This addendum is issued by the Massachusetts Department of Transportation (MassDOT) Highway Division for the Foxborough-Middleborough-Norton Bridge Preservation project along Interstate 495, Federal Aid Project No. STP(BR-OFF)-004S(017)X, covering six bridge structures (F-06-023, M-18-042, M-18-043, N-23-026, N-23-027, and N-23-034). Addendum No. 4, dated October 27, 2026, revises contract documents and provides clarifications through eight questions and responses addressing payment methodology for various work items including removal and demolition of sidewalks, excavation for new sidewalks, and temporary traffic control measures. The revised Special Provisions on page A00801-20 address subletting and assignment of contract requirements. Proposals were originally scheduled to be opened and read on Tuesday, November 3, 2026 at 2:00 p.m. The estimated contract value is $9,271,000.
Key contractual modifications in this addendum include an amendment to Subsection 8.01 of the Standard Specifications that permits contractors to sublet a portion of the contract while performing work amounting to not less than 30 percent of the original total contract price, revised from the standard 50 percent requirement to accommodate the project's significant bridge painting component. The addendum clarifies that bridge painting items may exceed 50 percent of total contract price and establishes procedures for payment of specialty services at cost plus 10 percent when required by the Engineer. A proposal guaranty equal to five percent of the bid value is required, and the project is subject to prevailing wage rates established by the Massachusetts Department of Labor and Workforce Development and the United States Department of Labor. The contract includes minority and female participation goals and is governed by Massachusetts General Laws Chapter 30 Section 39M and federal equal employment opportunity requirements.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 mass.gov/massdot
October 27, 2026
616276-136791
ADDENDUM NO. 4
To Prospective Bidders and Others on:
FOXBOROUGH-MIDDLEBOROUGH-NORTON
Federal Aid Project No. STP(BR-OFF)-004S(017)X
Bridge Preservation Along I-495, F-06-023, M-18-042, M-18-043, N-23-026, N-23-027 &N-23-034
THIS PROPOSAL TO BE OPENED AND READ: TUESDAY, NOVEMBER 3, 2026 at 2:00 P.M.
Transmitting revisions to the Contract Documents as follows:
QUESTIONS AND RESPONSES: Three pages.
DOCUMENT A00801: Revised page 20.
Take note of the above, substitute the revised page for the original and acknowledge Addendum No. 4 in your Expedite Proposal file before submitting your bid.
Very truly yours, Eric M. Cardone, P.E.
Construction Contracts Engineer
CS
cc: Albin Napit, Project Manager
THIS PAGE IS INTENTIONALLY LEFT BLANK
Bridge Preservation Along I-495, F-06-023, M-18-042, M-18-043, N-23-026, N-23-027 &N-23-034
(616276-136791) Questions and Responses Addendum No.4, October 27, 2026
John Rocchio Corporation, email dated October 22, 2026
Question 12
Please clarify how the R & D existing bituminous sidewalks at the bridge approaches are paid for.
Response 12
The R&D of the existing bituminous sidewalks is being paid under item 120.1 Unclassified Excavation.
Question 13
Please clarify how the excavation for new sidewalks is paid for.
Response 13
The excavation for new sidewalks is being paid under item 120.1 Unclassified Excavation.
NEL Corporation, email dated October 23, 2026
Question 14
MassDOT has advertised this bid proposal as Project Type: Bridge – Construction, Painting - Structural. Subsection 8.01: Subletting or Assignment of Contract states that the Contractor must perform not less than 50 percent of the original total contract price. The Bridge Painting items of work may exceed 50 percent of the total contract price. Will MassDOT designate the Bridge Painting items of work as “specialty items” or grant a waiver to the contractor 50 percent rule for this bid proposal?
Response 14
See the revised Special Provisions, page A00801-20.
Commonwealth Scaffold, email dated October 26, 2026
Question 15
Could you provide readable current repair/painting requirements and the work phases by bridge structure?
Response 15
Refer to the Special Provisions for Items 961.201 thru 961.204 and Subsection 961of the Standard Specifications.
Bridge Preservation Along I-495, F-06-023, M-18-042, M-18-043, N-23-026, N-23-027 &N-23-034
Question 16
What allowable loads/attachments, containment/environmental boundaries and setup/work-window restrictions govern temporary platforms?
Response 16
Refer to Subsection 961 of the Standard Specifications.
John Rocchio Corporation, email dated October 26, 2026
Question 17
Please clarify if temporary Steel Traffic Plates are required for the reconstruction of the Abutment joints at Bridge N-23-034 if only nightly closures are allowed.
Response 17
The reconstruction of the bridge joints at Bridge N-23-034 is anticipated to be completed utilizing nightly closures. Temporary steel traffic plates may be utilized if allowed by the Engineer.
