This document is a set of Questions and Answers related to Combined Synopsis/Solicitation FA9301-24-Q-0006 for a Primary Crash Alarm System (PCAS) at AF Plant 42.

The solicitation is for a new PCAS system to replace the existing system and integrate with various existing systems and infrastructure. Key details include: the use of incorrect NAICS codes which have been updated, removal of a requirement to integrate with an existing FAA system, specifications for the VOIP phones and speakers, requirements for network switches and racks, details on cable/wiring infrastructure, and clarification on the replacement of garage door openers and airfield gate integration. The solicitation also provides information on the location of new equipment and phone/console placements across various buildings. No performance work statement or objectives are provided, as this document only addresses questions and answers related to the solicitation.

View the file

Other files

File Type Posted
Amendment-6 to Combined Synopsis Solicitation-Solicitation FA9301-24-Q-0006 PCAS dated 04 Apr 2024.pdf PDF
Questions and Answers Revision-1 for Combined Synopsis-Solicitation FA9301-24-Q-0006 PCAS dated 04 Apr 2024.pdf PDF
Pictures Referenced In Questions and Answers Revision-1 PCAS Solicitatoin FA9301-24-Q0006 dated 04 April 2024.pdf PDF
Amendment-5 to Combined Synopsis-Solicitation FA9301-24-Q-0006 PCAS dated 27 Mar 2024.pdf PDF
Pictures Referenced in Questions and Answers for PCAS Solicitation FA9301-24-Q-0006 dated 27 Mar 2024.pdf PDF
Combined_Synopsis-Solicitation_FA9301-24-Q-0006 Final 01 Mar 2024-- Revised 25-Mar-2024.pdf PDF
Model Contract Solicitation FA9301-24-Q-0006 Revised 25 Mar 2024.pdf PDF
Amendment-4 to Combined Synopsis-Solicitation FA9301-24-Q-0006 PCAS dated 25 Mar 2024.pdf PDF
Attachment-1 to FA9301-24-Q-0006 PCAS Statement of Work Dated 25 Mar 2024 Rev.2.pdf PDF
Model Contract Solicitation FA9301-24-Q-0006 Revised 08 Mar 2024.pdf PDF
Combined_Synopsis-Solicitation_FA9301-24-Q-0006 Final 01 Mar 2024-- Revised 08-Mar-2024.pdf PDF
Amendment-3 to Combined Synopsis-Solicitation FA9301-24-Q-0006 PCAS dated 08 Mar 2024.pdf PDF
Amendment-2 to Combined Synopsis-Solicitation FA9301-24-Q-0006 PCAS dated 06 Mar 2024.pdf PDF
Attachment-1 to FA9301-24-Q-0006 PCAS Statement of Work Dated 27 Feb 2024 Rev.1.pdf PDF
Amendment-1 to Combined SAynopsis-Solicitation FA9301-24-Q-0006 PCAS dated 05 Mar 2024.pdf PDF
Combined Syn-Sol Attachment - Site-Visit-Slides_FA9301-24-Q-0006_for_13-Mar-2024.pdf PDF
Model Contract Attachment-1 to FA9301-24-Q-0006 PCAS Statement of Work Dated 27 Feb 2024.pdf PDF
Combined_Synopsis-Solicitation_FA9301-24-Q-0006 Final 01 Mar 2024.pdf PDF
Model Contract Solicitation FA9301-24-Q-0006.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Combined Synopsis/Solicitation FA9301-24-Q-0006 “Questions & Answers” Posted via Amendment-4 Page 1 of 7

Questions & Answers for

Combined Synopsis/Solicitation FA9301-24-Q-0006 Primary Crash Alarm System (PCAS)

Date of this Q&A Document: 25 Mar 2024

This document is to address the questions which the Government has received and our responses to those questions to date. Please note, Offerors are permitted to submit additional questions up to the final due date of 3:00 PM on 02 Apr 2024, reflected on Amendment-4. The Government intends to post a final Q&A document via another Amendment to this Combined Synopsis/Solicitation by 4:00PM on 05 Apr 2024, but we reserve the right to have that date/time slip further out if required to be able to answer all Offerors questions submitted by the due date specified above.

# Question Government Answer 1 I don’t see the address to the site visit on the documents. Can you please provide that?

The location of the Pre-Award Site Visit and the ensuing contract installation was provided via Combine Synopsis/Solicitation FA9301-24-Q- 0006 Amendment-1 date 05 Mar 2024 on SAM.gov

2 Question was regarding the NAICS and associated Small Business Size Standard.

The one used by the Government do not appear to be correct for the effort at hand.

