This document is a U.S. Fish and Wildlife Service (USFWS) Not Likely to Adversely Affect (NLAA) Concurrence Verification Letter issued by the New England Ecological Services Field Office for Massachusetts Department of Transportation Highway Division Proposal No. 616276-136791. The project, titled "616276: Foxborough-Middleborough-Norton-Bridge Preservation Along I-495," consists of bridge preservation activities at six locations: Spruce Street bridge (Foxborough), Vernon Street bridge (Middleborough), Cherry Street bridge (Middleborough), N. Washington Street bridge (Norton), Newcomb Street bridge (Norton), and Plain Street bridge (Norton). The project was submitted for endangered species review under Section 7(a)(2) of the Endangered Species Act to determine potential effects on federally protected bat species. Based on the Assisted Determination Key (Dkey) submitted on August 5, 2026, the USFWS determined that the project may affect but is not likely to adversely affect the Northern Long-eared Bat (listed as Endangered) and the Tricolored Bat (proposed for listing as Endangered), allowing the project to proceed under the concurrence provided in the December 13, 2024, Programmatic Biological Opinion for Transportation Projects.
The determination includes specific project qualification criteria and conditions. The project involves bridge removal, replacement, and/or alteration activities; tree removal and trimming; temporary lighting; and percussive activities involving noise and vibration above existing background levels. All tree removal and trimming will occur within 100 feet of the road surface during the inactive season, with approximately 0.9 acres of tree removal planned. A Bridge Bat Assessment has not been conducted within the last 24 months; however, the local USFWS Field Office has confirmed that Indiana Bats, Northern Long-eared Bats, and Tricolored Bats are not using the bridges within the action area. The USFWS has 14 calendar days to notify the Federal Highway Administration (the lead federal agency) if the project does not meet the criteria for NLAA determination. Should bats be discovered during construction despite initial assessments finding no occupancy, the project proponent must notify the local Service Field Office within two working days and submit documentation of any incidental take within five working days of construction completion. The project must also comply with additional federal requirements regarding potential effects on the Monarch Butterfly and Plymouth Redbelly Turtle, though MassDOT's enrollment in the Monarch Butterfly Nationwide Candidate Conservation Agreement with Assurances and consultation with the Massachusetts Natural Heritage and Endangered Species Program determined no jeopardy or habitat concerns for these species at the project location.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Massachusetts Department Of Transportation Highway Division Proposal No. 616276-136791
A00844 - 1
DOCUMENT A00844
U.S. FISH AND WILDLIFE SERVICE
NLAA CONCURRENCE VERIFICATION LETTER
Massachusetts Department Of Transportation Highway Division
A00844 - 2
THIS PAGE IS INTENTIONALLY LEFT BLANK
08/05/2026 13:53:32 UTC
United States Department of the Interior
FISH AND WILDLIFE SERVICE
New England Ecological Services Field Office 70 Commercial Street, Suite 300
Concord, NH 03301-5094 Phone: (603) 223-2541 Fax: (603) 223-0104
In Reply Refer To:
Project code: 2026-0127541 Project Name: 616276: FOXBOROUGH- MIDDLEBOROUGH- NORTON- BRIDGE
PRESERVATION ALONG I-495
Subject: Not Likely to Adversely Affect Concurrence verification letter for the '616276:
FOXBOROUGH- MIDDLEBOROUGH- NORTON- BRIDGE PRESERVATION
ALONG I-495' project under the December 13, 2024, FHWA, FRA, FTA Programmatic Biological Opinion for Transportation Projects within the Range of the Indiana Bat, Northern Long-eared Bat, and Tricolored Bat.
To whom it may concern:
This letter records the determination of effects to federally listed (or proposed) bat species anticipated to result from the 616276: FOXBOROUGH- MIDDLEBOROUGH- NORTON- BRIDGE PRESERVATION ALONG I-495 (the Project). This determination is based upon information you entered into the assisted determination key (Dkey) associated with the above referenced Programmatic Biological Opinion/Conference Opinion (PBO/PCO) in the U.S. Fish and Wildlife Service’s (Service) Information for Planning and Consultation (IPaC) system on the date listed above to verify that the Project may rely on the concurrence provided in the PBO/ PCO to satisfy requirements under section 7(a)(2) of the Endangered Species Act of 1973 (ESA) (16 USC 1536), as amended.
