THE LOCAL
UTILITIES TO HAVE THE DUMPSTER EMPTIED AT LEAST TWICE A WEEK AND THE WASTE
TAKEN TO AN APPROPRIATE LANDFILL. NO CONSTRUCTION WASTE MATERIALS SHALL
BE BURIED ON SITE. THE SUPERINTENDENT SHALL ORGANIZE TRAINING FOR THE
EMPLOYEES IN THE PROPER PRACTICES WHEN DEALING WITH WASTE MATERIALS. THE
SUPERINTENDENT SHALL BE RESPONSIBLE FOR POSTING AND ENFORCING WASTE
MATERIAL PROCEDURES.
HAZARDOUS WASTE - HAZARDOUS WASTE MATERIALS SHALL BE DISPOSED OF IN
ACCORDANCE WITH ALL LOCAL AND STATE LAWS OR AS DIRECTED BY THE
MANUFACTURER. THE SUPERINTENDENT SHALL ORGANIZE THE PROPER TRAINING
FOR EMPLOYEES IN THE PROPER PRACTICES WHEN DEALING WITH HAZARDOUS WASTE
MATERIALS. THESE PROCEDURES SHALL BE POSTED ON THE SITE. THE PERSON WHO
MANAGES THE SITE SHALL BE RESPONSIBLE FOR ENFORCING THE PROCEDURES.
SANITARY WASTE - SANITARY WASTE SHALL BE COLLECTED AND DISPOSED OF IN
ACCORDANCE WITH ALL LOCAL AND STATE LAWS. THE SUPERINTENDENT SHALL
COORDINATE WITH THE LOCAL UTILITY FOR COLLECTION OF THE SANITARY WASTE AT
LEAST THREE TIMES A WEEK TO PREVENT SPILLAGE ONTO THE SITE.
OFF-SITE TRACKING
A STABILIZED CONSTRUCTION ENTRANCE SHALL BE PROVIDED TO REDUCE SEDIMENT
TRACKING OFFSITE. THE MAJOR ROAD CONNECTED TO THE PROJECT SHALL BE
CLEANED ONCE A DAY TO REMOVE ANY EXCESS MUD, DIRT OR ROCK RESULTING FROM
CONSTRUCTION TRAFFIC. ALL TRUCKS HAULING MATERIALS OFFSITE SHALL BE
COVERED WITH A TARPAULIN.
DUST & DEBRIS CONTROL
THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL WITHIN THE
CONSTRUCTION LIMITS AS WELL AS ALONG HAUL ROUTES AND ROADWAYS USED BY
THE EQUIPMENT AND VEHICLES. THE CONTRACTOR SHALL ENSURE THAT EXCESSIVE
DUST IS NOT TRANSPORTED BEYOND THE LIMITS OF CONSTRUCTION IN POPULATED
AREAS. THE CONTRACTOR MAY CONTROL DUST FOR EMBANKMENTS OR OTHER
CLEARED OR UNSURFACED AREAS BY APPLYING WATER. INSTALL MULCH, SEED, SOD,
OR TEMPORARY PAVING AS EARLY AS PRACTICAL. CONTROL DUST DURING STORAGE
AND HANDLING OF DUSTY MATERIALS BY WETTING, COVERING, OR OTHER MEANS AS
APPROVED BY THE ENGINEER. CONTRACTOR SHALL ENFORCE REDUCED VEHICLE
SPEEDS ON UNPAVED ROADS AND IF NECESSARY PROHIBIT CONSTRUCTION GRADING
WHEN WIND GUSTS EXCEED 25 MPH, OR OTHERWISE DIRECTED BY E.O.R. OR COUNTY
INSPECTOR.
DEBRIS AND TRASH SHALL NOT BE ALLOWED TO ACCUMULATE ON THE PROJECT SITE.
CONTRACTOR SHALL COLLECT LOOSE…