EAFB Design Standards.doc

DOC document 7 MB Posted

Attached to
Painting Services Federal contract opportunity
Solicitation number
FA930110R0008a
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Attachment 4 Edwards AFB Design Standards

View the file

Other files for this federal contract opportunity

Other files attached to Painting Services, newest first.
File Type Posted
Amendment 0004.pdf PDF
QR Paint Recompete 37-57.doc DOC document
Amendment 03.pdf PDF
Amendment 02 to Solicitation FA930110R0008a.pdf PDF
Attendee Lists Paint Pre-Proposal Conference.pdf PDF
Pre-Proposal Conference 10 June 2010.ppt PPT presentation
Amendment 0001 to Solicitation FA930110R0008a.pdf PDF
Paint FY10 Changed Location Notice.doc DOC document
Attachment 1 CA100031.doc DOC document
Attachment 2 CA100013.doc DOC document
Paint FY10 Site Visit Notice.doc DOC document
CA31_dvb.txt TXT text file
Exhibit E Year 5.xls XLS spreadsheet
Specification Paint FY10.docx DOCX document
Exhibit D Year 4.xls XLS spreadsheet
Exhibit F with 3 attachments.doc DOC document
Exhibit B Year 2.xls XLS spreadsheet
Exhibit A Year 1.xls XLS spreadsheet
Exhibit C Year 3.xls XLS spreadsheet
FA9301-10-R-0008 Solicitation.doc DOC document
CA13_dvb.txt TXT text file
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EDWARDS AIR FORCE BASE

DESIGN STANDARDS

PREPARED BY

95ABW/CEC

CIVIL ENGINEERING/TRANSPORTATION DIRECTORATE

Initial Issue: 6 JAN 2009

THIS PAGE INTENTIONALLY BLANK

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
Chapter 1
Introduction
1
Initial
6 JAN 09
Para 1.1
Executive Summary
1
Initial
6 JAN 09
Para. 1.1.2
Design Standard Ownership & Revision
2
Initial
6 JAN 09
Para. 1.2
Design Requirements in General
2
Initial
6 JAN 09
Para. 1.2.1
Scope Statement for Design & Construction
2
Initial
6 JAN 09
Para. 1.2.2
Energy and Water Conservation
3
Initial
6 JAN 09
Para. 1.2.3
Utility and Water Metering Requirements
3
Initial
6 JAN 09
Para. 1.2.4
ADA Accessibility & Compliance
3
Initial
6 JAN 09
Para. 1.2.5
EMCS/SCADA Integration
3
Initial
6 JAN 09
Para. 1.2.6
Commitment to Sustainable Design
3
Initial
6 JAN 09
Para. 1.2.7
Design Progress and Submission
10
Initial
6 JAN 09
Para. 1.3
Project Siting and Site Construction Limit Requirements
11
Initial
6 JAN 09
Para. 1.3.1
General
11
Initial
6 JAN 09
Para. 1.3.2
Construction Facilities and Job Site Standards
11
Initial
6 JAN 09
Para. 1.3.3
Contractor Storage & Laydown Areas
11
Initial
6 JAN 09
Para. 1.3.4
Project Site Disturbance Limits
12
Initial
6 JAN 09
Para. 1.3.5
Energy Conservation
12
Initial
6 JAN 09
Para. 1.4
Computer Aided Design and Drafting (CADD) Requirements
12
Initial
6 JAN 09
Para. 1.4.1
General
12
Initial
6 JAN 09
Para. 1.4.2
Drawings/Plots
13
Initial
6 JAN 09
Para. 1.4.3
Digital Files
13
Initial
6 JAN 09
Para. 1.5
Record Drawings
14
Initial
6 JAN 09
Para. 1.6
Standard Design References and Criteria
14
Initial
6 JAN 09
Para. 1.6.1
Unified Field Criteria (UFC)
14
Initial
6 JAN 09

Edwards Air Force Base Design Standards

Page i

Revision : Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
Chapter 2
Architecture
16
Initial
6 JAN 09
2.1
Base General Plan
16
Initial
6 JAN 09
2.1.1
Facility Siting
16
Initial
6 JAN 09
2.1.2
Area Development Plans (ADP)
16
Initial
6 JAN 09
2.1.3
Air Installation Compatibility Use Zone
17
Initial
6 JAN 09
2.1.4
Housing Community Plan (HCP)
17
Initial
6 JAN 09
2.2
EAFB Overall Architectural Style
18
Initial
6 JAN 09
2.2.1
Facility Colors
18
Initial
6 JAN 09
2.3
Materials
20
Initial
6 JAN 09
2.3.1
Metal
20
Initial
6 JAN 09
2.3.2
Concrete
20
Initial
6 JAN 09
2.3.3
Exterior Insulation Finish System (EIFS)
21
Initial
6 JAN 09
2.3.4
Stucco
21
Initial
6 JAN 09
2.3.5
Wood
21
Initial
6 JAN 09
2.3.6
Composite Building Panels
21
Initial
6 JAN 09
2.3.7
Other Finishes
21
Initial
6 JAN 09
2.4
Roofing
21
Initial
6 JAN 09
2.4.1
Basic Requirements
21
Initial
6 JAN 09
2.4.2
Asphalt Shingles/ Lightweight Concrete Tiles
22
Initial
6 JAN 09
2.4.3
Built-up Roofs (BURs)
22
Initial
6 JAN 09
2.4.4
Roof Service Walkway
22
Initial
6 JAN 09
2.4.5
Equipment Curbs
22
Initial
6 JAN 09
2.4.6
Roof Drains
22
Initial
6 JAN 09
2.4.7
Gutters
23
Initial
6 JAN 09
2.4.8
Downspouts
23
Initial
6 JAN 09
2.4.9
Standing Seam Metal Roofs (SSMRs)
23
Initial
6 JAN 09
2.4.10
Roof-Top Equipment
24
Initial
6 JAN 09
2.4.11
Roof Ladders
24
Initial
6 JAN 09
2.4.12
ASBESTOS WARNING
24
Initial
6 JAN 09

Page ii

Revision : Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
2.5
Exterior Design
24
Initial
6 JAN 09
2.5.1
Renovations and Additions
24
Initial
6 JAN 09
2.5.2
Overhangs and Shadings
24
Initial
6 JAN 09
2.5.3
Entrances
25
Initial
6 JAN 09
2.5.4
Facades, Fascias, and Soffits
25
Initial
6 JAN 09
2.5.5
Metal Railings and Handrails
25
Initial
6 JAN 09
2.5.6
Doors, Hardware and Locksets
25
Initial
6 JAN 09
2.5.7
Insulation
26
Initial
6 JAN 09
2.6
Interior Design
26
Initial
6 JAN 09
2.6.1
Spatial Guidelines
27
Initial
6 JAN 09
2.6.2
Interior Finishes
27
Initial
6 JAN 09
2.6.3
Wall & Corner Guards
27
Initial
6 JAN 09
2.6.4
Ceilings
28
Initial
6 JAN 09
2.6.5
Floorings
28
Initial
6 JAN 09
2.6.6
Tiles and Countertops
29
Initial
6 JAN 09
2.6.7
Carpets
29
Initial
6 JAN 09
2.6.8
Walk-Off Flooring
29
Initial
6 JAN 09
2.6.9
Ceramic Tile
29
Initial
6 JAN 09
2.6.10
Trim
30
Initial
6 JAN 09
2.6.11
Doors, Hardware & Locksets
30
Initial
6 JAN 09
2.6.12
Bulletin Boards
31
Initial
6 JAN 09
2.6.13
Pre-Wired Work Stations
31
Initial
6 JAN 09
2.6.14
Interior Signs
31
Initial
6 JAN 09
2.6.15
Toilet Compartments
31
Initial
6 JAN 09
2.6.16
Interior Handicapped Accessibility
31
Initial
6 JAN 09