Question 18
Section 6 on sheet 53 of 65, please clarify if the demo of the sidewalk is paid under 127.4, 127.12 or 127.1.
Response 18
Demo of the sidewalk is being paid under 127.1.
Question 19
Section 04 and 02 on sheet 39, please clarify if the demo of the sidewalk, safety curb and parapet is paid under 127.42.
Response 19
Yes it is being paid for under 127.42.
Bridge Preservation Along I-495, F-06-023, M-18-042, M-18-043, N-23-026, N-23-027 &N-23-034
John Rocchio Corporation, email dated October 27, 2026
Question 20
Section 04 and 02 on sheet 39, please clarify if the new sidewalk, safety curb and parapet are paid under item 909.3 or 904.3.
Response 20
The new sidewalk, safety curb and parapet are paid under item 909.3.
THIS PAGE IS INTENTIONALLY LEFT BLANK
Massachusetts Department Of Transportation Highway Division Proposal No. 616276-136791
A00801 - 20
Addendum No. 4 October 27, 2026 TRUCK SAFETY DEVICES (Continued)
Thereafter, the Contractor shall have an affirmative obligation to continue to provide such evidence of compliance on an ongoing basis and no later than 7 days after certification with the Registry of Motor Vehicles of any additional vehicles operated under this Contract by the Contractor and its subcontractors and vendors.
Non-compliance with respect to a vehicle that is subject to 540 CMR 4.00 may subject the Contractor to statutory fines as established in M.G.L. c. 90, § 7 and/or contractual remedies up to and including termination of the Contract.
NON-BID-ITEM
The following specs included under Non-bid Item will be required only as directed by the Engineer to cover such a work that has not been included in any contract bid Items. the Contractor will not bid on the specialty services; however, the Contractor will be reimbursed for the cost as required by the engineer:
PAYMENT FOR SPECIALTY SERVICES
The Contractor will be paid for any specialty services (Regardless of whether hired by the Contractor as a specialty sub-contractor crew, or as an individual artisan) required for work that has not been included as incidental to any Contract Bid Item plus ten (10) percent. However, no specialty services shall be hired until approved by the Engineer and competitive prices may be required if the Engineer so directs. The specialty services will be used only as required by the Engineer.
SUPPLEMENTAL REQUIREMENTS FOR NON-BID ITEMS
(Supplementing Subsection 3.04)
The Contractor will be paid for additional artisans, equipment rental, materials, engineering services and specialty services required to perform the work plus (10%) percent, plus actual increased bond premium.
The Contractor shall be required to furnish certified paid receipts for additional artisans, equipment rental, materials, engineering services and specialty services that are required to perform the work prior to payment by the Department. Increased bond premium for additional artisans, equipment rental, materials, engineering services and specialty services will be paid after a certified paid receipt is submitted showing payment of the increased bond.
SUBLETTING OR ASSIGNMENT OF CONTRACT
This contract, Subsection 8.01 of the Standard Specifications is amended to permit the Contractor to sublet a portion thereof, but shall perform with their own organization work amounting to not less than 30 percent of the original total Contract price.
| Addendum Letter-A4 |
| Questions and Responses-A4 |
| A00801 Special Provisions-A4 |
| METHOD OF MEASUREMENT |
| BASIS OF PAYMENT |
| (FULL DEPTH) |
| (PARTIAL DEPTH) |
| METHOD OF MEASUREMENT |
| The Engineer's Field Office and the equipment included herein including the computer system, and printer shall remain the property of the Contractor at the completion of the project. Disks, flash drives, and card readers with cards shall become the p... |
| ITEM 767.121 SEDIMENT CONTROL BARRIER FOOT |
| MATERIALS AND CONSTRUCTION |
| COMPOST FILTER TUBE |
| Outer tube fabric shall be made of 100% biodegradable materials (i.e., cotton, hemp or jute) and shall have a knitted mesh with openings that allow for sufficient water flow and effective sediment capture. |
| STRAW BALES |
| SEDIMENTATION FENCE |
| MAINTENANCE |
| DISMANTLING & REMOVING |
| METHOD OF MEASUREMENT AND BASIS OF PAYMENT |
| MATERIALS |
| MATERIALS |
| Construction Methods |
| BASIS OF PAYMENT |
| MATERIALS |
| Construction Methods |
| PLACEMENT AND FINISHING |
| BRIDGE DECK VIBRATION |
| STRUCTURAL STEEL |
| The work under this Item shall conform to the relevant provisions of Subsection 961 of the Standard Specifications, and the following: |
| PIGEON WASTE/DEBRIS REMOVAL AND CLEANING |