Can the Government evaluate the NAICS used to determine if a more applicable one should be used?

The Government confirms that the NAICS used on the original Combine Synopsis/Solicitation posting was done in error. In evaluating the NAICS and associated Size Standard, the Government has determined that the appropriate ones to use are 334290 and 800 Employees. This was addressed via Combine Synopsis/Solicitation FA9301-24-Q- 0006 Amendment-3 date 08 Mar 2024 on SAM.gov.

3 Section 2.1 states “the new system shall replace the existing PCAS and integrate with the existing FAA STVS”. What type of equipment is the FAA STVS?

Requirement removed by government. After further investigation with FAA personnel, The new PCAS system is NOT required to integrate with FAA STVS. SOW section 2.1 –“ and integrate with the existing FAA STVS” the wordings are to be disregarded.

4 Will documentation on the FAA STVA be provided for integration purposes?

Since integration to STVS is NOT required. No documentation to be provided.

5 Are there specific requirements regarding the nature of integration of the new PCAS with the existing FAA STVS?

There is no specific requirement is needed. The new PCAS system is NOT required to integrate with FAA STVS.

Combined Synopsis/Solicitation FA9301-24-Q-0006 “Questions & Answers” Posted via Amendment-4 Page 2 of 7

6 In general, if the distance between the network switch and the endpoints (call handlers, monitor stations, VOIP phones, Garage door openers, gate interface) is longer than a standard patch cable can accommodate, are there existing ethernet patch panels and ethernet cable infrastructure between the switch and the endpoints? Or is new cable infrastructure to be installed new by the offeror?

The distance between the network switch and the endpoints (call handlers, monitor stations, VOIP phones, Garage door openers, gate interface) are vendor specific and design dependent. The existing patch panels or network drops that are available by the government are within standard limited distance. Contractor needs to provide final patch cables from the jacks to its endpoint or install new cables.

The only challenging location is the flightline gate, it’s opened by remote control or keypad code entry. There are no cable runs to the gate currently, contractor is to propose most cost effective and technically acceptable solution to meet this requirement. i.e. “wireless device” or bridging”.

7 Per section 2.1.1: “Each device shall receive unique emergency ringtone and flashing lights.” Is there a preferred ringtone and/or flashing light sequence?

What is the desired dB level of the ringtone?

Standard ringtone that is use by industry, red flashing light by default. Standard or normal phone dB level ring volume.

8 Regarding the ringdown phones in section

2.2.2 and listen-only phones in section 2.2.3: Please specify the type of each VOIP phone desired (wall mount or desktop phone).

All red desktop phone with Push-to-talk, and able to configure for listen only phone capability.

9 Will the new VOIP phones be mounted in the same location as the previous phones, and are there any special mounting considerations if phones are uniquely mounted on stands/mounting boxes/other equipment?

All desktop phones.

10 What is the expected purpose of the LCD display on the VOIP phones? What information is required to be presented on the LCD display?

At the standby mode: Each phone will display its’ own location information, such as “Fire Station #2, phone # and date/time. At the active mode, either incoming/outgoing call, each phone will show incoming/outgoing information, such as “Fire Station #2, phone # and date/time. At the screen saving mode: Each phone will display “AFP 42 Primary Crash System”

Combined Synopsis/Solicitation FA9301-24-Q-0006 “Questions & Answers” Posted via Amendment-4 Page 3 of 7

11 Regarding section 2.2.4.1: What is the communication and/or control interface to the airfield gate? Is there an API for electronic/IP communication, hardwired signaling via relay, or another interface?

Please elaborate and describe the demarcation point between the new system and existing equipment.

Currently the airfield gate is open by the keypad code entry or remote control. No other known API or IP communication or hardwired signaling via relay.

12 Regarding section 2.2.4.2: What is the communication and/or control interface to the garage door openers? Is there an API for electronic/IP communication, hardwired signaling via relay, or another interface?

Currently the station gates/stall doors can be remotely opened by the Fire Dispatch via software control or the buttons at the DMTF panel located at each fire station. Contractor shall NOT integrate with existing software system. DMTF panels for FD 1 and FD 2 are shown by picture attached, the DMTF panel can be integrated for use. (See pictures #14, #15)

13 Is the offeror expected to completely replace existing garage door openers with new equipment, or only integrate the new PCAS with the existing equipment?

