This document is an Air Force Base Civil Engineering Work Clearance Request Form. It is used to coordinate work that may disrupt aircraft/vehicle traffic, utility services, fire/security systems, or base operations. The form requires details on the type of work, location, date clearance is needed, and a signature from the requesting official. Reviewers from various base departments (electrical, fire, communications, etc.) must approve or disapprove the request prior to work commencement. Specific precautionary measures to be taken during the work must be described. This form is used for both contract and in-house work on the air force base.
The related federal contract opportunity is for replacing two 12,470V to 480V transformers and installing a 200A panelboard in Building 27497 on Kirtland Air Force Base. The transformers are outdated from the original building construction and need to be replaced like-for-like, including reconnecting the associated equipment and wiring. The solicitation number is FA940124B0003 and it is being issued by the Department of the Air Force Materiel Command Nuclear Weapons Center.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The document you are trying to load requires Adobe Reader 8 or higher. You may not have the Adobe Reader installed or your viewing environment may not be properly configured to use Adobe Reader.
For information on how to install Adobe Reader and configure your viewing environment please see http://www.adobe.com/go/pdf_forms_configure.
DATE PREPARED
BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST
(See Instructions on Reverse)
1. Clearance is requested to proceed with work at on Work Order No.
, Contract No.
, involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.
2. TYPE OF FACILITY/WORK INVOLVED
G. AIRCRAFT OR VEHICULAR TRAFFIC FLOW
A. PAVEMENTS
D. FIRE DETECTION & PROTECTION SYSTEMS
H. SECURITY
B. DRAINAGE SYSTEMS
E. UTILITY
OVERHEAD
UNDERGROUND
I. OTHER
C. RAILROAD TRACKS
F. COMM
OVERHEAD
UNDERGROUND
4. DATE OF CLEARANCE
3. DATE CLEARANCE REQUIRED
5. SIGNATURE OF REQUESTING OFFICIAL
6. TELEPHONE NO.
7. ORGANIZATION
REMARKS
(Use Reverse for additional comments)
REVIEWER'S NAME AND INITIALS
ORGANIZATION
8.
A. ELECTRICAL DISTRIBUTION
B A S
B. STEAM DISTRIBUTION
E
C. WATER DISTRIBUTION
C I
D. POL DISTRIBUTION
V I L
E. SEWER DISTRIBUTION
E N
F. ENVIRONMENTAL
G I
G. PAVEMENTS/ GROUNDS
N E E
H. FIRE PROTECTION
R I
I. ZONE
N G J. OTHER (Specify)
9. SECURITY POLICE
10. SAFETY
11. COMMUNICATIONS
12. BASE OPERATIONS
13. CABLE TV
14. COMMERCIAL UTILITY COMPANY
TELEPHONE
GAS
ELECTRIC
15. OTHER (Specify)
APPROVED
DISAPPROVED
16. REQUESTED CLEARANCE
17. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 17a. DATE SIGNED
PREVIOUS EDITIONS ARE OBSOLETE.
AF IMT 103, 19940801, V3
Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign
INSTRUCTIONS
The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.
18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)
AF IMT 103, 19940801, V3
(REVERSE)
8.2.1.3158.1.475346.466429
| HAS: |
| HASNOT: |
| APPRVD: |
| DAPPRVD: |
| Entery date as YYYYMMDD.: |
| LOCA: |
| WONO: |
| CTRNO: |
| ABC: |
| ABC_2: |
| ABC_3: |
| D: |
| E: |
| F: |
| OVHA: |
| OVHB: |
| UNDGA: |
| UNDGB: |
| GHI: |
| GHI_2: |
| GHI_3: |
| OTH: |
| Enter date as YYYYMMDD.: |
| ReqOffclSig: |
| TELE: |
| ORGN: |
| REMKA: |
| SIGNATURE1: |
| REMKA_2: |
| SIGNATURE2: |
| REMKA_3: |
| SIGNATURE3: |
| REMKA_4: |
| SIGNATURE4: |
| REMKA_5: |
| SIGNATURE5: |
| REMKA_6: |
| SIGNATURE6: |
| REMKA_7: |
| SIGNATURE7: |
| REMKA_8: |
| SIGNATURE8: |
| ZONE: |
| REMKB: |
| SIGNATURE9: |
| OTHB: |
| REMKC: |
| SIGNATURE10: |
| REMKD: |
| SIGNATURE11: |
| REMKD_2: |
| SIGNATURE12: |
| REMKD_3: |
| SIGNATURE13: |
| REMKD_4: |
| SIGNATURE14: |
| REMKD_5: |
| OTHC: |
| REMKE: |
| COMUTIL: |
| COMUTIL_2: |
| COMUTIL_3: |
| AppOffcrSig: |
| SIGNATURE16: |
| SIGNATUREfor13: |
| EF_1: |
| EF_2: |
| REMKSF: |
| SignatureStyle1: |
| SignatureStyle2: |
File details come from the government source that posted it. Updated .