20200131_FA890320R0014_BECOS_Relevancy_PPQ.docx

DOCX document 41 KB Posted

Attached to
BRAC Environmental Construction Optimization Services (BECOS) - NorCal Region Federal contract opportunity
Solicitation number
FA8903-20-R-0014
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

This document contains a past performance questionnaire template related to the BRAC Environmental Construction Optimization Services solicitation for the NorCal region issued by the Department of the Air Force Materiel Command. The questionnaire collects information about a contractor's past work on a federal contract, including contract details, customer information, and performance ratings in areas such as program management, regulatory interaction, analysis and data management. Respondents are asked to provide narrative explanations for any marginal or unsatisfactory ratings. The related solicitation seeks proposals for BRAC environmental construction optimization services supporting bases in the NorCal region. Offerors are advised to review the attached solicitation documents for full details.

View the file

Other files for this federal contract opportunity

Other files attached to BRAC Environmental Construction Optimization Services (BECOS) - NorCal Region, newest first.
File Type Posted
202000401_FA8903-20-R-0014 NorCal RFP Questions and Answers UPDATED.xlsx XLSX spreadsheet
20200313_FA890320R0014_NorCal_BECOS_Section_M v3 Amendment 1.docx DOCX document
Solicitation Amendment FA890320R00140001 SF 30.pdf PDF
FA890320R0014 NorCal Amendment Changes.docx DOCX document
20200109_NorCal TO2 Price Model-Amendment 1.xlsx XLSX spreadsheet
20200323_FA890320R0014_BECOS_NorCal_Section_L-Amendment 1.docx DOCX document
20200317_20-R-0014 NorCal RFP Questions and Answers Set 2 of 2.xlsx XLSX spreadsheet
FA890320R0014_BECOS NorCal RFP Questions and Answers Set 1 of 2_03102020.xlsx XLSX spreadsheet
20200203_FA890320R0014_BECOS_NorCal_Section_L v4.docx DOCX document
20191217_Compensation Plan Model.xlsx XLSX spreadsheet
20200203_NorCal IDIQ_Sched B_CLIN Structure v2.xlsx XLSX spreadsheet
BECOS IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT).pdf PDF
WA20190076 1Nov2019 Spokane Heavy.pdf PDF
BECOS IDIQ DD1423 CDRLS EXHIBIT A013 (MISC CONT).pdf PDF
BECOS IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT).pdf PDF
20200131_FA890320R0014_BECOS_Relevancy_Matrix v2.docx DOCX document
IDIQ PWS Attch 3 NorCal Del Rev Process BECOS vf1.docx DOCX document
BECOS IDIQ DD1423 CDRLS EXHIBIT B005-B006-B007 (ADMN).pdf PDF
CA20190018 24Jan2020 Merced Santa Clara Building, Heavy.pdf PDF
CA20190007 24Jan2020 Sacramento Building, Heavy.pdf PDF
TO 1 PWS NorCal BECOS vf3.docx DOCX document
BECOS IDIQ DD1423 CDRLS EXHIBIT A005-A006-A011 (CMAN).pdf PDF
TO 2 PWS NorCal BECOS vf3.docx DOCX document
20200122_NorCal FFP FBLR Tables v2.xlsx XLSX spreadsheet
TO 2 CDRLs Exhibit A B NorCal BECOS vf2.docx DOCX document
TO 2 PWS Attch 2 Mather Base Spec Req NorCal BECOS vf3.docx DOCX document
BECOS IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN).pdf PDF
TO 1 CDRLs Exhibit A B NorCal BECOS vf2.docx DOCX document
20200109_NorCal TO2 Price Model jb - Copy.xlsx XLSX spreadsheet
20200203_FA890320R0014_NorCal_BECOS_Section_M v3.docx DOCX document
IDIQ PWS Attch 1 NorCal Site List BECOS vf2.xlsx XLSX spreadsheet
TO 2 PWS Attch 1 NorCal Site List BECOS vf5.xlsx XLSX spreadsheet
BECOS IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC).pdf PDF
TO 2 PWS Attch 2 McClellan Base Spec Req NorCal BECOS vf4.docx DOCX document
TO 2 PWS Attch 2 Castle Base Spec Req NorCal BECOS vf2.docx DOCX document
BECOS IDIQ DD1423 CDRLS EXHIBIT A007-A008-A009 (ENVR).pdf PDF
BECOS IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC).pdf PDF
BECOS IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR).pdf PDF
IDIQ PWS NorCal BECOS vf5.docx DOCX document
20200131_FA8903-20-R-0014_BECOS RFP Questions and Answers Template.xlsx XLSX spreadsheet
Solicitation - FA890320R0014 v2.pdf PDF
BECOS IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT).pdf PDF
IDIQ PWS Attch 2 NorCal Acr and Def BECOS vf2.docx DOCX document
BECOS IDIQ DD1423 CDRLS EXHIBIT B001 (MISC).pdf PDF
WA20190017 15Nov2019 Spokane Building.pdf PDF
IDIQ PWS Attch 4 NorCal Perf Obj Def BECOS vf1.docx DOCX document
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8903-20-R-0014

NorCal Region Past Performance Questionnaire

Past Performance Questionnaire Record Solicitation BECOS

Section 1: Contract Identification A. Contractor (Company/Division):

B. Contractor Cage Code:

C. Contract Specifics:

1. Contract or Task Order Number:

2. Contract Type (e.g. firm-fixed-price, CR, etc):

3. Period of Performance:

4. Geographic Location of work:

5. Contract Dollar Value: $

6. Description/scope of work performed:

7. Contractor’s Role: ☐ Prime Contractor ☐ Subcontractor

Section 2: Customer/Agency Identification

A. Customer/Agency name:

B. Primary Point of Contact:

1. Primary Name:

2. Primary Office:

3. Primary Address:

4. Primary Telephone:

C. Other suggested points of contact:

Section 3: Performance Areas:

In the tables below, indicate the rating that most accurately describes the contractor’s performance or situation by placing an “X” in the appropriate block to the right of each question. Provide supporting information in the remarks space provided. Attach additional pages if more space is needed. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF M or U. The performance rating scale is defined as follows:

Code Performance Rating

E EXCEPTIONAL – Performance meets contractual requirements and exceeds many requirements to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

V VERY GOOD – Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

S SATISFACTORY – Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

M MARGINAL – Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

U UNSATISFACTORY – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

N/A NOT APPLICABLE – Unable to provide a rating. Contract did not include performance for this element, performance was not observed, or information was not available. Do not know.

1. Program Management and Quality Assurance The Contractor:

E
VG
S
M
U
N/A

A. Provided documents, technical plans, and reports accurate, timely and complete and with demonstrated quality. (did not require excessive revision)

B. Performed site work in compliance with required and applicable regulations. (such as, health and safety, ARARs, environmental, OSHA, state, federal, professional certifications and registrations)

C. Performed record of decision, decision documents, feasibility studies and / or conceptual site models preparation and amendments timely, as required, and IAW regulation.

D. Implemented RCRA processes and / or CERCLA processes IAW regulation and protective of Human Health and the Environment (an "exceptional or very good" represents completion of combined actions / interrelated pieces of the entire the RCRA and / or CERCLA process).

E. Worked with state regulatory processes IAW regulation and protective of Human Health and the Environment.

Narrative/Remarks:

2. Regulatory Interaction and Stakeholder Coordination

E
VG
S
M
U
N/A

A. Worked proactively and collaboratively with the Government and engaged regulatory agencies well in order to achieve goals such as project and / or performance objectives, reduced Life Cycle Costs, modification of remedies and decision documents.

B. Implemented and / or facilitated Community Involvement, addressed challenging stakeholders and / or collaborated with community stakeholders such as public events, meetings and during work related to Site Closeout, Restoration Advisory Boards, and / or additional outreach.

C. Transitioned work well, providing all the required documents (such as, GIS, mapping, records, and plans) to coordinate contract closeout and assist the incoming contractor successfully without major issues.

D. Performed an effort that required work on multiple remediation disciplines with more than (5) five sites on installations or former installations. (able to coordinate work on multiple sites and areas well)

E. Managed environmental restoration activities on property with multiple owners / stakeholders. Such as local redevelopment authorities, private entities, federal agencies and municipalities.

3. Analysis and Data Management

E
VG
S
M
U
N/A

A. Provided reports (such as, work plans and conceptual site models) that demonstrate knowledge and technical acumen in Environmental Remediation and / or Restoration.

B. Applied an innovative approach in order to accelerate site closeout at a site.

C. Exhibited technical acumen in assessing, analyzing, and validating data. (quality data analysis and integrity in sampling data)

D. Designed, installed, operated, maintained, and / or optimized remediation systems, such as, a pump and treat system in a manner that ensures maintenance of the selected remedy.

E. Consistently monitored the current remedy progress and / or tracked site progress issues, communicated progress / metrics, and reported on achievement of cleanup goals and performance objectives. (organized and clear metrics / reporting)

4. Were there any adverse performance issues/problems? If so, how were they resolved? (Please reference questions above by topic area and letter.)

Reports/LettersY/N
Contract Discrepancy Report

Cure Notice

Show Cause Notice

Suspension of Payment

Termination for Convenience/Default

Denial of Claim

Other

Remarks:

Response by:

___________________________________________
Print NameTitle
___________________________________________
SignatureDate

File details come from the government source that posted it. Updated .