Page iii Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
2.7
Utilities
32
Initial
6 JAN 09
2.7.1
Equipment Pads
32
Initial
6 JAN 09
2.7.2
Mechanical System Intakes
32
Initial
6 JAN 09
2.8
Exterior Facility Signage
32
Initial
6 JAN 09
2.8.1
Facility Identification
33
Initial
6 JAN 09
2.8.2
Logos and Supergraphics
33
Initial
6 JAN 09
2.8.3
Sign Typography and Type Size
33
Initial
6 JAN 09
2.8.4
Sign System Hierarchy
34
Initial
6 JAN 09

Page iv

Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
Chapter 3
Landscaping
35
Initial
6 JAN 09
3.1
Introduction
35
Initial
6 JAN 09
3.1.1
Open Space Requirement
35
Initial
6 JAN 09
3.1.2
Heat Island Effect Mitigation
35
Initial
6 JAN 09
3.2
Water Conservation Requirements
35
Initial
6 JAN 09
3.3
Maintenance Plans
35
Initial
6 JAN 09
3.4
Slopes and Grading
35
Initial
6 JAN 09
3.5
Planter Containment
36
Initial
6 JAN 09
3.6
Vegetation
36
Initial
6 JAN 09
3.7
Grass
40
Initial
6 JAN 09
3.8
Trees
40
Initial
6 JAN 09
3.9
Irrigation Systems
40
Initial
6 JAN 09
3.9.1
Piping
40
Initial
6 JAN 09
3.9.2
Bubblers and Spray Heads
41
Initial
6 JAN 09
3.9.3
Irrigation Control Systems
41
Initial
6 JAN 09
3.10
Rock
41
Initial
6 JAN 09
3.11
Boulders
41
Initial
6 JAN 09
3.12
Site Furniture and Other Elements
41
Initial
6 JAN 09
3.13
Monuments, Displays, and Flagpoles
42
Initial
6 JAN 09
3.14
Playgrounds, Sandboxes, and Picnic Areas
42
Initial
6 JAN 09
3.14.1
Tables and Seating
42
Initial
6 JAN 09
3.15
Planters
42
Initial
6 JAN 09
3.16
Trash Receptacle Screening
42
Initial
6 JAN 09
3.17
Recycling Bins
42
Initial
6 JAN 09
3.18
Bollards
43
Initial
6 JAN 09
3.19
Bike Racks
43
Initial
6 JAN 09
3.20
Exterior Equipment Screening
43
Initial
6 JAN 09
3.21
Cigarette Butt Cans
43
Initial
6 JAN 09

Page v

Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
3.22
Fencing and Screening
44
Initial
6 JAN 09
3.22.1
Masonry
44
Initial
6 JAN 09
3.22.2
Chain Link Fencing
44
Initial
6 JAN 09
3.22.3
Wood Fencing
44
Initial
6 JAN 09

Page vi Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
Chapter 4
Civil
45
Initial
6 JAN 09
4.0.1
Utility System Location, Placement, and Screening
45
Initial
6 JAN 09
4.0.2
Right of Way
45
Initial
6 JAN 09
4.0.3
Tracer Wire
45
Initial
6 JAN 09
4.0.4
Utility Markers
46
Initial
6 JAN 09
4.0.5
Use of Reduced Pressure Principle Devices (RPPD)
46
Initial
6 JAN 09
4.1
Wastewater Systems
47
Initial
6 JAN 09
4.1.1
General
47
Initial
6 JAN 09
4.1.2
Covers
47
Initial
6 JAN 09
4.1.3
Trenches
47
Initial
6 JAN 09
4.1.4
Manholes
47
Initial
6 JAN 09
4.1.5
Industrial Wastewater Permit Application
47
Initial
6 JAN 09
4.2
Water System
48
Initial
6 JAN 09
4.2.1
General
48
Initial
6 JAN 09
4.2.2
Water Line Material/Installation
48
Initial
6 JAN 09
4.2.3
Water Meter Requirements
48
Initial
6 JAN 09
4.2.4
Fire Flow Testing and Distribution Adequacy Verification
48
Initial
6 JAN 09
4.2.5
Backflow Preventers
49
Initial
6 JAN 09
4.2.6
Air Release Valves
49
Initial
6 JAN 09
4.2.7
Isolation Valves
49
Initial
6 JAN 09
4.3
Natural Gas System
49
Initial
6 JAN 09
4.3.1
Gas Valves
49
Initial
6 JAN 09
4.3.2
Gas Regulators
49
Initial
6 JAN 09
4.3.3
Pipe Material
50
Initial
6 JAN 09

Page vii Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
4.3.4
Cathodic Protection
50
Initial
6 JAN 09
4.3.5
Gas Meter Requirement
50
Initial
6 JAN 09
4.4
Storm Drainage System
50
Initial
6 JAN 09
4.4.1
Existing Conditions
50
Initial
6 JAN 09
4.4.2
Assessment
51
Initial
6 JAN 09
4.4.3
Permits
51
Initial
6 JAN 09
4.4.4
Design Storm Event
51
Initial
6 JAN 09
4.5
Fuel Tanks
51
Initial
6 JAN 09
4.6
Roads
52
Initial
6 JAN 09
4.6.1
Layout and Siting
52
Initial
6 JAN 09
4.6.2
Rumble Strips
52
Initial
6 JAN 09
4.6.3
Entry Control Facilities & Inspection Areas
52
Initial
6 JAN 09
4.6.4
Road Signage
52
Initial
6 JAN 09
4.6.5
Curbs
53
Initial
6 JAN 09
4.6.6
Guard Rails
53
Initial
6 JAN 09
4.6.7
Bollards
53
Initial
6 JAN 09
4.6.8
Lighting
53
Initial
6 JAN 09
4.6.9
Cutting of Pavement
54
Initial
6 JAN 09
4.6.10
Erosion Control
54
Initial
6 JAN 09
4.6.11
Aprons
54
Initial
6 JAN 09
4.6.12
Shoulders
54
Initial
6 JAN 09
4.6.13
Crosswalks
54
Initial
6 JAN 09
4.7
Parking
55
Initial
6 JAN 09
4.7.1
General
55
Initial
6 JAN 09
4.7.2
Planning
55
Initial
6 JAN 09
4.7.3
MFH Area
55
Initial
6 JAN 09
4.7.4
Siting
55
Initial
6 JAN 09

