Flooring Pricing Page.xlsx
XLSX spreadsheet 6 KB Posted
- Solicitation number
- ARFQ 0618 BVH2600000006 2
- Issued by
- Cabell County, West Virginia
About this file
This file is a pricing spreadsheet for a flooring project in West Virginia, specifically for Administration and Elevators work as detailed in Addendum 1 of the contract opportunity. The document serves as a pricing schedule that bidders would use to submit their cost proposals for the flooring installation and related work. The spreadsheet appears structured to capture detailed pricing information for various flooring materials, labor costs, and installation specifications required for the administration building and elevator areas covered under this contract amendment.
The pricing page contains line-item cost breakdowns that allow bidders to propose pricing for specific flooring components and installation services associated with the Administration and Elevators project scope. This document functions as the mechanism through which contractors submit their financial proposals, enabling the state of West Virginia to evaluate and compare bidder pricing competitively. The structured format facilitates transparent cost analysis and comparison of bids based on standardized pricing categories defined by the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_ARFQ_0618_BVH2600000006_2_WV_ARFQ_FORM.PDF | ||
| Flooring Specs (1).docx | DOCX document | |
| Addendum 1-Flooring Questions.docx | DOCX document | |
| Provisions for Federally Funded Procurements.pdf | ||
| Final_ARFQ_0618_BVH2600000006_1_WV_ARFQ_FORM.PDF | ||
| TCA - Flooring Admin (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| EXHIBIT A: PRICING PAGE | ||
| Materials: | $ | |
| Labor: | $ | |
| Total Bid: | 0 | |
| Enter total materials cost in Column B, Line 3. Enter total Labor cost in Column B, Line 4. Add all values in Column B for Total Bid. | ||
| Vendor should complete the Pricing Page in full as failure to complete the Pricing Page in its entirety may result in Vendor’s bid being disqualified. | ||
| Vendors should type or electronically enter the information into the Pricing Pages through wvOASIS, if available, or as an electronic document. |
File details come from the government source that posted it. Updated .