FEMA Public Assistance Program and Policy Guide (PAPPG) v5.0 Amended Summary
The FEMA Public Assistance Program and Policy Guide Version 5.0 Amended (effective January 6, 2025) is a comprehensive federal policy document that consolidates all Public Assistance Program requirements and procedures for disaster recovery assistance administered by the Federal Emergency Management Agency. This guide applies to incidents declared on or after January 6, 2025, and supersedes all previous versions, incorporating amendments reflecting executive orders issued after January 20, 2025. The PAPPG establishes the framework through which FEMA provides supplemental federal grant assistance to state, local, Tribal Nation, and territorial (SLTT) governments and eligible private nonprofit (PNP) organizations for debris removal, emergency protective measures, and restoration of disaster-damaged publicly owned facilities. The guide covers the complete lifecycle of Public Assistance projects, from initial damage assessments and declaration requests through project formulation, obligation, monitoring, and final closeout, with specific eligibility criteria, cost principles, and compliance requirements for emergency work (Categories A and B) and permanent work (Categories C-G). Key administrative timelines include a six-month deadline for emergency work completion from the declaration date, 18 months for most permanent work projects, and 180 days for building code and floodplain management administration activities. All presidential disaster declarations must designate incident types, incident periods, specific geographic areas, types of assistance authorized, and federal cost share percentages (minimum 75 percent, potentially increased to 90 percent).
The PAPPG establishes that federal cost share funding must be applied uniformly at the project level, with applicants responsible for the non-federal share through their own resources or, in limited circumstances, through other federal agency funds with specific statutory authority. All work must result from the declared incident, be located within designated areas, be the legal responsibility of eligible applicants, meet reasonable cost standards, and comply with applicable federal and state codes, standards, and environmental regulations. Significant policy updates in Version 5.0 include enhanced protections for Tribal Nations regarding sacred sites and traditional structures, clarification that hazard mitigation measures can address all hazard types regardless of the incident cause, removal of pre-approval requirements for certain private property debris removal activities, expanded emergency sheltering eligibility to include household pets and service animals, and simplified documentation requirements for small projects. The guide emphasizes resilience and risk reduction throughout recovery, incorporating benefit-cost analysis methodologies for evaluating mitigation measures and allowing flexible restoration through improved projects, alternate projects, and alternative procedures. Recipients and applicants must maintain comprehensive documentation, obtain and maintain appropriate insurance on restored facilities, comply with all environmental and historic preservation laws, and follow strict procurement requirements when contracting for eligible work. The PAPPG represents FEMA's commitment to transparent, equitable, and efficient disaster recovery assistance that balances rapid community recovery with long-term resilience building and protection of environmental and cultural resources.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Disaster_Debris_Removal_Services.pdf | ||
| Disaster_Debris_Removal_Services.pdf | ||
| 2025_Temp_Debris_Staging_Sites_Map_8x11_(2).pdf | ||
| 2025_Temp_Debris_Staging_Sites_Map_8x11_(2).pdf | ||
| fema_pa_pappg-5.0-amended.pdf | ||
| Appendix_II_for_2_CFR_Part_200.pdf | ||
| Appendix_II_for_2_CFR_Part_200.pdf | ||
| Chapter_8_Section_I_(1).pdf | ||
| EFT_FORM.pdf | ||
| W-9_(2024).pdf | ||
| Chapter_8_Section_I_(1).pdf | ||
| W-9_(2024).pdf | ||
| Certificate_of_partial_payment.pdf | ||
| EFT_FORM.pdf | ||
| Certificate_of_partial_payment.pdf | ||
| Warranty_Letter_.pdf | ||
| Certificate_of_final_payment.pdf | ||
| Certificate_of_final_payment.pdf | ||
| Warranty_Letter_.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Public Assistance Program and Policy Guide Version 5.0 Amended, Effective January 6, 2025
(FP 104-009-2)
PAPPG v5
This page intentionally left blank
PAPPG Version 5.0 has been amended to reflect the issuance of Executive Orders on and after January 20, 2025. Amendments are reflected in the following: Chapters 4, 6, 8, 10, Appendices A, B, C, D, G, & the removal of the option for an independent expert panel cost estimate review for projects with a federal cost share greater than $5 million.
Foreword On behalf of the Federal Emergency Management Agency (FEMA), I am pleased to issue the fifth edition (Version 5.0 Amended) of the “Public Assistance Program and Policy Guide” (PAPPG). This version applies to incidents declared on or after January 6, 2025 and supersedes Version 4.1 As with prior versions, FEMA has archived previous editions for reference, and Version 5.0 Amended serves as the comprehensive, consolidated resource for Public Assistance (PA) Program policies throughout the disaster recovery lifecycle.
The PAPPG provides a robust and streamlined guide for evaluating eligibility under the PA Program. It consolidates relevant policies into a single document, while also referencing external FEMA policies and resources to support stakeholders involved in the implementation of each recovery step. The release of Version 5.0 Amended reflects FEMA's continued commitment to improving access to the PA Program, reducing the documentation burden on our customers, and promoting fair and timely recovery efforts. By integrating cost-effective hazard mitigation measures, Version 5.0 also helps facilitate resilient rebuilding in communities affected by disasters.
Significant updates in this edition include policy changes related to Tribal Nations, resilience and mitigation, and adjustments based on Title 2 Code of Federal Regulations (C.F.R.) updates that took effect on October 1, 2024. FEMA will continue to prioritize further updates to PA guidance to ensure continued alignment with emerging needs in disaster recovery and Administration priorities.
We are confident that Version 5.0 Amended of the PAPPG will further enhance the effectiveness, accessibility, and resilience of the PA Program as it supports the recovery of communities across the nation.
We look forward to your feedback to help inform the next version. All recommendations for the PAPPG can be sent to FEMA-Recovery-PA-Policy@fema.dhs.gov.