Page viii Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
4.7.5
Service Access
55
Initial
6 JAN 09
4.7.6
90-degree Parking
55
Initial
6 JAN 09
4.7.7
Off-Street Parking
56
Initial
6 JAN 09
4.7.8
Reserved Parking
56
Initial
6 JAN 09
4.7.9
Military and Oversized Vehicles
56
Initial
6 JAN 09
4.7.10
Motorcycle and Bicycle Parking
56
Initial
6 JAN 09
4.7.11
ADA Parking Provision
56
Initial
6 JAN 09
4.7.12
Drainage
56
Initial
6 JAN 09
4.7.13
Erosion Control
57
Initial
6 JAN 09
4.7.14
Curbing and Sidewalks
57
Initial
6 JAN 09
4.7.15
Fire Lanes
57
Initial
6 JAN 09
4.8
Sidewalks, Trails, and Bikeways
57
Initial
6 JAN 09
4.8.1
Function
57
Initial
6 JAN 09
4.8.2
Planning
57
Initial
6 JAN 09
4.8.3
Sidewalks
58
Initial
6 JAN 09
4.8.4
Bikeway Standards
59
Initial
6 JAN 09
4.9
Aircraft Runways, Taxiways, and Ramps
61
Initial
6 JAN 09
4.9.1
Function
61
Initial
6 JAN 09
4.9.2
General
61
Initial
6 JAN 09
4.9.3
General Design Considerations
61
Initial
6 JAN 09
4.10
Soil and Subsurface Investigation
63
Initial
6 JAN 09
4.10.1
Fill Soil Standards
63
Initial
6 JAN 09

Page ix Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
4.11
Demolition
63
Initial
6 JAN 09
4.11.1
Landfill Use
64
Initial
6 JAN 09
4.12
Structural
64
Initial
6 JAN 09
4.12.1
Design Loads
64
Initial
6 JAN 09
4.12.2
Frost Depth
65
Initial
6 JAN 09
4.12.3
Shear Wall Design & Construction
65
Initial
6 JAN 09
4.12.4
Design Criteria
65
Initial
6 JAN 09
4.12.5
Portland Cement Concrete (PCC) Minimum Strength Requirement
65
Initial
6 JAN 09

Page x

Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
Chapter 5
Mechanical Systems
66
Initial
6 JAN 09
5.0.1
General
66
Initial
6 JAN 09
5.1
Air Conditioning Systems, Chillers, and Air Handling Systems
66
Initial
6 JAN 09
5.2
HVAC Fuel
68
Initial
6 JAN 09
5.3
Plumbing
68
Initial
6 JAN 09
5.4
Energy Management Control Systems (EMCS)
68
Initial
6 JAN 09
5.4.1
HVAC Controls
68
Initial
6 JAN 09
5.4.2
Energy Management System
69
Initial
6 JAN 09
5.4.3
EMCS
69
Initial
6 JAN 09
5.4.4
System Commissioning
69
Initial
6 JAN 09
5.4.5
System Measurement and Verification
69
Initial
6 JAN 09
5.5
Corrosion Control
69
Initial
6 JAN 09
5.6
Water Treatment
70
Initial
6 JAN 09
5.6.1
Water Treatment Systems
70
Initial
6 JAN 09
5.6.2
Installation Requirements
70
Initial
6 JAN 09

Page xi Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
Chapter 6
Fire Protection
71
Initial
6 JAN 09
6.0.1
Introduction
71
Initial
6 JAN 09
6.0.2
Objectives
71
Initial
6 JAN 09
6.0.3
Design Analysis
72
Initial
6 JAN 09
6.0.4
Fire Protection Building Design, Engineering, and Construction Analysis
73
Initial
6 JAN 09
6.0.5
Services and Qualifications of Fire Protection Engineers
73
Initial
6 JAN 09
6.1
Fire Protection During Construction
73
Initial
6 JAN 09
6.2
Documentation Approval and Acceptance
74
Initial
6 JAN 09
6.2.1
Preparation of Completion Documents
74
Initial
6 JAN 09
6.2.2
Building Construction Basic Criteria
74
Initial
6 JAN 09
6.2.3
Egress and Safety to Life
74
Initial
6 JAN 09
6.3
Partitions
75
Initial
6 JAN 09
6.4
Type of Construction
75
Initial
6 JAN 09
6.5
Separation Between Buildings
75
Initial
6 JAN 09
6.5.1
Special Requirements
75
Initial
6 JAN 09
6.5.2
Fire Areas
75
Initial
6 JAN 09
6.5.3
Building Height Limitations
76
Initial
6 JAN 09
6.6
Limiting Interior Fire Spread
76
Initial
6 JAN 09
6.6.1
Penetrations
76
Initial
6 JAN 09
6.7
Interior Finish
76
Initial
6 JAN 09
6.7.1
Interior Wall and Ceiling Finish
76
Initial
6 JAN 09
6.7.2
Interior Floor Finish
76
Initial
6 JAN 09
6.8
Insulation
77
Initial
6 JAN 09
6.8.1
Flame Spread – No Smoke Developed Rating Limitation
77
Initial
6 JAN 09
6.8.2
No Flame Spread or Smoke Limitation
77
Initial
6 JAN 09

Page xii Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
6.9
Roof Coverings and Roof Deck Assemblies
78
Initial
6 JAN 09
6.9.1
Roof Coverings
78
Initial
6 JAN 09
6.9.2
Roof Deck Assemblies
78
Initial
6 JAN 09
6.9.3
Roof Access
78
Initial
6 JAN 09
6.10
Fire Department Vehicle Access
78
Initial
6 JAN 09
6.10.1
Vehicle Access
78
Initial
6 JAN 09
6.10.2
All-Weather Ground Access
78
Initial
6 JAN 09
6.10.3
Access for Emergency Vehicle Response
79
Initial
6 JAN 09
6.10.4
Fire Department Connection
79
Initial
6 JAN 09
6.11
Air Handling
79
Initial
6 JAN 09
6.11.1
Corridors
79
Initial
6 JAN 09
6.11.2
Plenums
79
Initial
6 JAN 09
6.11.3
Smoke and Heat Vents
79
Initial
6 JAN 09
6.12
Plastic Pipe and Conduit
80
Initial
6 JAN 09
6.12.1
Penetrations
80
Initial
6 JAN 09
6.12.2
Prohibited Locations
80
Initial
6 JAN 09
6.13
Fire Retardant Treated (FRT) Plywood
80
Initial
6 JAN 09
6.13.1
Existing Construction
80
Initial
6 JAN 09
6.14
Automatic Fire Suppression Systems
80
Initial
6 JAN 09
6.14.1
Fire Sprinkler Coverage Requirements
80
Initial
6 JAN 09
6.14.2
System Designer Requirements
81
Initial
6 JAN 09
6.14.3
Wrench Requirement
81
Initial
6 JAN 09
6.14.4
Post-Installation Drain Requirement
81
Initial
6 JAN 09
6.14.5
Labeling & Backflow Prevention Requirements
81
Initial
6 JAN 09
6.14.6
Cross-Connection Protection
82
Initial
6 JAN 09

Page xiii Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
6.14.7
Plans and Calculations
82
Initial
6 JAN 09
6.14.8
Water Flow Testing
82
Initial
6 JAN 09
6.14.9
Installation
83
Initial
6 JAN 09
6.15
Fire Protection Standpipe System
83
Initial
6 JAN 09
6.15.1
Class I Standpipe System
83
Initial
6 JAN 09
6.15.2
Class II and Class III Standpipes
83
Initial
6 JAN 09
6.16
Fire Protection Water Supply System Evaluation
83
Initial
6 JAN 09
6.17
Fire Hydrants
84
Initial
6 JAN 09
6.18
Aircraft Hangar Fire Protection Detection and Suppression Systems
84
Initial
6 JAN 09
6.19
Fire Alarm Systems
84
Initial
6 JAN 09
6.19.1
Plans and Calculations
85
Initial
6 JAN 09
6.19.2
Installation
85
Initial
6 JAN 09
6.20
HVAC Duct Fire Detector
85
Initial
6 JAN 09
6.20.1
Equipment and Material Installed in Plenum
85
Initial
6 JAN 09
6.21
Electronic Equipment Installations
86
Initial
6 JAN 09
6.21.1
Requirements
86
Initial
6 JAN 09
6.21.2
Automatic Sprinkler Protection
86
Initial
6 JAN 09
6.21.3
Use of a Clean Agent Fire Extinguishing System
86
Initial
6 JAN 09
6.22
Air Force Requirements for New and Existing Pre-Fabricated and Site Built Structures in Aircraft Hangars
87
Initial
6 JAN 09
6.23
Commercial Kitchen Cooking Equipment Exhaust System
87
Initial
6 JAN 09