Ensuring Accurate Determinations When Using IPaC:
The Service developed the IPaC system and this Dkey in accordance with the ESA and based on the PBO/PCO. All information submitted by the project proponent into IPaC must accurately represent the full scope and details of the Project.
Failure to accurately represent or implement the Project as detailed in the Dkey invalidates this letter. Answers to certain questions in the Dkey commit the project proponent to implementation of conservation measures that must be followed for the ESA determinations to remain valid. Carefully review this letter, your ESA requirements are NOT yet complete.
Determinations:
A00844 - 3
Based on the information you provided (Project Description shown below), you have determined that the Project is within the scope and adheres to the criteria of the PBO/PCO, including the adoption of applicable avoidance and minimization measures. Based on your IPaC submission and the PBO/PCO, the Project is consistent with the following effect determinations:
Species Listing Status Determination Northern Long-Eared Bat (Myotis septentrionalis) Endangered NLAA Tricolored bat (Perimyotis subflavus) Proposed
Endangered
NLAA
The tricolored bat is proposed for listing as endangered under the ESA, but not yet listed. For actions that may affect a proposed species, agencies cannot consult, but they can confer under the authority of section 7(a)(4) of the ESA. Such conferences can follow the procedures for a consultation and be adopted as such if the proposed species is listed. Should the tricolored bat be listed, agencies must review projects that are not yet complete, or projects with ongoing effects within the tricolored bat range that previously received a no effect or not likely to adversely affect (NLAA) determination from the key to confirm that the determination is still accurate.
The Service has 14 calendar days to notify the lead Federal action agency or designated non-federal representative if we determine that the Project does not meet the criteria for a NLAA determination under the PBO/PCO. If the Service does not notify the lead Federal action agency or designated non-federal representative within that timeframe, you may proceed with the Project under the terms of the NLAA concurrence provided in the PBO/PCO. This verification period allows Service Field Offices to apply local knowledge to implementation of the PBO, as we may identify a small subset of actions having impacts that were unanticipated. In such instances, Service Field Offices may request additional information that is necessary to verify inclusion of the proposed action under the PBO/PCO.
If the Project is modified, or new information reveals that it may affect the Indiana bat, northern long-eared bat, or tricolored bat in a manner or to an extent not considered in the PBO/PCO, further review to conclude the requirements of ESA section 7(a)(2) may be required.
For Proposed Actions that include bridge/culvert or structure removal, replacement, and/or maintenance activities:
If your initial bridge, culvert, or structure assessment failed to detect Indiana bat, northern long-eared bat, or tricolored bat use or occupancy, yet bats are later detected prior to, or during construction, promptly notify the local Service Field Office within 2 working days of the discovery. In addition, please document whether incidental take occurred, and if so, the type (i.e.
kill or harm) and amount (i.e. number of individuals) and submit documentation to the local Service Field Office within 5 working days from the completion of the bridge, culvert, or structure construction (use Appendix E - Post Assessment Discovery of Bats at Bridge/Culvert or Structure Form in the User’s Guide). In these instances, potential incidental take of Indiana bats, northern long-eared bats, or tricolored bats may be exempted provided that the take is reported to
Proposal No. 616276-136791
A00844 - 4 https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat the Service. In these instances, potential incidental take of Indiana bats, northern long-eared bats, or tricolored bats may be exempted provided that the take is reported to the Service.
If the Project may affect any other federally listed or proposed species and/or designated critical habitat, additional consultation between the lead Federal action agency and this Service Field Office is required for those species/designated critical habitat. If the Project has the potential to take bald or golden eagles, additional coordination with the Service under the Bald and Golden Eagle Protection Act may also be required. In either of these circumstances, please advise the lead Federal action agency to contact this Service Field Office
The following species may occur in your project area and are not covered by this determination:
Monarch butterfly Danaus plexippus Proposed Threatened Plymouth Redbelly Turtle = Plymouth Redbelly Cooter Pseudemys rubriventris bangsi Endangered
A00844 - 5
PROJECT DESCRIPTION
The following project name and description was collected in IPaC as part of the endangered species review process.
