Attachment 12 SF1408.pdf

PDF 730 KB Posted

Attached to
Request For Proposal - Application Support Center (ASC) USCIS Federal contract opportunity
Solicitation number
Final_RFP_ASC_USCIS_28Dec2022
Issued by
Department of Homeland Security US Citizen and Immigration Services

About this file

This Standard Form 1408 document is a pre-award survey of a prospective contractor's accounting system. The survey evaluates whether the contractor's accounting system is acceptable for awarding the prospective contract. It assesses the system's compliance with accounting principles and ability to provide required cost and financial data. The survey recommends the accounting system is acceptable for award with a follow-on review after contract award.

The related Request for Proposal solicits Application Support Center services for United States Citizenship and Immigration Services. Offerors must submit questions by January 10, 2023 at 5:00 PM EST. The solicitation includes the SF1449 cover sheet, terms and conditions, evaluation criteria, and ten associated attachments. It seeks products and services to support USCIS application centers.

View the file

Other files for this federal contract opportunity

Other files attached to Request For Proposal - Application Support Center (ASC) USCIS, newest first.
File Type Posted
Attachment 6 - ASC Pricing Sheet_Amendment 9.xlsx XLSX spreadsheet
70SBUR23R00000004 Amendment 0009.pdf PDF
Attachment 6 - ASC Pricing Sheet_Amendment 8.xlsx XLSX spreadsheet
Attachment 9 Question Submission Form_CO Responses_7.xlsx XLSX spreadsheet
Attachment 9 Question Submission Form_CO Responses_6.1.xlsx XLSX spreadsheet
Attachment 9 Question Submission Form_CO Responses_6.xlsx XLSX spreadsheet
70SBUR23R00000004 Amendment 0006.pdf PDF
Attachment 1_PWS_ASC_1Feb23_Amendment 5.docx DOCX document
Attachment 6 - ASC Pricing Sheet_Amendment 5.xlsx XLSX spreadsheet
ASC RFP Amendment 5_1Feb23.docx DOCX document
70SBUR23R00000004 Amendment 0004.pdf PDF
Attachment 9 Question Submission Form_CO Responses_3.xlsx XLSX spreadsheet
Attachment 11_ASC_Factor1_Subfactor2_Two Problem Statements.docx DOCX document
Attachment 6 - ASC Pricing Sheet_Amendment 3.xlsx XLSX spreadsheet
ASC RFP Amendment 3_30Jan23.docx DOCX document
Attachment 5 - CHRI Statement of Understanding.pdf PDF
ASC RFP_70SBUR23R00000004.docx DOCX document
Attachment 2_Wage Determinations.docx DOCX document
Attachment 1_PWS_ASC_23Jan23_Amendment 2.docx DOCX document
Attachment 6 - ASC Pricing Sheet_Amendment 2.xlsx XLSX spreadsheet
70SBUR23R00000004 Amendment 2.pdf PDF
70SBUR23R00000004 Amendment 1 19Jan23.pdf PDF
Attachment 9 - Question Submission Form_CO responses.xlsx XLSX spreadsheet
Attachment 1_PWS_ASC_15Dec2022.docx DOCX document
Attachment 6 - ASC Pricing Sheet.xlsx XLSX spreadsheet
Attachment 1_PWS_ASC_10Jan23_Amendment 1.docx DOCX document
Attachment 6 - ASC Pricing Sheet_Amendment 1.xlsx XLSX spreadsheet
ASC RFP Amendment 1.docx DOCX document
Attachment 8 - Compliance Matrix_Amendment 1.docx DOCX document
Attachment 3_CBA.pdf PDF
Attachment 4_CHRI security and management control outsourcing standard for non-channelers.pdf PDF
Attachment 10 - Security Requirement 5 (Aug 2020).pdf PDF
Attachment 9 - Question Submission Form.xlsx XLSX spreadsheet
Attachment 7_Past Performance Reference Form.docx DOCX document
Attachment 8 - Compliance Matrix.docx DOCX document
ASC_Factor1_Subfactor2_Two Problem Statements.docx DOCX document
70SBUR23R00000004 Amendment 1 19Jan23.pdf PDF
ASC RFP Amendment 1.docx DOCX document
Attachment 9 - Question Submission Form_CO responses.xlsx XLSX spreadsheet
Attachment 1_PWS_ASC_10Jan23_Amendment 1.docx DOCX document
Attachment 6 - ASC Pricing Sheet_Amendment 1.xlsx XLSX spreadsheet
Attachment 8 - Compliance Matrix_Amendment 1.docx DOCX document
Attachment 5 - CHRI Statement of Understanding.pdf PDF
Attachment 3_CBA.pdf PDF
Attachment 9 - Question Submission Form.xlsx XLSX spreadsheet
Attachment 7_Past Performance Reference Form.docx DOCX document
Attachment 2_Wage Determinations.docx DOCX document
Attachment 1_PWS_ASC_15Dec2022.docx DOCX document
Attachment 4_CHRI security and management control outsourcing standard for non-channelers.pdf PDF
Attachment 10 - Security Requirement 5 (Aug 2020).pdf PDF
Show all 50

Request For Proposal - Application Support Center (ASC) USCIS has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION I - RECOMMENDATION

YES

YES, WITH A RECOMMENDATION THAT A FOLLOW ON ACCOUNTING SYSTEM REVIEW BE PERFORMED AFTER CONTRACT AWARD (Explain in 2. NARRATIVE)

NO (Explain in 2. NARRATIVE)

PREAWARD SURVEY OF

PROSPECTIVE CONTRACTOR

(ACCOUNTING SYSTEM)

SERIAL NUMBER (For surveying activity use)

PROSPECTIVE CONTRACTOR

OMB Control Number: 9000-0011 Expiration Date: 1/31/2024

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0011. We estimate that it will take 24 hours to read the instructions, gather the facts, and answer the questions.

Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S.

General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT

2. NARRATIVE (Clarification of deficiencies and other pertinent comments. If additional space is required, continue on plain sheets of paper.)

IF CONTINUATION SHEETS

ATTACHED - MARK HERE

b. TELEPHONE NUMBER (include area code)

b. TELEPHONE NUMBER (include area code)

c. DATE SIGNED

c. DATE REVIEWED

3. SURVEY

MADE BY

4. SURVEY

REVIEWING

OFFICIAL

a. SIGNATURE AND OFFICE (Include typed or printed name)

a. SIGNATURE AND OFFICE (Include typed or printed name)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is NOT usable

STANDARD FORM 1408 (REV. 1/2014)

Prescribed by GSA - FAR (48 CFR) 53.209 -1(f)

SECTION II - EVALUATION CHECKLIST

MARK "X" IN THE APPROPRIATE COLUMN (Explain any deficiencies in SECTION I NARRATIVE) YES NO

NOT

APPLI-

CABLE

1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH

GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. ACCOUNTING SYSTEM PROVIDES FINANCIAL INFORMATION:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments

(FAR 52.216-16).

b. Required to support requests for progress payments.

4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS?

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION?

(If not, describe in Section I Narrative which portions are

(1) in operation, (2) set up, but not yet in operation,

(3) anticipated, or (4) nonexistent.)

STANDARD FORM 1408 (REV. 1/2014) BACK

SECTION I - RECOMMENDATION

YES

YES, WITH A RECOMMENDATION THAT A FOLLOW ON ACCOUNTING SYSTEM REVIEW BE PERFORMED AFTER CONTRACT AWARD (Explain in 2. NARRATIVE) NO (Explain in 2. NARRATIVE)

PREAWARD SURVEY OF

PROSPECTIVE CONTRACTOR

(ACCOUNTING SYSTEM)

SERIAL NUMBER (For surveying activity use)

PROSPECTIVE CONTRACTOR

OMB Control Number: 9000-0011 Expiration Date: 1/31/2024 Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0011. We estimate that it will take 24 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT

2. NARRATIVE (Clarification of deficiencies and other pertinent comments. If additional space is required, continue on plain sheets of paper.)

IF CONTINUATION SHEETS

ATTACHED - MARK HERE

b. TELEPHONE NUMBER (include area code)

b. TELEPHONE NUMBER (include area code)

c. DATE SIGNED

c. DATE REVIEWED

3. SURVEY MADE BY

4. SURVEY REVIEWING OFFICIAL

a. SIGNATURE AND OFFICE (Include typed or printed name)

a. SIGNATURE AND OFFICE (Include typed or printed name)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is NOT usable

STANDARD FORM 1408 (REV. 1/2014)

Prescribed by GSA - FAR (48 CFR) 53.209 -1(f)

SECTION II - EVALUATION CHECKLIST

MARK "X" IN THE APPROPRIATE COLUMN (Explain any deficiencies in SECTION I NARRATIVE)

YES

NO

NOT APPLI-CABLE

1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. ACCOUNTING SYSTEM PROVIDES FINANCIAL INFORMATION:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16).

b. Required to support requests for progress payments.

4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS?

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION?(If not, describe in Section I Narrative which portions are

(1) in operation, (2) set up, but not yet in operation,

(3) anticipated, or (4) nonexistent.)

STANDARD FORM 1408 (REV. 1/2014) BACK

8.2.1.3144.1.471865.466429 Standard Form 1408 - Pre-Award Survey of Prospective Contractor (Accounting System)

PROSPECTIVE CONTRACTOR:
IF CONTINUATION SHEETS ATTACHED - MARK HERE: 0
1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT. YES: 0
1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT. YES, WITH A RECOMMENDATION THAT A FOLLOW ON ACCOUNTING SYSTEM REVIEW BE PERFORMED AFTER CONTRACT AWARD (Explain in 2. NARRATIVE): 0
1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT. NO (Explain in 2. NARRATIVE): 0
SERIAL NUMBER (For surveying activity use):
2. NARRATIVE (Clarification of deficiencies, and other pertinent comments,. If additional space is required, continue on plain sheets of paper.):
4. SURVEY REVIEWING OFFICIAL. a. SIGNATURE AND OFFICE (include, typed or printed name) (Typed name):
3. SURVEY MADE BY. a. SIGNATURE AND OFFICE (include, typed or printed name) (Typed name):
c. DATE REVIEWED. Enter 2 digit month, 2 digit day and 4 digit year.:
c. DATE SIGNED. Enter 2 digit month, 2 digit day and 4 digit year.:
b. TELEPHONE NUMBER (include area code):
b. TELEPHONE NUMBER (include area code):
4. Survey Reviewing Official. (a) Signature and Office. Sign here if you are the Survey Reviewing Official.:
1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES? YES.: 1
a. Proper segregation of direct costs from indirect costs. YES.: 1
b. Identification and accumulation of direct costs by contract. YES.: 1
c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.) YES.: 0
1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES? NO.: 0
a. Proper segregation of direct costs from indirect costs. NO.: 0
b. Identification and accumulation of direct costs by contract. NO.: 0
c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.) NO.: 0
1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES? NOT APPLICABLE.: 0
a. Proper segregation of direct costs from indirect costs. NOT APPLICABLE.: 0
b. Identification and accumulation of direct costs by contract. NOT APPLICABLE. : 0
c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.) NOT APPLICABLE. : 1
d. Accumulation of costs under general ledger control. YES.: 1
e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives. NOT APPLICABLE.: 1
f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives. YES.: 0
g. Interim (at least monthly) determination of cost charged to a contract through routine posting of books of account. NOT APPLICABLE.: 0
h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions. YES.: 1
i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract. NOT APPLICABLE.: 0
j. Segregation of preproduction costs from production costs. YES.: 0
a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16). NOT APPLICABLE.: 1
b. Required to support request for progress payments. YES : 0
4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS? NOT APPLICABLE.:
5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION? YES

(If not, describe in Section I Narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.): 1

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION? NO

(If not, describe in Section I Narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.) : 0

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION? NOT APPLICABLE

(If not, describe in Section I Narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.) : 0

4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS? NO.: 0
4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS? YES: 1
b. Required to support request for progress payments. NO.: 0
b. Required to support request for progress payments. NOT APPLICABLE.: 1
a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16). NO.: 0
a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16). YES.: 0
j. Segregation of preproduction costs from production costs. NO.: 0
j. Segregation of preproduction costs from production costs. NOT APPLICABLE.: 1
i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract. NO.: 0
i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract. YES.: 1
h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions. NO.: 0
h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions. NOT APPLICABLE.: 0
g. Interim (at least monthly) determination of cost charged to a contract through routine posting of books of account. NO. : 0
g. Interim (at least monthly) determination of cost charged to a contract through routine posting of books of account. YES.: 1
f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives. NO.: 0
f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives. NOT APPLICABLE.: 1
e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives. NO.: 0
e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives. YES.: 0
d. Accumulation of costs under general ledger control. NO.: 0
d. Accumulation of costs under general ledger control. NOT APPLICABLE. : 0

File details come from the government source that posted it. Updated .