Page xiv Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
6.24
Fire Extinguishers
88
Initial
6 JAN 09
6.25
Means of Egress
88
Initial
6 JAN 09
6.25.1
Means of Egress Marking
88
Initial
6 JAN 09
6.25.2
Emergency Lighting
89
Initial
6 JAN 09
6.26
Military Family Housing
89
Initial
6 JAN 09
6.26.1
Residential Street Width
89
Initial
6 JAN 09
6.26.2
Fire Hydrants
89
Initial
6 JAN 09
6.26.3
Windows
89
Initial
6 JAN 09
6.26.4
Fire Resistant Doors, Frames, and Structural Materials
89
Initial
6 JAN 09
6.26.5
Smoke Alarms
90
Initial
6 JAN 09
6.27
Submittals
90
Initial
6 JAN 09
6.27.1
Contractor Pre-Acceptance Testing
90
Initial
6 JAN 09
6.28
Fire Hydrants
90
Initial
6 JAN 09

Page xv Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
Chapter 7
Electrical
91
Initial
6 JAN 09
7.0.1
References
91
Initial
6 JAN 09
7.1
Drawings, Specifications, and Design Requirements
91
Initial
6 JAN 09
7.1.1
Drawings
92
Initial
6 JAN 09
7.1.2
Specifications
92
Initial
6 JAN 09
7.1.3
General Design Requirements
93
Initial
6 JAN 09
7.2
Medium Voltage System Requirements
93
Initial
6 JAN 09
7.2.1
Coordination Requirements
93
Initial
6 JAN 09
7.2.2
Transmission Line System
93
Initial
6 JAN 09
7.2.3
Medium Voltage Service Connection
94
Initial
6 JAN 09
7.2.4
Underground Service Connections
94
Initial
6 JAN 09
7.2.5
Manhole Requirements
94
Initial
6 JAN 09
7.2.6
Pad-Mount Transformers
94
Initial
6 JAN 09
7.2.7
Substation Transformers
94
Initial
6 JAN 09
7.2.8
Building Service Transformers
95
Initial
6 JAN 09
7.2.9
Switches
95
Initial
6 JAN 09
7.2.10
Overcurrent Relays
95
Initial
6 JAN 09
7.2.11
Control Conductors
95
Initial
6 JAN 09
7.2.12
Equipment Pads
95
Initial
6 JAN 09
7.2.13
Switch Ducts
95
Initial
6 JAN 09
7.2.14
Metering
96
Initial
6 JAN 09
7.3
Low Voltage Systems
96
Initial
6 JAN 09
7.3.1
Conductor Material
96
Initial
6 JAN 09
7.3.2
Neutral Bus Rating
96
Initial
6 JAN 09

Page xvi Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
7.3.3
Non-Linear Load Supply Requirements
96
Initial
6 JAN 09
7.3.4
Bus Requirements
96
Initial
6 JAN 09
7.3.5
Panel board Requirement
97
Initial
6 JAN 09
7.3.6
Power Shift Requirement – Multiple Transformers
97
Initial
6 JAN 09
7.3.7
Raceways
97
Initial
6 JAN 09
7.3.8
Feeder Sizing
97
Initial
6 JAN 09
7.3.9
Conduit Grounding Requirement
97
Initial
6 JAN 09
7.3.10
Duct Bury Depth
97
Initial
6 JAN 09
7.3.11
Autotransformers
97
Initial
6 JAN 09
7.3.12
Device Wiring Requirement
98
Initial
6 JAN 09
7.4
Motors
98
Initial
6 JAN 09
7.4.1
Motor Efficiency
98
Initial
6 JAN 09
7.4.2
Phase Requirement
98
Initial
6 JAN 09
7.4.3
Power Correction
98
Initial
6 JAN 09
7.4.4
Reduce Voltage (Soft Start) Requirement
98
Initial
6 JAN 09
7.4.5
Controller Requirement
98
Initial
6 JAN 09
7.4.6
Variable Frequency Drive
99
Initial
6 JAN 09
7.5
Service Equipment
99
Initial
6 JAN 09
7.6
Grounding
99
Initial
6 JAN 09
7.7
Wiring Systems and Circuits
100
Initial
6 JAN 09
7.8
Lighting
100
Initial
6 JAN 09
7.8.1
Illumination Levels
101
Initial
6 JAN 09
7.8.2
Power Level
101
Initial
6 JAN 09
7.8.3
Light Pollution Prevention
101
Initial
6 JAN 09
7.8.4
Street Lights
102
Initial
6 JAN 09

Page xvii Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
7.8.5
Parking Lot Lights
102
Initial
6 JAN 09
7.8.6
Pedestrian Lights
102
Initial
6 JAN 09
7.8.7
Sports Lighting
102
Initial
6 JAN 09
7.8.8
Accent Lighting
102
Initial
6 JAN 09
7.8.9
Exit and Emergency Lighting
102
Initial
6 JAN 09
7.9
Generators
102
Initial
6 JAN 09
7.10
Lightning Protection
102
Initial
6 JAN 09

Page xviii Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision

Number Page Revision Date

Chapter 8
System Control and Data Acquisition (SCADA) System Standards
103
Initial
6 JAN 09
8.1
Electric Metering
103
Initial
6 JAN 09
8.1.1
Medium Voltage Requirements
103
Initial
6 JAN 09
8.1.2
Low Voltage and Facility Metering Requirements
103
Initial
6 JAN 09
8.2
Natural Gas Metering
103
Initial
6 JAN 09
8.3
Water Metering
103
Initial
6 JAN 09
8.4
Water and Wastewater System
104
Initial
6 JAN 09
8.5
Electrical Distribution
104
Initial
6 JAN 09
8.5.1
Protective Relays
104
Initial
6 JAN 09
8.5.2
Transformer Protection
104
Initial
6 JAN 09
8.5.3
PLC Requirement
104
Initial
6 JAN 09
8.6
Emergency Power Generators
104
Initial
6 JAN 09
8.7
Communications and Protocols
105
Initial
6 JAN 09
8.8
HVAC EMCS Controls
105
Initial
6 JAN 09

