CDRL_A031_-_Systems_Engineering_Management_Plan_07March2014.pdf

PDF 22 KB Posted

Attached to
R&D for Advanced Space Superiority Technology and Engineering Requirements (RASTER)
Solicitation number
FA9451-13-R-0243
Issued by

About this file

This RFP Amendment replaces CDRL A031 - Systems Engineering Management Plan. Refer to Final RFP Q A 2 for information about the change(s) to this document.

View the file

Other files

File Type Posted
Updated_RASTER_Milestone_Schedule_20160316.pdf PDF
Updated_RASTER_Milestone_Schedule_20150827.pdf PDF
Updated_RASTER_Milestone_Schedule_20150528.pdf PDF
RASTER_Update.pdf PDF
Updated_RASTER_Point_of_Contact.pdf PDF
updated_milestones_Dec_2014.pdf PDF
updated_milestones_Aug2014.pdf PDF
https //www.fbo.gov/index s opportunity mode form tab core id 08b34b801f7a1a68b8a3c5d8e5a9ceb0 _cview 0 —
CDRL_A001_-_Technical_and_Management_Work_Plan_08April2014.pdf PDF
Q A_3.pdf PDF
RASTER_RFP_DD254_FA9451-14-R-0243_TO_0003_TO_3_Maui_V10.pdf PDF
RASTER_RFP_DD254_FA9451-14-R-0243 _TO_0002_MAUI_V10.pdf PDF
Final_RFP_Q A_2.pdf PDF
CDRL_A018_-_System_Safety_Program_Plan_07March2014.pdf PDF
CDRL_A030_-_Hazardous_Materials_Management_Program_Plan_07March2014.pdf PDF
Final_RFP_Q A_1.pdf PDF
FA9451-13-R-0243 _Task_Order_0001.pdf PDF
FA9451-13-R-0243_-_FINAL.pdf PDF
FA9451-13-R-0243 _Task_Order_0003.pdf PDF
FA9451-13-R-0243 _Task_Order_0002.pdf PDF
Updated_milestones.pdf PDF
RASTER_Q A__2.pdf PDF
Updated_RASTER_Milestone_Schedule.pdf PDF
RASTER_Q A__1.pdf PDF
RASTER_NDA_Bidder's_Library_17_June_2013.pdf PDF
DRAFT_FA9451-13-R-0243.pdf PDF
Site_Visit_Registration-Maui.pdf PDF
Site_Visit_Registration-SOR.doc.pdf PDF
Site_Visit_Registration-Maui.pdf PDF
Site_Visit_Registration-SOR.doc.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A. CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 0004

B. EXHIBIT....................................: A

C. CATEGORY..............................:

D. SYSTEM/ITEM........: RASTER

E. CONTRACT/PR NO. FA9451-13-R-0243

F. CONTRACTOR.........:

1. DATA ITEM NO........................: A031

2. TITLE OF DATA ITEM............: Systems Engineering Management Plan

3. SUBTITLE..................................:

4. AUTHORITY.............................: DI-SESS-81785

5. CONTRACT REFERENCE......:

6. REQUIRING OFFICE..............: AFRL/RDS

7. DD250 REQ................................: LT

8. APP CODE.................................: A

9. DIST. STATEMENT REQUIRED......: B

10. FREQUENCY......................................: See Blk 16

11. AS OF DATE........................................: See Blk 16

12. DATE OF FIRST SUBMISSION: 90 DAC

13. DATE OF SUBSEQUENT SUBM.: See Blk 16

14. DISTRIBUTION A. ADDRESSEES B. COPIES

DRAFT FINAL

AFRL/RDSS

1 1

AFRL/RDSM 1 1

AFRL/RVKDP Lt Lt

ACO Lt Lt

15. TOTAL: 2 2

16. REMARKS

Blk 4: DI-SESS-81785 is tailored as follows:

A. General: Contractor format is acceptable. Submission via unencrypted or unsecure email is not permitted. Copies shall be maintained and stored electronically at the individual site.

Blk 9: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government agencies, Administrative or Operational use, 20 FEB 2013. Other requests for this document shall be referred to Air Force Research Laboratory, AFRL/RDS, 3550 Aberdeen Ave SE, Kirtland AFB, NM 87117-5776.

Blk 10, 11, 12, 13, 14: The government will review, edit and return the draft no later than 10 business days. Upon receipt of the reviewed and edited draft, the contractor shall take no more than 10 business days to incorporate all required changes and deliver a final version.

DESTRUCTION NOTICE - For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :

G. PREPARED BY: Maj Daniel Wheeler I. APPROVED BY: Kim Kinifick H. DATE: 7 Mar 2013 J. DATE:7 Mar 2013

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1_ of 1 _ Pages

EXHIBIT A

A. CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188
A. ADDRESSEES

File details come from the government source that posted it. Updated .