Draft_RFP_Section_J_Atch_3_-__Task_Order_0001_PWS.pdf
PDF 28 KB Posted
- Attached to
- Joint Directed Energy Transition Office (DE-JTO) Professional Technical Support Services Federal contract opportunity
- Solicitation number
- FA9451-18-R-0002
About this file
This performance work statement outlines requirements for a labor and operations task order to provide advisory and assistance services to the Joint Directed Energy Transition Office. The task order scope includes providing subject matter experts specialized in areas such as high energy laser systems, technology, sources, beam control, atmospheric propagation, lethality, modeling and simulation, and concept development. The services will support the office in executing its investment portfolio and technology roadmap for multi-service high energy laser weapon system applications. The performance work statement specifies required labor categories, skill mixes, man-hours, and tasks such as technical oversight, strategic planning, requirements analysis, logistical meeting support, and personnel management. It also outlines security clearance requirements, deliverables, and a 30-day transition period to ensure a smooth handover between incumbent and successor contractors. Comments on the draft performance work statement are requested by May 9th, 2018.
Draft Task Order 0001 PWS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Draft_RFP_Questions_and_Answers_AFRL_RESPONSE.xlsx | XLSX spreadsheet | |
| Draft_RFP_Section_J_Atch_6_JTO_PTSS_Section_M_Evaluation_Criteria.pdf | ||
| Draft_RFP_FA9451-18-R-0002.pdf | ||
| Draft_RFP_Section_J_Atch_1_JTO_PTSS_PWS.pdf | ||
| Draft_RFP_Section_J_Atch_5_JTO_PTSS_Section_L_ITO.pdf | ||
| Draft_RFP_Questions_and_Answers_Template.xlsx | XLSX spreadsheet | |
| Draft_RFP_Section_J_Atch_2_Draft_Task_Order_0001.pdf | ||
| Draft_RFP_Section_J_Atch_8_Cross_Reference_Matrix.pdf | ||
| Draft_RFP_Section_J_Atch_4_Solicitation_DD_254.pdf | ||
| Draft_RFP_Letter_DE-JTO_PTSS.pdf | ||
| Draft_RFP_Section_J_Atch_7_DE-JTO_PTSS_RFP_TEP_Calculation.xlsx | XLSX spreadsheet | |
| Draft_RFP_Section_J_Atch_5_L-1_Subcontractor_Consent_Letter.pdf | ||
| Draft_RFP_Section_J_Atch_5_L-2_PPQ.pdf | ||
| Draft_RFP_Section_J_Exhibit_A_Draft_CDRLs.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section J, Attachment 3 Task Order 0001
Labor and Operations PWS Contract FA9451-18-R-0002
30 March 18
PERFORMANCE WORK STATEMENT
LABOR AND OPERATIONS TASK ORDER
Professional Technical Support Services (PTSS) to the
Joint Directed Energy Transition Office (DE-JTO)
1.0 SCOPE. This effort shall be conducted pursuant to the provisions of the Professional Technical Support Services (PTSS) contract Performance Work Statement (PWS) incorporated as Section J, Attachment 1 of the basic contract. The objective of this Task Order is to provide the labor and operations Advisory and Assistance Services (A&AS) for the Joint Directed Energy Transition Office (DE-JTO.) Specific requirements for this Task Order were drawn from the overall PWS and are stated in paragraph 3.0 below.
2.0 BACKGROUND:
2.1 The DE-JTO has a requirement for A&AS encompassing professional Directed Energy (DE) technical, engineering and scientific subject matter experts (SMEs) highly specialized in all aspects of advanced High Energy Laser (HEL) systems and technology including functions associated with Laser Sources; Beam Control; Atmospheric Propagation; Lethality; Modeling and Simulation; Advanced HEL Concepts and related services. The requirement includes services to support DE-JTO in the execution of their investment portfolio to advocate and execute a High Energy Laser technology roadmap and strategy that builds on existing Service/Defense Agency and International programs while investing in promising new technology developments for multi- Service High Energy Laser weapon system applications.
3.0 LABOR AND OPERATIONS: The following is applicable to the basic contract line item and all options, if exercised.
3.1 Scope. The contractor shall furnish all personnel, services, supervision and all other items necessary to accomplish the performance requirements stated herein. The overall task order scope is listed in paragraphs 1.2.1-1.2.10 of the basic PWS.
3.2 Tasks. The contractor shall perform all services described in the following basic PWS paragraphs. Note: Efforts included within the scope of paragraph 2.7 of the basic PWS will be authorized as separate task orders as contract requirements are identified.
2.1 General: All paragraphs apply to this order.
2.2 Technical Oversight and Management: All paragraphs apply to this order.
2.3 Strategic Planning for Technology Programs: All paragraphs apply to this order.
2.4 Concept Development and Requirements Analysis: All paragraphs apply to this order.
2.5 Logistical Support for Meetings: All paragraphs apply to this order.
2.6 Personnel Management: All paragraphs apply to this order. Note: The contractor’s approach to staffing shall be flexible and vary to ensure the proposed labor categories, skill mix, and man-hours are adequate to successfully perform the tasks/subtasks outlined in the PWS.
Section J, Attachment 3 Task Order 0001
Labor and Operations PWS Contract FA9451-18-R-0002
30 March 18
4.0 PERFORMANCE REQUIREMENTS: Paragraphs 3.1 Contractor Performance Assessment Reports System (CPARS), 3.2 Services Summary, 3.3 Right to Survey, 3.4 Quality Control and 3.5 Contractor Full-Time Equivalent Report from the Basic PWS are applicable to this task order in its entirety.
5.0 SECURITY: The contractor shall have a Top Secret Facility Clearance and sufficient personnel with Top Secret clearances to support technical efforts at time of contract award. Paragraphs 4.1 and 4.2 from the Basic PWS are applicable to this task order in its entirety.
6.0 DELIVERABLES: All contract data requirements list (CDRLs) listed in Section J, Exhibit A of the basic contract apply to this order.
7.0 ADDITIONAL REQUIREMNTS / INFORMATION: Paragraphs 6.1
Workspace/Supplies, 6.2 Non-Disclosure Agreements, 6.3 Travel Reimbursement, 6.4 Environment Safety and Health, 6.5 Hours of Operation and 6.6 Conflicts of Interest from the Basic PWS are applicable to this task order in its entirety.
8.0 TRANSITION PHASE-IN/PHASE-OUT: A transition period of 30 days is authorized to ensure a smooth transition with the incumbent DE-JTO A&AS support contractor. A transition period will not be authorized if the successor contractor is a current DE-JTO prime advisory and assistance contractor. Paragraphs 6.7.1 and 6.7.2 from the Basic PWS are applicable to this task order in its entirety.
| PERFORMANCE WORK STATEMENT |
| LABOR AND OPERATIONS TASK ORDER |
| Professional Technical Support Services (PTSS) to the |
| Joint Directed Energy Transition Office (DE-JTO) |
| 2.0 BACKGROUND: |
| 2.1 The DE-JTO has a requirement for A&AS encompassing professional Directed Energy (DE) technical, engineering and scientific subject matter experts (SMEs) highly specialized in all aspects of advanced High Energy Laser (HEL) systems and technology i... |