Page xix Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision

Number Page Revision Date

Chapter 9
Telecommunications
106
Initial
6 JAN 09

Page xx Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
Chapter 10
Environmental
107
Initial
6 JAN 09
10.1
National Environmental Policy Act (NEPA)
107
Initial
6 JAN 09
10.1.1
Environmental Impact Analysis Process (EIAP)
108
Initial
6 JAN 09
10.2
Air Quality
108
Initial
6 JAN 09
10.2.1
Air Emission Permits
108
Initial
6 JAN 09
10.2.2
Air Pollution Prevention
109
Initial
6 JAN 09
10.2.3
Fugitive Dust Minimization & Mitigation Requirements
110
Initial
6 JAN 09
10.2.4
Paint
111
Initial
6 JAN 09
10.2.5
Air Conformity Reporting Requirements
111
Initial
6 JAN 09
10.3
Solid Waste
111
Initial
6 JAN 09
10.3.1
Solid Waste Disposal
111
Initial
6 JAN 09
10.3.2
Concrete Rinsate Disposal
112
Initial
6 JAN 09
10.3.3
Solid Waste Disposal Minimization
113
Initial
6 JAN 09
10.4
Hazardous Waste
113
Initial
6 JAN 09
10.4.1
Contact Information
113
Initial
6 JAN 09
10.4.2
Project Manager Responsibilities
113
Initial
6 JAN 09
10.4.3
Land Disposal Restrictions
113
Initial
6 JAN 09
10.5
Hazardous Materials
115
Initial
6 JAN 09
10.5.1
Proponent/Contractor Requirements
115
Initial
6 JAN 09
10.5.2
Hazardous Material Authorization and Management
115
Initial
6 JAN 09
10.5.3
Hazardous Material Accounting
116
Initial
6 JAN 09
10.5.4
Non-HazMat Pharmacy-Obtained Material Reporting Requirements
116
Initial
6 JAN 09

Page xxi Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
10.5.5
Spill Response Plans
116
Initial
6 JAN 09
10.5.6
Propellant Use or Production
116
Initial
6 JAN 09
10.5.7
Used Oil and Waste Liquid Petroleum Products (WLPP) Management
116
Initial
6 JAN 09
10.5.8
Hazardous Materials within Piping Systems
116
Initial
6 JAN 09
10.5.9
Storage Tank Permit Requirements
117
Initial
6 JAN 09
10.6
Water, Wastewater, and Stormwater
118
Initial
6 JAN 09
10.6.1
Permit Requirements
118
Initial
6 JAN 09
10.6.2
EAFB Industrial Stormwater Pollution Prevention Plan (SWPPP) Compliance
118
Initial
6 JAN 09
10.6.3
Septic Tank Requirements
119
Initial
6 JAN 09
10.6.4
Well Abandonment
119
Initial
6 JAN 09
10.7
Land Use
119
Initial
6 JAN 09
10.7.1
Precision Impact Range Area (PIRA)
119
Initial
6 JAN 09
10.7.2
Air Installation Compatible Use Zone (AICUZ)
119
Initial
6 JAN 09
10.7.3
Bird Aircraft Strike Hazard (BASH) Requirements
119
Initial
6 JAN 09
10.7.4
Airfield Noise Advisory
120
Initial
6 JAN 09
10.8
Cultural Resources
120
Initial
6 JAN 09
10.8.1
Historical Facility Determination
120
Initial
6 JAN 09
10.8.2
Archeological Discovery
121
Initial
6 JAN 09
10.8.3
Cultural Resources Education
121
Initial
6 JAN 09
10.9
Environmental Restoration Program (ERP)
121
Initial
6 JAN 09
10.9.1
ERP Project Coordination
121
Initial
6 JAN 09
10.9.2
Actions Required following Contact with Potentially Contaminated Soil
122
Initial
6 JAN 09
10.10
Grading and Fill Materials
122
Initial
6 JAN 09

Page xxii Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision Number
Page Revision Date
10.10.1
Road Shoulder Grading Coordination Requirements
122
Initial
6 JAN 09
10.11
Natural Resources
122
Initial
6 JAN 09
10.11.1
Required Coordinations
123
Initial
6 JAN 09
10.11.2
Desert Tortoise Protection Requirements
123
Initial
6 JAN 09
10.11.3
Migratory Bird Protection Requirements
125
Initial
6 JAN 09
10.11.4
Bat Protection Requirements
125
Initial
6 JAN 09
10.11.5
Mohave Ground Squirrel Protection Requirements
125
Initial
6 JAN 09
10.11.6
Sensitive Plant Protection Requirements
126
Initial
6 JAN 09
10.11.7
Mesquite Tree Protection Requirements
126
Initial
6 JAN 09
10.11.8
Shrub and Joshua Tree Protection Requirements
126
Initial
6 JAN 09
10.12
Environmental Graphic Information system (GIS)
126
Initial
6 JAN 09
10.12.1
File Conformance Requirements
126
Initial
6 JAN 09
10.13
Affirmative Procurement of Environmentally Preferable Products
131
Initial
6 JAN 09

Page xxiii Revision: Initial

Paragraph or Chapter Number
Title
Page
Page Revision

Number Page Revision Date

Chapter 11
Intrusion Detection Systems
133
Initial
6 JAN 09
11.1
General
133
Initial
6 JAN 09
11.2
95SFS Design Approval Requirements
133
Initial
6 JAN 09
11.3
95ABW/CETE Design Approval Requirements
133
Initial
6 JAN 09
11.4
Post-Installation Acceptance Testing
134
Initial
6 JAN 09
11.4.1
Acceptance Test Components
134
Initial
6 JAN 09
11.5
System Activation
134
Initial
6 JAN 09
11.6
IDS Design Requirements
135
Initial
6 JAN 09
11.6.1
Control Panels
135
Initial
6 JAN 09
11.6.2
Control Panel Keyboards
136
Initial
6 JAN 09
11.6.3
General Installation Standards
136
Initial
6 JAN 09
11.6.4
Detection Loop Installation Standards
137
Initial
6 JAN 09
11.6.5
Detection Device Installation Standards
137
Initial
6 JAN 09
11.6.6
Wiring Installation Standards
138
Initial
6 JAN 09
11.6.7
Power Supply Installation Standards
138
Initial
6 JAN 09
11.6.8
Communication Installation Standards
138
Initial
6 JAN 09

Page xxiv Revision: Initial

Tables & Illustrations and Appendices
Title
Page
Page Revision

Number Page Revision Date

Table 1.2.6
LEED Checklist
4
Initial
6 JAN 09
Table 3.6
EAFB Approved Plants
37
Initial
6 JAN 09
Illustration 4.8.4
Bike path Types & Standards
60
Initial
6 JAN 09
Table 10.12.1 (1)
Edwards AFB Geographic Information System Parameters
127
Initial
6 JAN 09
Table 10.12.1 (2)
Edwards AFB Geographic Information System Requirements
128
Initial
6 JAN 09
Appendix 1
Abbreviations, Acronyms, and Key Terms
A-1
Initial
6 JAN 09
Appendix 2
Design Standard Revision History
A-2
Initial
6 JAN 09
Appendix 3
Design Standard Revision Request Form
A-3
Initial
6 JAN 09

Page xxv Revision: Initial Chapter 1.0 INTRODUCTION

The objective of the Edwards Air Force Base Design Standards is to provide guidelines necessary to achieve consistency in the design and construction of base buildings and infrastructure systems.

These Standards are written for Facilities Engineers and Architects-Engineers (A-E) who perform work for EAFB, and for those on base involved in planning or working to change or construct base facilities. The contents of the EAFB Design Standards represent base institutional knowledge derived from design, project construction management, operations and maintenance of facilities on Edwards Air Force Base. Its purpose is to clarify base-specific standards. It is not intended to dictate design solutions but to guide design decisions so that the product is in harmony with existing facilities and base expectations.

Creativity and innovation, including proposals to re-evaluate existing base standards are encouraged. However variances from the base standards require specific, written justification and approval from the Base Civil Engineer. Approval of variances should not be expected merely on the basis of performance convenience or project cost. A revision or variance request form is included in this Standard.