Paul Judson Acting Assistant Administrator Recovery Directorate
1 For previous editions of the PAPPG, refer to: Archives: FEMA Public Assistance Policy | FEMA.gov.
mailto:FEMA-Recovery-PA-Policy@fema.dhs.gov https://www.fema.gov/assistance/public/policy-guidance-fact-sheets/policy-archives
Table of Contents
Foreword
Summary of Changes
Policy and Guidance Documents Incorporated and Superseded
Introduction
I. Document Scope, Purpose, and Use
II. Applicability
III. Document Management and Maintenance
IV. Public Assistance Program Overview
V. Authorities
A. Statutes
1. Stafford Act
2. Other Statutes
B. Regulations
1. Title 44 of the Code of Federal Regulations
2. Title 2 of the Code of Federal Regulations
3. Other C.F.R
C. Policy
D. Public Assistance Web-Based Grants System
Chapter 1: Declarations and Planning
I. Damage Assessments
II. Declaration Request
III. Declaration Evaluation
A. State and Territorial Governments
B. Tribal Nations
IV. Declaration Determinations
A. Incident Type
B. Incident Period
C. Designated Areas
D. Types of Assistance
E. Federal Cost Share
F. Declaration-Related Appeals
G. Recipient Administrative Requirements
H. Application for Federal Assistance
I. FEMA-State/Tribal Nation Agreement
J. Payment Management System
K. Public Assistance Administrative Plan
L. Hazard Mitigation Plan
M. Recipient-Led Public Assistance
Chapter 2: Coordination and Appeal Rights
I. PA Eligibility
A. Simplified Procedures
B. Sampling Procedures
C. Facilitated Discussions
D. Requests for Information
E. Notification of an Ineligibility Determination
F. Appeal Rights and Requirements
G. Appeal Deadlines
H. Appeal Review and Decisions
I. Arbitration
Chapter 3: Applying for Public Assistance and Applicant Eligibility
I. Applicant Eligibility
II. Applicant Briefing
III. Request for Public Assistance
IV. Applicant Eligibility: State, Local, Tribal Nation, and Territorial Government Entities
A. State and Territorial Governments
B. Tribal Nations
C. Local Governments
V. Applicant Eligibility: Private Nonprofit Organizations
A. Organization Eligibility
B. For-Profit Entities
C. Facility Eligibility
D. Multiple Facilities
E. Mixed-Use Facility
F. Mixed-Use Space
G. Multiple Services
H. Use by Multiple Entities
I. Leased Facilities
J. Small Business Administration Loan Requirement
1. Small Business Loan Eligibility
K. Private Nonprofit Services
Chapter 4: General Facility and Work Eligibility
I. Facility Eligibility
A. Public Facility
B. Inactive or Partially Inactive Facility
C. Facility Scheduled for Repair or Replacement
II. General Work Eligibility
A. Emergency Work vs. Permanent Work
B. Minimum Work Eligibility Criteria
1. Result of Declared Incident
i. Documentation and Information to Support Cause of Impacts and Damage
ii. Protecting Tribal Sensitive Locations
2. Within Designated Area
i. Documentation and Information to Support Within Declared Area
3. Legal Responsibility
i. Documentation and Information to Support Legal Responsibility
ii. Facilities Under Contract for Construction
iii. Leased Facilities
iv. Federal Facilities
v. Jurisdiction Over an Area
vi. Conducting Activities on Private Property
vii. Work Under the Authority of Other Federal Agencies
viii. Environmental and Historic Preservation Requirements
ix. Policy Implementation Considerations
x. Resilience Considerations
Chapter 5: Damage and Impact Information
I. Impact List
A. Impact List Submission Deadline
B. Inundated and Submerged Roads
II. Grouping Impacts into Projects
A. Initial Debris Removal Grouping (Category A)
B. Initial Emergency Protective Measures Grouping (Category B)
C. Initial Permanent Work Grouping (Categories C-G)
1. Transportation
2. Water Control
3. Education
4. Housing
5. Health
6. Emergency Service Facilities
7. Other Government Facilities
8. Energy
9. Water/Wastewater
10. Communications/Information Technology
11. Natural and Cultural Resources
D. Final Grouping
E. Building Code and Floodplain Management Administration and Enforcement Activities Grouping (Category I)
F. Grant Management Activities Grouping (Category Z)
Chapter 6: Cost Eligibility
I. Eligibility Requirements
II. Reasonable Costs
A. Reasonable Cost Analysis
III. Applicant (Force Account) Labor
A. Labor Policies
B. Eligibility Criteria for Reimbursement of Employee Labor Costs
1. Reassigned Employees
2. Reassigned Employees Funded from an External Source
3. Backfill Employees
4. Essential Employees Called Back from Furlough
5. Supervisors
6. Other
7. Standby Time
IV. Applicant-Owned and Purchased Equipment
A. FEMA Rates
B. State, Tribal Nation, or Territorial Rates
C. Local Rates
D. Equipment with No Established Rate
E. Telecommunications Equipment Purchase
V. Rented or Leased Equipment
VI. Supplies
VII. Disposition of Equipment and Supplies
A. Disposition of Purchased Equipment
B. Disposition of Purchased Supplies
VIII. Disposition for Small Projects
IX. Disposition of Real Property
X. Procurement and Contracting Requirements
A. Procurement and Contracting Requirements for State and Territorial Government and Tribal Nation Entities
1. Procurement
2. Contracting
B. Procurement and Contracting Requirements for Local Government Agencies and Private Nonprofit Organizations
1. Pre-Procurement Considerations
2. General Federal Procurement Requirements
3. Procurement Methods
C. Noncompetitive Procurement
1. Contract Types
D. Time-and-Materials Contracts
1. Cost-Plus-Percentage-of-Cost or Percentage-of-Construction
2. Additional Contracting Considerations
i. Pre-Positioned Contracts
ii. Cooperative Purchasing
E. Required Documentation and Information for Procurement and Contracting
XI. Mutual Aid
