IDIQ PWS Attch 4 NorCal Perf Obj Def BECOS vf1.docx

DOCX document 33 KB Posted

Attached to
BRAC Environmental Construction Optimization Services (BECOS) - NorCal Region Federal contract opportunity
Solicitation number
FA8903-20-R-0014
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

This document defines performance objectives for a federal contract to provide BRAC Environmental Construction Optimization Services in the NorCal region. The contract will require the contractor to achieve Response Complete, Remedial Action-Operation, and Site Closeout at various sites through continuation and optimization of established remedies, development and review of performance models, regulatory documentation, and demonstration of progress toward cleanup goals within the period of performance. The contractor must complete restoration activities, obtain regulatory no further action determinations, and ensure no additional Air Force financial liabilities exist at sites achieving Site Closeout. Emerging contaminants may be excluded from regulatory concurrence requirements if other contaminant pathways demonstrate no further required activities. The related solicitation is issued by the Air Force Materiel Command Installation Contracting Agency for the identified environmental services.

View the file

Other files for this federal contract opportunity

Other files attached to BRAC Environmental Construction Optimization Services (BECOS) - NorCal Region, newest first.
File Type Posted
202000401_FA8903-20-R-0014 NorCal RFP Questions and Answers UPDATED.xlsx XLSX spreadsheet
20200323_FA890320R0014_BECOS_NorCal_Section_L-Amendment 1.docx DOCX document
20200109_NorCal TO2 Price Model-Amendment 1.xlsx XLSX spreadsheet
FA890320R0014 NorCal Amendment Changes.docx DOCX document
20200313_FA890320R0014_NorCal_BECOS_Section_M v3 Amendment 1.docx DOCX document
Solicitation Amendment FA890320R00140001 SF 30.pdf PDF
20200317_20-R-0014 NorCal RFP Questions and Answers Set 2 of 2.xlsx XLSX spreadsheet
FA890320R0014_BECOS NorCal RFP Questions and Answers Set 1 of 2_03102020.xlsx XLSX spreadsheet
BECOS IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC).pdf PDF
BECOS IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR).pdf PDF
IDIQ PWS NorCal BECOS vf5.docx DOCX document
BECOS IDIQ DD1423 CDRLS EXHIBIT A007-A008-A009 (ENVR).pdf PDF
TO 2 PWS Attch 2 Castle Base Spec Req NorCal BECOS vf2.docx DOCX document
20200131_FA8903-20-R-0014_BECOS RFP Questions and Answers Template.xlsx XLSX spreadsheet
Solicitation - FA890320R0014 v2.pdf PDF
BECOS IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT).pdf PDF
IDIQ PWS Attch 2 NorCal Acr and Def BECOS vf2.docx DOCX document
BECOS IDIQ DD1423 CDRLS EXHIBIT B001 (MISC).pdf PDF
WA20190017 15Nov2019 Spokane Building.pdf PDF
CA20190018 24Jan2020 Merced Santa Clara Building, Heavy.pdf PDF
BECOS IDIQ DD1423 CDRLS EXHIBIT B005-B006-B007 (ADMN).pdf PDF
CA20190007 24Jan2020 Sacramento Building, Heavy.pdf PDF
IDIQ PWS Attch 3 NorCal Del Rev Process BECOS vf1.docx DOCX document
TO 1 PWS NorCal BECOS vf3.docx DOCX document
BECOS IDIQ DD1423 CDRLS EXHIBIT A005-A006-A011 (CMAN).pdf PDF
TO 2 CDRLs Exhibit A B NorCal BECOS vf2.docx DOCX document
TO 2 PWS NorCal BECOS vf3.docx DOCX document
20200122_NorCal FFP FBLR Tables v2.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Mather Base Spec Req NorCal BECOS vf3.docx DOCX document
BECOS IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN).pdf PDF
TO 1 CDRLs Exhibit A B NorCal BECOS vf2.docx DOCX document
20200109_NorCal TO2 Price Model jb - Copy.xlsx XLSX spreadsheet
20200203_FA890320R0014_NorCal_BECOS_Section_M v3.docx DOCX document
IDIQ PWS Attch 1 NorCal Site List BECOS vf2.xlsx XLSX spreadsheet
TO 2 PWS Attch 1 NorCal Site List BECOS vf5.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 McClellan Base Spec Req NorCal BECOS vf4.docx DOCX document
BECOS IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC).pdf PDF
20200203_NorCal IDIQ_Sched B_CLIN Structure v2.xlsx XLSX spreadsheet
20191217_Compensation Plan Model.xlsx XLSX spreadsheet
20200203_FA890320R0014_BECOS_NorCal_Section_L v4.docx DOCX document
BECOS IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT).pdf PDF
WA20190076 1Nov2019 Spokane Heavy.pdf PDF
BECOS IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT).pdf PDF
BECOS IDIQ DD1423 CDRLS EXHIBIT A013 (MISC CONT).pdf PDF
20200131_FA890320R0014_BECOS_Relevancy_PPQ.docx DOCX document
20200131_FA890320R0014_BECOS_Relevancy_Matrix v2.docx DOCX document
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

