QA_17Jun.docx

DOCX document 13 KB Posted

Attached to
Relocation of Air Traffic Control Tower (ATCT) at Duke Field, FL
Solicitation number
FA8773-11-R-0058
Issued by

About this file

QA as of 17 Jun 2011

View the file

Other files

File Type Posted
Duke ATCT RelocationSOW _20110617REV02 —
Amd 03.doc DOC document
Duke Walk Thru Notes_Final.docx DOCX document
Q A.docx DOCX document
Amd 02.doc DOC document
SCA Determination.txt TXT text file
Duke ATCT RelocationSOW _20110614REV01.docx DOCX document
DUKE_ATCT_DRAWINGS_20110615.pdf PDF
EGLIN CAB Affidavit PA —
Amd 01.doc DOC document
FA8773-11-R-0058.pdf PDF
Duke ATCT RelocationSOW _20110519.docx DOCX document
DI-ADMN-81505-Meeting_Minutes.pdf PDF
DUKE_ATCT_DRAWINGS.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8773-11-R-0058

Duke Field ATCT Relocation Q&A as of 17 Jun 2011

1. Will the contractor be responsible for providing 4” x 4” boxes and receptacles for power to the racks on the 4th and 5th floors? Or are those boxes and receptacles being provided by the general contractor?

The MCP drawings show quad outlets in 4x4 j-boxes connected to the lc and ld power distribution panels. My recommendation is that the quad outlet be replaced by a single twist lock L5-20R outlet for; the MCT rack, ILS rack, and GRC/LMR rack, plus a L5-30R is required for the DALR rack. Power cord and plug matching each outlet, should be provided.

The STARS power source for the two floor mounted UPS units will require new 4x4 boxes with twist lock outlet and flex conduit. I recommend mounting these to the side of the STARS RT rack.

I mentioned a STARS GPS antenna previously. Please disregard there is no STARS RT GPS antenna.

2. A swing boom is located outside of 5th floor equipment room. Can it be weight tested for use by the contractors?

The swing boom is not recommended for use on this project due to its age.

3. It has come to our attention that Crenlo is not the manufacturer of the ATCT console. Will the console panel where the GRA-115 is being mounted have a cutout that will allow the contractor to mount the contractor fabricated GRA-115 components?

Yes, the consoles will have the appropriate cut outs for the GR-115 panels at the time of installation.