Only integrate the new PCAS with the existing equipment, if current system is unreliable then replacement can be recommended.

14 Regarding section 2.2.5: Is there a preferred type or style of speaker? (PA style speaker in drop ceiling, wall mounted speaker, desktop speaker, etc.)

Wall mounted speaker

15 What shall be the maximum dB of speaker output?

Standard normal hearing dB level 75, no harmful level or too long.

16 Can existing speakers be reused, or must all-new equipment be provided and installed?

Currently there is no speaker in each room, if contractor can locate the speakers, integration is allowed.

17 Regarding section 2.2.7: Are new network switches desired?

Yes, and each new switch MUST be TAA compliant.

18 Shall new network racks be provided for network switches and call handler equipment?

There is rack space are available for FD1, EM and Director building (See Picture #11, #12, #13).

There are NO rack space available for the tower (2nd floor), FD2 and BDOC, thus the contractor needs to provide appropriate size to house the equipment.

Combined Synopsis/Solicitation FA9301-24-Q-0006 “Questions & Answers” Posted via Amendment-4 Page 4 of 7

19 If existing racks are available, please specify the type (2 post or 4 post), and depth of any 4 post racks/cabinets.

We have 2-post rack space available in EM and Director building, and 4 post racks space available in FD1 with depth of 19”. The tower, FD2 and BDOC have no rack space, contractor is to provide appropriate size to house the equipment.

20 Is the contractor going to be removing any existing wiring in any of the locations?

NO, there is no existing wiring required contractor to remove.

21 Does AF Plant 42 still have strands that are unterminated?

NO

22 Fiber termination connectors: LC, SC or other?

All fibers are terminated with SC connectors.

23 Are there two devices in Building 552(Director Building)? Is Cable Required?

Yes, 2 listen only Phones. No need for cabling, Cable is already in place, but patch cables from the Jacks to the new phones are required. In Room 101: Jack # 039W/B; In Room 102: Jack # 036 W/B. (See Pictures #9, #10)

24 Are there two towers? Yes

25 Is cable being ran to the flight line gate? Currently there is NO cable runs to the flightline gate. The gate opener is manufactured by Eagle Access Control Systems; Model: EAGLE-2000- DC (See Picture #16). Contractor is to propose most cost effective and technically acceptable solution to meet this requirement.

26 Are UPS as a backup power supply required? If so, how long do you want them to run?

Yes, up to 30 minutes.

27 If it’s a building UPS will the contractor have access to it?

NO

28 In the tower, what stations will have the phones?

Locations for the phone in the tower are: 1st floor Jack #D3/4, 3rd floor Jack #C23/24, 4th Jack #C13/15, Cab Jack #B3/4 (See Pictures #1, #2, # 3, #4).

29 Did the builder of the tower do a Home Run from top to bottom floor?

Yes, some cables are home run to 2nd floor, and others are home run to 10th floor.

Combined Synopsis/Solicitation FA9301-24-Q-0006 “Questions & Answers” Posted via Amendment-4 Page 5 of 7

30 Are the cords going to a jack somewhere?

i.e. Terminated somewhere? What is the pathway to get to jack?

Some cords/cables are home run to 2nd floor, and others are home run to 10th floor.

31 Please identify the termination points in the top of the tower and provide picture please.

In the Cab, Jack # B3/4 is home run down to 2nd floor.

32 Do the contractors have to provide a server cabinet for their stuff? Are we permitted to use the existing cabinets if there is space available?

There is rack space are available for FD1, EM and Director building that the contractor is permitted to use. There are NO rack space available for the tower (2nd floor), FD2 and BDOC, thus the contractor needs to provide appropriate size to house the equipment.

33 Do 3rd and 4th floor of the Tower just have phones?

No, both 3rd and 4th floor will have a phone and console at each floor, 3rd floor Jack #C23/24, 4th

Jack #C13/15. SOW Section 2.2.1.2 is updated to reflect the locations of the consoles.

34 Please identify where specifically the phone is going for all locations?

In the tower: 1st floor Jack #D3/4, 3rd floor Jack #C23/24, 4th Jack #C13/15, Cab Jack #B3/4.

In FD 2: Room 103 (2 new jacks needed). In FD 1:

Chief’s office: Jack #D36/37. In BDOC: Jack # 13-3-1C/1D and 13-5-1C/1D. In Director: Room 101: Jack # 039W/B; Room 102: Jack # 036 W/B.

In EM, a new speaker is added, new cabling is needed for the speaker. SOW Section 2.2.5.1 is added.