NAME
616276: FOXBOROUGH- MIDDLEBOROUGH- NORTON- BRIDGE PRESERVATION
ALONG I-495
DESCRIPTION
616276: FOXBOROUGH- MIDDLEBOROUGH- NORTON- BRIDGE PRESERVATION
ALONG I-495, F-06-023, M-18-042, M-18-043, N-23-026, N-23-027 & N-23-034. This project will consist of Bridge Preservation at several bridge crossings in the I-495 corridor.
The locations are the Spruce Street bridge (Foxborough), the Vernon Street bridge (Middleborough), the Cherry Street bridge (Middleborough), the N. Washington Street bridge (Norton), the Newcomb Street bridge (Norton), and the Plain Street bridge (Norton).
Monarch Butterfly: Due to MassDOT's enrollment in the Monarch Butterfly Nationwide CCAA, the action is Not Likely to Jeopardize the continued existence of the monarch butterfly.
Redbelly Turtle: After consulting with the Massachusetts Natural Heritage and Endangered Species Program (NHESP), it was determined that there is no data to suggest the presence of habitat and/or individuals at this project location.
A00844 - 6
The approximate location of the project can be viewed in Google Maps: https:// www.google.com/maps/@41.97480285,-71.15113524876936,14z
Proposal No. 616276-136791
A00844 - 7 https://www.google.com/maps/@41.97480285,-71.15113524876936,14z https://www.google.com/maps/@41.97480285,-71.15113524876936,14z
1.
2.
3.
4.
5.
6.
7.
8.
DETERMINATION KEY RESULT
Based on your answers provided, this project(s) may affect, but is not likely to adversely affect the Indiana bat, northern long-eared bat or tricolored bat, therefore, consultation with the U.S.
Fish and Wildlife Service pursuant to Section 7(a)(2) of the Endangered Species Act of 1973 (ESA) (87 Stat. 884, as amended 16 U.S.C. 1531 et seq.) is required. However, also based on your answers provided, this project may rely on the concurrence provided in the Programmatic Biological Opinion/Conference Opinion for Transportation Projects in the Range of the Indiana bat, northern long-eared bat, and tricolored bat, dated December 13, 2024.
QUALIFICATION INTERVIEW
Which Federal Agency is the lead federal agency the action?
A) Federal Highway Administration (FHWA) Does the Action Area intersect the species list area of the Northern long-eared bat?
Automatically answered Yes Does the Action Area intersect the species list area of the tricolored Bat (TCB)?
Automatically answered Yes [Semantic] Is any portion of the action area within a 0.5 mile radius of an entrance/opening to any known NLEB or TCB hibernacula?
Note: The map queried for this question contains proprietary information and cannot be displayed. If you need additional information, please contact the Field Office listed in the letterhead of this letter.
Automatically answered No Does the action area overlap with any state where bats may use talus or anthropogenic or naturally formed rock crevices in rocky outcrops, rock faces or cliffs for hibernation?
Automatically answered Yes Does the action area contain or occur within 0.5 miles of (1) talus or (2) anthropogenic or naturally formed rock crevices in rocky outcrops, rock faces or cliffs?
No Does your project's activities include raising the road profile above the tree canopy in documented habitat for the Indiana bat, NLEB, or TCB?
Note: For the definition of documented habitat, refer to Appendix A: https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat
No Is your project located within a karst area?
No
Proposal No. 616276-136791
A00844 - 8 https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat
9.
10.
11.
12.
13.
14.
15.
16.
Will the project include bridge, culvert, or structure removal, replacement, and/or alteration activities?
Note: For definitions of bridge, culvert, and structure, refer to Appendix A: https:// www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat.
Yes Do your project’s activities involve tree removal/trimming, temporary lighting, new/ additional permanent lighting, ground disturbance, percussives that involves noise/ vibration above existing background levels, vibrations, or slash pile burning?
Yes Is there suitable summer habitat for the Indiana bat, NLEB, or TCB within the project action area?
Note: See the Service's summer survey guidance for current definitions of suitable habitat [https://www.fws.gov/ midwest/endangered/mammals/inba/inbasummersurveyguidance.html].
Yes Have P/A surveys for the Indiana bat, NLEB, or TCB been conducted within the suitable summer habitat located within your project action area? This refers to mist-netting or acoustic surveys, not bridge assessments.
Note: See the Service's survey guidance https://www.fws.gov/midwest/endangered/ mammals/inba/inbasummersurveyguidance.html No Will the project involve the removal or trimming of trees within suitable habitat for the Indiana bat, NLEB, or TCB?
Yes Will any tree removal or trimming occur during the bat pup season?
Note: For more information about bat pup seasons please visit https://www.fws.gov/sites/default/files/documents/ 2024-10/2024_usfws_rangewide_ibat-nleb_survey_guidelines.pdf
No Will the removal or trimming of trees occur within documented habitat for the Indiana bat, NLEB, or TCB?
Note: For the definition of documented habitat, refer to Appendix A: https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat
No Will all tree removal or trimming occur within 100 feet of the road or rail surface?
Yes
Proposal No. 616276-136791
A00844 - 9 https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat https://www.fws.gov/midwest/endangered/mammals/inba/inbasummersurveyguidance.html https://www.fws.gov/midwest/endangered/mammals/inba/inbasummersurveyguidance.html https://www.fws.gov/midwest/endangered/mammals/inba/inbasummersurveyguidance.html https://www.fws.gov/midwest/endangered/mammals/inba/inbasummersurveyguidance.html https://www.fws.gov/sites/default/files/documents/2024-10/2024_usfws_rangewide_ibat-nleb_survey_guidelines.pdf https://www.fws.gov/sites/default/files/documents/2024-10/2024_usfws_rangewide_ibat-nleb_survey_guidelines.pdf https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat
17.
18.
19.
20.
21.
22.
23.
24.
Does your project include activities involving the temporary or permanent exclusion of Indiana bats, NLEBs, or TCBs from a bridge/culvert or structure that is occupied by a large number of covered bats (>5)?
Note: exclusion is conducted to deny bats' entry or reentry into a bridge/culvert or structure. To be effective and to avoid harming bats, it should be done according to established standards. Coordinate with the local Service Field Office for additional assistance.
No Does your project involve the use of temporary lighting within Indiana bat, NLEB, or TCB suitable habitat?
Note: For the definition of lighting, refer to Appendix A: https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat
Yes Will the use of temporary lighting be conducted during the Indiana bat, NLEB, or TCB active season?
Note: For the definition of active season, refer to Appendix A: https://www.fws.gov/ media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat Yes Will temporary lighting be directed away from Indiana bat, NLEB, or TCB suitable habitat)?
Yes Will the project substantially increase baseline light conditions via the use of permanent lighting (replacement or new/additional) in suitable habitat.
No Will your project include percussive activities?
Note: Refer to Stressor #2 Noise/Vibration on page 109 of the PBO/PCO.
Yes Are the percussive activities only related to tree removal/trimming or bridge/culvert structural work?
No Will the percussive activities involve noise/vibration above existing background levels?
Note: For example, pile driving, rock drilling, hoe ramming, jackhammering, and blasting are examples of percussive activities that cause noise/vibration above existing background levels
Yes
Proposal No. 616276-136791
A00844 - 10 https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat
25.
26.
27.
28.
29.
30.
31.
32.
33.
Will percussive activities that involve noise/vibration above existing background levels be conducted during the bat active season?
Note: For the definition of active season, refer to Appendix A: https://www.fws.gov/ media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat Yes Will the percussive activities that involve noise/vibration above existing background levels be conducted greater than 100 feet from the road or rail surface?
No Will the project include bridge removal, replacement, and/or alteration activities?
Yes Has a Bridge Bat Assessment been conducted within the last 24 months to determine if the bridge is being used by the Indiana bat, NLEB, or TCB? If yes, upload assessment.