1.1 Executive Summary

Facilities’ design, construction, operation, and maintenance at EAFB shall be based on incorporation of industry standards, and the systematic analysis of life-cycle benefits received for the cost incurred. Design of the physical plant shall ensure that the facilities are “fit for use,” and provide facility conditions that effectively, efficiently, and safely support EAFB’s current and future mission need. In addition, sustainable design principles shall be applied from site planning to facility design, construction, and operation to ensure resource efficiency of the building and improve the health and productivity of the occupants. The safety and health of the base employees and the public, and any possible impact to the environment, shall take precedence over project issues such as performance, cost, or schedule.

These design standards are generally applicable to all disciplines on all EAFB projects. A-E design shall be both functional and cost effective. Facility design shall be tailored to fit its intended function, with emphasis on low-maintenance, energy-efficient, and energy-conscious design. Design facilities that are easily maintained, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities shall complement and enhance existing architecture at the site.

The A-E is encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contracted and built, high-performing, and aesthetically pleasing. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. In addition to the design requirements presented in these Base Design Standards, instructive information is provided to describe the sustainable building practice goals for design, construction, operation and maintenance of EAFB facilities. An A-E performing work on EAFB are encouraged to notify base PM of design best practices that are not included in these standards so that such practices may be considered for incorporation into future updates.

These standards do not normally re-state specific, required, Federal, State, Air Force, or local laws, regulations, standards, and code requirements. Reference to these specific standards within this document is done for emphasis only. Lack of reference shall not be interpreted to imply that other legal and regulatory requirements do not exist or that their satisfaction is not required.

These standards have no authority to overrule any State, Federal, or local law or regulation.

Any conflict between these Standards and other applicable standards must be brought to the attention of the CE Project Manager as soon as possible and timely resolution requested.

1.1.2 Design Standard Ownership & Revision

These Design Standards are authorized by 95ABW/CE, Mr. James Judkins. Mr. Judkins is the sole authority for revisions to this Standard. Annual revision of these Design Standards occurs in February. Comments and proposals for revision require submission for consideration NLT 15 DEC for in-cycle consideration. All proposed changes, including out-of-cycle changes must be submitted (email is preferred) to:

Mr. Brian Sponsler, Civil Engineering Technical Directorate

95ABW/CEC

Room 6, Building 3500

225 N. Rosamond Blvd

Edwards, CA

Phone (661) 275-2195

Brian.Sponsler@edwards.af.mil (email)

1.2 Design Requirements in General

1.2.1 Scope Statement for Design & Construction

A scope statement describes the basic requirements, goals, and design objectives of a project. Typically, this statement is written by Civil Engineering. The formality and detail of this scoping statement will vary depending on the size and/or complexity of the effort.

The Design Professional must strive to fully understand the purpose and intended result of the users’ scope statement in order to create solutions that properly meet the requirements of all EAFB stakeholders and enable them to propose timely and accurate value-added design improvements and suggestions and raise organizational concerns effectively during the design process.

1.2.2. Energy and Water Conservation

Edwards Air Force Base is recognized as the Command and Air Force leader in energy conservation and green-energy utilization. Edwards AFB intends to maintain that leadership and desires to achieve and be recognized as the leader in water conservation. No new construction, substantial remodeling, or large energy or water consuming system replacement will be done without connecting that facility or system into the existing Edwards EMCS/SCADA system. Water Conservation measures, capable of earning at least LEED WE Credit 1.1 (Water Conserving Landscaping) and LEED WE Credit 3.1 (20% Wastewater reduction) are to be designed into and implemented on all new construction or substantial remodeling projects.

1.2.3 Utility and Water Metering Requirements

All new utility and water installations must be metered. Metering is required at least the individual facility level, including Military Family Housing Units. Sub-metering within facilities is required if necessary if required to determine energy and water use across organizational lines, or if significant process energy or water use differences exist. Meters must be remotely readable and compatible and connected with our current EMCS-SCADA system.

1.2.4 ADA Accessibility & Compliance

Edwards Air Force Base maintains compliance with all legal requirements of the Americans with Disabilities Act (ADA). All building constructions and renovations must meet all ADA standards as specified by the 2006 International Building Code and the 2007 California Building Code. In the event of conflict, the code standard resulting in the greatest accommodation will apply. Any military or special-use exclusions, consistent with the Act must be noted and documented. See also Paragraph 2.6.16.

1.2.5 EMCS/SCADA Integration

The HVAC and lighting systems of many buildings on Edwards Air Force Base are currently integrated into our base-wide EMCS/SCADA system The operating characteristics of existing and new equipment and the connectivity of these buildings to the EMCS/SCADA system must not be diminished by any building revisions.

Facilities not currently integrated into the base-wide EMCS/SCADA system undergoing significant HVAC upgrades or large system replacements must include full and effective system integration as part of the upgrade or replacement.

1.2.6 Commitment to Sustainable Design

Edwards Air Force Base is committed to sustainable design in all its aspects. The LEED® Green Building Rating System developed by the United States Green Building Council (USGBC) is the metric for determining satisfaction of sustainable design goals. The LEED® project checklist provided as Table 1.2.6 is to be completed prior to design to identify achievable project goals, during design to confirm goal satisfaction, and during and post construction to determine final satisfaction. This checklist is to be kept in the project folder. Satisfaction of the criteria of this checklist must be determined in accordance with the detailed requirements of the USGBC New Construction and Major Renovation Reference Guide, Second Edition. Electronic copies of this checklist are available and recommend for ease of use.

Table 1.2.6

Facility Construction

LEED Checklist

Instructions to Programmer/Project Planner:

The points listed below are either USGBC LEED-certification pre-requisites (indicated by a "Y") or are having been selected as normally achievable with ordinary engineering effort. Obviously, each project is unique.

Not all of the pre-selected points will be achievable on every project. Additional points will be achievable on most. Attention to design project scope is necessary to identify the maximum number of points available on each programmed project. Use the LEED Manual for EAFB Programming/Planning Effort to determine the credits applicable to this project and indicate and use the pull-down menus to indicate the points required to be earned by each Credit.

If 26 points or more cannot be achieved, contact the CE LEED

Team at 275-2195 for coordination.
LEED Credit Points Programmed

LEED Team Coordination (if <26)

LEED Credit Points Achieved

Instructions to Project Manager

Your project is has been programmed to meet the USGBC LEED Credit points indicated by a "Y" or by a number below. Attainment of these Credit points will require product specification and management efforts; therefore you must be familiar with the exact of each Credit. If following the receipt of this project you determine that some noted Credit points are not obtainable or that other Credit points are, you may revise this Checklist if it results in no-net-loss of Credit points.

If the programmed Credit points cannot be achieved, contact the CE LEED Coordinator at 275-2195 for coordination.

Project Number

Project Name

Table 1.2.6 (continued)

0
0
0

Sustainable Sites

Comments

See Para(s).

Y

Prereq 1
Construction Activity Pollution Prevention
Reqd
Checklist requirement of AF 813
Credit 1
Site Selection
1
Normally met at EAFB unless site is within a flood plain or within habitat not covered by a biological opinion.
1.3
Credit 2
Development Density & Community Connectivity
1
Not normally achievable at EAFB
1.3
Credit 3
Brownfield Redevelopment
1
Applicable if development is on IRP or similar site.
1.3
Credit 4.1
Alternative Transportation, Public Transportation Access
1
Not achievable at EAFB
1.3
Credit 4.2
Alternative Transportation, Bicycle Storage & Changing Rooms
1
Requires bicycle rack & designated changing rooms, examine existing or planned shower construction, distance requirements from facility entrance apply.
3.19 4.7.10 4.8.4
Credit 4.3
Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
1
Requires provision of designated preferred parking spaces for low-emitting & Fuel-Efficient Vehicles.
4.7.x
Credit 4.4
Alternative Transportation, Parking Capacity
1
Parking Capacity must be determined iaw AFH 32-1084 and provision must not exceed authorized amounts. Use existing parking whenever possible.
4.7
Credit 5.1
Site Development, Protect or Restore Habitat
1
Significant restrictions on disturbed areas limits construction techniques, laydown, and storage areas. See Guide for exact restrictions
1.3.4

3.6

Credit 5.2
Site Development, Maximize Open Space
1
Met by requirement of para. 3.1.1.
3.1.1
Credit 6.1
Stormwater Design, Quantity Control
1
New Construction increasing the impervious footprint of a site must not result in increased stormwater runoff. This is normally achieved with the use of water gardens and other landscape techniques. Requires runoff calculations. Use for all larger projects and larger site developments.
4.4, 10.6, 4.6.1, 4.7.16
Credit 6.2
Stormwater Design, Quality Control
1
New Construction normally increases the impervious footprint of a site, resulting in stormwater runoff that degrades receiving stream quality. Mitigation may be achieved by incorporation of water gardens and other landscape techniques which slow & capture the runoff on-site. Downstream protection measures may also be required.
4.4, 10.6, 4.6.1, 4.7.16
Credit 7.1
Heat Island Effect, Non-Roof
1
Requires the use of shade, high albedo pavement, or open-grid paving for at least 50% of site hardscape.
3.1.2
Credit 7.2
Heat Island Effect, Roof
1
Requires the use of high albedo roofing.
2.4
Credit 8
Light Pollution Reduction
1
Exterior lighting must be zoned iaw IESNA RP-33 standards, cut-off lighting fixtures, and positioning of interior luminares away from windows.
7.8
Yes
?
No
0
0
0
Water Efficiency
5 Points
Credit 1.1
Water Efficient Landscaping, Reduce by 50%
1
Specify Xeriscape. Use of turf must be minimized.
3.2
Credit 1.2
Water Efficient Landscaping, No Potable Use or No Irrigation
1
No water use (past immediate establishment needs) allowed in landscaping.
3.2
Credit 2
Innovative Wastewater Technologies
1
May be applicable if treated wastewater (purple pipe) is available at site.
3.9.4
Credit 3.1
Water Use Reduction, 20% Reduction
1
Applies to bathroom uses only. Normally available if 1-pint urinals, 1.2 gpf toilets, low flow faucets and showerheads are specified.
2.6.15
Credit 3.2
Water Use Reduction, 30% Reduction
1
May be available. Applies to bathroom uses only.
2.6.15
0
0
Energy & Atmosphere
17 Points
Prereq 1
Fundamental Commissioning of the Building Energy Systems
Required
Recommended for projects with HVAC capacity of up to 50 tons. Assume 5% addition in HVAC component costs for programming purposes.
5.4.4
Prereq 2
Minimum Energy Performance
Required
For new construction, met by California Title 24 Requirements
N/A
Prereq 3
Fundamental Refrigerant Management
Required
Met by current practice
N/A
0
0
0
Credit 1
Optimize Energy Performance
1 to 10
Energy performance is measured as reduction from the Minimum (Title 24) requirements above.

Energy modeling is required. Seek input of LEED Energy Coordinator (Jim Golden) for determination of appropriate savings for projects with HVAC costs in excess of $100k.

10.5% New Buildings or 3.5% Existing Building Renovations
1
14% New Buildings or 7% Existing Building Renovations
2
17.5% New Buildings or 10.5% Existing Building Renovations
3
21% New Buildings or 14% Existing Building Renovations
4
24.5% New Buildings or 17.5% Existing Building Renovations
5
28% New Buildings or 21% Existing Building Renovations
6
31.5% New Buildings or 24.5% Existing Building Renovations
7
35% New Buildings or 28% Existing Building Renovations
8
38.5% New Buildings or 31.5% Existing Building Renovations
9
42% New Buildings or 35% Existing Building Renovations
10
Credit 2
On-Site Renewable Energy
1 to 3
Applicable only if the project includes on-site generation. Does not apply to renewable energy generated off-site, such as our Green Power. Green Power is accounted for in EA Credit 6.
2.5% Renewable Energy
1
7.5% Renewable Energy
2
12.5% Renewable Energy
3
Credit 3
Enhanced Commissioning
1
Highly recommended on HVAC installations of 50 tons or more.
5.4.4
Credit 4
Enhanced Refrigerant Management
1
Refrigerants with Ozone Depletion Potential and Global Warming Potential and equipment with charge size and leakage rates that when calculated in accordance with the Credit requirements do not exceed 100 reqd for large system per paragraph 5.0.1.
5.0.1
Credit 5
Measurement & Verification
1
Highly recommended for all MILCON & large HVAC projects with HVAC capacity of 50 tons or more.
5.4.5
Credit 6
Green Power
1
Met by Base-wide Green Power purchases, all projects.
N/A
Yes
?
No
Table 1.2.6 (continued)
0
0
0
Materials & Resources
13 Points

Y

Prereq 1
Storage & Collection of Recyclables
Required
All new construction and facility remodels require the installation of centralized recycling centers, similar to those in Bldg 3500.
10.3.1.5
Credit 1.1
Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
1
Applicable to remodeling projects. Not applicable to small-scale renovation projects.
10.8
Credit 1.2
Building Reuse, Maintain 100% of Existing Walls, Floors & Roof
1
Applicable to remodeling projects. Not applicable to small-scale renovation projects.
10.8
Credit 1.3
Building Reuse, Maintain 50% of Interior Non-Structural Elements
1
Applicable to remodeling projects. Not applicable to small-scale renovation projects.
10.8
Credit 2.1
Construction Waste Management, Divert 50% from Disposal
1
Met if Construction Waste is handled by Benz Company. If not, records must be kept in accordance with USGBC MR 3 requirements.
10.3
Credit 2.2
Construction Waste Management, Divert 75% from Disposal
1
May be met if Construction Waste is handled by Benz Company. If not, records must be kept in accordance with USGBC MR 3 requirements.
10.3
Credit 3.1
Materials Reuse, 5%
1
Opportunities best if recycled asphalt or concrete used.
10.3.1.8
Credit 3.2
Materials Reuse,10%
1
Opportunities best if recycled asphalt or concrete used.
10.3.1.8
Credit 4.1
Recycled Content, 10% (post-consumer + ½ pre-consumer)
1
Specify use of recycled materials whenever possible. Carpets should always be made of recycled content.
10.13
Credit 4.2
Recycled Content, 20% (post-consumer + ½ pre-consumer)
1
Specify use of recycled materials whenever possible. Carpets should always be made of recycled content.
10.13
Credit 5.1
Regional Materials, 10% Extracted, Processed & Manufactured Regionally
1
PCC & ACC is most commonly a regional material. See Guidebook for calculation basis.
N/A
Credit 5.2
Regional Materials, 20% Extracted, Processed & Manufactured Regionally
1
PCC & ACC is most commonly a regional material. See Guidebook for calculation basis.
N/A
Credit 6
Rapidly Renewable Materials
1
Specify use of rapidly renewable materials whenever possible.
2.6.5
Credit 7
Certified Wood
1
Highly encouraged for hardwood applications. Certifying Body is Forest Resource Council (FRC)
2.6.5 2.6.10 2.6.11.2
Yes
?
No
0
0
0
Indoor Environmental Quality
15 Points

Y

Prereq 1
Minimum IAQ Performance
Required
Met by required satisfaction of ASHRAE 62.1-2004.

Y

Prereq 2
Environmental Tobacco Smoke (ETS) Control
Required
Met by existing smoking prohibitions.
3.21
Credit 1
Outdoor Air Delivery Monitoring
1
Credit 2
Increased Ventilation
1
Credit 3.1
Construction IAQ Management Plan, During Construction
1
Credit 3.2
Construction IAQ Management Plan, Before Occupancy
1
Credit 4.1
Low-Emitting Materials, Adhesives & Sealants
1
Requires use of low-VOC adhesives & sealants.
2.6.2
Credit 4.2
Low-Emitting Materials, Paints & Coatings
1
Requires use of low-VOC paints and coatings
2.6.2
Credit 4.3
Low-Emitting Materials, Carpet Systems
1
Requires use of low-VOC carpets and pads.
2.6.2
Credit 4.4
Low-Emitting Materials, Composite Wood & Agrifiber Products
1
Requires use of low-VOC plywood and composites.
2.6.2
Credit 5
Indoor Chemical & Pollutant Source Control
1
Available if copy rooms and other chemical use areas may be segregated with non-shared ventilation systems.
Credit 6.1
Controllability of Systems, Lighting
1
Met by satisfaction of Title 24 Energy Standards
Credit 6.2
Controllability of Systems, Thermal Comfort
1
Met by satisfaction of Title 24 Energy Standards
Credit 7.1
Thermal Comfort, Design
1
Met by combination of window patterns and control systems. Specify design in accordance with USGBC EQ 7.1 Credit requirements.
Credit 7.2
Thermal Comfort, Verification
1
Requires post-construction occupant survey to be accomplished by LEED Coordination Team.
Credit 8.1
Daylight & Views, Daylight 75% of Spaces
1
Specify calculation of daylight percentage iaw USGBC procedures by designer.
2.5.6.2

2.5.6.3

Credit 8.2
Daylight & Views, Views for 90% of Spaces
1
Specify calculation of daylight percentage iaw USGBC procedures by designer.
2.5.6.2

2.5.6.3

?
No
0
0
0
Innovation & Design Process
5 Points
Credit 1.1
Innovation in Design: Provide Specific Title
1
Additional points are available in several categories for performance beyond the maximum criteria. Points may also be awarded for particular innovations on a case-by-case basis.
Credit 1.2
Innovation in Design: Provide Specific Title
1
Credit 1.3
Innovation in Design: Provide Specific Title
1
Credit 1.4
Innovation in Design: Provide Specific Title
1
Credit 2
LEED® Accredited Professional
1
Available only if a LEED AP was significantly involved in the project.
Yes
?
No
0
0
0
Project Totals (pre-certification estimates)
69 Points

Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points

1.2.7 Design Progress and Submission

Specific design requirement and submission requirements are as required by contract. Timely submission of contract-required design and construction plans is essential to the achievement of a fully cooperative design that maximizes customer satisfaction.

1.3 Project Siting and Site Construction Limit Requirements

1.3.1 General

Prior to design, construction projects are reviewed specifically to determine the best acceptable site. Often a project is granted siting approval subject to a variety of conditions which must be adhered to in the design and construction of the project.

The site parameters vary with each project, including such issues as access, parking considerations, utility relocations, flood plain issues, noise proofing requirements, environmental concerns, and others. To determine the specific restrictions associated with each project site the A-E, with the CE Project Manager, must contact the 95 ABW/CETM Base Community Planner and the Base Architect, and the base PM. Any change in the site location of a facility, even those minor in nature, must be coordinated with the base PM, base Community Planner and the Base Architect.

The preservation of the natural resources of EAFB, including the preservation of undisturbed desert areas within the main base cantonment area requires the minimization of laydown and construction assembly and storage areas, as well as strict limitations on the area of construction-related disturbance on the site.

1.3.2 Construction Facilities and Job Site Standards

EAFB may limit the number and location of various construction and office trailers, temporary structures, and open storage and staging areas used by contractors. These facilities are to be clean, in good condition, and free of rust or surface deterioration. Temporary-use trailers shall match or complement the base color standards. Specifications to enforce these requirements shall be included in each project.

1.3.3 Contractor Storage & Laydown Areas

When projects are under design or in planning at EAFB, specific areas will be designated where contractors locate a construction office trailer and stockpile tools and materials. These areas will be designated on project drawings or in project contract documents, and will be located as conveniently as possible to the work site where visual impact will be minimal. The base PM will review all locations proposed for on-site construction office trailers and approve the location as a pre-construction conference agenda item.

The following specific requirements will apply:

Portable toilets needed by the contractor will be permitted at the construction site at a location that minimizes the visual impact, and shall be within the construction fence.

When fencing is required to restrict access, impact to construction work, or provide site safety, fencing shall consist of conventional chain link fence and screened to match base color standard.

All required signs for construction shall be combined into a single on-site sign. This sign shall include information on the standard Corps of Engineers project information (for those projects where applicable) and the contractor's business name. Mandatory "Hard Hat Area" signs will be posted as safety regulations dictate.

Construction office trailers shall be in good repair, of minimum size, and a color to match or complement the base color scheme.

1.3.4. Project Site Disturbance Limits

To help meet LEED Credit SS 5.1, Protect or Restore Habitat, all site disturbances during and throughout construction on previously undisturbed sites must be limited to:

40’ beyond the building perimeter

10’ beyond surface walkways, patios, surface parking, and utilities less than 12” in diameter

15’ beyond primary roadway curbs and main utility branch trenches

EXCEPTION – If larger staging areas are required to limit compaction on previously constructed areas with permeable surfaces (such as pervious paving, stormwater detetention facilities, and playing fields) disturbance to up to 25’ is allowed.

1.3.5 Energy Conservation

The drawings and specifications shall require contractors to use energy on all EAFB construction projects in a responsible manner. Requirements shall include, but are not limited to the following:

Minimize idling of construction equipment

Turn off lights when an area is not occupied

Reduce heat when an area is not occupied.

Provide enclosures to prevent unnecessary heat loss from building envelope.

Minimize water use.

1.4 CADD (Computer Aided Design and Drafting) Requirements

1.4.1 General

The as-built drawings shall be delivered in the form of digital media, plots, and related documents to comprise a complete set of drawings for evaluation and approval to the base PM. All dimensions shall be expressed in inch-pound (English Imperial) and Standard International (SI) metric units.

1.4.2 Drawings/Plots

Red-lined as-built drawings will be developed and submitted on 30”x42” sheets. The as-built drawings shall be complete and detailed drawings, and shall accurately depict the as-constructed or “as-built” conditions of the project. All reproducible material shall have sufficient contrast to reproduce clear and concise prints. All red-lined as-built drawings shall be stamped “AS-

BUILT” and must be signed and dated by the contractor, to reflect dates as-built corrections were made to the digital graphic as-built files.

1.4.3 Digital Files

Where A-E contracts include inspection of construction, all changes made to the design during construction shall be indicated in the CADD drawing files. The revised CADD files must be a true representation of the final as-built construction. All graphic information on consolidated composite drawings (CCDs) and shop drawings provided by the construction contractor shall be merged into the CADD files. Where CADD graphics are duplicated on CCDs or shop drawings, the duplicates will be deleted leaving a single copy of each graphic element in the revised CADD file. The revised CADD files shall be delivered to the Base Civil Engineer within 90 days after completion of construction.

1.4.3.1 Digital Graphic Files:

The completed “as-built” drawings which…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .