Exhibit E Year 5.xls
XLS spreadsheet 42 KB Posted
- Attached to
- Painting Services Federal contract opportunity
- Solicitation number
- FA930110R0008a
About this file
Exhibit E Year 5 ELIN Pricing Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0004.pdf | ||
| QR Paint Recompete 37-57.doc | DOC document | |
| Amendment 03.pdf | ||
| Amendment 02 to Solicitation FA930110R0008a.pdf | ||
| Attendee Lists Paint Pre-Proposal Conference.pdf | ||
| Pre-Proposal Conference 10 June 2010.ppt | PPT presentation | |
| Amendment 0001 to Solicitation FA930110R0008a.pdf | ||
| Paint FY10 Changed Location Notice.doc | DOC document | |
| Attachment 1 CA100031.doc | DOC document | |
| Attachment 2 CA100013.doc | DOC document | |
| Paint FY10 Site Visit Notice.doc | DOC document | |
| CA31_dvb.txt | TXT text file | |
| Exhibit F with 3 attachments.doc | DOC document | |
| Exhibit B Year 2.xls | XLS spreadsheet | |
| EAFB Design Standards.doc | DOC document | |
| Exhibit A Year 1.xls | XLS spreadsheet | |
| Exhibit C Year 3.xls | XLS spreadsheet | |
| FA9301-10-R-0008 Solicitation.doc | DOC document | |
| CA13_dvb.txt | TXT text file | |
| Specification Paint FY10.docx | DOCX document | |
| Exhibit D Year 4.xls | XLS spreadsheet |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit E Year 5 (2014-2015)
| Section B | |||||
| Construction Prices/Costs | |||||
| Maintenance, Repair, or alteration of Real Property | |||||
| Exterior and Interior Painting of Various Base Facilities | |||||
| All Work to be accomplished in accordance with the Specifications | |||||
| Description of Work: The contractor shall provide, as specified in each delivery order issued hereunder, | |||||
| painting of various base facilities, including tanks, hangars, single and multi story buildings and structures, | |||||
| up to 120' in height. All work to be accomplished in accordance with the specifications. | |||||
| ELIN # | ITEM | UM | Est. Qty | Unit Price | Estimate Total |
| EXTERIOR | |||||
| E001 | Apply Prime Coat (1 coat) includes surface prep | SF | 400,000 | ||
| E002 | Apply Finish Coat to Walls, Soffits, Duct Work & Mech Equipment Exterior(2 coats) | SF | 300,000 | ||
| E003 | Apply Finish Coat to Doors and Door Frames (2 coats) | SF | 3,000 | ||
| E004 | Apply Finish Coat to Window Frames and Sash (2 coats) | SF | 1,000 | ||
| E005 | Apply Finish Coat to Fascia including gutters and downspouts (2 coats) | SF | 2,000 | ||
| E006 | Apply Finish Coats to Railings (2 coats) | LF | 1,000 | ||
| E007 | Apply Finish Coat to Ladders, grills and Steel Stairs (2 coats) | SF | 1,000 | ||
| E008 | Apply Coarse Texture Coat to match existing | SF | 500 | ||
| E009 | Replace Metal Gutter and downspouts with pre-finished metal | LF | 500 | ||
| E00A | Replace Rotted or Deteriorated Wood Fascia | SF | 1,000 | ||
| E00B | Bold Helvitica numbers/letters | SF | 250 | ||
| E00C | Stucco, 3 coat, 1" thick, including lath, metal and accessories (whole structure) | SY | 5,000 | ||
| E00D | Stucco Repair, 3 coat, to match existing, including lath, metal and accessories (patching or whole wall <10 sy) | SY | 200 | ||
| E00E | Install Pre-Finished (colored) Sheetmetal Siding complete finished installation | SF | 5,000 | ||
| E00F | Any CLIN, over 100' high based on percentage increase | % | |||
| INTERIOR | |||||
| E00G | Apply Prime Coat (1 coat) includes surface prep | SF | 25,000 | ||
| E00H | Interior walls, 2 coats. | SF | 20,000 | ||
| E00J | Interior ceilings, 2 coats. | SF | 5,000 | ||
| E00K | Interior Flat Door incl Frames and Trim, 2 coats painted. | SF | 1,000 | ||
| E00L | Interior Flat Door incl Frames and Trim, both sides, stained and 2 finished coats . Includes Surface Preparation | SF | 200 | ||
| E00M | Interior Louvered Doors, incl frame and trim, two finish coats. | SF | 400 | ||