A. Post-Incident Agreements
B. Eligibility
C. Emergency Management Assistance Compact
D. Required Documentation and Information for Mutual Aid
XII. Prisoners
XIII. National Guard
XIV. Direct Federal Assistance
XV. Increased Federal Cost Share for a Limited Timeframe
XVI. Donated Resources
A. Offset Amounts
B. Required Documentation and Information for Donated Resources
XVII. Project Management and Design Services
XVIII. Grant Management and Administration
XIX. Surveys to Assess or Locate Damage or Debris Impacts
XX. Duplication of Benefits
A. Insurance Proceeds
B. Non-Federal Grants and Cash Donations
C. Third-Party Liability
D. Other Federal Awards
XXI. Duplication of Funding Between FEMA Programs
XXII. Interest on Loans
XXIII. Ineligible Costs
A. Loss of Revenue
B. Loss of Useful Service Life
C. Tax Assessments
D. Increased Operating Costs
Chapter 7: Emergency Work Eligibility
XI. Eligibility Considerations for Emergency Work
XII. Debris Removal (Category A)
A. Hazardous Limbs, Trees, and Stumps
1. Hazardous Limb or Branch Removal
2. Hazardous Tree Removal
3. Hazardous Stump Removal
i. Contracted Stump Removal
ii. Documentation Requirements for Hazardous Limbs, Trees, and Stumps
B. Waterways
1. Navigable Waterways
2. Non-Navigable Waterways, Including Flood Control Works and Natural Waterways
3. Identifying Debris Impact Locations
C. Privately-Owned Vehicles and Vessels on Public Property
D. Disposal
1. Recycling Revenue
2. Temporary Staging Sites
3. Hand-Loaded Trucks and Trailers
4. Landfills and Tipping Fees
E. Monitoring Contracted Debris Removal Operations
F. Private Property Debris Removal
1. PPDR Eligibility Determination Process
i. Public Interest
2. Debris Removal from Private Roads
3. Debris Removal from Private Non-Commercial Property
4. Debris Removal from Private Commercial Property
5. Duplication of Benefits in Private Property Debris Removal
XIII. Emergency Protective Measures (Category B)
A. Saving Lives and Protecting Public Health and Safety
B. Protecting Improved Property
C. Emergency Protective Measures on Private Property
D. Emergency Protective Measures Conducted by Private Nonprofit Organizations.. 133
E. Pre-Positioning Resources
F. Increased Operating Costs
G. Emergency Public Transportation and Communication (DFA Only)
H. Flood Fighting
I. Emergency Operations Centers
J. Emergency Access
K. Hazardous Materials
L. Supplies and Commodities
M. Meals
N. Emergency Medical Care
O. Evacuation and Sheltering
1. Evacuation
2. Sheltering
i. Congregate Sheltering
a. Congregate Shelter Facility Costs
b. Congregate Shelter Staff Costs
c. Congregate Shelter Supplies and Commodities
d. Congregate Shelter Services
ii. Non-Congregate Sheltering
a. Requests for Non-Congregate Sheltering
b. Eligible Costs for Non-Congregate Sheltering
c. Ineligible Costs for Non-Congregate Sheltering
d. Survivor Insurance and Non-Congregate Sheltering
e. Time Extensions for Non-Congregate Sheltering
f. NCS Work Eligibility Requirements
g. Data Collection, Management, and Reporting During NCS Operations
3. Host-State or Host-Tribe Evacuation and Sheltering
4. Childcare Services
P. Infectious Disease Incident
Q. Mosquito Abatement
R. Safety Inspections
S. Animal Carcasses
T. Demolition of Private Structures
1. Conditions of Eligibility for Demolition
2. Commercially Owned Structures
3. Eligible Demolition Work
4. Ineligible Work
U. Temporary Relocation of Essential Services
1. Eligible for Temporary Relocation
2. Ineligible for Temporary Relocation
3. Determining Eligibility of Temporary Relocation
4. Lease, Purchase, or Construct
5. Safe Rooms for Temporary School Facilities
6. Temporary Relocation Costs
7. Time Limitations
i. Conditions When Temporary Facility Funding is Limited
a. Improved Project
b. Alternate Project
c. Alternative Procedures Project
8. Disposition Requirements
V. Snow-Related Activities
1. Limited Time Period
2. Eligible Work
W. Emergency Repair or Stabilization
1. Operation Blue Roof (DFA Only)
2. Slope Stabilization
3. Mold Remediation
4. Emergency Berms on Beaches
X. Elections and Polling Activities
XIV. Damage Caused During Performance of Emergency Work
Chapter 8: Permanent Work Eligibility (Categories C-G)
I. Facility Restoration (Categories C-G)
II. Codes and Standards
A. Consensus-Based Codes, Specifications, and Standards
1. Identification Requirements
2. Verification Requirements
3. Additional Eligible Work and Costs
4. Other Considerations
B. Locally Adopted Codes and Standards
C. Codes and Standards Eligibility Criteria
1. Applies to the Type of Restoration Required
2. Appropriate to Pre-Disaster Use
3. Reasonable
4. Written, Formally Adopted, and Implemented
5. Applies Uniformly
6. Enforced
D. Ineligible Upgrades
E. Accessibility for Individuals with Disabilities
F. Path of Travel
G. Permit Requirements
H. Additional Resources
III. Hazard Mitigation
A. Eligibility Criteria
B. Future Damage Reduction
1. Cost Effectiveness
2. Compliance with Legal Requirements
3. Proposing PA Hazard Mitigation
4. Reduce Adverse impacts
5. Post-Repair Hazard Mitigation
6. Completed Hazard Mitigation Eligibility
C. Historic Preservation Compliance
1. Federal Requirement
2. State, Tribal Nation, or Territorial Government Requirement
D. Public Assistance Mitigation Funds for Capped Projects
1. Improved Project
2. Alternate Project
E. Construction Method
F. Pre-Existing Site Conditions
IV. Flexible Restoration (Capped Projects)
A. Processing Projects with Capped Funding
B. Improved Project
1. Use of Improved Project Funds
C. Alternate Project
1. Use of Alternate Project Funds
V. Eligibility Considerations by Facility
A. Roads and Bridges (Category C)
