616276 FOXBOROUGH-MIDDLEBOROUGH-NORTON FAP No. STP(BR-OFF)-004S(017)X Bridge Preservation along I-
Solicitation number
BD-27-1030-0H100-0H002-133657
Issued by
Norfolk County, Massachusetts

About this file

This addendum is issued by the Massachusetts Department of Transportation (MassDOT) to prospective bidders for the Foxborough-Middleborough-Norton Bridge Preservation project along Interstate 495, Federal Aid Project No. STP(BR-OFF)-004S(017)X. The project encompasses bridge preservation activities at six locations identified as F-06-023, M-18-042, M-18-043, N-23-026, N-23-027, and N-23-034. Electronic proposals are due on October 27, 2026 at 2:00 p.m. via www.bidx.com. Bidders must be pre-qualified by MassDOT in either the Bridge-Construction or Painting-Structural category prior to submission, with approval obtained through a Request Proposal Form (R109) submitted to prequal.r109@dot.state.ma.us, which serves as a mandatory eligibility gate. Existing plans for each bridge are available on bidx.com at the appropriate letting date.

Addendum No. 2, dated October 9, 2026, transmits questions and responses from prospective bidders. Three questions submitted by John Rocchio Corporation regarding armored joint replacement procedures, detour utilization, pier identification discrepancies on contract drawings, and deck milling requirements remain unresolved, with responses to be provided in future addenda. The estimated contract value is $9,271,000, and a proposal guaranty equal to five percent of the bid value is required. Price adjustment provisions apply to hot mix asphalt, Portland cement mixtures, diesel fuel, gasoline, and structural steel tied to specified base prices posted on MassDOT's Highway Division website. The contract is subject to prevailing wage rate schedules as determined by the Massachusetts Department of Labor and Workforce Development and the United States Department of Labor, with minority and female participation goals specified in the contract documents. The project is governed by Massachusetts General Laws Chapter 30 Section 39M and includes federal equal employment opportunity requirements under Executive Order 11246.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 mass.gov/massdot

October 9, 2026

616276-136791

ADDENDUM NO. 2

To Prospective Bidders and Others on:

FOXBOROUGH-MIDDLEBOROUGH-NORTON

Federal Aid Project No. STP(BR-OFF)-004S(017)X

Bridge Preservation Along I-495, F-06-023, M-18-042, M-18-043, N-23-026, N-23-027 &N-23-034

THIS PROPOSAL TO BE OPENED AND READ: TUESDAY, OCTOBER 27, 2026 at 2:00 P.M.

Transmitting revisions to the Contract Documents as follows:

QUESTIONS AND RESPONSES: One page.

Take note of the above and acknowledge Addendum No. 2 in your Expedite Proposal file before submitting your bid.

Very truly yours, Eric M. Cardone, P.E.

Construction Contracts Engineer

CS

cc: Albin Napit, Project Manager

THIS PAGE IS INTENTIONALLY LEFT BLANK

FOXBOROUGH-MIDDLEBOROUGH-NORTON

Federal Aid Project No. STP(BR-OFF)-004S(017)X

Bridge Preservation Along I-495, F-06-023, M-18-042, M-18-043, N-23-026, N-23-027 &N-23-034

(616276-136791) Questions and Responses Addendum No. 2, October 9, 2026

Tri-State Painting LLC, email dated October 8, 2026

Question 1

Please post on Bix (Bid Express) the existing drawings for each of the bridges.

Response 1

The existing plans are available on bidx.com at the appropriate letting date.

John Rocchio Corporation, email dated October 9, 2026

Question 2

Please clarify how the replacement of the existing armored joints at the abutments (Bridge N-23-

034) will be accomplished. Can a detour similar to Bridges M-18-042 and M-18-043 be used for a single weekend Friday thru Monday to perform the deck joints?

Response 2

This will be answered in a future addendum.

Question 3

Note 1 on sheet 57 and 59 of 65 states that the detour is to be used for reconstruction of bridge deck joints at Pier 2. Is this an error and should state Pier 1 and 4?

Response 3

Question 4

Please clarify if the bridge decks need to be milled before partial deck repairs are performed. Can traffic travel on the exposed concrete deck surface while repairs are performed?

Response 4

THIS PAGE IS INTENTIONALLY LEFT BLANK

Addendum Letter-A2
Questions and Responses-A2
2026-10-09T11:38:12-0400
Eric M. Cardone

File details come from the government source that posted it. Updated .