| E00N | French Doors, 10-15 lite, incl. Frame & trim, stained and 2 finish coats | SF | 200 | ||
| E00P | French Doors, 10-15 lite, incl. Frame & trim, two finish coats | SF | 200 | ||
| E00Q | Interior Raised Panel Door incl Frames and Trim, 2 coats. | SF | 200 | ||
| E00R | Interior Raised Panel Door incl Frames and Trim, 2 finish coats | SF | 200 | ||
| E00S | Windows, Interior Side, 2 finish coats | SF | 150 | ||
| E00T | Windows, Interior Side, 2 finish coats, over 6 lites. | SF | 150 | ||
| E00U | Grilles | SF | 200 | ||
| E00V | Trim (baseboards, casings, crowns, etc.), including surface preperation, up to 6" wide, painted or stained 2 coats | LF | 1,000 | ||
| E00W | Drywall, patch repair, type, thickness, taped and textured to match existing, less than 32 SF, walls | SF | 500 | ||
| E00X | Drywall, patch repair, type, thickness, taped and textured to match existing, greater than 32 SF, walls | SF | 500 | ||
| E00Y | Drywall, patch repair, type, thickness, taped and textured to match existing, less than 32 SF, ceiling | SF | 250 | ||
| E010 | Drywall, patch repair, type, thickness, taped and textured to match existing, greater than 32 SF, ceiling | SF | 500 | ||
| E011 | 1/2" or 5/8" Drywall, full wall installation on existing framing, taped, textured, corner beads and all accessories | SF | 3,000 | ||
| E012 | 1/2" or 5/8" Greenboard Drywall, full ceiling installation on existing framing, taped, textured, corner beads and all accessories | SF | 500 | ||
| E013 | Wall Paper Removal | SF | 1,000 | ||
| E014 | Wall Texturing | SF | 10,000 | ||
| ABATEMENT | |||||
| E015 | Asbestos Abatement | SF | 2,000 | ||
| E016 | Lead Based Paint Abatement | SF | 2,000 | ||
| E017 | Asbestos/Lead paint/texture abatement Exterior | SF | 10,000 | ||
| E018 | Lead containing/based road marking paint removal | SF | 10,000 | ||
| FLOOR COATING | |||||
| E019 | Epoxy Floor Coating with non-skid on concrete surface including surface preparation | SF | 10,000 | ||
| E01A | Epoxy Floor Coating with non-skid , chemical resistant, on concrete surface | SF | 10,000 | ||
| E01B | Conductive elastomeric Floor Coating with non-skid on concrete surface | SF | 10,000 | ||
| E01C | Hardwood Flooring, sanding and finishing, 2 coats polyurethane | SF | 1,000 | ||
| E01D | Aircraft hangar floor coating with non-skid including surface preparation | SF | 100,000 | ||
| E01E | Aircraft hangar floor striping <6" wide including surface preparation | LF | 3,000 | ||
| ROAD MARKINGS AND STRIPING | |||||
| E01F | Striping on concrete and asphalt with type 1 reflective beads, includes airfield, parking and roads, up to 4" | LF | 10,000 | ||
| E01G | Striping on concrete and asphalt with type 3 reflective beads, includes airfield, parking and roads, up to 4" | LF | 10,000 | ||
| E01H | Striping on concrete and asphalt with type 1 reflective beads, includes airfield, parking and roads, up to 12" | LF | 10,000 | ||
| E01J | Striping on concrete and asphalt with type 3 reflective beads, includes airfield, parking and roads, up to 12" | LF | 10,000 | ||
| E01K | Road markings paint letters, numbers, symbols, etc with reflective beads. | SF | 500 | ||
| E01L | Road marking paint removal non-lead | SF | 1,000 | ||
| TANKS | |||||
| E01M | Tanks, water/fuel exterior solid color (2 finish coats) | SF | 10,000 | ||
| E01N | Tanks, water exterior checkerboard (2 finish coats) | SF | 10,000 | ||
| E01P | Tanks, fuel interior | SF | 2,000 | ||
| E01Q | Tanks, water interior | SF | 5,000 | ||
| INSPECTION | |||||
| E01R | Exterior Paint Inspection, includes condition of surface, life expectancy, square footage of painted areas (according to CLIN items) and recommendations | SF | 100,000 | ||
| TOTAL | $ - 0 |
&CExhibit E ELIN Pricing Schedule Year 5, 2014-2015 Page &P of &N
File details come from the government source that posted it. Updated .