1. Components
2. Road and Bridge Eligibility for Permanent Work
3. Types of Damage
i. Deterioration, Deferred Maintenance, Negligence
ii. Scour and Erosion
4. Inundated and Submerged Roads
i. Inundated Roads with Visible Damage
a. Documentation to Support Claimed Damage
ii. Inundated Roads without Visible Surface Damage
a. Projected Loss of Useful Service Life
iii. Surface Damage Resulting from Reopening Roads Prematurely
iv. Closed Basin Flooding
a. Documentation to Support Claimed Damage for Closed Basin Flooding
v. Gravel Roads
a. Documentation and Information to Support Gravel Loss
b. Documentation and Information to Support Gravel Road Rutting
5. Demonstrating Disaster-Related Damage
B. Water Control Facilities (Category D)
1. Restoring the Capacity of Channels, Basins, and Reservoirs
2. Flood Control Works
C. Buildings and Equipment (Category E)
1. Buildings
i. Earthquake Damage to Welded Steel Moment Frame Buildings
2. Contents and Supplies
i. Files
ii. Library Books and Publications
iii. Irreplaceable Collections and Individual Objects
iv. Research-Related Contents
v. Animals
3. Equipment
4. Vehicles
D. Utilities (Category F)
1. Power Restoration
2. Right-of-Way Clearance
3. Power: Transmission and Distribution System Conductor Replacement
E. Parks, Recreational, Other (Category G)
1. Beaches
F. Landslides and Slope Stabilization
VI. Repair vs. Replacement
A. Calculation
B. Request for Replacement
C. Eligible Funding
D. Replacement of Components of a Facility or System
VII. Relocation
A. FEMA-Directed Relocation
B. Applicant-Driven: Repair vs. Replacement
C. Code-Driven: Part 9 and Other Code and Standard Relocations
D. Eligible Work and Funding
E. Sale or Lease of Property at Original Site
VIII. Environmental and Historic Preservation Requirements
A. Floodplain Management and Wetland Protection
1. Critical Actions
i. Potential Critical Actions
ii. Non-Critical Actions
2. Coastal High Hazard Areas
3. Requirement for Communities Participating in the National Flood Insurance
Program
IX. Facility Located in or Impacting a Floodplain
A. 8-Step Decision-making Process
B. Hydrologic and Hydraulic Studies
C. Facility Located in a Special Flood Hazard Area
1. National Flood Insurance Program
X. Requirement to Obtain and Maintain Insurance
A. Failure to Obtain and Maintain Insurance
XI. Building Code and Floodplain Management Administration and Enforcement (Category I)
A. General Requirements
B. Eligible Work
1. Building Code Administration
2. Code Enforcement
3. Floodplain Management Ordinance and Enforcement
4. Substantial Damage Determinations
C. Ineligible Work
D. Required Documentation and Information for Category I Work
Chapter 9: Scoping, Costing, and Final Reviews
I. Scope of Work Development
A. Traditional Tribal Residential and Ceremonial Structures – Inspecting, Scoping, & Estimating
II. Cost Development
A. Project Thresholds
B. Expedited Projects for Emergency Work
C. Costs for Projects with All Work Completed
D. Estimating Emergency Work Projects with Work to be Completed
E. Estimating Permanent Work Projects with Work to be Completed
1. Projects Requiring Engineering Analysis
2. Applicant Estimates
3. FEMA Estimates
4. Insurance Reductions
III. Compliance Reviews
IV. Obligation
A. Obtaining Funds
B. Strategic Funds Management
Chapter 10: Environmental and Historic Preservation
I. EHP Compliance
A. EHP Compliance Review
1. Required Information and Documentation
B. Projects that Qualify for Streamlined EHP Review
C. Projects Requiring Complex EHP Review
1. Emergency Work (Categories A and B)
2. Debris Removal (Category A)
3. Emergency Protective Measures (Category B)
4. Permanent Work (Categories C-G)
i. Disposition of Original Facility
D. Navigating the EHP Compliance Process
E. Understanding EHP Laws and Executive Orders
1. National Environmental Policy Act
2. National Historic Preservation Act
3. Endangered Species Act
4. Executive Orders 11988 & 11990: Floodplain Management and Wetlands
Protection
5. Coastal Barrier Resources Act
6. Clean Water Act
F. Coordination with Other Federal Agencies
1. Unified Federal Review
G. Partnerships and Resources
1. Heritage Emergency National Task Force
H. Resource Links
Chapter 11: Project Monitoring and Amendments
I. Post Award Change in Scope of Work
II. Work Completion Deadlines
A. Project Schedule
III. Large Project Quarterly Progress Reports
IV. Financial Status Reports
V. Federal Funding Accountability and Transparency Act
VI. Audits
A. Single Audits
B. Government Accountability Office
C. Office of the Inspector General
1. Report Fraud
D. FEMA Office of Civil Rights
E. Recovery of Improper Payments
Chapter 12: Final Reconciliation and Closeout
I. Project Reconciliation and Closeout
A. Small Projects
1. Net Small Project Overrun Appeal Request
2. Small Project Closeout
B. Large Projects
C. Subrecipients
II. Stafford Act Section 705
III. Public Assistance Award Closeout
IV. Documentation Retention Requirements
Appendix A. References and Resources
I. Public Assistance Program References
II. Public Assistance Forms and Templates
III. Statutes
IV. Code of Federal Regulations
V. Environmental Protection Laws
VI. Executive Orders
VII. Historic Preservation Laws and Tools
VIII. Federal Emergency Management Agency References
IX. Other Federal Agencies
Appendix B. Acronyms
Appendix C. Terms and Definitions
Appendix D: Environmental and Historic Preservation Compliance
I. National Environmental Policy Act
II. National Historic Preservation Act
III. Endangered Species Act
IV. Clean Water Act
V. Rivers and Harbors Act
VI. Safe Drinking Water Act
VII. Clean Air Act
VIII. Coastal Barrier Resources Act
