FARM II Attachment L-6 Relevancy Matrix.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
Facilities Acquisitions for Restoration and Modernization (FARM II) Federal contract opportunity
Solicitation number
DraftFA910121R0001
Issued by
Department of the Air Force Materiel Command Test Center

About this file

This document contains a draft request for proposal for facilities acquisition services. The draft RFP is for the Facilities Acquisitions for Restoration and Modernization II (FARM II) multiple award, indefinite-delivery/indefinite-quantity contract to provide mechanical, electrical, instrumentation, data, and control systems, and utilities design-build, construction projects, and two-phase design/build services for military ground testing facilities within the Arnold Engineering Development Complex. The proposed performance period is five years. Reviewers are requested to provide comments on the clarity of tasks to be completed, the evaluation criteria, and the completeness of proposal preparation instructions. The government intends to consider all feedback to finalize the solicitation and create a competitive procurement process. Questions regarding the draft RFP are due by April 30, 2021.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prime

Name of Prime ContractorReference 1Reference 2Reference 3Reference 4Reference 5
Management Subfactor
M-2.2.1.1.1.Teaming and Subcontractor Management
M-2.2.1.1.2.Quality Management System
M-2.2.1.1.3.Qualified Personnel
Technical Capabilities (SOW 1.2)
Mechanical
M1Air duct, expansion joints, and control/process valves (≥ 36” Ø and 150 psig)
M2High pressure duct/piping & valves (typ. 4" to 8"Ø, ≥ 4000 psig)
M3Large pressure vessels (≥ 2000 psig; ≥ 10K gallons)
M4Desiccant bed air dryers (≤ 300 psia & ≥ 200 lb/s)
M5Turning vanes for large air ducting (up to 50-ft Ø; 0.5-160 psia)
M6Cooling water/raw water pumps (300-50,000 gpm; 30-4,000 hp), filters/strainers, control/process valves,and distribution lines (typ. 6” to 90” Ø)
M7Hydraulic systems with high flow and pressure requirements (20-200 gpm (typ. 2 pumps @ 100 gpm ea) and 2500 psig)
M8Large steam distribution systems (60 kpph boilers, and piping up to 14" Ø)
M9Chillers and refrigeration equipment (300-5000 refrigeration tons)
M10Large heat exchangers: air to air; water to air; shell and tube, etc. (∆T up to 325 °F)
Electrical
E1Interior & exterior lighting for industrial buildings
E2Medium voltage gas insulated switchgear (≤ 13.8kV)
E3Unit substations (typical 6.9/2.4kV)
E4Motor Control Centers (≤ 600V)
E5Transformers (≤ 161/13.8kV)
E6Uninterruptable Power Supply (UPS)
E7Ducting/vaults/ cables (13.8kV & 6.9kV)
E8Motor exciters
E9Oil circuit breakers (typical 3000 amp & 550kV BIL)
E10Power panels/conduit/wiring (≤ 480V)
E11Variable frequency drives for motors (≥ 600V & ≤ 69kV)
ID&C
I1PLC-based industrial control systems
I2High Speed (< 10ms Loop Time) facility control systems
I3Controls software development and modification
I4Secure control systems
I5Data logging system design and integration
I6Control systems instrumentation design and integration

&"Times New Roman,Bold"ATTACHMENT L-6 RELEVANCY MATRIX &"Times New Roman,Regular"FARM II

FA9101-21-R-0001

Attachment 8

Partners

Name of Partner (Subcontractor/Joint Venture)Reference 1Reference 2Reference 3
Management Subfactor
M-2.2.1.1.1.Teaming and Subcontractor Management
M-2.2.1.1.2.Quality Management System
M-2.2.1.1.3.Qualified Personnel
Technical Capabilities (SOW 1.2)
Mechanical
M1Air duct, expansion joints, and control/process valves (≥ 36” Ø and 150 psig)
M2High pressure duct/piping & valves (typ. 4" to 8"Ø, ≥ 4000 psig)
M3Large pressure vessels (≥ 2000 psig; ≥ 10K gallons)
M4Desiccant bed air dryers (≤ 300 psia & ≥ 200 lb/s)
M5Turning vanes for large air ducting (up to 50-ft Ø; 0.5-160 psia)
M6Cooling water/raw water pumps (300-50,000 gpm; 30-4,000 hp), filters/strainers, control/process valves,and distribution lines (typ. 6” to 90” Ø)
M7Hydraulic systems with high flow and pressure requirements (20-200 gpm (typ. 2 pumps @ 100 gpm ea) and 2500 psig)
M8Large steam distribution systems (60 kpph boilers, and piping up to 14" Ø)
M9Chillers and refrigeration equipment (300-5000 refrigeration tons)
M10Large heat exchangers: air to air; water to air; shell and tube, etc. (∆T up to 325 °F)
Electrical
E1Interior & exterior lighting for industrial buildings
E2Medium voltage gas insulated switchgear (≤ 13.8kV)
E3Unit substations (typical 6.9/2.4kV)
E4Motor Control Centers (≤ 600V)
E5Transformers (≤ 161/13.8kV)
E6Uninterruptable Power Supply (UPS)
E7Ducting/vaults/ cables (13.8kV & 6.9kV)
E8Motor exciters
E9Oil circuit breakers (typical 3000 amp & 550kV BIL)
E10Power panels/conduit/wiring (≤ 480V)
E11Variable frequency drives for motors (≥ 600V & ≤ 69kV)
ID&C
I1PLC-based industrial control systems
I2High Speed (< 10ms Loop Time) facility control systems
I3Controls software development and modification
I4Secure control systems
I5Data logging system design and integration
I6Control systems instrumentation design and integration

&"Times New Roman,Bold"ATTACHMENT L-6 RELEVANCY MATRIX &"Times New Roman,Regular"FARM II

FA9101-21-R-0001

Attachment 8

File details come from the government source that posted it. Updated .