This Performance Work Statement (PWS) details aircrew facility support services for the Visiting Aircrew Support Facility at Kirtland Air Force Base, New Mexico. The contract is a non-personnel services agreement to maintain a high-readiness facility for up to 38 crewmembers, with potential surges to 50 or more personnel. Key service requirements include billeting services such as room assignments, key management, cleaning rooms with fresh linens, and maintaining facility accommodations in top condition.
The contractor must provide comprehensive housekeeping services with strict performance standards, including deep cleaning, sanitizing all areas, managing supplies, and adhering to specific cleaning checklists for rooms, kitchens, laundry areas, and common spaces. Critical requirements include respecting crew rest hours (no disruptive cleaning during an 8-hour period after crew arrival), using recycled paper products, maintaining a living document of room issues, and providing 24-hour support with a two-hour response time for inbound aircraft. The contract emphasizes quality control, safety compliance, and mission-essential service continuity.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
Visiting Aircrew Support
Facility Kirtland Air Force Base, NM
22 October 2025
1.0 INTRODUCTION
1.1 Mission. Kirtland AFB is tasked with providing lodging and related support services for visiting aircrew performing national security missions. These missions require 24-hr support with minimal arrival and/or departure notification.
2.0 SCOPE
2.1 Objective. This is a non-personnel services contract to provide facility services. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn, is responsible to the Government. The contractor shall provide all personnel, equipment, supplies, tools, materials, supervision, and other items and non-personal services necessary to perform as defined in this Performance Work Statement, except for those items specified as Government provided. The contractor shall perform to the standards in this contract.
The contractor shall provide aircrew facility support services, tasks, and functions to ensure the facility is always maintained in a high state of readiness and all aircrew facility accommodations are fully functional. Services include facility services for aircrew lodging, assigning room keys, and associated equipment management functions. The contractor shall provide services for up to routinely 38 crewmembers from arrival to departure. The number of crewmembers may surge to 50 or more based on mission requirements.
3.0 PERFORMANCE OBJECTIVES
3.1. Aircrew Facility Billeting Services.
3.1.1. Ensure rooms are clean and fresh linen are on the beds prior to check-in. Also ensure dirty/used linen are placed in bags and removed from the room and placed in the collection points for linen contractor.
3.1.2. The contractor shall give the Contracting Officer’s Representative (COR) a list of the rooms that will be utilized throughout the period of occupancy.
3.1.3. Determine crewmember room assignments, distribute keys upon check-in, and collect keys upon check-out to ensure out-going crewmembers will no longer have access to rooms.
3.1.3.1. Maintain a system to issue back-up keys that can be accessed after hours for any crewmember locked out of their respective room. The facility currently utilizes physical keys; the facility may convert to a digital key system in the future. The contractor will be expected to utilize the digital key system.
3.1.3.2. Resolve issues with individual rooms and provide updates to the COR concerning issues needing further attention. The contractor will produce a living document of all issues pertaining to room availability to ensure on-going traceability.
3.2. Aircrew Facility Housekeeping Services. The contractor shall accomplish all housekeeping tasks and be required to provide and replenish room supplies. To ensure adequate crew rest, housekeeping activities that could disturb sleeping crewmembers are prohibited during crew rest hours. Crew rest hours are defined as the 8-hour period immediately following a mission/crew arrival. For example, if a crew arrives at 0200, no room cleaning, vacuuming, or other disruptive housekeeping tasks are permitted in crew rooms or adjacent areas until 1000. The contractor is responsible for proactively communicating with the COR to understand the limitations on housekeeping activities during crew rest hours. Any questions regarding permissible tasks during this window must be resolved with the COR prior to performance.
3.2.1. Initial Deep Cleaning. Upon initial contract award the contractor will be expected to deep clean the facility. The facility has not been occupied in several years, and experienced partial renovation. This includes significant accumulation of dust, grime, and stains. This one-time cleaning shall include but is not limited to meeting expectations of 3.2.2 through 3.2.15 and appendix C checklist items.
3.2.2. Floors. The contractor shall maintain all floors free of grit, soil, dust, dirt, debris, litter, scuff and heel marks, stains, spills, and other foreign matters by effective routine vacuuming/mopping. The contractor shall accomplish cleaning by the most appropriate method (vacuum, sweep, dust mop, damp mop, spot clean, etc.) and with cleaning solutions if applicable, for the specific floor type. The contractor shall remove any spots and/or spills by the floors manufacturer’s approved methods or other commercially accepted practices as soon as noticed to maintain the floor’s longevity. After cleaning, the contractor shall ensure floor surfaces, to include grout, shall have a uniform, clean appearance without streaks, swirl marks, detergent residue, or any evidence of soil, stain, film, or standing water. The contractor shall clean baseboards, corners, and wall/floor edges. The contractor shall move all chairs, trash receptacles, and other easily moveable items to maintain floors underneath these items and return them to their original and proper position after cleaning. The contractor shall bring all tears, burns, and damage to the attention of the COR.
3.2.3. Trash Collection/Removal. The Contractor shall empty all trash receptacles as part of their required cleaning functions and return them to their original locations. The Contractor is responsible for providing and replacing trash can liners suitable for the receptacles when soiled or torn. Receptacles shall be kept clean, free of debris, grime, and odors. Emptied trash shall be deposited in the nearest designated outdoor collection points.
3.2.4. Exterior Grounds Upkeep. The contractor shall perform regular removal of unsightly trash and debris from public areas by regularly inspecting grounds, sidewalks, parking lots, and transporting the trash or debris to designated central collection points on a daily basis.
3.2.5. Dusting. The contractor shall accomplish dusting on surfaces within 6 feet of the floor (low dusting). The contractor must maintain these surfaces free of dust, lint, cobwebs, and litter.
The contractor shall accomplish (high dusting) on surfaces between 6 feet to 10 feet from the floor. Surfaces could include items such as tables, shelves, bookcases, storage lockers, windowsills, handrails, pictures, clocks, window blinds, fans, etc.
3.2.6. Windows and Glass. The Contractor shall maintain all interior windows clean and free of dirt, smudges, insects, and any other visible residue or blemishes.
3.2.7. Clean and Disinfect Bathroom. The Contractor shall maintain all bathroom areas in a clean, sanitary, and odor-free condition. Bathrooms shall have a clean scent or no odor at all. This includes the following specific requirements:
3.2.7.1. Cleaning and Disinfecting: Using a germicidal detergent, the Contractor shall clean and disinfect all surfaces of sinks, toilets, plumbing fixtures, and walls.
3.2.7.2. Showers: The Contractor shall clean showers using manufacturer-approved methods, ensuring they are free of spots, water spots, scale buildup, soap scum, odors, and any other deposits.
3.2.7.3. Mirrors: The Contractor shall clean and maintain mirrors to be free of streaks and other removable matter.
3.2.7.4. Vents: The Contractor shall clean all vents (within 72 inches of the floor) to ensure they are free of dust and other buildup.
3.2.7.5. Sinks, Countertops, and Fixtures: The Contractor shall maintain bathroom sinks, countertops, and fixtures free of water and scale deposits, soil, streaks, and other removable matter.
3.2.8. Walls and Grout: The Contractor shall maintain walls and grout free of all film, spots, and detergent buildup.
3.2.9. Plumbing Upkeep. One time per week, when not occupied by aircrew(s), the contractor shall flush every toilet and run every shower for at least five minutes.
3.2.10. Clean and Disinfect Kitchen. The Contractor shall maintain all kitchen areas in a clean, sanitary, and odor-free condition. The kitchen shall have a clean scent or no odor at all. This includes the following specific requirements:
3.2.10.1. Cleaning and Disinfecting: Using a germicidal detergent, the Contractor shall clean and disinfect all surfaces of sinks, plumbing fixtures, and walls.
3.2.10.2. Appliances: The Contractor shall clean all appliances using manufacturer-approved methods.
3.2.10.3. Vents: The Contractor shall clean all vents (within 72 inches of the floor) to ensure they are free of dust and other buildup.
3.2.10.4. Surfaces and Fixtures: The Contractor shall maintain kitchen sinks, countertops, cabinetry, and fixtures free of water and scale deposits, soil, streaks, and other removable matter.
3.2.10.5. Dishes, Pots, and Pans: The Contractor shall maintain all dishes, pots, and pans in a clean and sanitary condition.
3.2.10.6. Walls and Grout: The Contractor shall maintain walls and grout free of all film, spots, and detergent buildup.
3.2.11. Laundry Room. The Contractor shall maintain all laundry room areas in a clean, sanitary, and odor-free condition. The laundry room shall have a clean scent or no odor at all. This includes the following specific requirements:
3.2.11.1. Cleaning and Disinfecting: Using a germicidal detergent, the Contractor shall clean and disinfect all walls.
3.2.11.2. Appliances: The Contractor shall clean appliances using manufacturer-approved methods.
3.2.11.3. Dryer Vents/Lint Traps: The Contractor shall clean dryer vents and lint traps, removing all lint and debris.
3.2.11.4. Walls: The Contractor shall maintain walls free of all film, spots, and detergent buildup.
3.2.12. Hallways, Stairwells and Common Areas. The Contractor shall maintain hallways, stairwells, and common areas in a clean, odor-free (or clean-scented), and orderly condition. This includes the following specific requirements:
3.2.12.1. Routine Cleaning: Regularly vacuuming and/or mopping to ensure all surfaces are free from soil, dirt, debris, litter, and other foreign matter.
3.2.12.2. Spot and Spill Removal: Immediately removing any spots and spills using the floor manufacturer's approved methods or other commercially accepted practices to preserve the vinyl floor's integrity.
3.2.13. Obstacle Removal: Moving easily movable items, such as chairs and trash receptacles, to clean underneath them, and then returning them to their original and proper positions.
3.2.14. Stock Room Amenities. The contractor shall ensure rooms are stocked sufficiently so any provided linens, towels, amenities and supplies including toilet tissue, facial tissue, and similar items do not run out. The contractor shall store supplies in designated areas.
3.2.15. Contractor Furnished Trash Liners and Restroom Supplies. See Appendix E.
3.2.15.1. Recycled Products: 100 percent of all paper products procured (toilet tissue and paper towels) shall contain recycled materials. The contractor shall produce all manufacturer specifications they are required to adhere to, so the COR can determine conformance.
3.2.15.2. The contractor shall produce all manufacturer specifications they are required to adhere to, so the COR can determine conformance.
3.2.15.3. Inoperative, missing, or broken equipment will be reported to the COR
4.0 SERVICES SUMMARY
The table below identifies the essential standards that will be measured by the Government. The contractor shall have these elements as part of their quality control program and may have others, as necessary, to meet contractor quality standards. Rework needed due to mistakes shall be accomplished at no additional cost to the Government.
Performance Objective PWS Reference
Performance Standard
SS-1 Performs billeting services 3.1 The contractor’s performance shall be considered acceptable when the number of controllable discrepancies concerning billeting services does not exceed 2 valid complaints per month.
SS-2 Performs housekeeping and cleaning services
3.2 The contractor’s performance shall be
considered acceptable if the number of controllable discrepancies concerning room cleanliness does not exceed 4 valid complaints per month.
5.0 GENERAL INFORMATION
5.1. Hours of Operation. Working hours will be defined as “normal” and “on-call”. Estimated normal working hours are between 9:00am - 9:00pm Monday through Friday. On-call hours will be each day from the end of normal hours until the start of normal hours the next day. The contractor shall be available for contact during this time and shall be capable of a two (2) hour response time in the event of inbound aircraft. While there are guests in the aircrew facility, continuous support shall be provided during nonstandard working hours as well as after duty hours in a normal or on-call status, as applicable.
5.1.1. Federal Holidays. The contractor shall have staff on-call for Federal Holidays in the event of an active mission. The Federal holidays observed are as follows: New Year’s Day, Birthday of Martin Luther King, Jr., Washington’s Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day.
5.1.2. Installation Closures. Work scheduled but not completed due to installation closures (e.g., weather, exercises, active mission) shall be performed as soon as the installation reopens.
5.2. Base Support. The Government will provide on-site Contractor personnel with the resources necessary to perform the requirements of this contract. These resources include:
office space, office supplies, computers, telephone communications, internet access, a printer, and access to appropriate Government files, databases, and Common Access Cards (CAC).
Receipt of a CAC will be IAW DoDI 1000.13, Identification (ID) Cards for Members of the Uniformed Services, Their Dependents, and Other Eligible Individuals. Use of these resources is limited to official Government business directly related to this contract. A complete list of Government-furnished facilities, equipment, materials, and services is detailed in Appendix B.
5.3. Contractor Identification. Contractor personnel shall present a neat appearance and shall be easily recognized as contractor employees while on the installation providing services.
Contractor personnel shall wear distinctive clothing, overcoats, or hats, bearing the company name or logo.
5.4. Security Requirements
5.4.1. Background Investigation. Contractor employees who require access to government technology (IT)/automated information system (AIS) under the terms of a government contract must be determined to be trustworthy by a designated Government Official, prior to IT/AIS access being granted. Contractor IT/AIS access security background investigations will be processed in accordance with (IAW) DoDI 5200.2-R, DoD Personnel Security Program. The Government will provide the contractor employees with the system security classification guidance, as required.
5.4.2. Physical Security. The contractor shall be responsible for safeguarding all Government equipment provided for contractor use. See Appendix B.
5.4.3. Key Control. The contractor shall establish and implement methods of ensuring that all keys issued to the contractor by the Government are not duplicated, lost, misplaced, or used by unauthorized persons. In the event keys are lost or duplicated the contractor may be required to re-key or replace the affected lock(s).
5.4.4. Pass and Identification Items. The contractor shall ensure all pass and identification items required for Contractor employees (e.g. valid driver’s license, vehicle registration, proof of insurance) are obtained for employees and non-Government-owned vehicles.
5.4.5. OPSEC Requirements. The Contractor’s Management will ensure that all employees, to include any sub-contractor employees, performing work in support of this effort receive Operations Security (OPSEC) Awareness training. The training must be accomplished prior to entering the work site on day one of the work effort. The government (i.e., Contracting Officer, Unit Security Assistant, Unit OPSEC Coordinator, or 377 Air Base Wing OPSEC/Signature Manager (377 ABW/SMO)), can provide a tailored lesson plan for use by the Contractor’s Management to ensure training requirements are met. It is critical that contractor employees fully understand the importance of not discussing work details associated with this effort, such as: actions or activities observed, aircrew arrival/departure times, nature of the missions being performed, the statement of work, etc., in public or outside of the worksite. The Contractor’s Management will track all training by employee name and date the training was provided using a spreadsheet or similar document, such as a sign-in roster, and provide a copy to the assigned Contracting Officer.
5.5. Safety Requirements. The contractor shall comply with all safety regulations and procedures. The contractor shall maintain and provide a copy of a written safety plan to the Wing Safety office prior to start of work IAW USACE EM-385-1-1.
5.5.1. Contractor shall be required to maintain a mishap record at or below the national average for their industry. Upon request, Contractor will provide OSHA 300 and 301 logs to the Wing Safety office for mishaps occurring on the installation. Any mishaps involving damage to USAF property or injury to USAF personnel will be immediately reported to the Wing Safety office.
5.5.2. In performance of their duties, the Contractor shall manage their own occupational safety and health program as outlined by the U.S. Occupational Safety and Health Administration (OSHA). Additionally the Contractor will follow the Department of the Air Force Instructions (DAFI): DAFI 91-202, The Department of Air Force (DAF) Mishap Prevention Program, DAFI 91-204, Safety Investigations and Reports, DAFMAN 91-203, Air Force Occupational Safety Fire and Health Standards, and DAFVA 91-209, Air Force Occupational Safety and Health Program. The Air Force will not oversee the contractor’s OSHA program or related employee program requirements, and they may be subject to an OSHA inspection while on the installation. All contractor mishaps and injuries which happen on the installation, or on AF property while performing their contract duties, will be reported to the COR and forwarded to the installation Safety Office (377 ABW/SE) for tracking and trending purposes. If the contractor needs to enter a confined space, as defined by OSHA, on Air Force property they will first contact the 377 ABW/SE for concurrence prior to entry and will receive a known hazard briefing.
5.5.3. Hazardous Material Identification. Safety Data Sheets (SDS) are required as specified in the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract) for any other material designated by a government technical representative as potentially hazardous and requiring safety controls. SDSs must be submitted by the contractor within 30 days upon contract award. Failure to provide SDSs or certificates when requested could result in the contractor being considered non-responsive/non-compliant and result in termination of the contract.
5.6. Quality Assurance. The Government will monitor the contractor’s performance under this contract in accordance with the Government’s Quality Assurance Surveillance Plan (QASP).
This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
5.6.1. The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is how they assure themselves that the work complies with the requirements of the contract.
5.7. Phase-in. The contractor shall ensure a smooth transition in the change of work effort. The contractor shall provide an orderly transition of work acceptance and accomplishment such that any impact to the requirement is minimized.
5.8. Phase-out. The contractor shall ensure a smooth transition with the successor during the contract phase-out period prior to completion of contractual performance. The incumbent contractor shall aid the successor in the development of plans, procedures and methods for the assumption of all on-going work. The contractor shall provide an orderly transition of work acceptance and accomplishment, such that full control by the successor is achieved by the end of the new contract phase-in period.
5.9. Mission Essential Services.
5.9.1. The government has identified a portion of the functions in the PWS as essential contractor services in support of mission essential functions. The functions which are mission essential are those listed under subparagraphs 3.1.1 through 3.1.3.2, paragraph 3.2.1, paragraph 3.2.5, paragraph 3.4.2, and paragraph 3.4.3.
5.9.2. IAW DFARS 252.237-7023 “Continuation of Essential Contractor Services” the contractor shall be responsible to perform those services identified as essential contractor services during crisis situations (as directed by the Contracting Officer), in accordance with its Mission- Essential Contractor Services Plan. In the event the Contractor anticipates not being able to perform any of the essential contractor services during a crisis situation, the Contractor shall notify the Contracting Officer or other designated representative as expeditiously as possible and use its best efforts to cooperate with the Government in the Government’s efforts to maintain the continuity of operations.
5.9.3. The Mission-Essential Contractor Services Plan, submitted by the Contractor in response to the solicitation, will be incorporated in this contract. The Contractor shall maintain and update its plan as necessary. The Contractor shall provide all plan updates to the Contracting Officer for approval.
6.0 DELIVERABLES
Deliverables shall be specified by the Government. The Government is the final approval authority for all deliverables. In the event a deliverable does not adequately meet the Government's need, the Government shall notify the contractor in writing and identify nonconformance and the contractor shall resubmit the deliverable.
Deliverable
Number Name Frequency Quantity
1 Monthly Report: The contractor shall provide monthly status updates on the current efforts to include detailing the number of rooms used per month.
Monthly 1 per month
7.0 REFERENCES
AFMAN 16-1404, KAFB BDP 31-101
AFI 31-701 Operations Security (OPSEC), 377 ABW OPSEC IPlan DoDM 5200.02/AFMAN 16-1405
USACE EM-385-1-1
8.0 APPENDICES
Appendix A. Workload Estimate
Appendix B. Government Furnished Property/Equipment
Appendix C. Cleaning Checklist
Appendix D. Contractor Furnished Equipment/Restroom Supplies
Appendix E. Building Schematics, separately attached, see:
1. App F 917-1 Room SqFt.pdf
2. App F 917-2 Room SqFt.pdf
APPENDIX A
Workload Information
- Average number of personnel is up to 40 per arrival to the facility depending on the mission requirements.
- Average time on station fluctuates between 90 and 200 days per year.
- There are a total of 41 beds maximum in conjoining or single rooms, 3 suites and 3 government office spaces.
APPENDIX B
Government Provided Property/Equipment
A. Government-Provided Facilities: Approximately 200 sq ft located in Bldg. 917 is designated as the contractor’s work and office area. Janitorial closets will be available for use by the Contractor, without cost, for the purpose of storing materials and equipment, excluding flammable materials. The Contractor will be required to maintain odorless and clean closets.
Closets will be free of clutter and debris. Cleaning supplies and tools will be stored and organized in such a manner as to allow easy access and movement in closet. Closets provided for janitorial service use will be locked if locks are available. The government will not be responsible for Contractor's stored supplies or equipment kept in the building or janitor's closets or for the Contractor's employees' personal belongings. All contractor items and equipment shall identifiable as belonging to the Contractor.
B. Government-Provided Equipment: The Government will furnish the following equipment.
This list of equipment is subject to change as replacement equipment is received. The government will maintain this equipment.
Name Quantity
Computer 2
Printer 1
Common Office Supplies (i.e. pens, highlighters, sticky notes, etc.)
As needed
APPENDIX C
Cleaning Checklist
ROOM CLEANING
1. Make all beds.
2. Dust all horizontal and vertical surfaces to include corners, air vents and PTAC filters.
3. Spot clean inside of all windows.
4. Clean and dust lamps.
5. Clean all furniture to include free of crumbs/trash between and under cushions.
6. Thoroughly clean coffee machines/pots, refrigerators, and microwave ovens, inside and out.
7. Empty trash receptacles and sanitize using disinfectant.
8. Clean all floors to include under and behind furniture.
9. Replace all towels with clean towels.
10. Stock toilet paper, hand soap, and facial tissues.
11. Clean and disinfect hard surfaced floors per manufacturer’s recommendations.
12. Clean shower with approved cleaner per manufacturer’s recommendations.
II. CREW CHANGEOVER ROOM CLEANING
1. Remove and provide linens in rooms that will be occupied.
2. Dust all horizontal and vertical surfaces to include corners, air vents and PTAC filters.
3. Clean inside of all windows.
4. Clean and dust lamps and televisions
5. Clean inside and outside of all desks and nightstands.
6. Thoroughly clean coffee machines/pots and microwave ovens, inside and out.
7. Clean inside and outside of refrigerator. Empty and clean ice trays.
8. Empty trash receptacles and sanitize using disinfectant.
10. Detail vacuum/mop floor.
11. Clean all furniture to include free of crumbs/trash between and under cushions.
12. Stock toilet paper, hand soap, and facial tissues.
13. Clean and disinfect hard surfaced floors per manufacturer’s recommendations.
14. Clean shower with approved cleaner.
15. Replace all towels with clean towels.
III. KITCHEN/LAUNDRY ROOMS CLEANING
1. Thoroughly clean appliances inside and out.
2. Empty trash receptacles and sanitize using disinfectant.
3. Clean all floors to include under and behind furniture.
4. Clean and disinfect hard surfaced floors per manufacturer’s recommendations.
5. Clean all furniture to include free of crumbs/trash between and under cushions.
6. Dust all horizontal and vertical surfaces to include corners and air vents.
IV. HALLWAYS/STAIRWELLS/LOBBY/COMMON/GYM ROOMS CLEANING
1. Empty trash receptacles and sanitize using disinfectant.
2. Clean all floors to include under and behind furniture.
3. Clean and disinfect hard surfaced floors per manufacturer’s recommendations.
4. Spot clean walls, paying attention to areas around switch plates.
5. Clean all furniture to include free of crumbs/trash between and under cushions.
6. Dust all horizontal and vertical surfaces to include corners and air vents.
V. DEEP CLEANING (Twice A Year)
In addition to “CREW CHANGEOVER” cleaning.
1. Remove and replace boxspring covers.
2. Remove mattress and clean under bed.
3. Flip mattress.
VI. GENERAL HOUSEKEEPING DUTIES
1. Inventory guest and employee supplies. Order as needed.
2. Inspect guest storage rooms throughout the day to ensure that room amenities and cleaning supplies are stocked.
APPENDIX D
Contractor Furnished Equipment/Restroom Supplies
The contractor shall provide the following equipment/restroom supplies for Building 917:
Trash Liners and ice bucket liners Facial tissue Toilet Tissue: Two-ply* Paper Towels: Bi-Fold, Trifold, Dispenser type * Hand Soap: Liquid anti-bacterial soap for installed liquid soap dispensers, and/or hand size push/pump liquid anti-bacterial soap when installed dispensers are non-operational.
*Recycled Products: 100 percent of all paper products procured (toilet tissue and paper towels) shall contain recycled materials.
There may be several types of dispensers (pump, single/double/trifold as well as multiple roll).
Contractor is responsible to ensure the proper product is inserted into the correct dispenser. With CO approval, Contractor may replace dispenser, at no additional cost to the Government, with standardized dispenser in approved locations. If approved to install dispensers, Contractor shall be required to maintain, repair, or replace broken or defective dispensers. All contractor provided dispensers shall become the property of the Government at the end of the contract. Descriptive literature of dispensers and materials/supplies to be used shall be submitted with proposal package.
APPENDIX E
Building Schematics are separate attachments to this PWS, please see:
1. App F 917-1 Room SqFt.pdf
2. App F 917-2 Room SqFt.pdf