IX. Migratory Bird Treaty Act
X. Bald and Golden Eagle Protection Act
XI. Magnuson-Stevens Fishery Conservation and Management Act
XII. Marine Mammal Protection Act
XIII. National Marine Sanctuaries Act
XIV. Coastal Zone Management Act
XV. Farmland Protection Policy Act
XVI. Wild and Scenic Rivers Act
XVII. Resource Conservation and Recovery Act
XVIII. Comprehensive Environmental Response, Compensation and Liability Act
XIX. Executive Order 11988, Floodplain Management
XX. Executive Order 11990, Protection of Wetlands
XXI. Executive Order 13112, Invasive Species
Appendix E: Private Nonprofit Facility Eligibility Examples
I. Facility Owned by PNP – PNP Leases Portion of Facility to For-Profit Service
II. PNP Recreational Center Providing Eligible Services
III. Support Facility Owned by PNP
IV. Facilities Owned by PNP Homeowners’ Association
V. Recreational Center – Primarily Athletic Services
VI. Mixed Use Community Center – Nominal Fee
VII. School Operated by a Religious Institution
VIII. Religious Institution with a Dock, a Church, and a Pastor’s Residence
Appendix F: Mosquito Abatement
Appendix G: Alternative Procedures for Permanent Work
I. Differences Between Standard and Alternative Procedures
II. Fixed Cost Estimate
A. Architectural, Engineering, Environmental Review, and Design Fees
B. Construction and Other Restoration Costs
C. Expert Panel Cost Estimate Review
D. Public Assistance Hazard Mitigation
III. Fixed Cost Offer
A. Fixed Cost Offer Deadlines
IV. Use of Funding
A. Excess Funds
III. Scope of Work Changes
IV. Closeout Requirements
V. Other Considerations
A. Requirement to Obtain and Maintain Insurance
B. Appeals for Alternative Procedures Projects
C. Office of the Inspector General
Appendix H: Mold Remediation
I. Mold Remediation Methods
II. Application of Remediation Methods
Appendix I: Work Eligibility Considerations by Type of Facility
I. General Work Eligibility Considerations for Facilities
II. Work Eligibility Considerations for Roads and Bridges
III. Work Eligibility Considerations for Water Control Facilities
IV. Work Eligibility Considerations for Buildings, Equipment, and Vehicles
V. Work Eligibility Considerations for Contents
VI. Work Eligibility Considerations for Utilities
VII. Work Eligibility Considerations for Parks, Recreation, and Other
Appendix J: Cost-Effective Public Assistance Hazard Mitigation Measures
I. Drainage Structures
II. Transportation Facilities
III. Mechanical, Electrical, Plumbing Components
IV. Pipes
V. Water/Wastewater
VI. Electric Power Systems
VII. Storage Tanks
VIII. Buildings and Structures
IX. Signage
Appendix K: Snow Declarations
I. Record or Near-Record Snowfall
II. Winter Storm or Snowstorm Declaration Requests
Appendix L: Validation of Applicant-Provided Cost Estimates
Appendix M. Consensus-Based Codes, Specifications, and Standards
Tables
Table 1. List of Changes and Clarifications Grouped by General Topic Table 2. SBA Loan Requirements Table 3. PNP Eligible Critical Services Table 4. PNP Eligible Noncritical, Essential Social Services Table 5. PNP Ineligible Services Table 6. Required Documentation and Information for PNP RPA Table 7. Documentation and Information to Support Cause of Impacts and Damage Table 8. Required Documentation and Information to Support Within Declared Area Table 9. Required Documentation and Information to Support Legal Responsibility Table 10. Required Documentation and Information for Labor Costs Table 11. Emergency Work Labor Eligibility Table 12. Required Documentation and Information for Applicant-Owned or Purchased Equipment Costs Table 13. Required Documentation and Information for Rented or Leased Equipment Costs Table 14. Required Documentation and Information for Materials and Supplies Costs Table 15. Required Documentation and Information for Contract Costs Table 16. Required Documentation and Information for Mutual Aid Costs Table 17. Required Documentation and Information for Prison Labor Costs Table 18. Required Documentation and Information for Offset Values for Donated Resources Table 19. Required Documentation and Information for Insurance Proceeds Table 20. Required Documentation and Information for Work Eligibility Table 21. Required Documentation and Information for Debris Removal and Disposal Table 22. Required Documentation and Information for PPDR Table 23. Required Documentation and Information to Support Damage to Inundated or Submerged Roads Table 24. Required Information to Support Damage Resulting from Reopening Roads Prematurely Table 25. Required Documentation and Information to Support Closed Basin Flooding Table 26. Required Documentation and Information to Support Gravel Loss Table 27. Required Documentation and Information to Support Gravel Road Rutting Table 28. Required Documentation and Information to Support Pre-Incident Capacity of Channels, Basins, and Reservoirs Table 29. Required Documentation and Information to Support Pre-Disaster Conductor Condition 204 Table 30. Required Documentation and Information for Category I Work Table 31. Required Documentation and Information to Support Scope of Work Changes Table 32. Deadlines for Submitting Quarterly Progress Reports Table 33. Required Documentation and Information for Quarterly Progress Reports Table 34. Required Documentation and Information to Support a Large Project Closeout Request 255 Table 35. Differences Between Standard and Alternative Procedures Table 36. Eligible Work and Costs for Use of Fixed Cost and Excess Funds Table 37. Mold Remediation Methods Table 38. Application of Mold Remediation Methods Table 39. Work Eligibility Considerations: All Facilities Table 40. Work Eligibility Considerations: Roads and Bridges Table 41. Work Eligibility Considerations: Water Control Facilities Table 42. Work Eligibility Considerations: Buildings, Equipment, and Vehicles Table 43. Work Eligibility Considerations: Contents Table 44. Work Eligibility Considerations: Utilities Table 45. Work Eligibility Considerations: Parks, Recreation, and Other