35 Is it a wall mount or desk phone? All locations are desktop phones.

36 Is on 4th floor of the tower has only a phone?

No, 4th floor of the tower will have 1 phone and 1 console. SOW Section 2.2.1.2 is updated with the locations of all 3 consoles.

37 Is the contractor providing switches? Yes, switches are needed at all locations. All switches MUST be TAA compliant.

38 Is the console going in the first-floor office location of the Tower? If so, what jack #?

No console is needed in the 1st floor of the tower.

Further clarification: 3 consoles are requested for this effort. 1 at the ATCT 3rd floor; Jack #C23/24, 1 at ATCT 4th floor; Jack #C13/15, and 1 at FD2- Alternate Fire Dispatch; new jacks are needed.

SOW Section 2.2.1.2 is updated with the locations of all 3 consoles.

Combined Synopsis/Solicitation FA9301-24-Q-0006 “Questions & Answers” Posted via Amendment-4 Page 6 of 7

39 Will the government require another rack in Comm Room #106 in FD2?

Yes, new rack is required in FD 2 because there is NO rack space available.

40 Room #104 is Alternate Dispatch Location, Will the contractor need to run a new cable to room #106?

Yes, FD2 Room #104 is Alternate Dispatch Location (See picture #8). No cables are available in this room. Contractor is to install 2 new cables, 1 for the phone and 1 for the console machine.

Cables will need to home run back to Room #106.

41 Is there a requirement/specification for audio to be transmitted over radio?

No, there is NO requirement for audio to be transmitted over radio at any location.

42 How many speakers and how many rooms in the Fire Departments?

In FD 2, There are 11 rooms and need 11 speakers, wall mounted speakers. In FD 1, there are 8 rooms and need 8 wall mounted speakers. In EM Building, a new speaker is requested at the hallway. Therefore, a total of 20 speakers. SOW Section 2.2.5.1 is added for new speaker in EM.

43 Is the contractor required to run wire to all 11 rooms in Fire Department 2? There is a network patch panel labeled #1-18 that is unused. Can the contractor reuse this?

Cables are required for all rooms speakers;

contractor can repurpose the existing cables marked PD#1-18 that runs to each room at the closet located at the end of hallway. A home run cable back to main Comm Room #106 is required.

44 Can Contractor repurpose the cables in each room at Fire Department 1?

Yes, if there are available cables, contractor can repurpose the cable.

45 Discussion was had about if the contractor can do a wall mount to the left of the door when entering the Com Room#219 as there is a free jack behind the printer? Will the Government accept a Wall Mount here?

No, in FD1, Chief’s office requests a desktop phone: Jack #D36/37. (See Picture #7).

46 Can you verify the jack # for the phone in

BDOC?

In BDOC, Jack # 13-3-1C/1D and Jack 13-5- 1C/1D are available to use. (See Picture #5, #6).

47 Can the Government please identify the specs or interface that the System Dispatch station uses to open the Fire Station #1 and 2 doors?

Government has NO documentation for the Fire Dispatch (FD) software system. SOW section 2.2.4.2, government has NO indication of interfacing to this FD software system.

48 Is the Flightline Gate controlled or able to be opened from the BDOC?

NO, BDOC/FD can’t open the flightline gate remotely. Authorized government personnel can either open the gate by the keypad code entry or remote control.

Combined Synopsis/Solicitation FA9301-24-Q-0006 “Questions & Answers” Posted via Amendment-4 Page 7 of 7

49 Is there conduit ran out to the flightline gate by Fire Station #1?

No physical copper cable runs to the gate.

50 If there is power supply going out to that gate?

Yes, there is power supply to operate the gate opener.

51 Please provide the room number, exact location, and jack # for the phone in EM?

EM phone is replaced by a speaker. New cabling is required for the speaker at the hallway. SOW Section 2.2.5.1 is added to reflect the new speaker.

52 Comm room #102 is locked? Is there available rack Space?

Yes, rack space available for use in EM Building.

(See Picture #12).

53 In which walls in all locations is the contractor going to require penetration for fire rated walls?

All locations have NO fire rated interior walls, but in BDOC building, there are Non Man Passible wall, if penetration required, contractor MUST follow UFC/AFI standard to make the penetration.

54 There is plenty of rack space in the Com Room#109 in Director Building, is the contractor permitted to use it?

Yes. Rack #1 has available space and contractor is permitted to use the space in Rack 1. (See Picture #13).