- Former Plattsburgh AFB PBR RFI - SOO Enclosure 5 Acronyms and Definitions

NorCal Region Attachment 4 5 December 2019

Performance Objectives (PO) Definitions and Requirements

PO - LTM:

Long-term Management LTM is defined as environmental monitoring, review of site conditions, and maintenance of a remedial action to ensure continued protection as designed once a site achieves response complete. Long-term management includes the operations and maintenance measures required to maintain the effectiveness of response actions and should be used until no further response actions are appropriate or anticipated. Examples of long-term management include landfill cap maintenance, leachate disposal (i.e., disposing of undesirable liquid material that drains from land or stockpiled material), fence monitoring and repair, performance of 5-year reviews, and land use control maintenance. [DoDI 4715.07, DERP, May 21, 2013]

Requirements for this objective include:

· Continuation of established activities required to ensure compliance with existing remedies as documented in the decision document (DD) at sites that have achieved RC, excluding emerging contaminants unless otherwise specified (e.g., landfill cap maintenance, groundwater monitoring, LUC inspection/monitoring/reporting, and Five-Year Reviews).

· LTM includes implementing cost-saving approaches where feasible.

· LTM may also include sites where activities are being completed by the AF or another contractor and the only remaining requirements are LTM.

PO – RA-O:

Remedial Action–Operation RA-O is defined as the period of time that a selected remedy must operate before achieving remedial action objectives. At the end of this phase of work, the response is complete. [DoDI 4715.07, DERP, May 21, 2013]

Requirements for this objective include:

· Continuation of remedial actions in accordance with the DD or current approach and optimization of the established remedy to continue to advance the site toward closure where feasible and cost effective to advance sites toward completion.

· Development and establishment of a performance model, including strategy, metrics, and model for the site which illustrates the anticipated progress towards achieving the proposed remediation goal by year during the PoP. Some possible optimization endpoints are: a) reduction in plume size exceeding cleanup levels, b) reduction in concentrations exceeding cleanup levels in specified wells, and c) reduction in monitoring requirements and other efforts.

· Review of monitoring data against the performance model to demonstrate adequate progress and measure the success of remedial action, as well as identify the need for alternative action where necessary, during the PoP.

· Demonstration that the proposed remediation goal has been achieved during the PoP using the performance metrics.

· Documentation of the remaining activities and a realistic schedule to achieve RC or SC, excluding emerging contaminants, after the PoP.

· Recommendations to accelerate site completion where feasible.

PO - RC:

Response Complete RC is defined as a milestone signifying that the DoD Component has met the remedial action objectives for a site, documented the determination, and sought regulatory agreement. Response complete signifies that DoD has determined at the end of the preliminary assessment or site inspection or remedial investigation that no additional response action is required; achieved remedy in place and the required remedial action-operation has achieved the remedial action objectives; or where there is no remedial action-operation phase, then the remedial action-construction has achieved the remedial action objectives. Long-term management may occur after response complete is achieved. [DoDI 4715.07, DERP, May 21, 2013]

Requirements for this objective include:

· Completion of all restoration activities necessary to achieve cleanup at sites where UU/UE is not the objective for remedial action and in accordance with applicable DDs and regulatory requirements for all contaminants (except emerging contaminants as noted below) and pathways associated with the site. This includes the removal and decommissioning of any remediation system or monitoring well network not required for LTM and site restoration consistent with the surrounding area, unless specifically excluded by the AF.

· Written documentation from the regulatory agencies of NFA with restrictions or equivalent determination with respect to the contamination resulting from the site with the exception of LTM (such as monitoring, maintenance, LUCs, and Five-Year Reviews). Where regulatory acceptance/concurrence cannot be obtained within the PoP, provide documents acceptable to the AF to achieve RC, in accordance with applicable DDs, laws, and regulations.

· Optimization of the established remedy where feasible and cost effective to achieve RC.

· Development and establishment of a performance model, including strategy, metrics, and model for the site, which illustrates the anticipated progress towards achieving RC by year during the PoP.

· Review of monitoring data against the performance model to demonstrate adequate progress and measure the success of remedial action, as well as identify the need for alternative action where necessary, during the PoP.

· For sites with both emerging contaminants and non-emerging contaminants, the Contractor can achieve RC as defined above with the exception of regulatory concurrence within the PoP for non-emerging contaminants where it can be demonstrated that no further activities are required for non-emerging contaminants associated with the site with the exception of LTM. The same conditions for achieving RC would apply to non-emerging contaminants contamination.

PO - SC:

Site Closeout The stage at which the DoD has completed active management and monitoring at an environmental restoration site, and no additional environmental restoration funds will be expended at the site. SC occurs when environmental restoration goals have been achieved that allow UU/UE of the property (e.g., no further LTM, including LUCs, is required). Also may be a no further action. [DoDM 4715.20, March 9, 2012] Requirements for this objective include:

· Completion of all restoration activities necessary to achieve cleanup resulting in unrestricted use/unlimited exposure (UU/UE) and in accordance with applicable DDs and regulatory requirements for all contaminants (except emerging contaminants as noted below) and pathways associated with the site. This includes the removal and decommissioning of any remediation system or monitoring network and site restoration consistent with the surrounding area, unless specifically excluded by the AF.

· Written documentation from the regulatory agencies of no further action (NFA) or equivalent determination with respect to contamination resulting from the site that includes no further monitoring, maintenance, LUCs, or Five-Year Reviews. Where regulatory acceptance/concurrence cannot be obtained within the PoP, provide closeout documents acceptable to the AF to achieve closeout in accordance with applicable DDs, laws, and regulations.

· Demonstrating to the AF that no additional known AF financial liabilities associated with the site exist (e.g., wells and systems decommissioned, site restored, no further LUC responsibilities that could generate costs to the AF).

· Optimization of the established remedy where feasible and cost effective to achieve SC.

· Development and establishment of a performance model, including strategy, metrics, and model for the site which illustrates the anticipated progress towards achieving SC by year during the PoP.

· Review of monitoring data against the performance model to demonstrate adequate progress and measure the success of remedial action, as well as identify the need for alternative action where necessary, during the PoP.

· For sites with both emerging contaminants and non-emerging contaminants, the Contractor can SC as defined above with the exception of regulatory concurrence within the PoP for non-emerging contaminants associated with the site where it can be demonstrated that no further activities are required for non-emerging contaminants. The same conditions for achieving SC would apply to non-emerging contaminants.

File details come from the government source that posted it. Updated .