Table 46. Standard Setting Organization and Consensus-Based Codes, Specifications, and Standards by Facility Type
Figures
Figure 1. 44 C.F.R Figure 2. PA Eligibility Pyramid Figure 3. Applicant Eligibility Figure 4. PNP Eligibility Figure 5. SBA Loan Outcomes Figure 6. Facility Eligibility Figure 7. Categories of Work Figure 8. Cost Eligibility Figure 9. Emergency Work Eligibility Figure 10. Immediate Threats Figure 11. Debris on Public Property Figure 12. Distribution of Supplies Figure 13. Staging Area with Ambulances Figure 14. Evacuees Boarding a Bus Figure 15. Determining Eligibility of Emergency Berms on Beaches Figure 16. Permanent Work Eligibility Figure 17. Path of Travel Figure 18. PA Hazard Mitigation Process Flowchart Figure 19. Typical Beach Profile Figure 20. Category I Work Eligibility Figure 21. Work Completion Deadlines
Summary of Changes This PAPPG version incorporates the following changes:
Table 1. List of Changes and Clarifications Grouped by General Topic
Topic Highlighted V5 Improvements
Tribal Nations To support the protection of tribal significant artifacts, culturally sensitive landscapes and sites, cultural resources, and human remains; clarified that FEMA will not require photos, site maps, and specific location details (such as GPS coordinates) for locations where these cultural artifacts are located;
Clarified that FEMA will accept a Tribal Nation’s certified damage assessment, scope of work for restoration, and estimated costs for traditional tribal residences or tribal ceremonial buildings;
Clarified that for locations where only tribal members are allowed, site inspections by FEMA staff are not permitted;
Clarified that mutual aid agreements or memoranda of understanding are available resources for Tribal Nations and provided guidance on reimbursement when there is no pre-existing written agreement; and, Clarified that if a Tribal Nation received funding from the Bureau of Indian Affairs or Federal Highway Administration for construction or maintenance of tribal roads, those roads are still eligible for FEMA PA funding under a presidentially declared disaster.
Resilience Included language about resilience considerations throughout;
Clarified that PA mitigation measures can be implemented for all hazards, not just the hazard that caused the damage;
Added information and reference to the benefit-cost analysis (BCA)
Toolkit;
Increased opportunities to mitigate improved projects involving facility replacement or relocation; and, Expanded Appendix J to include additional measures, with two measures focused on wildfire
Simplification As a result of stakeholder feedback, removed non-regulatory processes for inclusion in other PA guidance;
Where possible, removed “may” and “should,” and replaced with “must” to clarify requirements; and, Redefined acronyms at the beginning of each chapter and reduced acronym use.
Topic Highlighted V5 Improvements
Documentation and Requirements
Clarified documentation and information requirements for small projects and large projects;
Reduced documentation and information requirements for small projects;
Incorporated PA’s sampling procedures;
Clarified that maintenance records are not always required to substantiate damage;
Included more options for documentation to support legal responsibility; and, Removed requirement for pre-approval prior to completing private property debris removal.
Added Content Incorporated Validated as You Go (VAYGo) content and resources;
Added subsection titled “Telecommunications Equipment Purchase;”
Added “self-insurance or self-insured retention” to list of insurance types; and, Included insurance commitment opportunities which benefit applicants experiencing subsequent disasters.
Clarifications Clarified road damage from damage caused by submerged and inundated as distinct types of damage;
Clarified that snow assistance is not authorized for emergency declarations; and, Conveyed FEMA’s support to report suspicious activities as well as who and how to report.
Private Non-Profit (PNP) Consolidated private non-profit information into one section;
Explained for-profit entities’ ineligibility; and, Clarified that Houses of Worship and faith-based organizations are considered private nonprofit organizations.
Sheltering Removed pre-approval requirement for non-congregate sheltering activities in traditional settings (i.e., hotels/motels, dormitories, etc.);
Removed childcare services as a standalone emergency protective measure and is now only eligible when associated with emergency sheltering; and, Expanded emergency sheltering eligibility to include survivors’ “household pets, service animals, assistance animals” and removed requirement for pet owners to be sheltered for pet sheltering to be eligible.
Topic Highlighted V5 Improvements
Environmental and Historic Preservation (EHP)
Explained and provided examples of projects that have potential to impact EHP resources;
Provided guidance on navigating the EHP compliance process;
Clarified documentation requirements for streamlined EHP reviews and complex EHP reviews;
Provided EHP considerations by category of work; and, Provided examples of project types that may have impacts to natural and cultural resources.