Note: Refer to the Service’s current survey guidance for acceptable assessment practices and validity timeframe of bridge/culvert and structure bat assessments: https://www.fws.gov/library/collections/range-wide-indiana-bat-and-northern-long-eared-bat-survey-guidelines.
No Has the local Service Field Office confirmed that Indiana bats, NLEB, and TCBs are not using bridges within the action area?
Yes
SUBMITTED DOCUMENTS
20260309 New England bridge culvert survey bats letter pdsigned alm.pdf https:// ipac.ecosphere.fws.gov/project/PEVCACSF5VARRNLG46SWENZBJM/ projectDocuments/184954155
Does the project include culvert removal, replacement, and/or alteration activities?
No Does the project include structure removal, replacement, and/or alteration activities?
No Will the project involve the removal or trimming of more than 20 acres of Indiana bat, NLEB, or TCB suitable habitat per 5-mile section of road/rail?
No Will the removal or trimming of trees occur within 0.5 miles of a known Indiana bat, NLEB, or TCB hibernaculum?
No
Proposal No. 616276-136791
A00844 - 11 https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat https://www.fws.gov/library/collections/range-wide-indiana-bat-and-northern-long-eared-bat-survey-guidelines https://www.fws.gov/library/collections/range-wide-indiana-bat-and-northern-long-eared-bat-survey-guidelines https://ipac.ecosphere.fws.gov/project/PEVCACSF5VARRNLG46SWENZBJM/projectDocuments/184954155 https://ipac.ecosphere.fws.gov/project/PEVCACSF5VARRNLG46SWENZBJM/projectDocuments/184954155 https://ipac.ecosphere.fws.gov/project/PEVCACSF5VARRNLG46SWENZBJM/projectDocuments/184954155 https://ipac.ecosphere.fws.gov/project/PEVCACSF5VARRNLG46SWENZBJM/projectDocuments/184954155
34.
35.
36.
37.
1.
2.
3.
4.
5.
Will the removal or trimming of these trees occur during the active season?
Note: For the definition of active season, refer to Appendix A: https://www.fws.gov/ media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat No Will the removal or trimming of trees occur beyond 100 feet of the existing road/rail surfaces?
No Does the Action Area intersect the species list area of the tricolored Bat (TCB)?
Automatically answered Yes Does the Action Area intersect the species list area of the northern long-eared bat (NLEB)?
Automatically answered Yes
PROJECT QUESTIONNAIRE
Have you made a No Effect determinations for all other species included on the FWS IPaC generated species list?
No Have you made a May Affect determination for any other species on the FWS IPaC generated list?
No How many acres of trees are proposed for removal/trimming outside of documented habitat for the Indiana bat, NLEB, or TCB within 100 feet of the existing road/rail surfaces during the inactive season (NLAA)?
Note: If described as number of trees, multiply by 0.09 to convert to acreage and enter that number. If all the tree removal will occur in the year-round active area, answer "0."
0.9 How many acres of trees are proposed for removal/trimming outside of documented habitat for the Indiana bat, NLEB, or TCB within 100 feet of the existing road/rail surfaces during the active season (outside the pup season and not between Dec 15th-Feb 15th in Zone 1 of the NLEB and TCB YR active areas) (LAA)?
Note: If described as number of trees, multiply by 0.09 to convert to acreage and enter that number.
How many acres of trees are proposed for removal/trimming outside of documented habitat for the Indiana bat, NLEB, or TCB within 100 feet of the existing road/rail surfaces during the pup season (trees must be <9 in DBH, and not between Dec 15th- Feb 15th in Zone 1 of the NLEB and TCB YR active areas) (LAA)?
Proposal No. 616276-136791
A00844 - 12 https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat
6.
7.
8.
9.
Note: If described as number of trees, multiply by 0.09 to convert to acreage and enter that number.
How many acres of trees are proposed for removal/trimming either outside or within documented habitat for the Indiana bat, NLEB, or TCB between 100-300 feet of the existing road/rail surface during the inactive season (LAA)? Note: If described as number of trees, multiply by 0.09 to convert to acreage and enter that number. If all the tree removal will occur in the year-round active area, answer "0."
How many acres of trees are proposed for removal/trimming either outside or within documented habitat for the Indiana bat, NLEB, or TCB between 100-300 feet of the existing road/rail surfaces during the active season (outside the pup season, and not between Dec 15-Feb 15 in Zone 1 of the NLEB and TCB YR active areas) (LAA)?
Note: If described as number of trees, multiply by 0.09 to convert to acreage and enter that number.
How many acres of trees are proposed for removal/trimming either outside or within documented habitat for the Indiana bat, NLEB, or TCB beyond 300 feet of the existing road/rail surfaces during the inactive season (LAA)?
Note: If described as number of trees, multiply by 0.09 to convert to acreage and enter that number. If all the tree removal will occur in the year-round active area, answer "0."
How many acres of trees are proposed for removal/trimming either outside or within documented habitat for the Indiana bat, NLEB, or TCB beyond 300 feet of the existing road/rail surfaces during the active season (outside the pup season, and not between Dec 15th-Feb 15th in Zone 1 of the NLEB and TCB YR active areas) (LAA)?
Note: If described as number of trees, multiply by 0.09 to convert to acreage and enter that number.
AVOIDANCE AND MINIMIZATION MEASURES (AMMS)
This determination key result includes the commitment to implement the following Avoidance and Minimization Measures (AMMs):
GAMM1
Ensure all operators, employees, and contractors working in areas of Indiana bat, NLEB, or TCB suitable habitat are aware of all Transportation Agency environmental commitments, including all applicable AMMs.
LAMM1
Direct temporary lighting away from suitable habitat during the active season
A00844 - 13
TRTAMM1
Modify all phases/aspects of the project (e.g., temporary work areas, alignments) to the extent practicable to avoid tree removal/trimming in excess of what is required to implement the project safely.
TRTAMM2
Ensure tree removal/trimming is limited to that specified in project plans and ensure that contractors understand clearing limits and how they are marked in the field (e.g., install bright colored flagging/fencing prior to any tree removal/trimming to ensure contractors stay within clearing limits
TRTAMM3
Ensure tree removal/trimming is limited to the inactive season, occurs within 100 ft of the road/ rail surface, and is outside of documented habitat for the Indiana bat, NLEB, and TCB
A00844 - 14
DETERMINATION KEY DESCRIPTION: FHWA, FRA, FTA
PROGRAMMATIC CONSULTATION FOR TRANSPORTATION
PROJECTS AFFECTING IBAT, NLEB, OR TCB
This key was last updated in IPaC on May 14, 2026. Keys are subject to periodic revision.
This decision key is intended for projects/activities funded or authorized by the Federal Highway Administration (FHWA), Federal Railroad Administration (FRA), and/or Federal Transit Administration (FTA), which may require consultation with the U.S. Fish and Wildlife Service (Service) under Section 7 of the Endangered Species Act (ESA) and may affect the federally listed endangered Indiana bat (Myotis sodalis), northern long-eared bat (Myotis septentrionalis), and/or federally proposed endangered tricolored bat (Perimyotis subflavus).
This decision key should only be used to verify project applicability with the Service’s Programmatic Biological Opinion/Conference Opinion for Transportation Projects in the Range of the Indiana bat, northern long-eared bat, and tricolored bat, dated December 13, 2024. The programmatic consultation limited transportation activities that may affect the covered bat species and addresses situations that are both likely and not likely to adversely affect the covered bat species. This decision key will assist in identifying the effect of a specific project/activity and the applicability of the programmatic consultation. The programmatic consultation is not intended to cover all types of transportation actions. Activities outside the scope of the programmatic consultation, or that may affect ESA-listed species other than the Indiana bat, northern long-eared bat, or tricolored bat, or their designated critical habitat, may require additional ESA Section 7 consultation.
A00844 - 15
IPAC USER CONTACT INFORMATION
Agency: Massachusetts Department of Transportation Name: Lindsey Forg Address: 10 Park Plaza City: Boston State: MA Zip: 02116 Email lindsey.e.forg@dot.state.ma.us Phone: 8572489090
LEAD AGENCY CONTACT INFORMATION
Lead Agency: Federal Highway Administration
A00844 - 16
File details come from the government source that posted it. Updated .