Statutory and Regulatory Updates
Incorporated the revision to 2 C.F.R. Part 200 which integrates Office of Management and Budget (OMB)'s policy priorities and strives to reduce agency and recipient burden;
Updated guidance from the Payment Integrity Information Act, which supersedes the Improper Payments Elimination and Recovery Improvement Act; and, Added compliance with EO 14148, Initial Recissions of Harmful Executive Orders and Actions
Policy and Guidance Documents Incorporated and Superseded Building Code and Floodplain Management Administration and Enforcement
(FEMA Policy 204-079-01)
“Combining Wildfires Under a Major Disaster Declaration” Memo (August 21, 2021)
Consensus-Based Codes, Specifications, and Standards for Public Assistance (FEMA Recovery Interim Policy 104-009-11 Version 2)
“Emergency NCS” Memo (June 28, 2022)
Mission Assignments (FEMA Policy 104-010-3)
Public Assistance Appeals and Arbitration (FEMA Policy 104-22-0001)
Public Assistance Guidance on Inundated and Submerged Roads (FEMA Policy 104-009-13)
Public Assistance Simplified Procedures (FEMA Policy 104-23-001)
“Recovery Program Enhancements to Support Tribal Nations” Memo (November 22, 2023)
“Simplifying the PA Management Costs” Memo (March 01, 2023)
“Simplifying the PA Program 1” Memo (March 28, 2022)
“Simplifying the PA Program 2” Memo (September 6, 2022)
“Wildfire Policy Guidance” Memo (October 17, 2022)
Tribal Declarations Interim Guidance (FP 104-009025-001) https://www.whitehouse.gov/presidential-actions/2025/01/initial-rescissions-of-harmful-executive-orders-and-actions/ https://www.whitehouse.gov/presidential-actions/2025/01/initial-rescissions-of-harmful-executive-orders-and-actions/
(For a list of guidance documents summarized and referenced, please see the Appendix A: References and Resources list.)
Introduction I. Document Scope, Purpose, and Use The Federal Emergency Management Agency’s (FEMA’s) “Public Assistance Program Policy Guide” (PAPPG) contains consolidated Public Assistance (PA) Program policies and procedural requirements for the entire program delivery life cycle. The PAPPG provides comprehensive PA policy to use when evaluating eligibility.
The PAPPG references and provides links to other FEMA policies and documents such as standard operating procedures and fact sheets that provide guidance for those involved with implementing each of the various steps.
Based on extensive feedback from internal and external stakeholders, this version of the PAPPG no longer includes content focused on FEMA’s internal processes. Instead, a new companion document for FEMA staff known as the “Public Assistance Program Delivery Guide”2 provides an overview of how FEMA implements the PA Program.
II. Applicability FEMA applies Version 5 of the PAPPG to incidents declared on or after January 6, 2025. Individuals who have responsibilities managing, implementing, or relating to the PA Program should refer to the PAPPG for PA policy and regulatory procedural requirements.
III. Document Management and Maintenance FEMA generally publishes proposed PA policy language for public comment prior to publishing in the PAPPG.3 When the policy is deemed economically significant,4 FEMA generally publishes it in the Federal Register. Additionally, FEMA is committed to strengthening its nation-to-nation relationship and will consult with tribal officials on actions that have tribal implications.5 FEMA conducts a comprehensive review of this publication no less than every three years. All recommendations for the PAPPG should be sent to FEMA- Recovery-PA-Policy@fema.dhs.gov.
IV. Public Assistance Program Overview The mission of FEMA’s PA Program is to provide assistance to state, local, Tribal Nation, and territorial (SLTT) governments and certain types of private nonprofit (PNP) organizations so that communities can quickly respond to and recover from major disasters or emergencies. Through the PA Program, FEMA provides supplemental federal grant assistance for debris removal, emergency protective measures, and the restoration of disaster-damaged, publicly owned facilities, and specific facilities of certain PNP organizations.
The PA Program also encourages protection of these damaged facilities from future incidents by providing
2 For more information, refer to: Public Assistance Program Delivery Guide.
3 Stafford Act § 325; 42 United States Code (U.S.C.) § 5165c.
4 EO 12866, Regulatory Planning and Review.
5 FEMA Tribal Consultation Policy FEMA Policy #101-002-02.
mailto:FEMA-Recovery-PA-Policy@fema.dhs.gov mailto:FEMA-Recovery-PA-Policy@fema.dhs.gov https://www.fema.gov/assistance/public/library?name=program+delivery&field_keywords_target_id=All https://www.fema.gov/about/organization/tribal-affairs/consultations assistance for hazard mitigation measures and code compliance. FEMA provides this assistance based on the authority granted in statutes, executive orders (EOs), regulations, and policies.
Along with the PAPPG, there are many resources that help navigate the PA Program. References, including EOs, policies, regulations, and laws are available in the Appendix A: References and Resources. The Public Assistance Resource Library6 contains general program guidance that focuses on restoring communities affected by major disasters or emergencies. The “Public Assistance Program Delivery Guide”7 also contains additional process information and context for the PA Program; while its primary audience is FEMA staff, SLTT partners may find it a useful resource. Lastly, definitions for terms used throughout this document can be found in Appendix C. Terms and Definitions.
V. Authorities FEMA provides assistance based on authorities defined in statutes and regulations. These authorities specify requirements that must be met by both FEMA and the communities it serves.
A. Statutes Statutes are federal laws passed by the U.S. Congress and signed by the president. All PA Program assistance must comply with all applicable statutes. The Robert T. Stafford Disaster Relief and Emergency Assistance Act, as amended (Stafford Act), Title 42 of the United States Code (U.S.C.) § 5121 et seq.
authorizes FEMA to provide assistance under the PA Program.
1. STAFFORD ACT
Stafford Act sections that apply to the assistance FEMA provides under the PA Program include:
Title I – Findings, Declarations and Definitions
Title III – Major Disaster and Emergency Assistance Administration o Sec. 308. Nondiscrimination in Disaster Assistance o Sec. 311. Insurance o Sec. 312. Duplication of Benefits o Sec. 316. Protection of Environment o Sec. 323. Minimum Standards for Public and Private Structures o Sec. 324. Management Costs
Title IV – Major Disaster Assistance Programs (applies to Major Disaster Declarations) o Sec. 403. Essential Assistance o Sec. 406. Repair, Restoration, and Replacement of Damaged Facilities o Sec. 407. Debris Removal
6 For more information, refer to: Public Assistance Resource Library | FEMA.gov.
7 For more information, refer to: Public Assistance Program Delivery Guide.
https://www.fema.gov/assistance/public/library https://www.fema.gov/assistance/public/library?name=program+delivery&field_keywords_target_id=All o Sec. 422. Simplified Procedures o Sec. 428. Public Assistance Program Alternative Procedures
Title V – Emergency Assistance Programs (applies to Emergency Declarations) o Sec. 502. Federal Emergency Assistance
Title VII – Miscellaneous o Sec. 705. Disaster Grant Closeout Procedures
2. OTHER STATUTES
Americans with Disabilities Act of 1990
Sections 504 and 508 of the Rehabilitation Act of 1973
Civil Rights Act of 1964
Federally Recognized Tribe List Act of 1994
Environmental and Historic Preservation Acts
Payment Integrity Information Act of 2019
Executive Order 13175, Consultation and Coordination with Indian Tribal Governments
Presidential Memorandum of November 5, 2009, Tribal Consultation
Federally Recognized Tribe List Act of 1994
Fair Labor Standards Act
B. Regulations Regulations8 are federal rules with the force and effect of law that implement a statute based on a federal agency’s interpretation of that statute.9 FEMA and any entity receiving PA assistance must comply with all applicable federal regulations.10
1. TITLE 44 OF THE CODE OF FEDERAL REGULATIONS
FEMA published PA Program rules in the following parts of Title 44 of the Code of Federal Regulations (C.F.R.), Emergency Management and Assistance:11
Part 206 Subpart G, Public Assistance Project Administration;
Part 206 Subpart H, Public Assistance Eligibility; and
Part 206 Subpart I, Public Assistance Insurance Requirements.
8 For the electronic version for the C.F.R., refer to: eCFR.
9 Stafford Act § 321; 42 U.S.C. § 5164.
10 44 C.F.R. § 206.200(b).
11 Stafford Act § 325; 42 U.S.C. § 5165c; 44 C.F.R. § 1.4.
Figure 1. 44 C.F.R.
https://www.ecfr.gov/
Additional regulations that must be adhered to when receiving funding through the PA Program:
Part 7 Subpart A, Nondiscrimination in FEMA-Assisted Programs – General
Part 7 Subpart E, Nondiscrimination on the Basis of Age in Programs or Activities Receiving Federal Financial Assistance from FEMA
Part 9, Floodplain Management and Protection of Wetlands
Part 201, Mitigation Planning
Part 204, Fire Management Assistance Grant (FMAG) Program
Part 206, Federal Disaster Assistance
2. TITLE 2 OF THE CODE OF FEDERAL REGULATIONS
The Office of Management and Budget published 2 C.F.R. Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards to establish uniform rules for federal awards, including but not limited to:
Subpart C – Pre-Federal Award Requirements and Contents of Federal Awards
Subpart E – Cost Principles
Subpart F – Audit requirements
Subpart D – Post Federal Award Requirements
Appendix II - Contract provisions for non-federal entity contract under federal awards, and
Appendix VI - PA Cost Allocation Plans
3. OTHER C.F.R.
7 C.F.R. § 1730.25, Corrective action (Rural Utilities Service [RUS] borrowers only)
15 C.F.R. Part 774, The Commerce Control List
22 C.F.R. Part 121, The United States Munitions List
40 C.F.R. Part 261, Identification and Listing of Hazardous Waste
48 C.F.R. Subpart 2.1, Federal Acquisition Regulation
C. Policy FEMA issues policy to articulate the Agency’s intent and direction in applying statutory and regulatory authority to achieve desired outcomes. The purpose of the PAPPG is to define FEMA’s PA Program policy and procedural requirements. Separate FEMA policies and guidance documents that apply to the PA Program are referenced in the PAPPG where applicable and listed in the Appendix A: References and Resources section.
PA funding must comply with these requirements. Only the Associate Administrator of Recovery at FEMA Headquarters has the authority to modify or waive PA policy.
D. Public Assistance Web-Based Grants System FEMA uses web-based systems to promote transparency and manage project information. Recipients and applicants use PA Grants Portal12 to submit documentation and information, review all aspects of Public PA project applications, and track the progress of their applications. FEMA uses PA Grants Manager13 to review Requests for Public Assistance (RPA), oversee the development and review of project applications, track application progress, and receive necessary information from recipients and applicants.
12 For more information, refer to: Grants Portal.
13 For more information, refer to: Grants Manager.
https://grantee.fema.gov/ https://pagrants.fema.gov/Account/Login?ReturnUrl=%2f
Chapter 1: Declarations and Planning The Stafford Act authorizes the president to provide federal assistance when the magnitude of an incident or threatened incident exceeds the affected state,14 local,15 Tribal Nation,16 and territorial (SLTT) government capabilities to respond and recover. This chapter explains requirements for damage assessments, declaration requests and FEMA’s evaluation criteria, the contents of the declaration, and the initial administrative requirements for a state, Tribal Nation, and territorial (STT) government to receive assistance.
I. Damage Assessments After an incident causes widespread damage, the STT government conducts an initial damage assessment before requesting a joint Preliminary Damage Assessment (PDA) to confirm the need for federal assistance.17 When the STT government determines that the incident exceeds its ability to respond, it requests a joint PDA with FEMA. This initial damage assessment should identify affected jurisdictions, damaged infrastructure, and provide preliminary cost estimates for response and recovery efforts.
Additionally, the STT collects data to assess the need for federal assistance, including evaluating local resource capacity to support ongoing response and recovery.
During a joint PDA, FEMA, SLTT governments, and certain private nonprofit (PNP) organization officials work together to estimate and document the impact and magnitude of the incident.18 Accurate and comprehensive PDAs are critical to enabling efficient response and recovery. FEMA’s “Preliminary Damage Assessment Guide”19 provides detailed information to assist staff involved with damage assessments and describes how FEMA utilizes the information when preparing requests for major disaster declarations. For example, applicants must provide insurance policies when requested during a PDA as FEMA only considers
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .